    TERMS OF REFERENCEFORCONSULT NCY SERVICES

    NAME OF WORK:- EXPRESSION OF INTEREST FOR CONSULTANCY SERVICES

    FOR:-

    Preparationof Master Plans, Integrated Town Ship Plans, and LayoutPlans of Allied Servicesfor New Residential Campus/NeighborhoodCentre/Para Military Campusat Pachin Area in between Naharlagunand Itanagar.

    COST OF PAPER :- 500/-DATE OF COMMENCEMENT : - 26TH AUGUST 2013

    LAST DATE OF SUBMISSION :-.2ND SEPT.2013

    DATE OF OPENING :-4TH SEPT. 2013 AT 3.00 PM

    Department of Urban Development & Housing Government of

    Arunachal Pradesh, Itanagar

  • 8/13/2019 Press Release (Master_Plan 21.10.13)

    5/20

    GOVT. OF ARUNACHAL PRADESH

    DEPARTMENT OF URBAN DEVELOPMENT & HOUSING

    ITANAGAR

    FINANCIAL BIDDING SHEET

    Sl.No

    NAME OF WORK RATE INFIGURE

    (RS. IN

    LAKHS)

    RATE INWORDS

    REMARKS

    "Expression of interest (EOI) is invitedfrom reputed Town Planners/ TownPlanning Firms Preparation of MasterPlans, Integrated Town Ship Plans, andLayout Plans of Allied Services for New

    Residential Campus/NeighborhoodCentre/Para Military Campus at PachinArea in between Naharlagun and Itanagar

  • 8/13/2019 Press Release (Master_Plan 21.10.13)

    6/20

    TERMS OF REFERENCE

    FOR

    CONSULLTANCY SERVICES

    MASTER PLAN FOR PACHIN :-

    1. INTRODUCTION

    The Department of Urban Development & Housing is programming a mission to extension of Capital

    Complex at Pachin area in between Naharlagun and Itanagar to accommodate the increasing urban

    population of Itanagar Capital Complex in planned manner with provision of physical, Social and Economic

    infrastructure including housing etc. This will help the citizens to access better accommodation with basic

    infrastructure facilities.

    2. ISSUESThe State Capital extended from Banderdwa to Hollongi with an area of 156 sqkm has an population of

    2.00 lakhs. The capital complex population are increasing rapidly due to various factors. In the recent past

    many educational institutions has developed right from nursery school to Central University including

    technical and non technical colleges, Poly technique, Management institutes, Vocational institute, Coaching

    institute etc. Apart from that Itanagar being the capital city of the State all the important works are done.

    Today the capital city has become administrative, educational, business and tourism centers which attract

    large numbers of population from various district headquarters and within the country. The existing

    physical, Social and Economic infrastructure including housing could not cater the present demands of the

    increasing population. To provides requirement of various infrastructure in systematic and plan manner theGovernment of Arunachal Pradesh has intended to develop a planned neighborhood center at PACHIN

    AREAsituated in between Naharlagun and Itanagar.

    3. Impact and Outcome of consultancy

    The impact of the consultancy will be help the State Government to established a well

    planned neighborhood centre with all requisites infrastructure facilities to cater the growing

    population of Itanagar, Capital Complex.

    4. Methodology and Key Activities

    The consultants has to prepare the Master Plan as per the norms of Institute of Town Planners India and as

    per theguidelines of Urban Development Plans Formulation and Implementation Guidelines (UDPFI). Also

    the consultancy will support for the development of PACHIN area as one of the planned neighborhood

    townofCapital Complex.

    6

  • 8/13/2019 Press Release (Master_Plan 21.10.13)

    7/20

    5.SCOPE OF WORK.

    The Master Plan shall be in the form of a report supported by illustrations and maps drawn to the scale

    ranging from 1:1000 -1:-1500 and shall incorporate existing characteristics and potentials, projected

    requirements and assessment of deficiencies, development aims, objective, policy, strategies, general

    programmes and priorities pertaining to the following as may be relevant.

    1. Physical characteristics and natural resources,

    2. Demography

    3. Economic base and employment generation covering formal sector, informal sector and special sectors

    like tourism and pilgrimage.

    4. Infrastructure development covering utilities like water supply, electricity, sewerage, drainage, refuse

    collection and disposal, facilities pertaining to education, health, recreation, service like communication(e.g.

    postal and telephone) ,protection (e.g. police, fire) &others.

    5. Housing andshelter development.6. Transportation. including road,parking.

    7. Environment protection

    8. Spatial development covering proposed generalized land use indicating direction, growth of settlement

    and its components like residential (formal/informal), commercial, industrial areas, open spaces, network of

    roads, major activity node, conservation of environmentally sensitive areas,historic sites and monuments

    and tourism, phasing of spatial development.

    9. Implementation and monitoring, priorities and monitoring mechanism and

    10. Capacity building for fiscal, manpower and land resources mobilization.

    Development proposals (formal and informal sector)

    1. Concept of hierarchy of planning units and spatial development of various activity nodes and

    corridors.

    2. Residential (formal and informal )

    3. Commercial activity nodes,

    4. Industrial activity nodes,

    5. Openspace system,

    6. Higher order facilities and centers,

    7. Public and semi -public offices,

    8. Transportation network and its interface with land use and activity nodes,

    9. Conservation, renewal and redevelopment areas,

  • 8/13/2019 Press Release (Master_Plan 21.10.13)

    8/20

    10. Proposed land use and

    11. Infrastructure development.

    12. Electrical,sewarege,drainagae,road ,street etc network and layout plan.

    6.Support and Development of Pachin Areas

    The consultant will also support the Neighborhood centres at Pachin during development and

    implementation of various infrastructure.

    7.Conduct of Training and Workshops

    A series of consultations will be required with relevant stakeholders in the course of preparation of Master

    Plan of Pachin area for development of neighbourhood center. In addition, training and workshops shall be

    provided by consultants during implementation period for lying out various infrastructures in the Pachin

    neighborhood centers.

    8.Implementation Arrangements

    The Urban Development and Housing Department, Government of Arunachal Pradesh will be theimplementing agency

    The State Government will provide (i) all relevant documents, data, statistics, information, that are are

    available.

    The time allowed for the completion of consultancy services is 2(two) months, fromthe date of agreement.

    9.ELIGIBLITY CRITERIA:- The detailed terms & conditions are:-

    Interested Applicant should ensure that they meet the following eligibility criteria before deciding to submit

    their EOI. Only those applicants who have submitted relevant documentary proof regarding their fulfillment

    of primary eligibility criteria mentioned in EOI shall be evaluated for short listing.

    1 The applications are invited in single envelopes and shall contain bid security and other information

    regarding eligibility criteria.

    2.The bid security should be in the form of a bank guarantee or demand draft, drawn on any scheduled

    bank in favour of Chief Enginner-cum-Director, Department of Urban Development and Housing,

    Government of Arunachal Pradesh, Itanagar.

    3.The committee shall opened as per the scheduled time.

    4.Tenders without bid security (BG/DD) and telegraphic, incomplete bidswouldnot be entertained.

    5. If the date of receipt / opening of bids are declared as Public Holiday, then the bids would be received /

    opened on next working day at same time.

    6. The CE-cum- Director, UD and Housing, Govt. of AP, Itanagar reserves the right to reject any or all the

    bids without assigning any reason.

  • 8/13/2019 Press Release (Master_Plan 21.10.13)

    9/20

    7.The Submission must be addressed to: The Chief Engineer-cum-Director, Department of Urban

    development and Housing, Government of Arunachal Pradesh, Itanagar.

    8. Interested bidders can submit the queries related to the EOI document at the above mentioned above

    address.

    19.LAST DATE FOR SUBMISSION OF BIDS: - 2nd Sept.2013

    10.Applicants may be a single entity or aconsortium of entities. If they prefer to do so, the consultants may

    associate with each other to form a consortium of a maximum of 3 consultants/firms, to complement their

    respective areas of expertise. Such an association should be of long term nature and should not be for this

    specific assignment.

    11.The application has to be submitted by the Lead member with the duly signed and stamped consent

    letter from each of the consortium members attached to the application..

    In case of a consortium, the applicant also has to submit a letter given at Annexure 2 (Copy of the

    agreement/MOU/Partnership deed already executed between the parties is to be submitted along with theEOI), and give details in Annexure 3.

    12.Applicant or the lead organization in case of a consortium must be registered in India as required by law

    with a minimum five years of continuous operation up to the date of

    publication of this EOI. (Give details in Annexure 3).

    13. Applicant should submit the details of management structure as sought in Annexure

    14. Applicant or one of the members of the consortium, if consortium is the applicant, must have provided

    Similar Services*, during the last seven years, at least for the followingprojects:

    i) 5 nos of Master Plan prepared for towns and city.

    ii) 5 nos of Development Plan prepared for towns and city

    16. Applicant or the lead member of the Consortium shall have an average annual turnover of more than

    Rs. 2 Crore (Rs. Two Crore) during the last three years ending 31.3.2013, with a net profit in each year

    during this period. Turnover means consultancy fee receivedduring the year (refer Annexure 6 format).

    17. Applicant shall be ineligible to submit a proposal, if it or any of its constituents has been barred or

    blacklisted by any Autonomous Body/Central and/or State Government in India or by any agencies abroad.

    Applicants are required to submit an undertaking to this affect (refer Annexure7 for format).

    18. Applicant or any of the members of the consortium, if a consortium is the applicant,

    should not have, during the last three years, either failed to perform on any agreement, or

    been expelled from any project or agreement or have any agreement terminated for breach

    by the Applicant. Applicants are required to submit an undertaking (Affidavit) to this

  • 8/13/2019 Press Release (Master_Plan 21.10.13)

    10/20

    affect (refer Annexure 7 for format).

    19. Applicant or one of the members of the consortium, if consortium is the applicant,

    should be registered with the Institute of Town Planner India & Indian Council of Architecture.

    20. An applicant should submit references and certificates from the concerned institutions/authorities in

    fulfillment of the eligibility criteria.

    21. An applicant is required to file the affidavit in respect of clauses 17and18on a

    non-judicial stamp paper of Rs 10/- so as to authenticate the facts as stipulated in these

    two clauses. A format of the proposed affidavit is given in Annexure 7

    10.REPORTINGThe Consultant shall submit to the client the following report and document after completion of each stageof work and in the number of copies indicated against each

    11.PAYMENT SCHEDULE22. The Consultant shall be paid consultancy fee on-stage payment basis for each stage in progress.

    The assignment is divided into4 stages as, given in manning schedule .No payment shall become eligible

    for the next stage till the consultant completes to the satisfaction of the client the work pertaining to the

    preceding stage.

    S.No Description of activity Payment

    1. Stage 1:. 15%

    2 Stage2 : 35%

    3 Stage 3 : 20%

    4 Stage-4 30%

    Note:-1. Payment shall be madeonadministrative and financial approval of the State Govt.

    S.No.

    Activity No. ofcopies

    Time w.e.f date ofcommencement of

    consultancy services

    (in days)

    Time period forAcceptance

    (in days)

    1. Stage I: An inception report after themobilization of the team leader, finalizing theapproach including a detailed work plan, and theimplementation schedule for the consultancy;

    2 10 days 05 days

    2 Stage-II:A interim report within20 days; 2 20 days 05 days

    4 Stage-III:- draft final report within 30 days 10 30days 05 days

    6 Stage-IV:- A final report within40 days after thereceipt of comments on the draft final report fromthe government, satisfying all requirements ofthe consultancy..

    10 45days 10days

  • 8/13/2019 Press Release (Master_Plan 21.10.13)

    11/20

    Annexure 1Format of Letter of Expression of Interest

    (On Companys/Firms/Lead Members (in case of Consortium) letter head)To,

    The CE-cum- Director,Deptt. of UD and HousingGovt. of Arunachal Pradesh

    ItanagarReference: Date

    SUBMISSION OF EXPRESSION OF INTEREST

    Preparation of Master Plans, Integrated Town Ship Plans, and Layout Plans of Allied Services for NewResidential Campus/Neighborhood Centre/Para Military Campus at Pachin Area in between Naharlagunand Itanagar.Dear Sir,

    We hereby submit our Expression of Interest for MP services for the afore-mentioned project. Insupport we submit all the necessary information and relevant documents (one original and one copy) foryour consideration for our shortlisting as MP Consultant forPreparation of Master Plans, Integrated Town

    Ship Plans, and Layout Plans of Allied Services for New Residential Campus/Neighborhood Centre/ParaMilitary Campus at Pachin Area in between Naharlagun and Itanagar.The submission is made by us, on behalf of .................................. in the capacity of

    duly authorized to submit the Expression of Interest.(In case of a consortium,following paragraph should be added)This submission is made on behalf of the proposed consortium comprising of.,., and (applicant to state the name of each member) ofwhich. (applicant to insert name of lead member of joint member of consortium ) has agreedto act as lead member.

    Wehereby submit our willingness to get pre-qualified forour participation in the process forselecting the consultant forPreparation of Master Plans, Integrated Town Ship Plans, and Layout Plans ofAllied Services for New Residential Campus/Neighborhood Centre/Para Military Campus at Pachin Area inbetween Naharlagun and Itanagar.We understand that UD&Hreserves the right to reject the submission, without assigning any reason.

    Yours faithfully,

    Signature of Applicant:Name of Signatory:

    Designation:Nameand address offirm: Contact number:

    Fax: Email:(Should be signed by authorized representative of Applicant or the lead member in case Applicant isconsortium)Enclosures:1 Copy of Board Resolution/Power of Attorney or Authority letter authorizing the representative to sign onbehalf of the Company/ Firm or the Consortium as the case may be.2 Confirmation by the Consortium members authorizing the Lead Member to sign on behalfof the Consortium

  • 8/13/2019 Press Release (Master_Plan 21.10.13)

    12/20

    Annexure 2Format for letter of Consortium

    (On each Company/Firms letter head)To,

    The CE-cum- Director,Deptt. of UD and HousingGovt. of Arunachal Pradesh

    ItanagarReference: Date:

    SUBMISSION OF EXPRESSION OF INTEREST

    Preparation of Master Plans, Integrated Town Ship Plans, and Layout Plans of Allied Services for NewResidential Campus/Neighborhood Centre/Para Military Campus at Pachin Area in between Naharlagunand Itanagar.

    Dear Sir,

    We wish to confirm that our company/firm has formed/intends to form a Consortium with.andmembers to insert names ofall other members of the group) for getting shortlisted for selection as MP Consultant forPreparation ofMaster Plans, Integrated Town Ship Plans, and Layout Plans of Allied Services for New ResidentialCampus/Neighborhood Centre/Para Military Campus at Pachin Area in between Naharlagun and Itanagar.The consortium will be led by (name of the lead member) whom we hereby authorize to act on our behalffor the purpose of applying for Expression of Interest. In the event of our group being invited to submit bidagainst EOI issued by UD Deptt. for the subject work, we agree to jointly and severally liable to Ud & Hdeptt., its successors and assignees for all obligations, duties and responsibilities arising or imposed by anycontract subsequently entered into between Ud & H deptt and our group. We agree not to change anycondition of formation of consortium till the completion of this project.

    Yours faithfully

    Signature of Applicant:Name of signatory:

    Designation:Name and address of firm:

    Contact number:Fax: Email

    Enclosures:1 Copy of Board Resolution/Power of Attorney or Authority letter authorizing the representative to sign onbehalf of the Company/Firm of the Consortium as the case may

  • 8/13/2019 Press Release (Master_Plan 21.10.13)

    13/20

    Annexure 3

    Performa: Expression of Interest QuestionnaireGeneral

    Name of Applicant/Company/Firm:

    State the structure of the applicants organization (applicants to indicate as

    appropriate) : IndividualCompanyFirm

    Consortium

    Individual applicant company or lead member (in case of Consortium) to

    provide this information:1 Name of the company/firm:

    2 Individual applicant company/lead member of Consortium:

    3 Legal status of company:

    4 Registration No. (with year of Registration and the Country of Registration) :

    5 Registered address:

    6 Principal place of business:

    7 Address of Branch Office (own):

    8. Whether wholly/partially owned subsidiary or foreign company: Yes/No(Give details)

    9 Name and address of Principal/Parent Company (if applicable) :

    10 Name of contact person:

    11 Complete details of the Contact person including designation, Address (at

    NCR/Haryana office, if any), telephone numbers, FAX numbers and e-mail id etc.

    For applicants who are in Consortium, State the following information for other

    members of Consortium (include additional sheet if required):1 Name of Company/Firm:

    2 Legal Status of the Company:

    3 Registration No. (with year of registration and the Country of Registration):

    4 Registered Address:5 Principal Place of Business:

    6 Address of branch office (Own):

    7 Whether wholly owned subsidiary or foreign company: Yes/No

    8 Name and address of Principal / Parent Company (if applicable

    9 Name of contact person, designation:

    10 Address, telephone and facsimile number, email address of contact person:

    11 Name of contact person and designation (at NCR/Haryana Office, if any):

    12 Address, telephone and facsimile number, email address of contact person

    (at Haryana Office):

    Does EOI application contain the Board Resolution/Power ofAttorney/Authority Letter, which empowers the person or persons to sign the

    letter of application? Yes/NoIf no, give reasons

    State the number of years the applicant (or each constituent member of consortium)

    has been in business under the business name appearing in the answer

    to question 3 and 4 above.Name No. of years

  • 8/13/2019 Press Release (Master_Plan 21.10.13)

    14/20

    1.

    2.

    3.

    State the number of years the applicant (or each constituent member of consortium)

    has been in business undertaking work similar in scope and nature of work for

    which prequalification is soughtName No. of Years

    1.2.

    3.

    Individual applicant or each members of consortium should compile a list

    showing their previous experience of work a s per Preforma at Annexure 5 and

    Annexure 8 in the manner and for the period indicated in the Performa (attach

    separate sheets duly referred as in response to question 9)Yes/No

    Have you (each constituent member in case of consortium) provided information

    regarding previous experience of work as per Annexure 1 & 2?

    Yes/No

    Whether individual applicant or members of consortium have in-house facility of all

    services and related staff?Yes/No

    If No, whether necessary legal agreements with various service consultancy

    organisations for a period of minimum 5 years from date of application are attached

    with the EOI application.Yes/No

    Note:Please provide sufficient information and valid proof for each parameter/ factor assigned for calculatingthe points in the evaluation criteria.

  • 8/13/2019 Press Release (Master_Plan 21.10.13)

    15/20

    Annexure-4

    Applicants Management Structure with Details of Key Personnel

    Individual Applicants or each constituent member of consortium should provide details of firms/companys

    current management structure/details of key personnel and if a subsidiary or a constituent of a lead firm, its

    principals management organization structure/details of key personnel including the followingon separate

    sheet clearly indicating the reference as in response.

    (A) Companys ownership,

    Current management structure,

    Details of key personnel

    (B) Its principals management,

    Organization structure

    Annexure 5Company/Firms Experience in MP Service or Similar Work(Details of major MPD service work of similar Nature executed during the last seven years)

    Name of Company/Firm:

    SI Name of Work

    AddressandcontactDeatailsof Client

    Date ofaward andcompletiondate

    Whetherparticipatedsingle firmor leadmember inaconsortium

    Projectcost inRs.

    Costconsultancyin Rs.

    Projectarea inacres

    Currentstatus ofproject

    Note:i. The information to be given by individual applicant or each member of the consortiumincluding lead member separately.ii. The list of work to be compiled as per the format above.iii. Copy of supporting documents (experience proof) should be enclosed.iv. Ongoing projects will not be considered, unless it is completed before 04.05.12.v. Where currency conversion is used, specify the assumed

  • 8/13/2019 Press Release (Master_Plan 21.10.13)

    16/20

    Annexure 6Details of Turnover and Net-worth of Last 3 YearsIndividual Applicants/Each Constituent Member of consortium should provide details ofturnover for last three years.

    Attach proof of the financial statement certified by auditor.

    Financial Year Turnover (Rupees in

    crores) fromconsultancy works

    Net Profit Net Worth (Rupees in

    crores)

    2010

    2009

    2008

    Note: Please attach certified copies of the following:-(i) Complete balance sheet for the three financial years duly certified by the Chartered Accountant.(ii) Income Tax Return for 3 years up to 2012-13(self-attested)(iii) Service Tax Returns for 3 years up to 2012-13(self-attested

  • 8/13/2019 Press Release (Master_Plan 21.10.13)

    17/20

    Annexure7Proposed Affidavit

    TO BE SWORN ON A NON-JUDICIAL STAMP PAPER OF RS.10/-AFFIDAVIT

    *I/We------------------------------------------(Name) ----------------------------------------------------------------------

    ...*Director/ Proprietor/Partner of

    (mention name of firm/company/ consortium and its complete address)do hereby solemnly affirm and declare asunder:-

    1. That *I/We (Name) *am/are registered as (mention name of *firm/

    company/consortium) vide Registration No..under the provisions of ..

    (mention the name of the Act) since ..(date of registration).

    2. That*I/We (Name)..have applied in response to the Invitation

    for Expressions of Interest of CE-cum-Director Urban Development and housing,Govt of Arunachal

    Pradesh,Itanagar for appointment as consultant for preparation of Master Plan and design of allied

    Services for NewResidential Area as neighborhood centre at PACHIN .

    3. That(mention name of firm/company/consortium) is

    eligible to submit the aforesaid proposal as neither the applicant has been barred and/or blacklisted by the

    Central Government and/or any State Government/or any autonomous body/or any other private body of

    India or any agencies abroad at any time prior to the date of submitting this affidavit.

    4. That . (mention name of

    firm/company/consortium) or any of its constituents during the last three years has neither failed to perform

    on any agreement nor was expelled from any project or agreement nor any agreement terminated for any

    breach by the applicants or any of its constituents.

    5. That an annexure attached to this affidavit gives list of all contracts of ...(mention

    name of firm/company/consortium) or any of its constituents that are in arbitration with the Central

    Government and/or any State Government/or any autonomous body/or any other private body of India or

    any agencies abroad.

    VERIFICATION DEPONENT

    *I/We (Name)... the above named deponent

    do hereby verify that the contents of the aforesaid paragraphs 1 to 4 are true and correct to the best

    of*my/our knowledge and belief and nothing is concealed there from.

    Verified at...(place) this. Day of . 2012.

    (*Strike off whichever is not applicable) DEPONENT

    Note: Deponent will be the authorized signatory of the Applicant.

  • 8/13/2019 Press Release (Master_Plan 21.10.13)

    18/20

    Annexure 8

    Experience Details: (For each project, subject to a maximum of 10 largest similar projects)

    Firms Name:

    1 Project name :2 Country:

    Location within country:

    3 Name of client :

    4 Address:

    5 Name of contactperson: Title:

    Telephone no: Email

    6 Approx. value of contract (Rupees in crores):

    7 Approx. value of the services provided by your firm under the contract (Rupees incrores):

    8 Start date (month/Year) Planned: Actual:Completion date (month/year) Planned: Actual9 Duration of assignment (months):

    10 Total No. of staff-months of the assignment:

    11 Name of associated consultants, if any:

    12 No. of professional staff-months provided by associated consultants:

    13 Name of senior professional staff of your firm involved and functions performed:(indicate most significant profiles such as project Director/coordinator, Team Leader

    14 Narrative description of project and its nature:

    15 Total campus area (in acres):

    16Total covered area (in sq. mtrs.):

    (give separate information about actual built up/under construction and proposed)

    17 Brief description of the general specifications of the special features:

    18 Any green technologies/features used:(particularly for climate control; energy, water and waste management

    Note:(i) The information is to be given by individual applicant or each member of the consortiumincluding lead member separately.(ii) Copy of supporting documents (in the form of certificates received) should be enclosed.(iii) Where currency conversion is used, specify the exchange rate and its date.

  • 8/13/2019 Press Release (Master_Plan 21.10.13)

    19/20

    Annexure9CVs of staff available with Applicants/each constituent member of consortium

    Individual applicants or each constituent member of consortium thereof must indicate the key professionalstaff employed (as on date of issue of EOI notice) in following indicative categories:

    Specialization Educational

    QualificationExperience Specific Experience

    Team LeaderTown Planner

    Environmental Planner/Scientist /Engineer

    Landscape Planner

    Transport Planner

    Architects

    Project Managers

    Civil Engineer

    MEP Engineers Water Management

    Expert

    Other Professional/

    Note:i. The above field of specialization is indicative. Applicants may add the field ofspecialization as per their experience.ii. Maximum two-page CV of each main member and key expert shall be furnished.iii. CVs of the executive head of the Applicants /lead member of consortium and all other

    main members and key experts should contain the following heads: Qualifications Experience in years (separately for each individual field of expertise if more than one) Name, nature, size of similar works handled and responsibility therein Publications Personal awards and recognition Professional memberships Years of service with organization Other professional involvements (in fields of expertise) (Please attach proofs thereof at all places)

  • 8/13/2019 Press Release (Master_Plan 21.10.13)

    20/20

    Annexure 10

    T&P available with Applicants/each constituent member of consortium

    Sl No Name of T&P & Equippment Qty Age Manufactured