PRHTA Compliance Response

download PRHTA Compliance Response

of 5

Transcript of PRHTA Compliance Response

  • 8/19/2019 PRHTA Compliance Response

    1/10

    ES I ADO 1.115R1 ASOCIADO DI.

    PUERTO RICO

    Atitoridad do Carreteras y Fransportacion

    March 11, 2016

    Mr. Jaime Lopez

    Senior Enforcement Officer

    Multimedia Permits and Com pliance Branch

    Caribbean Environmental Protect ion Div is ion

    U.S. Environmental Protection Agency

    City View Plaza, Suite 7000

    48 Rd.165 km. 1.2

    Guaynabo, Puerto Rico 00968-8069

    Com pl iance P lan For

    Administrat ive Compl iance Order

    Docket Num ber CW A-02 -2016 -3109

    Construct ion of Dr i lled shaf t Retaining W al l at PR-25 K m 1.1

    Add it ional Stabi l izations W ork S

    Mun icipali ty of San Juan

    AC-002533 /R000025033

    Dear Mr. Lopez:

    As required by item Num . 62 of the above referenced

    Administrat ive Compliance Order (ACO),

    issued on March 4,

    2016, the

    Puerto Rico Highways and Transportat ion Authori ty (PRHTA)

    respectfully submits for USEPA revision

    and approval, the

    Com pl iance Plan (CP) prepared for the project. This CP

    intends to comply w ith the requirements

    detailed in the

    A C O

    and in the 2012 Construction General Permit

    (2012 CG P) .

    In addition we want to inform you that the

    P R H T A

    and

    Del Va l le Group SP (DVG ),

    Project General Contractor,

    ceased all construction operations related to the project on March 1 2016, after DVG received the Order and in

    compliance with paragraph No. 59 of the same. DVG confirmed receipt of the Order on March 1, 2016. PRHTA

    received the Order on March 4, 2016 but started coordination with USEPA on March 1, 2016 as soon as the

    contractor made PRH TA aw are of the Order received.

    On the same date, DVG and PRHTA representatives contacted and coordinated a meeting with USEPA

    representatives as required on paragraph 61 of ACO. After the meeting, held on March 2, 2016 DVG submitted an

    email notification regarding the resuming of activities to continue with the installation and maintenance of erosion and

    sedimentation control BMPs required by the PREQB and the SWP PP. USEP A via email acknowledged its receipt on

    March 3, 2016.

    The followin g is a description of the already performed and p roposed activities. Such activities are being executed in

    compliance with the mandatory requirements of the

    ACO.

    The information will be presented in the same order as the

    A C O .

    4

  • 8/19/2019 PRHTA Compliance Response

    2/10

    Mr. Jaime Lopez

    March 11, 2016

    Page 2

    Respond ent 's contac t in fo rmat ion fo r those respons ib le fo r the deve lopm ent and im p lementa t ion o f

    the Com pl iance Plan

    Respondent contact information responsible for the development and implementation of the Compliance

    Plan are:

    Mr. Javier Arroyo Rosario, P.E., Deputy Executive Director for Infrastructure., Telephone

    787-721-8787 X-1055;

    Jarroyodtop.qov.pr

    Mr. Noel Rosario Hem andez P.E. Construction Area Director. M r. Rosario was designated by

    Mr. Arroyo to act on his behalf. Telephone 787- 721-8787 X-1101,

    nrosario(@ Atop.qov.pr

    Implementat ion dates ( in i t iat ion and complet ion) for each of the act ions to be taken, which shal l not

    e x c e e d o n e h u n d r e d e i g h t y (1 8 0 ) c a le n d a r d a y s o f t h e r e c e i p t o f th i s o r d e r , u n l e s s o t h e r w i s e

    speci f ied

    As we have previously informed you the scope of the original project was substantially completed. The

    additional construction phases have been agreed upon by the

    P R H T A a n d D e l V a l le G r o u p S P ( G C ) ;

    therefore, a new project schedule including dates for the commencement and completion of the described

    actions has been d eveloped. Major tasks include:

    Providing temporary stabilization to areas where clearing, grading, and excavation

    activities has temporarily ceased;

    Providing final stabilization to areas where clearing, grading and excav ation activities will

    no longer be performed;

    Implementing erosion and sediment controls, and

    Best Managem ent Pract ices (BMP's )

    at the site;

    Providing Maintenance for the existing and future

    BMP's

    and

    Installation and maintenance of sediment and erosion controls required by the

    Puerto

    Rico Envi ronm enta l Qual ity Board

    (provided that a w ritten notification is submitted to

    E P A

    no later than five 5) calendar days before the commencement of such activity. The

    notifications shall include a description and itinerary of implem entation of the activities to

    be u ndertaken.

    The implementation of the temporary erosion and sediment control measures will be accomplished within

    the thirty (30) calendar-day period established in the Order. Despite some of the permanent stabilization

    activities already begun, such as the installation of stone revetment (i.e. breakwater reshaping), the same

    are intended for completion within a four (4) month period. The termination date will be on June 17, 2016. A

    copy of the Project Stabilization Plans as included as

    Attachment 1

    of this report.

    A copy o f the revised itinerary has been included in

    Append ix A- Pro jec t Schedule

    of the

    S W P P P

    and as

    At tachment 2

    of this letter. However, it shall be noted that installation of temporary as well as permanent

    soil stabilization

    BMP's

    have already started in the project as authorized under the original NPDES Permit

    P R R 1 2 A 8 2 5

    granted on June 20, 2015. The permit was modified to include the additional stabilization

    works and it was re-authorized on March 4, 2016.

    Developmen t /Select ion, implem entat ion and maintenance of soi l s tabi lization BM P's

  • 8/19/2019 PRHTA Compliance Response

    3/10

    Mr. Jaime Lopez

    March 11, 2016

    Page 3

    The development/selection, implementation and maintenance of the soil stabilization practices for the

    project has been taken based on the current conditions of the project, as required by

    EPA. For the

    stabilization practices have been divided in two (2) broad catego ries. They are:

    Temporary M easures

    Tem porary m easures selected for its use in the project include:

    Installation of Silt fences

    Reshaping of temporary stabilized entrance/exits

    Installation of Erosion control w attles

    Construction of temporary swales

    Installation of Plastic liners to cover the unstable embankments

    Installation of Temporary slope drain ( if deem necessary)

    Maintenance of vegetation w here possible

    The location for the mentioned measures can be observed in the

    eros ion Contro l

    Measures Drawings , (Temporary and Perm anent )

    for the slope stabilization works as

    they were incorporated in the Modified

    SWP P P

    and also attached to th is letter.

    Per manent M easur es

    Permanent measures for slope stabilization were designed in-house by PRHTA Design

    Area personnel. Those m easures include:

    Reshap ing and s t rengthen ing o f the b reakwater ( s tone reve tment

    type V)

    R e m o v a l o f u n s t a b l e m a t e r i a l a n d r e c o n s t r u c t io n o f s l o p e s

    emb ankmen t with selected ma ter ia l

    Placing of top soi l

    Instal lat ion of erosion control Mat — 24 m onth of longevi ty

    P l a n t in g o f V e t iv e r G r a s s ( C h r y s o p o n g o n z i z a n o i d e s ) s i e r ra

    variety

    Developm ent of s i te speci f ic inspect ion repo rt forms

    Specific Inspection Forms for the additional works were developed using the forms developed for the

    original SWP PP. Copies of the Form s have been included in the modified

    SWPPP.

    Inspection reports have

    been duly completed and filed since construction resumed.

    Performance of inspect ions by qual i f ied personne l

    Inspections of the project for

    SWP P P

    purposes will be handled by qualified personnel as defined in the

    C G P

    requirements. The

    P R H T A

    has designated the following personnel for conducting the inspections:

    Eng. Axel Carrasquillo cuevas

    Eng. Eduardo F. Ruiz Velez,

    P E

  • 8/19/2019 PRHTA Compliance Response

    4/10

    Cord

    Noe . Rosa o Hernandez

    Director

    Construction area

    Mr. Jaime Lopez

    March 11, 2016

    Page 4

    The reason to designate two 2) persons is to maintain a resource available in the event that one of them is

    unavailable due to unforeseen conditions. Both engineers have experience in the construction of highway

    projects; and although already having experience in site inspections, were also trained in the specific

    requirements of compliance with the

    2 0 1 2 C G P

    conditions. They will interact with the Del Valle Group SP

    designated inspector.

    Preparat ion of inspect ions reports by qual i f ied personn el

    The new forms will be used to document the project inspections and will be performed

    s

    reviously

    indicated by qualified personnel from both the contractor and the

    PRHTA.

    Designat ion of author ized representat ives

    The designated authorized representative of the

    P R H TA

    for the 2012 C G P

    implementation of this project

    will be Eng. Axe l Carrasquillo Cuevas. (Cell. phone: 787-487-1313).

    C o s t e s t i m a t e s t o im p l e m e n t th e C o m p l ia n c e P l a n a n d e a c h e r o s i o n a n d s e d i m e n t c o n t ro l .

    Stabi l izat ion pract ice an d p ol lut ion p revent ion act iv i ty

    Detailed cost estimates of the erosion and sediment control stabilization practices and pollution prevention

    activities have been prepared. They are included in

    Attachment 3

    of this report.

    Mod i fied as needed and imp lement the SW PPP to com ply wi th the te rms and requ i rements o f 20112

    C G P

    The

    P R H T A

    has modified the

    SWP P P

    jointly developed with Del Valle Group SP

    (GC)

    for the Original

    project. The

    S W P P P

    was revised by the

    P R H T A

    to incorporate erosion co ntrols, stabilizations practices and

    pollution preventions measures, which can be identified in the slope stabilization plans, for the purpose of

    improving the actual conditions of the project. Such m easures include:

    Improved tem porary and final soil stabilization BMP s based on existing project conditions

    Updated time schedule for the additional works based on actual project conditions

    Measures to control run-on across the com pleted slopes

    Revised inspections forms

    As required by the

    2 0 1 2 C G P ,

    the revised

    SWP P P

    incorporates the PRHTA solutions to address the

    deficiencies identified in your

    Reconnaissance Inspect ion Report

    of March 17, 2016

    We look forward that the submitted information complies with the

    A C O

    requirements, however, if there is a need to

    provide additional information don t hesitate to contact us, at (787) 721-8787 X -1105, 1158, 1167

  • 8/19/2019 PRHTA Compliance Response

    5/10

    ATTACHMENTS

  • 8/19/2019 PRHTA Compliance Response

    6/10

    Attachment

    Cost of implementation of BMP on the Project

    9

  • 8/19/2019 PRHTA Compliance Response

    7/10

    Q T Y

    320.00

    1,200.00

    2,732.00

    100.00

    1.00

    100.00

    1,700.00

    ESTADO I.IRR I A SO( I A DO

    PUERTO RI O

    Avieridad de C arrot

    ransportaeicrni

    DRILED SHAFT RETAINING WALL, HIGHWAY P R-25R KM 1.1

    MUNICIPALITY OF SAN JUAN

    AC 002533 / R000025033

    COST OF IMPLANTATION OF BMP

    O N T H E P R O J E C T A R E A

    P E R M A N E N T S T A B I LIZA T I O N A N D L A N D S C A P IN G

    I T E M

    U N I T

    D E S C R I P T I O N

    Q T Y

    U N I T P R I C E

    A M O U N T

    5

    CuM

    Borrow Calss B

    3,950.00

    20.00

    79,000.00

    8

    SqM

    Double Net Erosion Control Blanket

    1,818.00

    5.00

    9,090.00

    1 4

    CuM

    Stone Revetment Type V

    1,790.00

    60.00

    107,400.00

    21 CuM

    Polymeric Marine Mattress

    165.74

    400.00

    66,296.00

    2 2 CuM

    Sand Filled Geocontainer

    203.75

    280.00

    57,050.00

    3 6

    CuM

    Non-Woven Geotextile

    1,270.00

    5.00

    6,350.00

    40 Each

    Planting Vetiveria zizanioides (Vetiveria Grass)

    6,200.00

    8.00

    49,600.00

    T E M P O R A R Y E R O S I O N C O N T R O L

    ITEM UNIT

    E S C R I P T I O N

    6

    ach

    traw Bales

    7

    nM

    8

    qM

    3 5

    S

    Special and/or Additional Works (asphalt berm)

    Plastic Liner

    Double Net Erosion Control Blanket

    Special and/or Additional Works

    (Barrera para minizar turbidez en el mar)

    Construction Exit

    Silt Fence

    U

    N I T P R I C E

    A M O U N T

    12.00

    3,840.00

    8.00

    9,600.00

    5.00

    13,660.00

    62.24

    6,224.00

    2,500.00

    2,500.00

    25.00

    2,500.00

    8.00

    13,600.00

    T O T A L

    4 2 6 , 7 1 0 . 0 0

    4 1 ach

    42

    S

    44

    qM

    VOCIODID Of tfiNbffetaf

    rrww avdtatw

  • 8/19/2019 PRHTA Compliance Response

    8/10

    Attachment 2

    Project Schedule

  • 8/19/2019 PRHTA Compliance Response

    9/10

    M

    2

    I

    N

    I

    V

    J

    A

    M

    S

    1

    z

     

    T

    V

    M

     

    .1

    E w

    0

    0

    0

    g

    a

    u

     

    3

    N

    O

    I

    D

    D

    M

    I

    P

     

    0

    P

    I

    -

    0

    P

    I

    -

    0

    P

    D

    0

     

    P

    0

    P

    I

    -

    0

    P

     

    -

    0

    C

    A

     

    9

    9

    i i

    C

    u

    o

    A

    v

    e

    G

     

    0

    G

    A

    v

    e

    F

    i

    n

    C

    l

    e

    n

     

    V

    e

    v

    G

    E

    r

    o

    o

    N

    C

    o

     

    B

    l

    a

    F

    n

    B

    U

    n

    E

    x

    o

    B

    a

    S

    o

    R

    m

     

    t

    s

    a

    a

    o

    F

    e

    F

    c

    G

    e

    e

    E

    x

    o

    S

    o

    R

    m

    A

    e

    C

    o

    u

    o

    D

    v

    o

    D

    k

    C

    o

    u

    o

    E

    S

    F

    S

    a

    w

    B

    e

     

    n

    a

    a

    o

    M

    z

    o

    A

    p

    o

    E

    W

    D

    m

    3 3

    .

    0

    l

     

    k

     

  • 8/19/2019 PRHTA Compliance Response

    10/10

    Estado Libre Asociado de Puerto Rico

    CT-174

    Departamento de Transportacion y Obras Publicas

    Rev. 6/92)

    AUTORIDAD DE CARRETERAS Y TRANSPORTACION

    H O J A D E T R A M I T E

    RECIBIDO

    FECHA:

    15 de marzo de 2016

    A: 1er.

    A: 2do.

    A: 3ro.

    A: 4to.

    A: 5to.

    Sr. Jaime Lopez-EPA

    =

    i

    . c

    7

    r

    C.,,

    f

     : 1:

    DE:

    ASUNTO:

    Ana L. Torres Santana-Jefa, Oficina Gerencia de Construccion

    •••C)

    COMPLIANCE PLAN FOR ADMINISTRATIVE COMPLIANCE ORDER

    DOCKET NUMBER CWA 02 2016 3109

    AC 002533

    Corres./De:

    orres. Fechada:

    Contestar para firma del Secretario

    ometer recomendaciones

    Contester para mi firma

    nvestigar e Informal*

    Contestar directamente

    reparar opini6n

    Acusar recibo

    nterarse y enviar a archivo

    N e c m i

    Accion pertinente

    nterarse y devolver

    Discutir conmigo

    studiar y radicar la alegaciOn

    MO

    Para su informacion

    orrespondiente

    OBSERVACIONES:

    e incluye asunto mencionado para su informacion y tr6mite que estime

    pertinente.

    6512/Iir

    Anexo