BSc Architectural Technology – Year 3
Technical Design and Detailing - BIM
Project No.3
Thesis – Primary Healthcare Clinic
Mark Grincell - C00162901
BSc Architectural Technology – Year 3Technical Design and Detailing - BIMProject No.3Thesis – Primary Healthcare ClinicMark Grincell - C00162901
Secion 1 - Plans:Site Plan MG102Site 3D MG103Ground Floor Plan MG104First / Seconf Floor Plan MG105Underground Parking Plan MG106
Secion 2 - Elevations:Elevations North/East MG107Elevatons South/West MG108Elevations West Wing MG109Elevation East Wing MG109Elevation Main Entrance MG109
Secion 3 - Detail Sections / 3D SectionsSections AA + BB + EE MG110Sections CC + DD + GG MG1113D Sections AA + BB MG1123D Sections EE + GG MG113
Secion 4 - Details:Detail -1+2+3 MG114Detail - 4+5+6 MG115Detail - 7+8+9+10 MG116Detail -11+12+13 MG117Detail - 14+15 MG118Detail - 16+17 MG119Detail - 18+19 MG120Detail - 20+21+22 MG121Detail - 23+24+25 MG122
Secion 4 -Building Regulation MG123Building Regulation MG124Sustanibility Sheet MG125Office+Room Layout / Finish MG126Office Services Layout MEP MG127
List of Details:Detail 1 - Fiber Cement Panel - ParapetDetail 2 - Fiber Cement Panel - Floor JunctionDetail 3 - Fiber Cement Panel - Head+CillDetail 4 - Fiber Cement Panel - Corner JunctionDetail 5 - Fiber Cement Panel - Cherry Cladding JunctionDetail 6 - Fiber Cement Panel - Concrete Wall JunctionDetail 7 - Cherry Vertical Cladding - BaseDetail 8 - Cherry Vertical Cladding - CillDetail 9 - Cherry Vertical Cladding - HeadDetail 10 - Cherry Vertical Cladding - Roof JunctionDetail 11 - Curtain Wall - Door CillDetail 12 - Curtain Wall - Door HeadDetail 13 - Curtain Wall - Roof JunctionDetail 14 - Euroseam Aluminium Roof - Panel JunctionDetail 15 - Euroseam Aluminium Roof - Cladding JunctionDetail 16 - Front Column/Louvers - Base ConnectionDetail 17 - Front Column/Louvers - Top ConnectionDetail 18 - Basment - FoundationDetail 19 - Basment - Ground Floor JunctionDetail 20 - Flat Roof/ Glazing - HeadDetail 21 - Flat Roof/ Glazing - CillDetail 22 - SlylightDetail 23 - Main Stairs - LandingDetail 24 - Main Stairs - Mid Floor JunctionDetail 25 - Main Stairs - GF Junction
Existing EntranceTo be used as Entrance ONLY
Native Deciduous TreesTo line the Boundary Wall
Existing Walkway to beRetained and Refurbished usingCobble-lock Stone Work
UnusedEntrance to beused as ExitONLY
180 Car Parking Spaces in TotalIn accordance with TGD-M andMetric Handbook
Existing Building
Existing Private Parking
Yield Sign
Turning Area/Roundabout andExit
Staff AirparkEntrance
Zebra Crossing forPedestrianswith Amber lights andRailings
Disabled Parking and Mother and Child Parking
Yield Sign
Flat Concrete Roof Slopedtowards Gutter.
Euroseam Aluminium Roofhas Gutters at both sides ofthe Roof.
- Down Pipes at Spacing of10000mm
Downpipes leads down toground and to a soak away.
Downpipes from GutterLead to the Flat Roofwhere it flows down toSecond Gutter
Down Pipes to beplaced along WindowMullions
Downpipe to run in the HollowSupport Beam.
Downpipes from Gutter Lead to the FlatRoof where it flows down to SecondGutter
Downpipes leads down to ground andto a soak away.
Roof to be Slanted to aid the flow of rainwaterTo be Take down to ground and to Soak away
Roof to be Slanted to aid the flow of rainwaterTo be Take down to ground and to Soak away
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
As indicated
29/0
4/2
014
12:1
3:5
8
Site Plan
No.3
30-04-2014
MG102
1 : 1000
Site Plan1
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation (290mm)
Glazing / Windows:APA Window System ST80 Tilt and Turn,Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore to beto Engineers Specs), Structural ConcreteScreed, Kingspan Kooltherm InsulationSlab, Waterproof Membrane, Screed.(435mm)
Site MAP 1:2000
The Barrow River
Main Road:Dublin Road
Co.Carlow Train Station
Existing Hospital
Main Road:Athy Road
Exisiting Entrance to SiteIn Full Use
Old Exit to Dublin RoadNot in Use
Existing Carparking Area
Existing Grotto
Array of Trees Along theRear of Site + Walkway
Cluster of Trees on Site
Boundry Wall
North
Legend: Site Map
Site Boundry Outline
Existing Building Outline
Traffic Direction
Vegitation (Various)
Storm Water Drainage Pipes
Site MAP 1:5000
The Site is located on the Athy Road, Carlow. On the grounds of St’Dympna'sHospital. The hospital provides 115 beds, offering both acute and long-staycare. Services include out-patient clinics, day care facilities, addictioncounselling, and a community hostel.
1 : 300
Roof Plan - Graywater Managment3
Exit Only Barrier Operated System
Entrance and Exit forExisting Car Park
Existing Car Park
Existing Hospital
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
1 : 1
29/0
4/2
014
12:0
0:4
0
Site 3D
No.3
30-04-2014
MG103
3D Site1
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation(290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, Waterproof Membrane,Screed. (435mm)
1 : 1
Underground Entrance2
1 : 1
Car Park Arial31 : 1
Front Arial4
The Carpark in total have a capacity of 180 Spaces. There is 3 DisabledParking spaces directly at the Entance of the Building.All the Spaces apply to the Building Regulation and and drawn from theMetric HandbookThe one way System will ease the flow of traffic and make the facilitie safewhen in full opperation
The Underground Parking will be for staff only there is a twoway sytem in opperation. There is Natural Ventilaion as there ina half basment design incorperated. The Slope is 1:6. Therewill be a Barrier/ Fob System in opperation to avoid any visitorsentering the area.
On approch to the Entance of the Primary Healthcare Facility there is spacesfor Mother and Child and three Disabled Spaces.There is a one way System in Opperation here that consists of a roundaboutto aid in turning.
UP
UP
UP
UPDN
UP
C
B
A
12
3
4
5
6
78
9
10 11
6680
1.253°
1.421°
1.845°
1.845°
1.845°
1.845°
1.845°1.772°
Q
P
O
161718202122
23
24
25
D
E
F
G
K
L
M
6578 5682 6076 52575985
5300
7700
5300
5975
1725
5283
7495
6000
6797
1
MG110
2
MG110
2
MG111
1
MG111
3
MG110
18 m²Speech Thearpy
12
28 m²Book TR Rm
13
27 m²Book TR Rm
14
16 m²Speach Thearpy
16
37 m²Hallway
15
100 m²Pharmacy
38
238 m²Layout TBA
37
20 m²Office
32
71 m²Room TBA
25
8 m²WC28
13 m²WC29
14 m²Room TBA
30
19 m²Child Health
11
18 m²Bookable Rm
1017 m²
Book TR Rm9 7 m²
Storage8
42 m²Hallway
22
19 m²Phycology
17
22 m²Wound Clinic
1818 m²
Examination19
19 m²Wound Clinic
20 12 m²Medical Storage
2133 m²
Family Room24
71 m²Hallway
1
45 m²Hallway
23
18 m²Sound Proof Room
7 18 m²Child Health
6 17 m²Bookable Room
5 17 m²Bookable Room
4 24 m²Community Welfare Room
3
5 m²Storage
2
Room TBA26
Room TBA27
38 m²Room TBA
36
47 m²Room TBA
35
18 m²Hall31
15 m²Office
33
5 m²Store
34
5085
1710
Clear Area (Fire)
Concrete Footpath 2000mm
Concrete Footpath 2000mm
Stairs for Maintenance of Half-Basement
3 Disabled Parking SpacesCloset to Entrance of Building
ConcreteCrib forRetainingof Soil
Concrete Cribfor Retainingof Soil
Ramp to Basement 1:6
G03
G02
G01
G04
G06
G16
G29
G37
G26
G05G08
G07G09
G11G12
G15
G22
G28G32
G33
G35
G36G34
G31G30
G27
G17
G14G13
G10
G40 G48
G45
G47
G46
G43
G42
G41G23
G24
G25
G18
G19
G20G21
G50
G51
G55 G54
G52
G53
G44G39
G49
G38
Canteen Area
Waiting AreaReception
818 1030 970 2030 1970 1030 1970 2030 1970 1030 970 3030 2970 3030 1970 1030 1970 2030 1557
12 13 14 15
6680 6685 6680 6680
34
03
03
01
93
04
02
03
09
70
10
30
97
02
03
06
30
53
00
37
00
13
95
10
30
97
02
03
09
70
20
30
97
01
03
08
50
16
89
82
57
5
377 4030 1275 695 4030 1351 634 4015 608
1155 1030 970 2030 1393
1138
1030
1970
1030
1629
341
2030
970
2030
629
1576
3030
677
308
2000
985
3030
1173
2320
1700
300
1700
2363
2083 1820 2082 6578 2306 1814 1563 3876 131 1820 249 1550 3707
5270
1527
6000
5682 3876 2200 1550 3707
74
81
55
19
5208 868 5257
6680 3088 2642 950 1406 2000 3280 213 3741 2503 223 6680
1
MG124
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
1 : 200
29/0
4/2
014
12:0
3:2
5
Ground Floor Plan
No.3
30-04-2014
MG104
1 : 200
Level 0 Ground Floor Level1
Wall Construction External:Outside to Inside
- Fibercement Board 12mm (Tegral - Equitone Natura) Secret Fix1000mmx2000mm Panels- Secured to Vertical Carrier Rail System 150mm 600 c/c- Vertical Carrier Rail System Held by Wallbracket Wall Bracketsecured to Cement Board 15mm- Horizontal Channel System 150mm Secured to Steel Column- Rockwool Insulation 150mm thick packed between the ChannelSystem- Gypson Board 15mm Held by Vertical Omega Brackets OmegaBrackets provide 30mm Cavity for Services
Wall Construction Internal:
All Internal Walls are the same build up, they all will be fire ratedGypson Board and sound proofed where necessary.
-Gypson Board 12.5mm-Steel Stud 75mm Cavity-Gypson Board 12.5mm
Floor Construction Hollowcore:Top to Bottom
Slabs to be Suspend on Steel I Beams, 100mm Bearing, GalvanizedSteel Edge to be secured to Beam to Hold in the Screed.
- 75mm of Concrete Screed- 160mm Hollowcore Slab 1200mm (Slab to Hollowcore to be toEngineers Specs)- 600mm Void to be used as Service Area below Hollowcore Floor- Suspended Ceiling 35mm x 600mm x 600mm Slabs
Floor Construction Slab:Top to Bottom
The Ground Floor Slab will be on the East Side of the building.The Kingspan Insulation will run under the concrete slab and beextended up to meet the external Rockwool Insulation in theExternal Wall.
- 75mm Structural Concrete Screed- 125mm Concrete Structural Slab- Radon Barrier- 90mm Kingspan Kooltherm Insulation- 100mm Sand Blinding- Hardcore (Site Ground)
Floor Finishes Specs:Floor Finishes will vary in the building:- Carpet- Hard Wood- Linoleum
They all will be no more then 15mm thick.All finishes will be Non-Slip Surface and will have no hindrance toWheelchair user.
Roof Construction - Curved Aluminum:Outside to Inside
The Curved Aluminum Roof (Euroseam) will be supported by thesteel structure. The curved roof will be along the back of thebuilding.
- Euroseam ES400 Aluminum Sheeting. Standing Seam.- 200mm Rockwool Insulation- Vapor Membrane-15mm Plywood Sheeting secured to Steel Channel.- 50mm x 50mm Channel System 300mm c/c- 305mm x 350mm Structure Beam Curved (To Engineers Specs)
Walkable Roof Construction - Concrete:Outside to Inside
The Concrete Roof Will be constructed to bewalkable, the construction will be a screed followedSlabs to be Suspend on Steel I Beams, 100mmBearing, Galvanized Steel Edge to be secured toBeam to Hold in the Screed. The Roof will besloped at 3 points towards gulleys for Drainage.
- 50mm Concrete Screen (Walking Section)- 50mm Decking- Waterproof Membrane- 150mm Kingspan Kooltherm Insulation Slab- 75mm of Structural Concrete Screed- 160mm Hollowcore Slab 1200mm (Slab toHollowcore to be to Engineers Specs)
Curtain Walling Specs:
APA Facade System Facade TB50
The use of multiple polyamide strips and threegasket barriers achieve a thermal enhancement,which helps to maintain a low U Value rating foryour facade design. The insert sash and glasspanels are retained in place by means of toggles,which is then covered in a silicone seal keeping theoverall aesthetic, look of the facade.
- Frame 60mm- Water tightness : 600 Pa (class R7) (EN 12155,EN 12154)- Wind load resistance : 2200 Pa (EN 12179, EN13166)
Windows / Glazing Specs:
APA Window System
This ST80 tilt & turn window and door system was designedusing modern thermal evaluation software to meet today’sextreme performance requirements of low U values.
- Frame 80mm- Thermal insulation :0.6Wm²K a- Water tightness : 1050 Pa (class R7) (EN 12155, EN12154)- Wind load resistance : 2200 Pa (EN 12179, EN 13166)
Internal Door Specs:
Vicaima / Portaro E130 Inverse
Door- Wooden rail structure (EN 942 Standard)- Chipboard interior (EN 13986 Standard)- CPL or HPL finish (EN 438 Standard)- PVC lipping on the whole perimeter of the door- Stainless steel “Yale” type lock with CE mark (EN 12209Standard)- Fixing screws Class 4 corrosion resistant (EN 1670Standard)
Frame- Dense plywood structure (EN 13986 Standard)- Rebate and rounded architraves in dense plywood (EN13986 Standard)- Intumescent seals – CPL finish (EN 438 Standard)- 3,7” Stainless steel hinges and CE mark (EN 1935Standard)
External Door Specs:
APA System ST80 Rebate DoorThe ST80 rebate door system was designed usingmodern thermal evaluation software to meet today’sextreme performance requirements of low U values.Integrated fanlights and sidelights can be included in thedesign of the ST80 Rebate Door. All doors are internallybeaded for extra security.
- Acoustic Properties Tested to 40dB- Fully tested up to 600pa for water and air- Internally beaded for extra security- Fitted with a fully weathered dedicated meeting style fordouble doors- Multipoint locking, 8mm rebate cover
North
Ground Floor - Door Schedule
Description Count Height Width
Internal Single Door 40 2400 910
Internal Single Door - 60Min Fire Rated 1 2400 1010
Internal Double Door 11 2400 1820
External Double Door- Glass CW 3
Grand total: 55
Ground Floor - Room Schedule
Name Number Area
Hallway 1 71 m²
Storage 2 5 m²
CommunityWelfare Room
3 24 m²
Bookable Room 4 17 m²
Bookable Room 5 17 m²
Child Health 6 18 m²
Sound ProofRoom
7 18 m²
Storage 8 7 m²
Book TR Rm 9 17 m²
Bookable Rm 10 18 m²
Child Health 11 19 m²
Speech Thearpy 12 18 m²
Book TR Rm 13 28 m²
Book TR Rm 14 27 m²
Hallway 15 37 m²
Speach Thearpy 16 16 m²
Phycology 17 19 m²
Wound Clinic 18 22 m²
Examination 19 18 m²
Wound Clinic 20 19 m²
Medical Storage 21 12 m²
Hallway 22 42 m²
Hallway 23 45 m²
Family Room 24 33 m²
Room TBA 25 71 m²
Room TBA 26 82 m²
Room TBA 27 87 m²
WC 28 8 m²
WC 29 13 m²
Room TBA 30 14 m²
Hall 31 18 m²
Office 32 20 m²
Office 33 15 m²
Store 34 5 m²
Room TBA 35 47 m²
Room TBA 36 38 m²
Layout TBA 37 238 m²
Pharmacy 38 100 m²
Ground Floor - Window Schedule
Description Type Count Keynote
APA ST80 Tilt and Turn DoubleGlazedUnit GF
334 Thermalinsulation
:0.6Wm²K a
Grand total: 334
1800
DN
DN
DN
UPDN
UP
DN
C
B
A
10 11
Q
P
O
161718202122
23
24
25
D
E
FG
K
L
M -
SF01
SF02
SF11
SF12
SF25
SF22SF21
SF05SF03
SF07SF08
SF10
SF04
SF06
SF09
SF20SF19
SF13
SF14
SF15
SF16SF17
SF18
SF23
SF24
SF26
SF42
SF28
SF29
SF30 SF31
SF32
SF33 SF41
SF27
SF34
SF35
SF36 SF37 SF38
SF39
SF40
160
12 13 14 15
6680 6680 6685 6680 6680
5300
7700
5085
5300
5975
1725
5985 6578 5682 6076 5257
6797
6000
5283
7495
6 m²Stairs
78
29 m²Hall81
72 m²Hall72
16 m²Room TBA
77 17 m²Room TBA
76 18 m²Room TBA
75 19 m²Room TBA
74 32 m²Room TBA
73
22 m²Room TBA
86
29 m²Room TBA
85
24 m²Room TBA
84
21 m²Room TBA
83
29 m²Room TBA
82
43 m²Hall87
91 m²Outside Lobby
79
154 m²Open Area
80
11 m²Room
89
8 m²Room
90
7 m²Room
91
16 m²Room
92
13 m²Room
93
14 m²Room
94
112 m²Room TBA
95
89 m²GP Lobby
96
17 m²Room TBA
97
17 m²Room TBA
98
5 m²Store
99
15 m²Room TBA
100
15 m²Room TBA
101
75 m²GP Lobby
10211 m²Room103
1160 2000 2000 825 1175 2000 2000 1403 597 2000 2000 1085 915 2000 2000 1161 839 2000 2418
2000
2000
2000
775
5755
2751
12
50
10
00
14
00
10
00
43
56
59
35
53
00
01
94
55
52
00
01
00
01
00
01
00
02
00
06
45
833 1000 1000 2000 1847 153 1000 2000 2000 1527 473 1000 1000 3000 1212 1788 3000 1892 1081000 2000 2000 1572
891
0 2768 3794 3206 3374 218 6685 1635 4430 615 3043 3637
6680 646218
20
51
3
964 1820 3902 1635 5045 4091 1820 769
3070
36
00
23
00
37
00
3895
27
90
21
50
C
B
A
12
3
45
67
89
10 11
Q
P
O
161718202122
23
24
25
D
E
FG
K
L
M
12 13 14 15
5300
7700
5085
5300
5975
1725
5985 6578 5682 6076 5257
6680 6680 6680 6680 6680
5283
7495
6797
6000
124 m²Open Area - Room TBA
45
104 m²Hallway
44
24 m²Room TBA
43 26 m²Room TBA
42 21 m²Room TBA
4121 m²
Room TBA40
30 m²Room TBA
39
20 m²Room TBA
4835 m²
Room TBA49
46Room TBA
78 m²
47Room TBA
32 m² 160 m²Room TBA
50162 m²
Room TBA52
101 m²Room TBA
51
78 m²Room TBA
67
15 m²Room TBA
7116 m²
Room TBA70
18 m²Room TBA
6917 m²
Room TBA68
16 m²Room TBA
63
4 m²WC65
4 m²WC66
8 m²Store
64
116 m²Lobby Area
60
25 m²Reception Office
6217 m²
Room TBA61
14 m²Room TBA
53
15 m²Room TBA
54
15 m²Room TBA
5513 m²
Room TBA56
16 m²Room TBA
57
18 m²Room TBA
58
19 m²Room TBA
59
FF01
FF08
FF06FF05
FF04FF03
FF02
FF18FF17
FF16
FF15
FF09
FF14
FF13
FF10
FF11
FF12
FF07
FF20 FF21
FF19
FF36FF33
FF22
FF42FF41
FF40FF39
FF38
FF37
FF34
FF35
FF31
FF32
FF30 FF29 FF28 FF27
FF26
FF25
FF24
FF23
833 1000 1000 2000 1847 1531000 2000 2000 1527 473 1000 1000 3000 1207 1793 3000 1887 1131000 2000 2000 1567
35
53
00
01
94
55
52
00
01
00
01
00
01
00
02
00
06
45
14
10
10
00
10
00
20
00
10
00
20
00
10
00
10
00
86
51
13
55
90
1392 2000 1000 1000290 1710 2000 1000 1000366 1634 2000 1623
1170 1000 1000 2000 1408
1153
1000
2000
1000
1644
356
2000
1000
2000
644
1591
3000
692308
2000
1000
3000
1188
6680 6680 6680 1029 5651 6680
50
85
21
9
3259
3512 3400 3076 1770 1570
40
50
13
14
53
64
15
09
10
24
91
2124 5682 4398 910 768 5257
25
00
25
81
21
9
330 2160 910330 1656 851 569 2080 910 3502860
3179
3400
218
3088
2912
2250 4328
2173
2173
3150
665
1820
665
910
400
910
2458
1928
910
500
910
1752
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
As indicated
29/0
4/2
014
12:0
4:2
1
First / Second Floor Plan
No.3
30-04-2014
MG105
1 : 250
Level 2 Second Floor Level1
1 : 250
Level 1 First Floor Level2
North
1st Level - Door Schedule
Type Description Count Height Width
910 x 2110mm Internal Single Door 34 2400 910
1010 x 2110mm Internal Single Door - 60Min Fire Rated 1 2400 1010
1810 x 2110mm Internal Double Door 7 2400 1820
Grand total: 42
2nd Level - Door Schedule
Type Description Count Height Width
910 x 2110mm Internal Single Door 34 2400 910
1010 x 2110mm Internal Single Door - 60Min Fire Rated 1 2400 1010
1810 x 2110mm Internal Double Door 7 2400 1820
1810 x 2110mm 1 2400 1810
Grand total: 43
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation(290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, Waterproof Membrane,Screed. (435mm)
1st Floor - Room Schedule
Name Number Area
Room TBA 39 30 m²
Room TBA 40 21 m²
Room TBA 41 21 m²
Room TBA 42 26 m²
Room TBA 43 24 m²
Hallway 44 104 m²
Open Area -Room TBA
45 124 m²
Room TBA 48 20 m²
Room TBA 49 35 m²
Room TBA 50 160 m²
Room TBA 51 101 m²
Room TBA 52 162 m²
Room TBA 53 14 m²
Room TBA 54 15 m²
Room TBA 55 15 m²
Room TBA 56 13 m²
Room TBA 57 16 m²
Room TBA 58 18 m²
Room TBA 59 19 m²
Lobby Area 60 116 m²
Room TBA 61 17 m²
Reception Office 62 25 m²
Room TBA 63 16 m²
Store 64 8 m²
WC 65 4 m²
WC 66 4 m²
Room TBA 67 78 m²
Room TBA 68 17 m²
Room TBA 69 18 m²
Room TBA 70 16 m²
Room TBA 71 15 m²
2nd Floor - Room Schedule
Name Number Area
Hall 72 72 m²
Room TBA 73 32 m²
Room TBA 74 19 m²
Room TBA 75 18 m²
Room TBA 76 17 m²
Room TBA 77 16 m²
Stairs 78 6 m²
Outside Lobby 79 91 m²
Open Area 80 154 m²
Hall 81 29 m²
Room TBA 82 29 m²
Room TBA 83 21 m²
Room TBA 84 24 m²
Room TBA 85 29 m²
Room TBA 86 22 m²
Hall 87 43 m²
Room 89 11 m²
Room 90 8 m²
Room 91 7 m²
Room 92 16 m²
Room 93 13 m²
Room 94 14 m²
Room TBA 95 112 m²
GP Lobby 96 89 m²
Room TBA 97 17 m²
Room TBA 98 17 m²
Store 99 5 m²
Room TBA 100 15 m²
Room TBA 101 15 m²
GP Lobby 102 75 m²
Room 103 11 m²
Exterior Roof View of the walkway on the second floor. The Glazed wall give anopen appeal to the building. Combined with the skylights the flood the lobby withlight.
The Internal Main Stairwell is a precast open riser stairs, withthe Curtain Walling and the open stairs there is a vast amountof lighting being filtered through out the stairwell.
UP
Q
P
O Above Ground Building Footprint
1:20 Slope to Car Park
Underground Plant Room
Elevator ShaftPassenger Lift
Service/Trolley Lift
Half Basement400mm Retaining Wall/ Fan Louvers
Full Basement400mm Retaining Wall
6800
Walkway for Pedestrians/Pedestrians Areas
One-Way System in Operation
Stairwell Access/ Fire Escape
Half Basment Walkway
1800
6680 6680 6680
6680 6680 6680
Waste Storage
16 17 18 20 21 22
3264
5257 6076 5682 6578 5985
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
As indicated
30/0
4/2
014
09:4
1:4
4
Underground Parking
No.3
30-04-2014
MG106
1 : 200
Level -1 Basment Floor1
Construction Specs:
External Wall:Tegral Equitone Natura Fibercement Board,Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation (290mm)
Glazing / Windows:APA Window System ST80 Tilt and Turn,Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore to beto Engineers Specs), Structural ConcreteScreed, Kingspan Kooltherm InsulationSlab, Waterproof Membrane, Screed.(435mm)
1 : 100
Section FF - Underground Parking2
North
The Half Basment Deisgn will allow for Natural Ventilation in the basment as well as drawing in natural daylight.
Note: The Basement Design requiresStructural Design and Decision from aCertified Engineer.
101112131415
Curved Euroseam RoofStanding SeamFinish: Aluminum
Concrete Insitu WallInsulated 100mmFinish: Panel
Vertical CladdingTongued and GroovedFinish: Cherry
Vertical CladdingTongued and Grooved
Finish: Cherry
Tegral Fiber CementBoardSecret FixFinish: Equitone Natura
Ground Floor Level52.245
First Floor Level56.245
Second Floor Level60.245
Third Floor Level64.245
101200
12064
14243
66806680668066806680
Underground Parking Plantroom
17262
C B ADEF
Basment Plant Room / Underground Parking
Ground Floor Level52.245
First Floor Level56.245
Second Floor Level60.245
Third Floor Level64.245
5975 5300 5085 7700 5300
Concrete Insitu WallInsulated 100mm
Finish: Panel
Curved Euroseam RoofStanding SeamFinish: Aluminum
APA Systems ST80U-Value: 0.6Finish: Aluminum
Vertical CladdingTongued and GroovedFinish: Cherry
9303
17262
12047
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
As indicated
29/0
4/2
014
12:0
5:0
7
Elevations
No.3
30-04-2014
MG107
1 : 200
North Elevation1
1 : 200
East Elevation2
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation(290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, Waterproof Membrane,Screed. (435mm)
Basment Plant RoomUnderground Parking
161718202122 Vertical CladdingTongued and GroovedFinish: Cherry
Curved Euroseam RoofStanding Seam
Finish: Aluminum
Concrete Insitu WallInsulated 100mm
Finish: Panel
Vertical CladdingTongued and GroovedFinish: Cherry
Tegral Fiber Cement BoardSecret FixFinish: Equitone Natura
APA Systems ST80U-Value: 0.6Finish: Aluminum
Concrete Insitu WallInsulated 100mmFinish: Panel
Basment Plant Room Underground Parking
Ground Floor Level52.245
First Floor Level56.245
Second Floor Level60.245
Third Floor Level64.245
52576076568265785985
9303
16142
13663 1
6691
9240
101218
CBA D E F G
Concrete Insitu WallInsulated 100mm
Finish: Panel
APA Systems ST80U-Value: 0.6Finish: Aluminum
Curved Euroseam RoofStanding SeamFinish: Aluminum
Vertical CladdingTongued and GroovedFinish: Cherry
Basment Plant Room / Underground Parking
Ground Floor Level52.245
First Floor Level56.245
Second Floor Level60.245
Third Floor Level64.245
9303 1
2047
39167
17262
14216
5300 7700 5085 5300 5975 1725
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
As indicated
29/0
4/2
014
12:0
5:4
1
Elevations
No.3
30-04-2014
MG108
1 : 200
South Elevation1
1 : 200
West Elevation2
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation (290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, Waterproof Membrane,Screed. (435mm)
232425
Ground Floor Level52.245
First Floor Level56.245
Second Floor Level60.245
Third Floor Level64.245
6000 6797
Vertical CladdingTongued and GroovedFinish: Cherry
Underground Parking
Cherry LouversTo Provide VentilationSecured to Concrete Columns
Tegral Fiber Cement BoardSecret FixFinish: Equitone Natura
Precast Concrete SkylightDoubled Glazed Unit
Curved Euroseam RoofStanding SeamFinish: Aluminum
9303
12047
14272
17226
Tegral Fiber Cement BoardSecret Fix
Finish: Equitone Natura
Vertical CladdingTongued and GroovedFinish: Cherry
Curved Euroseam RoofStanding Seam
Finish: Aluminum
Plant Room
K L M
7495 5283
Plant Room Underground Parking
60580
Vertical CladdingTongued and Grooved
Finish: Cherry Concrete Insitu WallInsulated 100mmFinish: Panel
Curved Euroseam RoofStanding SeamFinish: Aluminum
Tegral Fiber Cement BoardSecret FixFinish: Equitone Natura
APA Facade System Facade TB50Support InteriorAluminium Framing
Tegral Fiber Cement BoardSecret FixFinish: Equitone Natura
Ground Floor Level52.245
First Floor Level56.245
Second Floor Level60.245
Third Floor Level64.245
9303
12047 1
4539
17238
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
As indicated
29/0
4/2
014
12:0
6:0
5
Elevations
No.3
30-04-2014
MG109
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation(290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, Waterproof Membrane,Screed. (435mm)
1 : 200
South Elevation / East Wing2
1 : 200
Main Entrance Elevation4
12 13 14 153
MG121
6680 6680 6680
4
MG116
3775
2175
3775
3680
930
3282
3775
225
3775
225
3680
450
3645
2000
2325
3178
2005
1
MG116
3
MG116
2
MG116
1
MG117
2
MG117
2400
11680
12047
3849
5
MG117
2
MG119
1
MG119
CBA D E F G
1
MG118
3
MG114
1
MG121
2
MG114
1
MG1142
MG120
5300 7700 5085 5300 5975 1725
3
MG120
2
MG118
500
2000
566
614
3775
225
3775
225
3680
1398
4142
3645
450
3147
2325
1845 2435
887
2000
595
452
728
2000
595
2
MG121
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
As indicated
29/0
4/2
014
12:3
0:1
4
Sections
No.3
30-04-2014
MG110
1 : 100
Section AA - Atrium1
1 : 50
Section BB - Front Glazing / Door21 : 100
Section EE - Short Section3
Construction Specs:
External Wall:Tegral Equitone Natura Fibercement Board,Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation (290mm)
Glazing / Windows:APA Window System ST80 Tilt and Turn,Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore to beto Engineers Specs), Structural ConcreteScreed, Kingspan Kooltherm InsulationSlab, Waterproof Membrane, Screed.(435mm)
AA
BB
EE
3323
3066
1335 2400
2000
2000
2000
2000
2000
2000
5001
614
5916
1
MG122
2
MG122
3
MG122
225
3870
225
3775
225
3680
450
3650
1929
1829
3850
3850
1796
930
16 17 18 20 21 22
12042
900
9775
1000
9240
500
2000
566
3323
3775
11680
Plant Room
3267
1970
5257 6076 5682 6578 5985
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
As indicated
29/0
4/2
014
12:3
0:5
3
Sections
No.3
30-04-2014
MG111
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation (290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, Waterproof Membrane,Screed. (435mm)
1 : 100
Section DD - Back Stair Well11 : 100
Section CC - Main Stairs2
1 : 200
Section GG - Underground Parking3
DD
CC
GG
The Internal Main Stairwell is a precastopen riser stairs, with the Curtain Wallingand the open stairs there is a vast amountof lighting being filtered through out thestairwell.
The East side of the buildingcontains a precast concretestairwell.The massive curtain wallingprovides plenty of light to filterinto the staitwell to give an openfeel.
Precast ConcreteStairwell Leadingto Basement Level
Precast Concrete SkylightDoubled Glazed Unit
Curved Euroseam RoofStanding Seam
Finish: Aluminum
Vertical CladdingTongued and GroovedFinish: Cherry
Curtain Walling SpportedSecured to Stairs Landing.
Tegral Fiber Cement BoardSecret Fix
Finish: Equitone Natura
Plaster StudInter Drywall
Tegral Fiber Cement BoardSecret Fix
Finish: Equitone Natura
Curved Euroseam RoofStanding SeamFinish: Aluminum
The East side of the buildingcontains a precast concretestairwell.The massive curtain wallingprovides plenty of light to filter intothe stairwell to give an open feel.
Plantroom in Basement Access
Precast Concrete RoofInsulated. Supported by
the Louver System at theMain Entrance.
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
29/0
4/2
014
12:3
1:3
8
Sections
No.3
30-04-2014
MG112
3D Section AA1
3D Section BB2
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation (290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, Waterproof Membrane,Screed. (435mm)
Curved Euroseam RoofStanding SeamFinish: Aluminum
Vertical CladdingTongued and GroovedFinish: Cherr
Tegral Fiber Cement BoardSecret FixFinish: Equitone Natura
Cherry LouversTo Provide Ventilation
Secured to Concrete ColumnsRamp to access theUnderground Parking Facilities.
1:20 Slope. Poured Concrete.
Precast Concrete SkylightDoubled Glazed Unit
Curved Euroseam RoofStanding SeamFinish: Aluminum
Vertical CladdingTongued and GroovedFinish: Cherry
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
29/0
4/2
014
12:3
2:4
5
Sections
No.3
30-04-2014
MG113
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation (290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, Waterproof Membrane,Screed. (435mm)
3D Section EE3
3D Section GG4
EE
GG
Aluminum Flashing 5mm ThickSupported by Vertical Railing Systemand Omega Vertical Railing System
Insect Mesh Secured to Flashing and FCB
Vertical Railing System 500mm c/cSecured via Wall Bracket
Wall Bracket Secured through Cement Board toHorizontal Rail System
50mm Kingspan Kooltherm Insulation Securedto Cement Board
15mm Cement BoardSecured to Horizontal Rail System
150mm Rockwool InsulationPacked between Horizontal Rail System
30mm Omega Vertical RailsSecured to Horizontal Omega Rails
Tegral Hidden Fix Hanger System
Tegral Equitone Natura Fibercement Board 12mmSecured via Secret Fix System
Vapour Barrier Membrane
Horizontal Rail System150mm x 65mm Secured to Steel Column
Galvanized Steel Edge Secured to Steel BeamTo Shutter Structural Screed.
Structural Screed 75mm (Engineers Specs)
Steel Column 305mm x 305mm (Engineers Specs)
Concrete Screed 75mmWith Upstand to Deflect Water
Waterproof MembraneTo be dressed Vertically
Kingspan Kooltherm Insulation150mm to Meet Rockwool Insulation
Hollowcore Slab 150mm100mm Bearing on Steel Beam
(Engineers Specs)
Steem Beam 305mm x 305mm(Engineers Specs)
Tegral Equitone Natura Fibercement Board 12mmSecured via Secret Fix System
Horizontal Omega Hanger300mm c/c
12 25 30 38 305 150 1515 100 25 12
75
150
75
150
303
15 30 305 50
10
667
400
Hollowcore Slab 150mm100mm Bearing on Steel Beam
(Engineers Specs)
Steel Beam 305mm x 305mm(Engineers Specs)
Structural Screed 75mm (Engineers Specs)
Steel Column 305mm x 305mm (Engineers Specs)
Tegral Hidden Fix Hanger SystemGreen: Panel BracketGrey: Horizontal Hanger
Tegral Equitone Natura Fibercement Board 12mmSecured via Secret Fix System
Galvanized Steel Edge Secured to Steel BeamTo Shutter Structural Screed.
Vapour Barrier Membrane
Horizontal Rail System150mm x 65mm Secured to Steel Column
150mm Rockwool InsulationPacked between Horizontal Rail System
Wall Bracket Secured through Cement Board toHorizontal Rail System
Vertical Railing System 500mm c/cSecured via Wall Bracket
15mm Cement BoardSecured to Horizontal Rail System
50mm Kingspan Kooltherm Insulation Securedto Cement Board
15mm Gyspon BoardSecred to Omega Hanger
(To Enclose Steel Column)
30mm Omega Vertical Rail
15mm Gyspon BoardSecred to Omega Hanger
(To Enclose Steel Column)
30mm Omega Vertical Rail
75
150
303
15 30 298 150 15 115 25 12
660
50 25 12
400
150
Cavity for VentilationInsect Proof
Tegral Hidden Fix Hanger SystemGreen: Panel BracketGrey: Horizontal Hanger
Tegral Equitone Natura Fibercement Board 12mmSecured via Secret Fix System
Vertical Railing System 500mm c/cSecured via Wall Bracket
Galvaized Bracked to secured to Railing SystemTo hold in place FCB
APA Window System ST80 Tilt and Turn,Frame 80mm U-Value:0.6
Aluminium Cill To be incorperatedinto Windows Frame
Insect Mesh
Vertical Rail System150mm x 65mm Secured to Steel Column
15mm Gyspon BoardSecred to Omega Hange
30mm Omega Vertical Rail
150mm Rockwool InsulationPacked between Horizontal Rail System
Vapour Barrier Membrane
30mm Timber Cill (Inside)
Wall Bracket Secured throughCement Board to
Horizontal Rail System
Horizontal Rail System150mm x 65mm Secured to Steel Column
75mm Screed Polished Finish.
15 30 150 15 115 25 1215 30
120 137
BSc in Architectural TechnologyYear 3: 2010 - 2011
Scale
LECTURER
Drawn by
Date
Project number
Institute of Technology CarlowBSc. in Architectural Technology
Year 3 2013-2014
1 : 10
29/0
4/2
014
12:3
7:4
4
Fiber Cement Board - Detail 1+2+3
No.3
Project Name
30-04-2014
Mark Grincell
Dan O'Sullivan
MG114
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with StructuralScreed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation(290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam(570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, WaterproofMembrane, Screed. (435mm)
1 : 10
Detail 1 - FCB Panel - Parapet3
1 : 10
Detail 2 - FCB - Floor Junction2
1 : 10
Detail 3 - FCB - Head + Cill1
12
525
60
50
15
150
30
13
10
10
5
Tegral Equitone NaturaFibercement Board 12mmSecured via Secret Fix System
Tegral Hidden FixHanger SystemGreen: Panel BracketGrey: Horizontal Hanger
Wall Bracket Securedthrough Cement Board toHorizontal Rail SystemSupporting the HorizontalHanger System fro FCB
150mm Rockwool InsulationPacked between Horizontal
Rail System
Vapor Barrier Membrane
50mm Kingspan KoolthermInsulation Securedto Cement Board
15mm Cement BoardSecured to Horizontal RailSystem
Thermal Broke Anchor toSecure Kingspan Insulationto Cement Board 600 c/c
360
30mm OmegaVertical Rail
15mm Gyspon BoardSecured to Omega Hanger
5mm Gap to Allow forExpansion
Steel Bracket Securedto Flange of Column tohold Cherry Paneling
12.5mm Cherry PanelingTo be secured directly toColumn
Corner Bracker to be securedto Horizontal Hanger System
10
Tegral Equitone NaturaFibercement Board 12mmSecured via Secret Fix System
Tegral Hidden Fix Hanger SystemGreen: Panel BracketGrey: Horizontal Hanger
Wall Bracket Secured through Cement Board toHorizontal Rail System Supporting theHorizontal Hanger System fro FCB
50mm Kingspan Kooltherm Insulation Securedto Cement Board
150
75
20
25
60
50
75 1515
100mm Cast in-Situ Concrete WallVapor Barrier Membrane
75mm Kingspan KoolthermInsulation Securedto Concrete Wall
20mm Vertical CherryCladding OverlappedSecured to HorizontalHanger System
Horizontal RailSystem Secured toWall Bracket
Steel Stud Wall15mm Gyspon Board75mm Steel Stud 400 c/c15mm Gyspon Board
150mm RockwoolInsulation
Packed betweenHorizontal Rail System
30mm Omega Vertical Rail
15mm Gyspon BoardSecured to Omega Hanger
75mm KingspanKooltherm
Insulation Securedto Concrete Wall
50mm Cast in-Situ Concrete WallInternal designed with Panel Finish
10
5
Tegral Equitone NaturaFibercement Board 12mm
Secured via Secret FixSystem
200mm Cast in-SituConcrete Wall
External Designedwith Panel Finish
100mm Kingspan KoolthermInsulation Secured to
Concrete Wall via Anchors
Wall Bracket Securedthrough Cement Board to
Horizontal Rail SystemSupporting the Horizontal
Hanger System fro FCB
5mm Gap to Allowfor Expansion
150mm Rockwool InsulationPacked between Horizontal Rail System
30mm Omega Vertical Rail
Vapor Barrier Membrane
12.5mm Cherry PanelingTo be secured directly to Column
Thermal BrokeAnchor to SecureKingspanInsulation toCement Board600 c/c
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
1 : 5
29/0
4/2
014
12:3
8:4
7
Fiber Cement Board - Detail4+5+6
No.3
30-04-2014
MG115
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation (290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, Waterproof Membrane,Screed. (435mm)
1 : 5
Detail 4 - FCB Corner Junction1
1 : 5
Detail 5 - FCB Corner Junction / Cherry Cladding2
1 : 5
Detail 6 - FCB Corner Junction / Concrete Wall3
Detail 4
Detail 5
Detail 6
75mm Kingspan KoolthermInsulation Secured to Concrete Wall
50mm Cast in-Situ Concrete WallInternal designed with Panel Finish
(To Engineers Specs)
Vapor Barrier Membrane
20mm Vertical Cherry Cladding OverlappedSecured to Horizontal Hanger System
Horizontal Rail System Secured to Vertical Rail System.For Cladding to be Secured to.
Wall Bracket Secured through Insulation to Concreteto Support Vertical Rail System
Vertical Rail System 150mm x 65mm Secured to Wall Bracket
150mm Cast in-Situ Concrete Wall(To Engineers Specs)
APA Window System ST80 Tilt and Turn,Frame 80mm U-Value:0.6
Aluminium Cill To be incorporatedinto Windows Frame
Wooden Window Cill 25mm
50 75 150
435
162
50
75mm Kingspan KoolthermInsulation Secured to Concrete Wall
50mm Cast in-Situ Concrete WallInternal designed with Panel Finish
(To Engineers Specs)
Vapor Barrier Membrane
Concrete Footpath 200mm1800mm Wide.
20mm Vertical Cherry Cladding OverlappedSecured to Horizontal Rail System
Horizontal Rail System Secured to Vertical Rail System.For Cladding to be Secured to. 500 C/C
Wall Bracket Secured through Insulation to Concreteto Support Vertical Rail System
Vertical Rail System 150mm x 65mm Secured to Wall Bracket
150mm Cast in-Situ Concrete Wall(To Engineers Specs)
50 75 150 50 90 20
435
50
100 23
45
50 75 150 50 92 20
437
162172
Galvanized Bracket to secured to Railing SystemTo hold in place Cherry Cladding
Cavity for Ventilation. Insect Proof with Mesh
Horizontal Rail System Secured to Vertical Rail System.For Cladding to be Secured to.
Vertical Rail System 150mm x 65mm Secured to Wall Bracket
20mm Vertical Cherry Cladding OverlappedSecured to Horizontal Hanger System
APA Window System ST80 Tilt and Turn,Frame 80mm U-Value:0.6
150mm Cast in-Situ Concrete Wall(To Engineers Specs)
75mm Kingspan Kooltherm Insulation Secured to Concrete Wall
50mm Cast in-Situ Concrete WallInternal designed with Panel Finish
(To Engineers Specs)
Vapor Barrier Membrane
Wall Bracket Secured through Insulation to Concrete to Support Vertical Rail System
15mm Gypson Board Securedby Bracket onto Concrete andto Window Frame
50 X 150mm Ridge Insulationto support window and stop
cold bridging
125 150
437
450
20mm Vertical Cherry Cladding OverlappedSecured to Horizontal Rail System
Vertical Rail System 150mm x 65mm Secured to Wall Bracket
Horizontal Rail System Secured to Vertical Rail System.For Cladding to be Secured to. 500 C/C
50mm Kingspan Kooltherm Insulation Securedto Concrete Via Thermally Insulated Anchors
50mm Cast in-Situ Concrete WallInternal designed with Panel Finish
(To Engineers Specs)
75mm Kingspan KoolthermInsulation Secured to Concrete Wall
Vapor Barrier Membrane
150mm Cast in-Situ Concrete Wall(To Engineers Specs
Wall Bracket Secured through Insulation to Concrete to Support Vertical Rail System
Insect Mesh Secured between Cladding Panel and Concrete OverhangTo allow for Ventilation.
Hollowcore Slab 150mm75mm Bearing on Concrete wall.
(Engineers Specs)
Kingspan Kooltherm Insulation150mm
75
150
75
150
75mm Structural Steel(Engineers Specs)
Concrete Screed 75mmto be extened to form over hang
BSc in Architectural TechnologyYear 3: 2010 - 2011
Scale
LECTURER
Drawn by
Date
Project number
Institute of Technology CarlowBSc. in Architectural Technology
Year 3 2013-2014
1 : 10
29/0
4/2
014
12:3
7:5
9
Vertical Cherry Cladding - Detail7+8+9+10
No.3
Project Name
30-04-2014
Author
Checker
MG116
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with StructuralScreed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation(290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam(570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, WaterproofMembrane, Screed. (435mm)
1 : 10
Detail 8 - Vertical Cladding Cill1
1 : 10
Detail 7 - Vertical Cladding Base2
1 : 10
Detail 9 - Vertical Cladding Head3
1 : 10
Detail 10 -Vertical Cladding Roof Junction4
Hollowcore Slab 150mm75mm Bearing on Concrete wall.(Engineers Specs)
Kingspan Kooltherm Insulation150mm
75mm Structural Steel(Engineers Specs)
Concrete Screed 75mmto be extened to form over hang
Cover plate, Clips onto thepressure plate to cover the system
APA Facade System Facade TB50The use of multiple polyamide strips andthree gasket barriers achieve a thermalenhancement, which helps to maintain alow U Value
Aluminium TransomeSecured to Steel Column
194x86mm(To APA Spec)
Hollow Round Steel ColumnCherry Colour Finish
(Engineers Specs)
To Carry the Curtain WallingTO Support the Precast Roof
Curtain Walling Transome Seured toConcrete Hollowcore Slab.Shims and Isolaters Pack inbetween.
75
150
75
149
9
24
27181150
86
194
449
Vapour Membrane
Concrete Gutter with Metal grates, the gutter must be a flatsurface and can not cause a hindrance to wheelchair users
APA System ST80 Rebate Door.Triple Glazed, Aluminum Frame. Internally beaded for extra security.Aluminum, Door Cill integrated into Design
125x225mm Insulated Blockwork to Support door,this will Stop Cold Bridging
Lean Concrete Infill
75mm Concrete ScreedFinished to a High Polish
Kingspan Kooltherm Insulation150mm
Hollow Round Steel ColumnCherry Colour Finish
(Engineers Specs)
To Carry the Curtain WallingTO Support the Precast Roof
Concrete Foothpath 200mm
11680
2400
3851
PA System ST80 Rebate Door.Triple Glazed, Aluminum Frame. Internallybeaded for extra security.Aluminum, Door Cill integrated into Design
Hollow Round Steel ColumnCherry Colour Finish
(Engineers Specs)
To Carry the Curtain WallingTO Support the Precast Roof
Aluminium TransomeSecured to Steel Column
194x86mm(To APA Spec) Cover plate, Clips onto the
pressure plate to cover thesystem
150 181
194
86
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
As indicated
29/0
4/2
014
12:3
9:1
1
Curtain Glazing MainEntrance - Detail 11+12+13
No.3
30-04-2014
MG117
1 : 5
Detail 13 - Curtain Walling - Roof Junction1
1 : 5
Detail 11 - Curtain Wall - Door Base2
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation (290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, Waterproof Membrane,Screed. (435mm)
1 : 50
Curtain Walling Section4
1 : 5
Detail 12 - Curtain Wall - Door Head5
Insect Mesh Secured to Flashing and FCB
Vertical Railing System 500mm c/cSecured via Wall Bracket
Wall Bracket Secured through Cement Board toHorizontal Rail System
50mm Kingspan Kooltherm Insulation Securedto Cement Board
15mm Cement BoardSecured to Horizontal Rail System
150mm Rockwool InsulationPacked between Horizontal Rail System
Vapour Barrier Membrane
Horizontal Rail System150mm x 65mm Secured to Steel Column
Tegral Equitone Natura Fibercement Board 12mmSecured via Secret Fix System
Vapour MembraneWarmside of Insulation to be
wrapped verticaly at end
150mm Rockwool InsulationPacked between Horizontal Rail System
15mm Cement BoardSecured to Horizontal Rail System
200mm Kingspan Kooltherm InsulationSecured to Cement Board
Waterproof MembraneTo be layed above Insulation
and carried into gutter
Euroseam ES400 Aluminum SheetingStanding Seam Secured using
Euroseam Fixing System
Steel Channel Secured to Steel Beam150mm x 75mm @5mm Thick
Steel Curved Beam (Engineers Specs)305mm x 305mm
Steel Column (Engineers Specs)305mm x 305mm
15mm Cement BoardSecured to Horizontal Rail System
350mm x 100mmm SteelChannel
Secured to Steel Beam tosupport Euroclad Bullnose
Rain Gutter: AluminiumThe Gutter is to be Wapped under Roofing Sheeting
and the Euroclad Bullnose Sheet is to over lap it alsoThe gutter is supported by packing
Euroclad BullnoseFasica System
3mm Aluminium.Manufactured as
required.Secure to Cement
board top and under
Insect Mesh Secured to Flashing and FCB
Vertical Railing System 500mm c/cSecured via Wall Bracket
50mm Kingspan Kooltherm Insulation Securedto Cement Board
15mm Cement BoardSecured to Horizontal Rail System
150mm Rockwool InsulationPacked between Horizontal Rail System
Vapour Barrier Membrane
Galvanized Steel Edge Secured to Steel BeamTo Shutter Structural Screed.
Structural Screed 75mm (Engineers Specs)
Steel Beam 305mm x 305mm (Engineers Specs)
Kingspan Kooltherm Insulation150mm to Meet Rockwool Insulation
Hollowcore Slab 150mm100mm Bearing on Steel Beam(Engineers Specs)
Waterproof MembraneTo be dressed Vertically
Concrete Screed 75mmWith Upstand to Deflect Water
20 15
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
As indicated
29/0
4/2
014
12:3
9:2
2
Euroseam Aluminium Roof -Detail 14+15
No.3
30-04-2014
MG118
1 : 10
Detail 14 - Euroseam Aluminium Roof- FCB1
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation (290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, Waterproof Membrane,Screed. (435mm)
1 : 10
Detail 15 - Euroseam Aluminium Roof - VC2
The Curved Aluminum Roof (Euroseam) will be supportedby the steel structure. The curved roof will be along theback of the building.
- Euroseam ES400 Aluminum Sheeting. Standing Seam.- 200mm Rockwool Insulation- Vapor Membrane-15mm Plywood Sheeting secured to Steel Channel.- 50mm x 50mm Channel System 300mm c/c- 305mm x 350mm Structure Beam Curved (ToEngineers Specs)
Bedding Space fro ColumnInfill with Grout
Anchor Plate ro secure bolt
Bolts set loose in concreteto allow movmentInfill with grout
Steel Base PlateAluminium Round Column 300mm
RadiusConnected to Steel Base Plate
(To Engineers Specs)
Hold Down Bolts
Concrete Gorund(Engineers Specs)
Concrete SceedVarious Depth depending on
specs of Bolts
Shims
300
180
Hollowcore Slab 150mm75mm Bearing on Concrete wall.
(Engineers Specs)
75mm Structural Screed (Engineers Specs)
Concrete Screed mesured to fill void
Aluminium RoundColumn 300mm RadiusConnected to Beam(To Engineers Specs)
Steel Beam 305mm x 305mm(Engineers Specs)
100
100mm Baring on Beam
150
143
100
57
450
100mm Hollowcore Slab(To Engineers Specs)
Hollowcore Slab and Structural Screedto act as overhang
300
157
57
100
143
150
450
75
150
75
150
450
86
Hollowcore Slab 150mm75mm Bearing on Concrete wall.(Engineers Specs)
Kingspan Kooltherm Insulation150mm
75mm Structural Steel(Engineers Specs)
Concrete Screed 75mmto be extened to form over hang
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
As indicated
29/0
4/2
014
12:3
9:3
6
Support Junctions for Roof -Detail 16+17
No.3
30-04-2014
MG119
1 : 5
Detail 16 - Front Column/Louvers - Base1
1 : 5
Detail 17- Front Column/Louvers - Top2
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation (290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, Waterproof Membrane,Screed. (435mm)
2215
1600
12 25 115 15 150 30 15 243 30 15
75
150
75
150
Horizontal Rail System150mm x 65mm Secured to Steel Column
Tegral Equitone Natura Fibercement Board 12mmSecured via Secret Fix System
Tegral Hidden Fix Hanger SystemGreen: Panel Bracket
Gray: Horizontal Hanger
150mm Rockwool InsulationPacked between Horizontal Rail System
Vapour Barrier Membrane
Wall Bracket Secured throughCement Board to
Horizontal Rail System
Concrete Screed 75mm
wt to Meet Rockwool Insulation
100
Hollowcore Slab 150mm100mm Bearing on Steel Beam(Engineers Specs
Structural Screed 75mm(Engineers Specs)
Steel Column 305mm x 305mm(Engineers Specs)
Steel Beam 305mm x 305mm(Engineers Sepcs)
The Basment Louver System:Pine Fins, Steel Hanger System
The Hanger System is secured back to the Steel ColumnsHanger System will be secured at the
bottem to the retaining Wall.
75mm Cast In-Situ Concrete(To Engineers Specs)
Bituthene 8000 Waterproof Membrane(As required to meet Design Specs)
300mm External Cast In-Situ Concrete Wall(To Engineers Specs)
Triton TT Waterbar and Triton TT Waterstop
75
300
75
300
Ground Baring Concrete Slab(To Engineers Specs)300mm of an Upstand
DELTA®-DRAIN 9000 HI-XSecured to Cast In-Situ Wall
Stone FillTo allow Drainage
Geotextile Membrane
Aquadrain™Perimeter Drainage Channel
Concrete Column for Steel Structure to beSecured to. (Engineers Specs)
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
As indicated
29/0
4/2
014
12:3
9:5
1
Basment Design - Detail 18+ 19
No.3
30-04-2014
MG1201 : 20
Wall Section - BB Basement1
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation (290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, Waterproof Membrane,Screed. (435mm)
1 : 10
Detail 19 - Basment - Ground Floor Junction2
1 : 10
Detail 18 - Basment - Foundation3
Hollowcore Slab 150mm75mm Bearing on Concrete wall.(Engineers Specs)
Kingspan Kooltherm Insulation150mm
75mm Structural Steel(Engineers Specs)
Concrete Screed 75mmto be extened to form over hang
Window Frame Seured to Concrete Hollowcore Slab.Shims and Isolaters Pack inbetween.
Vapour Barrier
Hollow Round Steel ColumnCherry Colour Finish
(Engineers Specs)
To Carry the Curtain WallingTO Support the Precast Roof
75
150
75
150
450
APA Window System ST80 Tilt and Turn,Frame 80mm U-Value:0.6
335 555
395
Overhang of Concrete
Hollow Round Steel ColumnCherry Colour Finish
(Engineers Specs)
To Carry the Curtain WallingTO Support the Precast Roof
100 100
APA Window System ST80 Tilt and Turn,Frame 80mm U-Value:0.6
335
75
150
305
530
305
15
30
150
Structural Screed 75mm (Engineers Specs)
Hollowcore Slab 150mm100mm Bearing on Steel Beam
(Engineers Specs)
Steel Beam 305mm x 305mm(Engineers Specs)
Aluminium Cill Intrigrated into Window Frame
Window Frame Seured to Concrete Hollowcore Slab.Shims and Isolaters Pack inbetween.
30mm Omega Vertical Rail
15mm Gyspon BoardSecred to Omega Hanger
Hollowcore Slab 150mm75mm Bearing on Concrete wall.(Engineers Specs)
Kingspan Kooltherm Insulation150mm
75mm Structural Steel(Engineers Specs)
Vapor Barrier
Steel Beam 305mm x 305mm(Engineers Specs)
75
150
75
150
305
755
Suspended Ceiling 30mmVoid for use of Electrical and Services500mm Void
Curved Ceiling Feature(Suppliers Specs)
Aluminum Flashing around Skylightat 2 Degree Slope
APA Window System ST80 Tilt and Turn,Frame 80mm U-Value:0.6
Curtain Walling Transome Seured to Concrete Hollowcore Slab.Shims and Isolaters Pack inbetween.
500
75
150
75
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
As indicated
29/0
4/2
014
12:4
0:2
0
Flat Roof - Detail 20+21+22
No.3
30-04-2014
MG121
1 : 10
Detail 20 - Flat Roof - Head1
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation (290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, Waterproof Membrane,Screed. (435mm)
1 : 10
Detail 21 - Flat Roof - Ground2
1 : 10
Detail 22- Skylight3
Aluminum Hand Rail
Glass Panel 30mm
Open Riser Stairs
Concrete String(Engineers Specs)
Tie Bar from PrecastConcrete Stairs
(To Manufactures Specs)
75mm Structural Screed(Engineers Specs)
Non Shrink GroutTo be placed when Precast
Stairs is being placed
Hollowcore Slab150mm thick(Engineers Specs)
150
75
225
75 150 150
375
160
300
2380Support for landingCast in-Situ with the
Concrete Wall(The Engineers Specs)
150mm Cast in-situConcrete Wall
(Engineers Specs
150mm KingspanKooltherm
Insulation Securedto Concrete
75mm Cast in-Situ Concrete(Engineers Specs)Panel Finish
Precast Concrete Stairs Unit(Engineers Specs)
Tie Bar from PrecastConcrete StairsTo Manufactures Specs
75mm Structural Screedto be poured onto Precast Slab
Non Shrink GroutTo be placed when PrecastStairs is being placed
Hollowcore Slab150mm thick
Aluminium Hand Rail
Glass Panel 30mm
Open Riser Stairs
160
160
160
325
75
150 225
Concrete String
Tie Bar from PrecastConcrete StairsTo Manufactures Specs
Aluminium Hand Rail
Glass Panel 30mm
Open Riser Stairs
160
160
160
325
Concrete String(Engineers Specs)
Hollowcore Slab 150mm75mm Bearing on Concrete wall.(Engineers Specs)
Kingspan Kooltherm Insulation150mm
75mm Structural Steel(Engineers Specs)
Concrete Screed 75mmto be extened to form over hang
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
As indicated
29/0
4/2
014
12:4
0:3
0
Stairs - Detail - 23+24+25
No.3
30-04-2014
MG122
1 : 10
Detail 23 - Main Stairs - Landing1
1 : 10
Detail 24 - Stairs - Floor Junction21 : 10
Detail 25 - Stairs - GF Junction3
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation (290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, Waterproof Membrane,Screed. (435mm)
Store for Pellet Boiler System
Store can be refilled by apipe leading to theexterior of the building.
Batterys for PV Panels
Concrete PavingOpen Graded Bedding CoursePermeable Joint Material Fill
Open Graded SubBase Reservoir
Uncompacted Sub Graded Soil
75
150
500
75
Open Graded Base Reservoir
Geotextile Membrane
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
As indicated
30/0
4/2
014
09:3
7:0
3
Sustanability
No.3
30-04-2014
MG125The Light on site will all be LED lighting and will have the added factor of beingaided by a PV panel ontop of the light. This these two factors will allow the lights tobe run at a minimum cost.
Onsite LED Lighting
System DescriptionBiomass is any plant-derived organic material that renews itself over a short period. Biomass energy systemsare based on either the direct or Indirect combustion of fuels derived from those plant sources.
The burner will be placed in the plant room of the basement as indicated by red square. It will be used toprovide hot air to heat the building.
Sizing Burner:· Calculate total energy requirement for space heating needs of building· Calculate quantity of pellets required to meet energy demand (1kg =5Kwh)· Calculate total cost for pellets ( €230 per tonne bulk)· Calculate total volume of pellets used (1m³ pellets = 650kg)· Calculate total volume required for pellet storage (Total volume of pellets used x 3/2)· Calculate total heat demand (1kw heat demand = 0.9m³ of space)
Space heating demand of Building per year = 5000m² x 87w/m²= 435,000 w/m²
435,000 / 5 = 870008.7Tonne x €230 = €2001435,000 /650 = 669.0m³669.0 x 3/2 = 1003.8m³
Benefits· Biomass-fuels can be used to produce energy on a continuous basis (unlike renewable's such as
wind or solar energy)· Biomass can be an economic alternative to fossil fuels· Biomass is a potential source of both heat and electricity· Biomass technology is flexible and scale able, from a single boiler to a power station Limitations· Biomass fuels have a lower energy density compared to fossil fuels· Biomass systems have particular design management and maintenance requirements associatedwith sourcing, transportation and storage· Biomass can be less convenient to operate than mains-supplied fuels such as natural gas· Biomass systems are more management intensive and require expertise in facilities management
Biomass storage considerationsThe on-site biomass storage facility may need to hold considerable volumes of fuel depending on the boilercapacity and rate of use. The main purpose of the store will be to keep the biomass dry and protected from rainand groundwater. Typical storage facilities include bunkers or silos.
Benefits of Natural VentilationThe use of natural ventilation is definitely an advantage with the raising concerns regarding the cost and environmental impact of energy use. Not only does natural ventilation provide ventilation (outdoor air) to ensure safehealthy and comfortable conditions for building occupants without the use of fans, it also provides free cooling without the use of mechanical systems of the toxicity of the fumes in the basement from all the cars a constantand rapid air flow is necessary. The half basement design will allow the air changes to be constant and a not expense.
System DescriptionPermeable Paving will be used in the parking area of the Site, All other footpaths will remain solid Concrete to not cause any hindrance to people wish disability's. During a heavyrainfall our town's sewer systems can get overwhelmed, while the ground gets very little benefit of the natural irrigation. But by using permeable materials the ground can capturewater runoff, absorb it and clean it during the process. By allowing the water to seep into the ground, the direct and surrounding areas will need much less man-produced irrigation.This will save you money and reduce the amount of water used for your everyday irrigation needs.
Security Lock on Doorto Allow Access to Staff Only
Water Conservation
Heating System Biomass
Natural Ventilation - Basement
Permeable Paving
System descriptionA wide range of water conservation measures appropriate for buildings are suggested by the Environment Agency. These are outlined below
Bathroom SinksBathroom sinks are the most commonly used bathroom appliance, they are also the most inefficient and inefficiently used.
Infra-red tapsInfra-red taps that can be bought from many eco-friendly appliance companies, are especially useful as they only turn on when the laser in crossed this can cut down on wasterwastage by half as there in so wasted running water, also modern taps like this have a better parts installed so they do not leak like older taps.
Low-Flow aeratorsInexpensive and simple to install, low-flow shower heads and faucet aerators can reduce your home water consumption as much as 50%, and reduce your energy cost ofheating the water also by as much as 50%. They allow Air to enter the tap so the water is dispersed into wider and better flow.
Dual flushFlush typed toilet bowls are undoubtedly consumes large amount of water, which not friendly enough to the environment and to the household. The dual flush toilet is a toilet watertank with a dual flush feature, which includes the half flush and the full flush. The product perfect for every home all around the world, because it will let every household savefrom water that they flush every now and then even if they only just urinated, which does not need large amount of water to flush.
Photovoltaic SystemPhotovoltaic Panels will be place on the roof of the building and willbe used to provide electricity for the building and stored in batteries.
Sizing PV Panels
· Total meter squared of PV Panels = 108,500m²· Solar Irradiance = 950 w/m²· Cell efficiency of Panel = 15%· Loss factor = 0.75
950 w/m² x 0.15 x 0.75 = 0.106 Kw/m²1m² = 0.106 Kw/m²108,500 m² = 11’500 Kw
PV Panels Line Up
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation (290mm)
Glazing / Windows:APA Window System ST80 Tilt and Turn,Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore to beto Engineers Specs), Structural ConcreteScreed, Kingspan Kooltherm InsulationSlab, Waterproof Membrane, Screed.(435mm)
Reception Admin Office 1
ConsultationRoom 1
ConsultationRoom 2
NursesRoom 1
NursesRoom 2
Family Consultation Room
Admin Office 2
Admin Office 3
Seating Area 1
Store (Equipment)Seating Area 2
Seating Area 3
WC 1
WC 2
Staff Entrance/Exit
Public Entrance/Exit
Landing/ Corridor
1810
910
1429 2
129
3400 3300 3300 3300 3850
5500
4200
3429
3850
2600
1155
1545
5636
1900 2081
910
3555
7431 6337
4328
3776
2860
4711
3191
2860
Vinyl FlooringSeamless Skirting(Medical Spec)
2200
Sound Proof Door(Medical Spec)
Patients Chair
Doctors Work Station(As Required)
Void for Services
Aluminum Window FrameTriple Glazed Unit
View for the Doctor(Work Environment)
Filing Cabinet
Patients bed Located behinddoor for privacy
(Bed to Medical Standard)
Wall to be painted with White Paintto incress the brightness
Cherry Cladding on Column
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
As indicated
30/0
4/2
014
09:3
7:1
6
Room -Finish/Layout/Services
No.3
30-04-2014
MG126
Construction Specs:
External Wall:Tegral Equitone Natura FibercementBoard, Secret Fix. (303mm)
Internal Wall:Gypson slab, Steel Stud. (100mm)
Hollowcore Slab:Hollowcore Slab with Structural Screed.Finish will vary through out. (235mm)NB:Engineers Specs
Concrete Slab:Ground baring Concrete Slab withKingspan Kooltherm Insulation (290mm)
Glazing / Windows:APA Window System ST80 Tilt andTurn, Frame 80mm U-Value:0.6
Curtain Walling:APA Facade System Facade TB50Frame: 60mm Thick
Curved Aluminum Roof:Euroseam ES400 Aluminum Sheeting.Standing Seam. Rockwool InsulationSupported by Structural Beam (570mm)
Concrete Flat Roof:Hollowcore Slab (Slab to Hollowcore tobe to Engineers Specs), StructuralConcrete Screed, Kingspan KoolthermInsulation Slab, Waterproof Membrane,Screed. (435mm)
1 : 50
First Floor - Office Layout1
1 : 30
Interior - GP Room - Left2 1 : 30
Interior - GP Room - Front3 1 : 30
Interior - GP Room - Right4
Scale
Checked by
Drawn by
Date
Project number
Technical Design andDetailing Year 3
Project 3 : Thesis
Mark Grincell
Dan O'Sullivan
1 : 70
30/0
4/2
014
11:4
4:0
3
Office Services Layout MEP
Project Number
Issue Date
MG127
1 : 70
First Floor- Electrical Sockets1
1 : 70
First Floor - Lighting2