PRESUPUESTO OBRA: CONSTRUCCION DE 02 AULAS Item Descripción Und. Metrado Precio (S/.) Parcial (S/.) 01 OBRAS PRELIMINARES 693.49 01.01 LIMPIEZA DE TERRENO MANUAL m2 136.00 0.47 63.92 01.02 TRAZO Y REPLANTEO m2 136.00 0.71 96.56 01.03 MOVIMIENTO DE TIERRAS 533.01 01.03.01 EXCAVACION DE ZANJAS Y ZAPATA m3 31.39 7.42 232.91 01.03.02 RELLENO CON MATERIAL PROPIO m3 2.59 2.65 6.86 01.03.03 NIVELACION Y APISONADO PARA FALSO PISO m2 138.33 1.55 214.41 01.03.04 ELIMINACION DE MATERIAL EXCEDENTE m3 33.98 2.32 78.83 02 ESTRUCTURAS 42,829.06 02.01 OBRAS DE CONCRETO SIMPLE 2,918.33 02.01.01 SOLADO PARA ZAPATAS 2" 1:12 CEM/HORM m2 18.72 7.23 135.35 02.01.02 CIMIENTOS CORRIDOS 1:10 + 30% P.G. m3 14.66 100.21 1,469.08 02.01.03 CONCRETO EN SOBRECIMIENTO 1:8 + 25% P.M. m3 3.72 161.16 599.52 02.01.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 39.08 18.28 714.38 02.02 OBRAS DE CONCRETO ARMADO 39,910.73 02.02.01 ZAPATAS 3,169.22 02.02.01.01 ZAPATA CONCRETO f'c= 175 kg/cm2 m3 7.49 251.40 1,882.99 02.02.01.02 ACERO DE REFUERZO FY=4200 KG/CM2 kg 200.66 6.41 1,286.23 02.02.02 VIGAS DE CIMENTACOIN 4,360.16 02.02.02.01 VIGAS DE CIMENTACION DE f'c=175 kg/cm2 m3 4.89 277.63 1,357.61 02.02.02.02 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 39.08 23.55 920.33 02.02.02.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 324.84 6.41 2,082.22 02.02.03 COLUMNAS 7,941.88 02.02.03.01 COLUMNA CONCRETO f'c=210 kg/cm2 M3 5.53 299.32 1,655.24 02.02.03.02 COLUMNAS ENCOFRADO Y DESENCOFRADO m2 40.18 26.18 1,051.91 02.02.03.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 816.65 6.41 5,234.73 02.02.04 VIGAS 10,484.99 02.02.04.01 VIGAS CONCRETO f'c= 210 kg/cm2 m3 9.29 292.31 2,715.56 02.02.04.02 VIGAS ENCOFRADO Y DESENCOFRADO m2 72.18 26.75 1,930.82 02.02.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 910.86 6.41 5,838.61 02.02.05 LOSA ALIGERADA 10,430.19 02.02.05.01 CONCRETO EN LOSAS ALIGERADAS F'C=175 KG/CM2 m3 11.10 287.66 3,193.03 02.02.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS M2 125.56 17.20 2,159.63 02.02.05.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS KG 641.50 6.52 4,182.58 02.02.05.04 LADRILLO HUECO DE ARCILLA 12X30X30 CM PARA TECHO ALIGERADO UND 1,297.03 0.69 894.95 02.02.06 MUROS DE ALBAÑILERIA 3,524.29 02.02.06.01 MURO DE LADRILLO KING KONG DE CABEZA m2 50.10 48.92 2,450.89 02.02.06.02 MURO DE LADRILLO KING KONG DE SOGA m2 43.92 24.44 1,073.40 03 ARQUITECTURA 25,330.16 03.01 REVOQUES ENLUCIDOS Y MOLDURAS 3,600.33 03.01.01 TARRAJEO EN INTERIORES MEZCLA 1:5 m2 94.03 9.41 884.82 03.01.02 TARRAJEO EN EXTERIORES MEZCLA 1:3 m2 94.03 10.27 965.69 03.01.03 TARRAJEO DE COLUMNAS - SUPERFICIE m2 40.18 19.32 776.28 03.01.04 TARRAJEO DE VIGAS - SUPERFICIE m2 72.18 12.22 882.04 03.01.05 VESTIDURA DE DERRAMES EN VANOS m 26.60 3.44 91.50 03.02 CIELORRASOS 1,846.51 03.02.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA m2 126.56 14.59 1,846.51 03.03 PISOS Y PAVIMENTOS 9,229.76 03.03.01 FALSO PISO DE 4" DE CONCRETO 1:10 m2 106.40 16.47 1,752.41 03.03.02 PISO DE MADERA MACHIHEMBRADO 1"X4"X10' AGUANO m2 106.40 64.26 6,837.26 03.03.03 VEREDAS CONCRETO 140 KG/CM2 E=4" m2 25.74 23.79 612.35 03.03.04 ENCOFRADO Y DESENCOFRADO - VEREDAS m2 3.12 8.89 27.74 03.04 CONTRAZOCALOS 674.97 03.04.01 CONTRAZOCALO DE MADERA CEDRO DE 3/4" X 3" RODON 3/4" m 54.20 7.89 427.64 03.04.02 CONTRAZOCALO CEMENTO S/COLOREAR H = 40 CM m 47.20 5.24 247.33 03.05 CARPINTERIA DE MADERA 928.08 03.05.01 PUERTA DE MADERA AGUANO DE TABLERO REBAJADO 2.10m x 1.10m. und 2.00 464.04 928.08 03.06 CARPINTERIA METALICA 4,976.00 03.06.01 VENTANAS METALICAS DE TUVO CUADRADO DE 2"x1/2" m2 44.09 112.86 4,976.00 03.07 CERRAJERIA 212.88 03.07.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 8.00 8.49 67.92 03.07.02 CERRADURA PUERTA EXTERIOR 3 GOLPES und 2.00 72.48 144.96 03.08 PINTURA 1,987.16 03.08.01 PINTURA EN CIELO RASO AL TEMPLE m2 103.34 7.02 725.45 03.08.02 PINTURA EN MUROS INT.Y EXT. ./LATEX m2 318.89 3.67 1,170.33 03.08.03 PINTURA ANTICOOROSIVA Y ESMALTE 2 MANOS PUERTAS VENTANAS Y REJAS m2 15.41 5.93 91.38 03.09 VIDRIOS Y CRISTALES 1,874.47 03.09.01 VIDRIO CRUDO NACIONAL 6MM p2 474.55 3.95 1,874.47 04 INSTALACIONES ELECTRICAS 1,209.73 04.01 SALIDA PARA CENTRO DE LUZ pto 12.00 29.56 354.72 04.02 SALIDA PARA TOMACORRIENTE SIMPLE pto 6.00 33.71 202.26

description

presupuesto

Transcript of presupeusto aulas combuco

PRESUPRESUPUESTOOBRA:CONSTRUCCION DE 02 AULAS1ItemDescripcinUnd.MetradoPrecio (S/.)Parcial (S/.)P. TOTAL101OBRAS PRELIMINARES693.49693.49101.01LIMPIEZA DE TERRENO MANUALm2136.000.4763.9201.02TRAZO Y REPLANTEOm2136.000.7196.5601.03MOVIMIENTO DE TIERRAS533.0101.03.01EXCAVACION DE ZANJAS Y ZAPATAm331.397.42232.9101.03.02RELLENO CON MATERIAL PROPIOm32.592.656.8601.03.03NIVELACION Y APISONADO PARA FALSO PISOm2138.331.55214.4101.03.04ELIMINACION DE MATERIAL EXCEDENTEm333.982.3278.8302ESTRUCTURAS42,829.0642,829.06102.01OBRAS DE CONCRETO SIMPLE2,918.3302.01.01SOLADO PARA ZAPATAS 2" 1:12 CEM/HORMm218.727.23135.3502.01.02CIMIENTOS CORRIDOS 1:10 + 30% P.G.m314.66100.211,469.0802.01.03CONCRETO EN SOBRECIMIENTO 1:8 + 25% P.M.m33.72161.16599.5202.01.04ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOm239.0818.28714.3802.02OBRAS DE CONCRETO ARMADO39,910.7302.02.01ZAPATAS3,169.2202.02.01.01ZAPATA CONCRETO f'c= 175 kg/cm2m37.49251.401,882.9902.02.01.02ACERO DE REFUERZO FY=4200 KG/CM2kg200.666.411,286.2302.02.02VIGAS DE CIMENTACOIN4,360.1602.02.02.01VIGAS DE CIMENTACION DE f'c=175 kg/cm2m34.89277.631,357.6102.02.02.02ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACIONm239.0823.55920.3302.02.02.03ACERO DE REFUERZO FY=4200 KG/CM2kg324.846.412,082.2202.02.03COLUMNAS7,941.8802.02.03.01COLUMNA CONCRETO f'c=210 kg/cm2M35.53299.321,655.2402.02.03.02COLUMNAS ENCOFRADO Y DESENCOFRADOm240.1826.181,051.9102.02.03.03ACERO DE REFUERZO FY=4200 KG/CM2kg816.656.415,234.7302.02.04VIGAS10,484.9902.02.04.01VIGAS CONCRETO f'c= 210 kg/cm2m39.29292.312,715.5602.02.04.02VIGAS ENCOFRADO Y DESENCOFRADOm272.1826.751,930.8202.02.04.03ACERO DE REFUERZO FY=4200 KG/CM2kg910.866.415,838.6102.02.05LOSA ALIGERADA10,430.1902.02.05.01CONCRETO EN LOSAS ALIGERADAS F'C=175 KG/CM2m311.10287.663,193.0302.02.05.02ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADASM2125.5617.202,159.6302.02.05.03ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADASKG641.506.524,182.5802.02.05.04LADRILLO HUECO DE ARCILLA 12X30X30 CM PARA TECHO ALIGERADOUND1,297.030.69894.9502.02.06MUROS DE ALBAILERIA3,524.2902.02.06.01MURO DE LADRILLO KING KONG DE CABEZAm250.1048.922,450.8902.02.06.02MURO DE LADRILLO KING KONG DE SOGAm243.9224.441,073.4003ARQUITECTURA25,330.1625,330.16103.01REVOQUES ENLUCIDOS Y MOLDURAS3,600.3303.01.01TARRAJEO EN INTERIORES MEZCLA 1:5m294.039.41884.8203.01.02TARRAJEO EN EXTERIORES MEZCLA 1:3m294.0310.27965.6903.01.03TARRAJEO DE COLUMNAS - SUPERFICIEm240.1819.32776.2803.01.04TARRAJEO DE VIGAS - SUPERFICIEm272.1812.22882.0403.01.05VESTIDURA DE DERRAMES EN VANOSm26.603.4491.5003.02CIELORRASOS1,846.5103.02.01CIELORRASOS CON MEZCLA DE CEMENTO-ARENAm2126.5614.591,846.5103.03PISOS Y PAVIMENTOS9,229.7603.03.01FALSO PISO DE 4" DE CONCRETO 1:10m2106.4016.471,752.4103.03.02PISO DE MADERA MACHIHEMBRADO 1"X4"X10' AGUANOm2106.4064.266,837.2603.03.03VEREDAS CONCRETO 140 KG/CM2 E=4"m225.7423.79612.3503.03.04ENCOFRADO Y DESENCOFRADO - VEREDASm23.128.8927.7403.04CONTRAZOCALOS674.9703.04.01CONTRAZOCALO DE MADERA CEDRO DE 3/4" X 3" RODON 3/4"m54.207.89427.6403.04.02CONTRAZOCALO CEMENTO S/COLOREAR H = 40 CMm47.205.24247.3303.05CARPINTERIA DE MADERA928.0803.05.01PUERTA DE MADERA AGUANO DE TABLERO REBAJADO 2.10m x 1.10m.und2.00464.04928.0803.06CARPINTERIA METALICA4,976.0003.06.01VENTANAS METALICAS DE TUVO CUADRADO DE 2"x1/2"m244.09112.864,976.0003.07CERRAJERIA212.8803.07.01BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"pza8.008.4967.9203.07.02CERRADURA PUERTA EXTERIOR 3 GOLPESund2.0072.48144.9603.08PINTURA1,987.1603.08.01PINTURA EN CIELO RASO AL TEMPLEm2103.347.02725.4503.08.02PINTURA EN MUROS INT.Y EXT. ./LATEXm2318.893.671,170.3303.08.03PINTURA ANTICOOROSIVA Y ESMALTE 2 MANOS PUERTAS VENTANAS Y REJASm215.415.9391.3803.09VIDRIOS Y CRISTALES1,874.4703.09.01VIDRIO CRUDO NACIONAL 6MMp2474.553.951,874.4704INSTALACIONES ELECTRICAS1,209.731,209.73104.01SALIDA PARA CENTRO DE LUZpto12.0029.56354.7204.02SALIDA PARA TOMACORRIENTE SIMPLEpto6.0033.71202.2604.03INTERRUPTOR BIPOLAR SIMPLE DE BAKELITAund4.0034.21136.8404.04INTERRUPTOR BIPOLAR DOBLE DE BAKELITAund2.0033.7167.4204.05FLUORESCENTE RECTANGULAR DE 40 W x 2 (COMPLETO)und8.0033.93271.4404.06FLUORESCENTE CIRCULAR DE 1 X 32 W (COMPLETO)und4.0030.93123.7204.07TABLERO DE DISTRIBUCIONund1.0053.3353.3305VARIOS5,606.795,606.79105.01LIMPIEZA FINAL DE OBRAm2136.003.09420.2405.02FLETE TERRESTREGLB1.002,500.002,500.0005.03FLETE RURALGLB1.001,800.001,800.0005.04PLACA RECORDATORIA DE ACRILICOGLB1.00250.00250.0005.06ROTURA DE TESTIGOS DE CONCRETOGLB4.0020.0080.0005.07TRATAMIENTO DE JUNTASm16.253.4856.5505.08PIZARRA ACRILICA INC. TICEROund2.00250.00500.00COSTO DIRECTOS/.75,669.231COSTO DIRECTO75,669.231GASTOS GENERALES13.25%10,026.171EXPEDIENTE TECNICO3.70%2,800.001GASTOS DE SUPERVISION (3%)3.00%2,270.001COSTO TOTAL90,765.401
MAT.RELACION DE INSUMOSOBRA:CONSTRUCCION DE 02 AULASAPORTE DE LA MUNICPALIDAD DE QUILCAPUNCUITEMDESCRIPCIONUND.CANTIDADP. UNITARIOP. PARCIALMANO DE OBRA13,080.190147000022OPERADOR DE EQUIPO LIVIANOhh17.763.6364.470147010002OPERARIOhh1525.503.635,537.550147010003OFICIALhh997.512.882,872.830147010004PEONhh2046.822.254,605.34MATERIALES55,996.940202000007ALAMBRE NEGRO RECOCIDO # 16kg65.657.20472.650202000008ALAMBRE NEGRO RECOCIDO # 8kg22.207.20159.820202010005CLAVOS PARA MADERA C/C 3"kg31.556.50205.060202010017CLAVOS PARA MADERA C/C PROMEDIOkg2.156.5013.950202020009CLAVOS PARA CEMENTO C/C 1"und2.716.5017.620202030100FIERRO LISO 1/2"m88.185.33470.000202040010ALAMBRE NEGRO N8kg18.477.20132.970202970002ACERO DE REFUERZO FY=4200 GRADO 60kg3097.135.4016,724.480204000000ARENA FINAm37.8815.00118.160205000003PIEDRA CHANCADA DE 1/2"m313.7115.00205.600205000009PIEDRA GRANDE DE 8"m37.1820.00143.670205000010PIEDRA MEDIANA DE 4"m31.5620.0031.170205010004ARENA GRUESAm313.5915.00203.910207200002CABLE AWG-TW #14m240.001.00240.000211000007ROTURA DE BRIQUETAS Y/O TESTIGOS DE CONCRETOGLB4.0020.0080.000212000049TABLERO ELECTRICO METALund1.0030.0030.000212090004CAJA GALV. RECTANGULAR LIVIANA DE 4"X2"und12.001.0012.000212090049CAJA GALV. OCTOGONAL LIVIANO DE 4"und12.001.0012.000212310080INTERRUPTOR BAKELITA BIPOLAR SIMPLEpza4.003.0012.000212310081INTERRUPTOR BAKELITA BIPOLAR DOBLEpza2.003.006.000212320031TOMACORRIENTE DE BAKELITA SIMPLEund6.003.0018.000212400083INTERRUPTOR TERMOMAGNETICO 2 X 40 AMP.pza2.008.0016.000212510001ARTEFACTO FLUORESCENTE DE 2X40 W C/REACTORund8.0028.00224.000212510010ARTEFACTO FLUORESCENTE CIRCULAR DE 32 Wund4.0025.00100.000213000006ASFALTO RC-250gln2.1620.0043.230217000025LADRILLO KING KONG HECHO A MANO 9x14x24 CMund5491.760.301,647.530217010000LADRILLO P/TECHO DE 12x30x30 CM 4 HCOS.und1361.880.55749.030221000000CEMENTO PORTLAND TIPO I (42.5KG)BOL566.1325.0014,153.180226070057CERRADURA EXTERIOR DE TRES GOLPESund2.0065.00130.000226080066BISAGRA CAPUCHINA PLOMA 3 1/2" X 3 1/2"PAR8.006.0048.000229030002YESO EN BOLSAS DE 25 KG.BOL6.805.0034.000229040003CINTA AISLANTEund4.803.0014.400229310010PIZARRA ACRILICA 4.80 X 1.20 M.und2.00250.00500.000230470003SOLDADURA CELLOCORD P 3/16"kg4.418.0035.270230910025SILICONAund10.448.0083.520238000000HORMIGONm348.9715.00734.580238000004HORMIGON (PUESTO EN OBRA)m313.3015.00199.500239020023LIJA DE AGUA PARA METAL # 100pza26.742.0053.490239050000AGUAm35.340.010.050243010003MADERA TORNILLOp2495.684.202,081.840243030052RODON 3/4" X 1/4"m54.741.0054.740243110022MADERA AGUANO 2" X 3" X 10'p280.864.20339.630243110026MADERA AGUANO CEPILLADO PARA CONTRAZOCALOSp254.745.50301.080243160052REGLA DE MADERAp299.735.50548.530243810001PUERTA P-1und2.00420.00840.000244000020MADERA CORRIENTEp27.182.2015.790244040015MADERA MACHIHEMBRADA 1"X4"X10'pqt41.50125.005,187.000245010001MADERA TORNILLO INC.CORTE P/ENCOFRADOp2860.402.201,892.880251070005TUBO CUADRADO DE ACERO 2" x 1/2"m85.5810.33884.090251070006TUBO CUADRADO DE ACERO 2" x 2"m112.4315.001,686.440251130054PLATINA 1/2" X 1/8"m264.542.50661.350252040051CLAVOS DE 3"und6.266.5040.690253030027THINERgln1.5415.0023.120254010015IMPRIMANTEgln19.8132.00633.980254030000PINTURA LATEXgln19.1332.00612.270254030027PINTURA LATEX SUPERMATEgln4.1335.00144.680254060000PINTURA ANTICORROSIVAgln0.7735.0026.970254110090PINTURA ESMALTEgln0.7735.0026.970275010003TUBO PVC SEL (E/C) 3/4" X 3.00 M.pza48.003.00144.000275130005CURVAS PVC SEL 3/4"pza52.000.5026.000279010095VIDRIO INCOLORO SEMIDOBLEp2517.262.901,500.050279560003PLACA RECORDATORIA DE ACRILICOund1.00250.00250.00EQUIPOS6,592.100337540016WINCHAund0.687.004.760348010011MEZCLADORA DE CONCRETO DE 9 -11P3hm27.5720.00551.320348070000SOLDADORA ELECT. MONOF. ALTERNA 225 AMP.hm27.5615.00413.340348090002ANDAMIO METAL TABLAS-ALQUILERest62.3910.00623.900348960005CIZALLA P/CORTE DE FIERROhm14.695.0073.450349010031COMPRESORAhm1.086.006.470349180024WINCHE DE DOS BALDES (350KG)M.E. 3.6HPhm5.9225.00147.990349520099VIBRADORhm18.575.0092.860232000033FLETEGLB1.002,500.002,500.000232000057FLETE RURALGLB1.001,800.001,800.00HERRAMIENTAS MANUALESGLB1.00378.00378.00COSTO DIRECTO75,669.23
GGDETERMINACION DE GASTOS GENERALESOBRACONSTRUCCION DE 02 AULASDPTO.: PUNOFECHAJul-08PROV.:SANN ANTONIO DE PUTINADIST.:QUILCAPUNCUTOTAL COSTO DIRECTOS/.75,669.23TIEMPO DE EJECUCION(MESES)2.500.00%1. GASTOS GENERALES FIJOS1.2 Utiles de Oficina, Mobiliario, Amortizacin de Equipos de OficinaConceptoMesCosto Mens.Total1 Utiles de Oficina2.0015.0030.00Copias y documentos2.0010.0020.00TOTAL 1.450.001.3 Gastos VariosConceptoMesCosto Mens.TotalEXPEDIENTE TECNICO1.002,300.002,300.00PERFIL DE SNIP1.00500.00500.00TOTAL 1.52,800.00TOTAL GASTOS GENERALES FIJOS (1.1 + 1.2 + 1.3 + 1.4 )2,850.00GASTOS AL PROYECTO100.00%2,850.001.5 Movilidad, Alojamiento y Viticos del Personal DirectivoConceptoNro. Viajes/mesNro. ViajesCosto daTotal2 Viajes a la Obra x 2 das x mes2.002.0020.0040.00ConceptoNro. Viajes/mesMesesCosto MesTotal1 Camioneta 4x41.002.0015.0030.00GasolinaConceptoUndTotalMantenimiento (x mes)Glb25.00Repuestos (x mes)Glb15.00TOTAL 1.6110.00TOTAL GASTOS FINANCIEROS (1.5)110.00TOTAL DE GASTOS GENERALES FIJOS2,960.002. GASTOS GENERALES VARIABLES2.1 COSTO DE DIRECCION TECNICA DE OBRA2.1.1 Sueldos del Personal Tcnico y AdministrativoCargoMesCoef. Part.Haber BsicoTotal1Ingeniero Residente2.500.503,000.003,750.00Auxiliar de Abastecimientos2.500.00900.000.001Meaestro de obra2.501.001,300.003,250.001Chofer2.000.00700.000.001Capacitador social - pre inversin1.001.00780.00780.001Capacitador social1.001.001,260.001,260.00Sub-total9,040.00TOTAL 2.1.19,040.00TOTAL PERSONAL DIRECTIVO Y ADMINISTRATIVO9,040.002.1.3 Gastos de OficinaConceptoMesCosto Mens.Total1 Utiles de Oficina2.5040.00100.00TOTAL 2.1.3100.002.1.4 VestuarioConceptoUnd.Costo Mens.Total1VestuarioGlb.TOTAL 2.2.20.002.1.6 Seguridad PersonalConceptomesCostoTotalBotiquin (primeros auxilios)215.0030.00TOTAL 2.1.530.001.3 Gastos VariosConceptoundCostoTotal1 medidas de mitigacinglb0.000.00TOTAL 1.50.002.1.7 combustibleCargoMesCost. Mens.Total1combustible2.0040.0080.00TOTAL 2.1.680.002.2 COSTO DE LIQUIDACION DE OBRA2.2.1 Sueldos del Personal EncargadoCargoH-MesHaber BsicoTotal1Ingeniero Responsable en Liquidacin0.301,500.00450.001Contador0.201,500.00300.00.Sub-total750.00TOTAL 2.2.1750.002.2.2 Utiles de Oficina, Mobiliario, Amortizacin de Equipos de OficinaConceptoMesCosto Mens.Total1Utiles de Oficina1.000.001Copias y documentos1.0026.1726.17TOTAL 2.2.226.17TOTAL DE GASTOS DIRECTOS VARIABLES (2.1.1+2.1.2+2.1.3+2.1.4+2.1.5+2.1.6+2.1.7+2.2.1+2.2.2+2.2.3+2.2.4)10,026.171. COSTO DE SUPERVISION DE OBRA1.1 Sueldos del PersonalCargoCoef.Part.MesHaber BsicoTotal1 Ingeniero Supervisor0.252.503,500.002,187.502,187.50Sub-total2,187.50TOTAL 1.12,187.501.2 Utiles de Oficina, Mobiliario, Amortizacin de Equipos de OficinaConceptomesCosto Mens.Total1Utiles de Oficina2.0025.0050.00TOTAL 1.250.001.3 AlimentacinConceptoMesCosto Mens.Total1 alimentacion en obra2.5013.0032.50TOTAL 1.532.501.4 Equipamineto de bienes duraderosConceptoNro. ViajesTot.Viaj.Costo mesTotalequipos varios2.000.000.000.001.5 RepuestosConceptoUndCostoCosto Totalrepuesto2.000.000.00TOTAL 1.40.001.5 Equipamiento de Bienes DuraderosConceptoTotalEQUIPOS DE OFICINA1Computadoras Pentium IV0.001Impresora HP 1300 Laserjet0.00TOTAL 2.1.40.00TOTAL COSTO SUPERVISION2,270.00RESUMENTOTAL GASTOS GENERALES FIJOS2,960.003.92%TOTAL GASTOS GENERALES VARIABLES10,026.1713.25%TOTAL GASTOS GENERALES12,986.1717.16%TOTAL COSTO DE SUPERVISION2,270.003.00%- 0TOTAL15,256.1720.16%
ANALITICOPRESUPUESTO ANALITICOOBRACONSTRUCCION DE 02 AULASFECHA:Jul-08Cd.Especficas de GastoCosto DirectoCosto IndirectoParcialGastos GeneralesSupervisin10Retribuciones y Complementos - Contratos a plazo fijo13,080.19- 0- 013,080.1911Obligaciones del Empleador- 0- 0- 013Gastos variables y ocasionales- 0- 0- 020Viticos y asignaciones- 0160.00- 0160.0022Vestuario- 0- 0- 023Combustibles y Lubricantes80.0080.0024Alimentos para personas32.5032.5026Materiales explosivos y municiones- 0- 027Servicios no personales9,040.002,187.5011,227.5029Materiales de construccin55,996.94- 055,996.9430Bienes de consumo- 032Pasajes y gastos de transporte4,300.00- 04,300.0039Otros servicios de terceros3,550.003,550.0045Medicamentos30.00- 030.0049Materiales de Escritorio126.1750.00176.1751Equipamiento y bienes duraderos378.00- 0378.0052Alquiler de Bienes Muebles1,914.101,914.10TOTAL75,669.2312,986.172,270.0090,925.40
FLETECALCULO DEL FLETE1.- NOMBRE DEL PROYECTOCONSTRUCCION DE 02 AULAS2.- NUMERO DEL EXPEDIENTEMUNICIPALIDAD DISTRITAL DE QUILCAPUNCU1- DATOS GENERALESA-POR PESOMATERIALESUNIDADAFECTO IGVPESO.UNIT.PESO.TOTALCEMENTOBL.566.0042.5024,055.00FIERRO, CLAV. ETCKG3,500.001.003,500.00MADERAP22,410.001.503,615.00CALAMINAUN0.003.000.00YESOBL10.0025.00250.00LADRILLO KKUN6,000.000.503,000.00LaADRILLO HUECOUND1,200.002.002,400.00OTROSKG2,300.001.002,300.000.000.000.000.00PESO TOTAL39,120.00B-POR VOLUMENEN AGREGADOS Y MADERADESCRIPC.UNIDADAFECTOS IGVSIN IGVARENAM39.00PIEDRAM320.00HORMIGNM355.007.0VOLUMEN TOTAL0.0084.000.0CAPACIDAD DEL CAMION (M3)12.00NUMERO DE VIAJES0.007.00REDONDEO0.007.00EN TUBERIACAPACIDAD DEL CAMION EN TUBOS / VIAJEMLNo de tubosNo VIAJESVolumen / tuboPeso/tuboPeso en KgTUBO PVC iso 4435 6"350.00ml0.000.000.000.144500.0015.530.00TUBO PVC iso 4435 8"250.00ml0.000.000.000.242000.0026.170.000.00Cachimba 6"850.00und0.000.000.000.004400.0050.000.000.00.093800.00100.000.000.00NUMERO TOTAL DE VIAJES0.000.00.00REDONDEO0.00TUBERIA EN VOLUMEN02- FLETE TERRESTREUNIDAD DE TRANSPORTEUNIDAD QUE DA COMPROBANTEUNIDAD QUE NO DA COMPROBANTECAPACIDAD DEL CAMION ( M3 )12.00CAPACIDAD DEL CAMION ( M3 )12.000.00COSTO POR VIAJE S/.1,600.00COSTO POR VIAJE S/.200.000.00CAPACIDAD DEL CAMION (KG)25,000.00CAPACIDAD DEL CAMION (KG)20,000.00FLETE POR KG0.060.01AFECTO IGVSIN IGVFLETE POR PESO =Peso Total * Flete por pesoFLETE POR PESO2,503.68391.20FLETE POR VOLUMEN=No viajes*costo por viajeFLETE POR VOLUMENAGREGADOS0.001,400.00TUBERIA0.000.00COSTO TOTAL FLETE TERR.2,503.681,791.20RESUMEN FLETE TOTALAFECTO IGVSIN IGVFLETE TERRESTRE2,503.681,791.20FLETE FLUVIALFLETE EN ACEMILAFLETES TOTALES S/.2,503.681,791.20