Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November...

27
Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013

Transcript of Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November...

Page 1: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

Presented to:

By:

Date:

Safety

Management

Systems

Oklahoma FFSHC

Stephanie Schroeder, CSP

November 14, 2013

Page 2: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

2Safety Management Systems – OFFSHCNovember 2013

Briefing Contents

• SMS Comparison• Benefits • Challenges• Related Costs• Continued Growth

Page 3: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

3Safety Management Systems – OFFSHCNovember 2013

FAA Mike Monroney Aeronautical Center

• 1,100 acres of land• 125 buildings with 3.5 million square feet of space• Approximately 7,500 employees and 1,300+ students daily• Largest concentration of DOT employees outside of

Washington DC• Customer Base

– Entire FAA– All branches of DOT– Other Federal Agencies– Foreign Governments– Passengers, Pilots, media, aircraft owners, and commercial air carriers

Page 4: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

4Safety Management Systems – OFFSHCNovember 2013

Move from Compliance to Best Practices

BestPractices

OHSAS 18001ANSI Z10

VPPOther Requirements

(FAA, Corporate, Consensus Standards)

Regulatory Requirements(OSHA)

Page 5: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

5Safety Management Systems – OFFSHCNovember 2013

Challenges

• Large Campus• Diverse Activities• Management from different locations

and at different levels• Tenant Organizations• Red Tape• Limited Resources• Compliance

Page 6: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

6Safety Management Systems – OFFSHCNovember 2013

Safety Management Systems

SMS utilized by MMAC • OSHA Voluntary Protection Program• OHSAS 18001:2007• ANSI Z10:2012

6

Page 7: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

7Safety Management Systems – OFFSHCNovember 2013

SMS Elements Comparison

VPP OHSAS 18001:2007 ANSI Z10: 2012Scope Scope, Purpose and Application

Reference Publications & Terms Definitions

OH&S PolicyManagement Leadership and

Employee Partic ipation

P lanning P lanning

Hazard Prevention and Control

Safety and Helath Training

Employee Partic ipation

Checking Evaluation and Corrective Action

Management Review Management Review

Management Leadership &

Employee Partic ipation

Worksite Analysis

Implementation and OperationImplementation and Operation

Page 8: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

8Safety Management Systems – OFFSHCNovember 2013

VPP Elements

8

VPP OHSAS 18001:2007 ANSI Z10: 2012

Scope Scope, Purpose and Application

Reference Publications & Terms Definitions

OH&S PolicyManagement Leadership and

Employee Partic ipation

Planning Planning

Hazard Prevention and Control

Safety and Helath Training

Employee Partic ipation

Checking Evaluation and Corrective Action

Management Review Management Review

Management Leadership &

Employee Partic ipation

Worksite Analysis

Implementation and OperationImplementation and Operation

Page 9: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

9Safety Management Systems – OFFSHCNovember 2013

VPP Program Requirements

• Management Leadership and Employee Involvement

• Worksite Analysis• Hazard Prevention and Control• Safety and Health Training

Page 10: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

10Safety Management Systems – OFFSHCNovember 2013

VPP at MMAC

• Approved as Merit Site in 2004– Employee Involvement– LOTO Program

• Reapproved as Merit Site in 2008– Employee Involvement

• Withdrawal from VPP in 2010– Considered changing application format– Moved towards OHSAS 18001

10

Page 11: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

11Safety Management Systems – OFFSHCNovember 2013

Benefits during VPP Participation

• Reduced injury and illness rates by 50% • Increased visibility of EOSH Staff • MMAC further evaluated SMS approach• Established SMS as a business goal

11

Page 12: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

12Safety Management Systems – OFFSHCNovember 2013

18001 Program Elements

VPP OHSAS 18001:2007 ANSI Z10: 2012

Scope Scope, Purpose and Application

Reference Publications & Terms Definitions

OH&S PolicyManagement Leadership and

Employee Partic ipation

P lanning Planning

Hazard Prevention and Control

Safety and Helath Training

Employee Partic ipation

Checking Evaluation and Corrective Action

Management Review Management Review

Management Leadership &

Employee Partic ipation

Worksite Analysis

Implementation and OperationImplementation and Operation

Page 13: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

13Safety Management Systems – OFFSHCNovember 2013

OSHMS Manual • OSHMS procedures for:

– Identifying Significant OSH Hazards*– Setting Objectives and Targets*– Legal and Other Requirements– Establishing Operational Controls– Communication*– Emergency Preparedness– Control of Documents and Records– Conducting Audits and Management Reviews*

Page 14: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

14Safety Management Systems – OFFSHCNovember 2013

Risk Assessments

• Applied to activities within each organization• Measures the Risk

– Usage– Severity of Injury– Likelihood

• Identified Priority

Page 15: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

17Safety Management Systems – OFFSHCNovember 2013

Communication, Participation and Consultation• External and Internal communications• Meetings

– OSH Representatives– Management and Labor– Organizations

• Employee participation– Incident investigations– Hazard identification

17

Page 16: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

18Safety Management Systems – OFFSHCNovember 2013

Audit Program

• Not a Compliance Audit• Minimum of Two OSHMS Audits per Year

– One Internal & One External

• Audits consist of:– Document Review

• OSH Documents – Operational Controls, SOP’s• Records – Training certificates, Maintenance Logs

– Walkthrough– Interviews

Page 17: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

19Safety Management Systems – OFFSHCNovember 2013

Management Review

• Gauges OSHMS performance annually• Covers key elements of the OSHMS• Reaffirms objectives and targets• Assess continual improvement

Page 18: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

20Safety Management Systems – OFFSHCNovember 2013

OHSAS 18001 at MMAC

• MMAC Certified September 2010– Root Cause Analysis– Corrective Action Tracking

• Recertified in May 2013– Emergency Preparedness

• Integrating EMS & OSHMS • Automate Change Management

Page 19: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

21Safety Management Systems – OFFSHCNovember 2013

Benefits of 18001

• Employee Involvement• Program Documentation• Continual Improvement of OSHMS• Prioritization

Page 20: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

22Safety Management Systems – OFFSHCNovember 2013

ANSI Z10 Program Elements

VPP OHSAS 18001:2007 ANSI Z10: 2012

Scope Scope, Purpose and Application

Reference Publications & Terms Definitions

OH&S PolicyManagement Leadership and

Employee Partic ipation

Planning Planning

Hazard Prevention and Control

Safety and Helath Training

Employee Partic ipation

Checking Evaluation and Corrective Action

Management Review Management Review

Management Leadership &

Employee Partic ipation

Worksite Analysis

Implementation and OperationImplementation and Operation

Page 21: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

23Safety Management Systems – OFFSHCNovember 2013

ANSI Z10 2012

• FAA Flight Inspection Services– Initial stages of implementation at MMAC – Six line stations for aircraft maintenance

• Implement system framework• Conducted Gap Analysis in 2010• Established Internal Audit Process

23

Page 22: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

24Safety Management Systems – OFFSHCNovember 2013

Challenges

• Employee Involvement• Management of Change• Establishing Trust

24

Page 23: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

25Safety Management Systems – OFFSHCNovember 2013

Benefits

• Employee Involvement• Culture Improvement• Tracking Completion

25

Page 24: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

26Safety Management Systems – OFFSHCNovember 2013

Associated Costs• VPP

– Promotional Materials– VPP SGE Support

• OHSAS 18001– Annual External Audit Team– Internal Audit and Corrective Actions– Document Maintenance

• ANSI Z10– Risk Assessments – Continual Improvements

26

Page 25: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

27Safety Management Systems – OFFSHCNovember 2013

MMAC Benefits from SMS

• OSHA recordable accidents reduced by 88%• Reduced inspection findings and severity• OSH program moved into best practices• Greater employee participation• OHSAS 18001 certified in 2010• Estimated cost savings of $10 million in direct

and indirect costs since FY 2001

Page 26: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

28Safety Management Systems – OFFSHCNovember 2013

Implementing an SMS

• Choose a method and move forward• Ensure top management commitment• Involve employees in every step • Include independent verification• Focus on continual improvement

28

Page 27: Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.

29Safety Management Systems – OFFSHCNovember 2013

For More Information

• Contact– Stephanie Schroeder, CSP

[email protected]• 405-954-0371

29