Pretium rodman renshaw sept 12 2017 final

25
VALUE THROUGH GOLD RODMAN & RENSHAW GLOBAL INVESTMENT CONFERENCE September 10-12, 2017

Transcript of Pretium rodman renshaw sept 12 2017 final

Page 1: Pretium rodman renshaw sept 12 2017 final

1

VALUE  THROUGH  GOLD

RODMAN & RENSHAW GLOBAL INVESTMENT CONFERENCE

September 10-12, 2017

Page 2: Pretium rodman renshaw sept 12 2017 final

2

CAUTIONARY STATEMENT

Forward-Looking InformationThis Presentation contains “forward-looking information” and “forward looking statements” within the meaning of applicable Canadian and United States securities legislation. Forward-looking information may include, but is not limited to, the anticipated production and developments in our operations in future periods, information with respect to our planned exploration and development activities, the adequacy of our financial resources, the estimation of mineral reserves and resources including the 2016 Valley of the Kings Mineral Resource estimate, realization of mineral reserve and resource estimates and timing of development of our Brucejack Project, costs and timing of future exploration, results of future exploration and drilling, production and processing estimates, capital and operating cost estimates, timelines and similar statements relating to the economic viability of the Brucejack Mine, timing and receipt of approvals, consents and permits under applicable legislation, our executive compensation approach and practice, the composition of our board of directors and committees and adequacy of financial resources. Wherever possible, words such as “plans”, “expects”, “projects”, “assumes”, “budget”, “strategy”, “scheduled”, “estimates”, “forecasts”, “anticipates”, “believes”, “intends”, “targets” and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative forms of any of these terms and similar expressions, have been used to identify forward-looking statements and information. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking information, including, without limitation, those risks identified in our Annual Information Form dated March 30, 2017 filed on SEDAR at www.sedar.com and in the United States on Form 40-F through EDGAR at the SEC’s website at www.sec.gov. Forward-looking information is based on the expectations and opinions of our management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise. We do not assume any obligation to update forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place undue reliance on forward-looking information. National Instrument 43-101Technical and scientific information contained herein relating to the Projects is derived from National Instrument 43-101 (“NI 43-101”) compliant technical reports (“Reports”), “Measured, Indicated, and Inferred Mineral Resource Update” dated July 21, 2016, “Feasibility Study and Technical Report on the Brucejack Project, Stewart, BC” dated June 19, 2014, “Mineral Reserve Update” dated December 15, 2016, “capital cost update” dated February 3, 2017, and . We have filed the Reports and Update under our profile at www.sedar.com. Technical and scientific information not contained within the Reports for the Projects have been prepared under the supervision of Mr. Ivor W.O. Jones, M.S.c., FAusIMM, Cpgeo, Mr. Kenneth C. McNaughton, P.Eng., Ian Chang, P.Eng., Mr. Russell Pennel, B.A.S.c., P.Eng., and Mr. Lyle Morgenthaler, B.A.S.c., P.Eng. each of whom is an independent “qualified person” under NI 43-101.This presentation uses the terms “measured resources”, “indicated resources” (together “M&I”) and “inferred resources”. Although these terms are recognized and required by Canadian regulations (under NI 43-101), the United States Securities and Exchange Commission does not recognize them. Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. There is no guarantee that all or any part of the mineral resource will be converted into mineral reserves.In addition, “inferred resources” have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre feasibility studies, or economic studies, except for a Preliminary Assessment as defined under NI 43-101. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. CurrencyUnless otherwise indicated, all dollar values herein are in Canadian $.

Page 3: Pretium rodman renshaw sept 12 2017 final

3

BRUCEJACK LOCATION

Page 4: Pretium rodman renshaw sept 12 2017 final

4

BRUCEJACK LOCATION

Access Road

Power Line

Brucejack Mine

Airstrip

Knipple Camp Transfer Station

Page 5: Pretium rodman renshaw sept 12 2017 final

5

HIGH-GRADE GOLD RESERVES(1,2)

Category Tonnes(mil)

Gold(g/t)

Silver(g/t)

Contained

Gold(mil oz)

Silver(mil oz)

Proven 1.4 7.2 383 0.3 17.4

Probable 1.5 6.5 181 0.3 8.6

Total P&P 2.9 6.9 279 0.6 26.0

Valley of the Kings

West Zone

(1) Source: Mineral Reserve Update, see news release dated December 15, 2016(2) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014

Category Tonnes(mil)

Gold(g/t)

Silver(g/t)

Contained

Gold(mil oz)

Silver(mil oz)

Proven 3.3 14.5 12.9 1.6 1.4

Probable 12.3 16.5 11.3 6.5 4.5

Total P&P 15.6 16.1 11.1 8.1 5.9

Mineral Reserve Estimate – Dec 2016

West Zone

Valley of the Kings

Page 6: Pretium rodman renshaw sept 12 2017 final

6

BRUCEJACK PRODUCTION

Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014; Mineral Reserve Update, see news release dated Dec. 15, 2016.

Mine Life 18 years

Feasibility Study Gold Production 7.27 million oz

Average Annual Gold Production

504,000 oz (years 1-8)

404,000 oz (life of mine)Gold and Silver Recoveries 96.7% and 90.0%

Processing Rate 2,700 tonnes per day

Page 7: Pretium rodman renshaw sept 12 2017 final

7

BRUCEJACK - ROBUST ECONOMICS

(1) Based on updated forecast of capital cost (see News Release dated February 3, 2017) and operating cost assumptions from the Feasibility Study and Technical Report Update on the Brucejack Project, with an effective date of June 19, 2014

(2) NPV is discounted to Dec 31, 2015.

Economic Results by Metal Price (1)

Low Case Base Case High Case

Gold Price (US$/oz) $800 $1,100 $1,400Silver Price (US$/oz) $10 $14 $18NPV(2) (5% US$M) Pre-Tax $1,050 $2,340 $3,620

After Tax $690 $1,530 $2,360Internal Rate of Return Pre-Tax 19.9% 34.4% 47.5%

After-Tax 16.5% 28.5% 39.1%Net Cash Flow (US$M) Pre-Tax $2,110 $4,220 $6,320

After-Tax $1,470 $2,820 $4,170Payback Pre-Tax 5.0 3.3 2.5

After-Tax 5.2 3.5 2.7

Capex (US$M) $811.1 $811.1 $811.1

Exchange Rate (US$:C$) 0.75 0.75 0.75

Page 8: Pretium rodman renshaw sept 12 2017 final

8

MAY: Wet commissioning complete

JUNE:Increase in production rate. First gold pour.

JULY:Achieved commercial processing rate. Mill optimization. Produced 25,392 ounces of gold in June/July from low-grade stockpiles, development muck, and in July, the addition of stope ore.

AUGUST: Continue mill optimization. Continue addition of stope ore.

SEPTEMBER >Optimize ore blending

MILL COMMISSIONING & RAMP-UP

2017 Focus:

Page 9: Pretium rodman renshaw sept 12 2017 final

9

OPERATIONS

Staffing complete Stoping underway with contract miner: Procon

Page 10: Pretium rodman renshaw sept 12 2017 final

10

LOCAL EMPLOYMENT

Brucejack Mine

54%British 

Columbia ‐Other

31% First 

Nations

Canada             ‐ Other

15% 

As of July 2017

Page 11: Pretium rodman renshaw sept 12 2017 final

11

UNDERGROUND DEVELOPMENT

View facing North West

Page 12: Pretium rodman renshaw sept 12 2017 final

12

LONGHOLE STOPING

Active Stopes 12 stopes in the mining and

backfill cycle at all times

Dimensions 30 meter level spacing 45 meter maximum length 15 meter widths

Dilution Factors Primary Stopes: 7% Secondary Stopes: 15%30 M 

SPACING

Page 13: Pretium rodman renshaw sept 12 2017 final

13

MILL BUILDING

VOK Portal

Mill

Camp

Waste RockDisposal

Contact WaterPond

West ZonePortal

Page 14: Pretium rodman renshaw sept 12 2017 final

14

PROCESSING FLOW SHEET

55% FROM CONCENTRATE

45% FROM GRAVITY

(1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014.

96.7% GOLD RECOVERY (LOM)

Page 15: Pretium rodman renshaw sept 12 2017 final

15

GOLD ROOM EFFICIENCY

Gold Recovery Optimized Metallic Slag Eliminated

Page 16: Pretium rodman renshaw sept 12 2017 final

16

GOLD RECOVERY OPTIMIZATION

PrimaryScreen

CycloneUnderflow

Primary Knelson

Bin

PrimaryShakerTable

PrimaryScreen

Bin Bin

SecondaryScreen

Primary Knelson

Secondary Knelson

SecondaryShakerTable

Table TailsGravity

Concentrate

Table Middlings

Oversize

KnelsonTails

Table Tails

KnelsonTails

KnelsonTails

Page 17: Pretium rodman renshaw sept 12 2017 final

17

FINANCIAL

2017 Capex Close Out Gold Sales Underway Working Capital Surplus Targeted for End of Q3

2018 Pay Down Debt Buy Back Stream

Page 18: Pretium rodman renshaw sept 12 2017 final

18

DELIVERING ON STRATEGY

Brucejack Reserve Expansion

Bowser Exploration Potential

Brucejack Production Expansion

Page 19: Pretium rodman renshaw sept 12 2017 final

19

RESERVE EXPANSION

N

250 m

1Outline of Measured, Indicated, and Inferred Mineral Resource as at 21 July 2016.2Outline of Proven and Probable Mineral Reserve, based on 19 June 2014 Updated Feasibility Study.

SU-658

SU-661

SU-654

SU-668

2.05m @ 2,100 g/t Au(Includes 0.5m @ 8,600 g/t Au)

1.18m @ 10.75 g/t Au

9.0m @ 21.87 g/t Au(Includes 0.5m @ 203 g/t Au)

1.5m @ 16.9 g/t Au

0.5m @ 137 g/t Au

Mineral Resource1

Mineral Reserve2

Exploration PotentialDrill Intercepts

Page 20: Pretium rodman renshaw sept 12 2017 final

20

NN

5km

2016201520142011/13 Pre 2011

BOWSER EXPLORATIONSURFACE SAMPLING

Page 21: Pretium rodman renshaw sept 12 2017 final

21

PRODUCTION EXPANSION

Page 22: Pretium rodman renshaw sept 12 2017 final

22

Construction Commissioning Commercial Production Completion Date Processing Stope Ore Targeting Steady State

Production - End of Q4

RAMPING-UP PRODUCTION

Page 23: Pretium rodman renshaw sept 12 2017 final

23

QUESTIONS

Page 24: Pretium rodman renshaw sept 12 2017 final

24

SHAREHOLDING & ANALYST COVERAGE

(1) As of September 5, 2017; ownership calculated on an undiluted basis.(2) As of September 5, 2017. Source: IPREO & SEDI.

Top Shareholders(2) (% S/O)

Black Rock Asset Management 10.6SSR Mining 9.3Van Eck Associates 5.9Zijin Mining 5.0Liberty Mutual Group 4.1M&G Investment Management 3.1BMO Asset Management 3.0Sun Valley Gold 2.7Orion Mine Finance 2.6Anchor Bolt Capital 2.5Pretivm Management 1.9

Equity Structure(1)(shares in millions)

Issued & Outstanding 181.4Fully Diluted 188.1

Market Cap (Sept 5, 2017) US$1.57 B

Working Capital (at June 30, 2017) (US$12.9) M

Analyst CoverageBMO Andrew KaipCanaccord Genuity Eric ZaunscherbCIBC Jeff KilleenCiti Alexander HackingCormark Securities Richard GrayCredit Suisse Robert ReynoldsH.C. Wainwright Heiko F. IhleNumis Jonathan GuyPareto Securities Rhys BradleyRBC Dan RollinsRoth Capital Partners Joseph ReagorScotiabank Ovais Habib

Page 25: Pretium rodman renshaw sept 12 2017 final

25

Brucejack Mine