Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ......

50
Brian Almquist Office of Naval Research Voice: (703) 696-3351 Fax: (703) 696-2710 [email protected] Presented to Presented to 2005 MINWARA Conference on 2005 MINWARA Conference on Sea Mine Warfare Sea Mine Warfare 23 23 - - 26 May 2005 26 May 2005

Transcript of Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ......

Page 1: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

Brian AlmquistOffice of Naval Research

Voice: (703) 696-3351 Fax: (703) 696-2710 [email protected]

Presented toPresented to2005 MINWARA Conference on 2005 MINWARA Conference on

Sea Mine WarfareSea Mine Warfare

2323--26 May 200526 May 2005

Page 2: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

Surf Zone / Beach Zone BreachingWeapon System Program Elements

DEPLOY(Organic Supportability)

EMPLOY(Stand-off, In-stride)

HIT(Targeting, Guidance, & Control)

KILL(Warheads)

• Mainstream Assault Breaching MCM

• Assault Breaching Becomes Part of Air and Surface Strike Mission Areas

• Focus: Utilize Existing Navy / AF Systems for Deployment and Employment of CMCO Warheads

• Key Technology Challenges: Warhead Effectiveness and Dispense Mechanisms

Page 3: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

Strategy Based on Concept of Spiral Development• JDAM Assault Breaching System (JABS): Exploit existing precision

guided (JDAM) bombs

• Advanced Warhead Development: Develop countermine darts with greater kill radius & effectiveness against buried mines in water and on land.

Rapid Transition to System Level Demonstrations: Reduces risk and shortens acquisition timeline.

USN and USAF MOA for Delivery of Breaching Warheads (Signed)• Response to OMCM FNC technology developments

Mine & Obstacle Breaching S&T Strategy

Develop a Precision Mine and Obstacle Breaching Capability• Enabled by ISR and Weapon Precision Guidance• Delivery by Naval TACAIR, USAF Bombers, and Naval Guns

Page 4: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

JDAM Assault Breaching System (JABS)

Objective: • Characterize the tactical performance

of existing precision guided bombs

Program Description:• 18-Month Test & Evaluation Period• Phase I: BZ low tide Demo (Completed)• Phase II: SZ / BZ Demo (Completed)• Mission Planner

Systems Effectiveness Issues:• Lethality vs. Mines / Obstacles

(Tactical, as delivered)• Fuze (HOB, detonation in water)• Deployment Tactics• Integrated CONOPS

Goal is to Enable an Operational Capability by FY 2006Goal is to Enable an Operational Capability by FY 2006

Water Depth (m)Profile At Mean Tide. 6-8 ft Tidal Variations

(+3-4 ft about mean tide)

AT mines (A, B, F, G, H)

174.21 m

5m10 m 50 m10 m

AL Mine, (E, L)

4 strand fence

AP mines (K)Tanglefoot

30 m

10 m

10 m

AT

min

es a

t 6 m

spa

cing

15 m

0.6 0.9 1.1 2.0

50 yds

Type 2 AL Mines (J, M)Triple Strand Concertina Wire w/AP mines

0.3

10 m

Sea Urchins

X

Target Set for JABS Surface Mines & Light Obstacles

Team:• Boeing Phantom Works• NSWC-PC• NAWC-CL• Northrop Grumman Corporation• USAF 49th T&E Squadron - Barksdale

Page 5: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

MK-84

JDAM Assault Breaching System (JABS)

B-52

Target Damage

Mission Planner Screen CaptureStandoff Delivery Platform

GBU-31(V)2/B

Precision Guidance

JDAM Tail Kit

Page 6: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

MCIA Threat

Water Depth (m)Profile At Mean Tide. 6-8 ft Tidal Variations

(+3-4 ft about mean tide)

AT mines (A, B, F, G, H)

174.21 m

5m10 m 50 m10 m

AL Mine, (E, L)

4 strand fence

AP mines (K)Tanglefoot

30 m

10 m

10 m

AT

min

es a

t 6 m

spac

ing

15 m

0.6 0.9 1.1 2.0

50 yds

Type 2 AL Mines (J, M)Triple Strand Concertina Wire w/AP mines

0.3

10 m

Sea Urchins

60 yds

Page 7: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

• Tactical threat laydown provided by MCIA• Obstacle barriers consist of four-strand barb wire fence (cattle

fence), tanglefoot, triple standard concertina (TSC) wire, and sea urchins

• Includes anti-tank and anti-landing mines

MCIA Threat LaydownMines & Light Obstacles

Page 8: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

JABS Phase I Beach Zone Lane Clearance

• Beach Effects Testing to Characterize Weapon Lethality at Tactical Impact Burial / Height of Detonation (Static); Completed- Beach arena test- Bombs detonated above and into ground (0”, -22”, -36”, +36”, +96”)- Tactical mines & light obstacles- USAF MK-84 bombs

• BZ Lane Clearance Demo to Prepare for Flight Demo (Static); Completed- 10 bombs tactically positioned and detonated- Tactical mines & light obstacles- USAF MK-84 bombs

• BZ Lane Clearance Demo to Characterize Weapon Lethality (Flight); China Lake / NAWC, CA; Completed- USAF B-52 will deploy 10 MK-84 bombs- Tactical mines & light obstacles- Low tide conditions

Page 9: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

JABS BZ Lane Clearance DemoNAWC-CL Flight Test - 13 Jan 2004

0900 – B-52H Left Barksdale AFB, LA1330 – Cold Pass 1345 – Hot Pass

BeforeSLIDEVIDEO

Page 10: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

• Met All Objectives

• Successfully Employed 10 of 10 Weapons from 1 USAF B-52

• Craters can be Avoided with Appropriate Fuze Settings

Beach Zone DemonstrationObservations & Results

January 13, 2004

Page 11: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

• Water Effects Testing to Characterize Fuze Performance in the Water Column (Flight); Completed- USN F-18 aircraft drop of 2 inert MK-84 bombs

• Water Effects Testing to Characterize Weapon Lethality at Tactical Impact / Height of Detonation (Static); Completed- Water arena test- Tactical mines & light obstacles- USAF MK-84 bombs- Parameters: Water depth, depth of weapon detonation, seabed penetration,

cavity formation

• SZ / BZ Lane Clearance Demo to Prepare for Flight Demo (Static); Completed- Several bombs tactically positioned and detonated- Tactical mines & light obstacles- USAF MK-84 bombs

• SZ / BZ Lane Clearance Demo to Characterize Weapon Lethality (Flight); Completed- Four USAF B-52 aircraft to drop multiple MK-84 bombs- Tactical mines & light obstacles arrayed on land and in water

JABS Phase II Combined SZ / BZ Lane Clearance

Page 12: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

JABS Water Effects Testing

VIDEO (Flight)

VIDEO (Test)VIDEO (Model)Field Test Slide

Page 13: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

JABS Combined SZ/BZ DemoNAWC-CL Flight Test - 9 Sept 2004

Before

0900 – 4 B-52Hs Left Barksdale AFB, LA1400 – Hot Pass

VIDEO

Page 14: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

JABS Combined SZ / BZ Demo Preliminary Observations & Results

• Met All Objectives

• Successfully Employed 40 of 42 Weapons from 4 USAF B-52s

- Aircraft Malfunction Caused One Weapon Failure

- Tail Kit Malfunction Caused One Weapon to Fall Short

• Water Depth Plays a Key Role in Determining the Correct Weapon Configuration

Page 15: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

JABS Mission Planner

Mission Planner

Desired Point of Impact (DPI) Locations

Allows Expeditionary Strike Group to Plan a JABS Breaching Mission

Page 16: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

JABS Status

• Transitioned to PMS-495

• Initiated Independent Statistical Assessment of Results

- Determine Confidence Levels

- Identify Critical Areas for Acquisition Testing

• Initiated Testing Against Buried Mines & Mines in 10’ Water Depth

• Stand-Alone Mission Planner

- Initiated Integration with MEDAL

Page 17: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

Advanced Warhead Development

• NSWC - IHD• NSWC - PC• NAWC - CL

Team: • Boeing Phantom Works• Lockheed Martin Adv Projects• SAIC

Demonstrate Technology by FY 2007Demonstrate Technology by FY 2007

Strategy: • Precision Guided CMCO

Warheads Delivered by Naval TACAIR, USAF Bombers and Naval Guns- Countermine Darts- Continuous Rod Warhead

Concepts:• Best Buy Projectile (NGFS)• TMD / Guided Munitions (Hydra-7)• BLU-109 / JDAM Tail Kit (MODS)

Effectiveness Issues:• Lethality vs. Mines / Obstacles• Dart Dispensing• Integrated CONOPS

High Threat Scenario

Page 18: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

Countermine Darts

Chemical Dart Detonating Dart

VIDEO (HE Dart Test)

Slots added to improve performance against proud

mines

2.5 mL DETA 5 mL DETA

VIDEO (Chemical Dart vs. Mine in Water)VIDEO (HYDRA-7 Dart Test)

35 CAL DARTPrimer: M42C2Free Volume: .22 cm3Delay : LEAD SALTMain Fill: PBXN-5

Mass 38.5 grams (21g subpenetrator)7.5 mL of DETA

Page 19: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

Countermine Darts

MODS Dispenser

Packed Canister of Darts

Controlled Dispense of Countermine Darts

Page 20: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

Dart Dispenser Concepts

MODS Forward Ejection NGFS Timed Tangential ReleaseVIDEO (Dispense) VIDEO (Sled Test)

VIDEO (Target)

Page 21: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

MODS Flight Test MODSMine/Obstacle Defeat System

Page 22: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

Advanced Warhead Development Status

• Reactive material dart put on the shelf; Focus investment on chemical and detonating darts

• CRW put on shelf; Focus investment on precision guided bombs for obstacle clearance

• Initiated Live System Demonstration

Page 23: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

FY 05• Conduct MODS Inert Flight Test with Dispense• Complete Chemical Dart (BZ Only)• Down-select Dart for Live Demonstration• Initiate Live Demonstration Effort

FY 06• Conduct Live Demonstration

FY 07• Complete Transition to Acquisition (PMS – 495)

Advanced Warhead DevelopmentPlans

Page 24: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

Summary

• System Technologies Transform Assault Breaching to a Strike Mission

• JABS Provides a Contingency Capability

• Integration of Mission Planner with MEDAL provides an Initial Fielded Capability

- Spiral to include countermine darts

• Combination of Countermine Darts & JABS will Enable a Full Operational Capability

Page 25: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

Brian AlmquistOffice of Naval Research

Voice: (703) 696-3351 Fax: (703) 696-2710 [email protected]

Presented toPresented to2005 MINWARA Conference on 2005 MINWARA Conference on

Sea Mine WarfareSea Mine Warfare

2323--26 May 200526 May 2005

Page 26: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

JABS Combined SZ / BZ Threat Laydown NAWC China Lake

Page 27: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

BZ Field Test vs. Threat Laydown (Static)

Beach Zone Test Eglin AFB12 September 2002

Demonstrated:• Effectiveness against light obstacles• Effectiveness against mines

Page 28: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

JDAM ASSAULT BREACHING SYSTEM NEAR-TERM SURF ZONE / BEACH ZONE REQUIREMENTS

MINIMUM NEAR-TERM REQUIREMENT

THRESHOLD OBJECTIVE ANTI-LANDING MINES, TYPE 2 P

ANTI-LANDING MINES C ANTI-PERSONNEL MINES (PLASTIC OR STEEL CASE) R

ANTI-TANK MINES, PLASTIC C MINES

ANTI-TANK MINES, STEEL CASED C CONCRETE CUBES (4’ x 4’ x 4’) R

CONCRETE TETRAHEDRONS (DRAGON’S TEETH) R H E A V Y CONCRETE JERSEY BARRIERS

(REINFORCED CONCRETE – 12’ LENGTH x 2.75’ HT) R

STEEL HEDGEHOG (SH) (4’ x 4’ x 3/8” ANGLE IRON) R

STEEL TETRAHEDRON (ST) (4’ x 4’ x 5/8” ANGLE IRON) R M E D I U M

LOG POSTS (LP) (16” DIA / BURIED 5’ DEEP / 30” – 48” ABOVE GROUND) R

SEA URCHINS (SU) C TRIPLE-STRAND CONCERTINA WIRE (TSC) (36” DIAMETER / ENGINEER STAKES @ 12’) C

TANGLEFOOT WIRE (TF) C

OBST

ACLE

TYP

ES

L I G H T

4-STRAND BARBED WIRE FENCE (BW) C COMBINED ANTI-PERSONNEL MINES WITH TANGLEFOOT R

10’ WATER DEPTH PLUS 6” OVERBURDEN P 10’ WATER DEPTH P 6’ WATER DEPTH C

3’ WATER DEPTH PLUS 6” OVERBURDEN P 3’ WATER DEPTH C

ON BEACH (PROUD) C

ENVIRONMENT

ON BEACH PLUS 6” OVERBURDEN P

Reference: JDAM Assault Breaching System (JABS) Interim Requirements Letter dated 1 Dec 04 signed by OPNAV N75

P – Pending ONR FY05 Test; R – Requirement; C - Completed

JABSPerformance Parameters Matrix

Page 29: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

Mk 84 Test, Summer 99 Mk 83 Test, Spring 01 Mk 83 Water Test

Arena Tests are Used to Characterize Weapon LethalityArena Tests are Used to Characterize Weapon Lethality

Arena Tests (Static)

Page 30: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

JABS BZ Lethality Data

Regression analysis used to evaluate kill / no kill data

Kill - All Mechanisms

00.20.40.60.8

11.2

0 20 40 60 80 100

Type AType BType FType GType H

Fragment KIlls

00.20.40.60.8

11.2

0 20 40 60 80 100

Type AType BType FType GType H

Pressure Kills

00.20.40.60.8

11.2

0 10 20 30 40 50 60

Type AType BType FType H

Page 31: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

Compilation of JABS Test DataExample

0-5 5-10 10-15 15-20 20-25 25-30 30-35 35-40 40-45 45-50 >50 A 1/1 1/1 2/2 2/3 5/8 10/10 4/4 3/4* 0/2 62 B 1/1 1/1 2/2 5/5 7/7 3/3 1/2 4/4 1/1 66 F 1/1 0/0 0/0 2/2 2/2 6/6 4/5 2/2 2/2 1/1 72 G 1/1 0/0 0/0 5/5 3/3 4/4 3/4 2/4 1/1 1/1 63 H 1/1 0/0 0/0 3/3 3/3 4/4 1/1 4/4 5/5 1/1 72

BZ A F BZSZ B * Upper end of bin

3-6 6-9 9-12 12-15 15-18 18-21 21-24 24-27 27-30 30-33 33-36 E(0.6m) 0ms 2/2 1/1 1/3 2/2 1/2 1/1 0/0 0/1 0/1 0/0 0/1 E(1.1m) 0ms 2/2 3/3 2/3 0/2 0/1 0/0 0/0 0/1

E(2.0m) 10ms 0/0 0/0 1/1 1/1 1/1 1/1 1/1 0/1 1/1

Page 32: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

• Joint Air Force / Navy Program

• GPS – Aided Guidance- Guidance commands provided by INS; GPS aids INS- 2.5 meter CEP without target location error

• Affordable, Adverse Weather, Accurate Guidance Kit- Attaches to the existing 500, 1,000 and 2,000-lb

general purpose bombs- Uses controlled tail fin movements to guide the weapon

• Production Began May 1998- Current production rate is 3000 kits / month

JDAM

Page 33: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

Staggered Column

The effects against this target lay-down were sufficient for a cleared lane for an AAV equipped unit.

Beach Zone Test Eglin AFB - 12 September 2002

BZ Field Test vs. Threat Laydown (Static)

Page 34: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

JABS Mission Planner / OBSCLR

• MP Predicted 50 Weapons - Lethality from Single Weapon Arena Tests

- Conservative Estimate

• OBSCLR Predicted 42 Weapons- Monte Carlo Analysis

- Accounts for Effects from Multiple Weapons

• Flight Demo Estimate- Based on Experience to Reduce Uncertainty

• Adjusted Weapon Laydown Due to Lower Water Levels- No Time to Run the MP or OBSCLR

• Dropped 42 Weapons

Sequence of Planning Events:

Page 35: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

Brian AlmquistOffice of Naval Research

Voice: (703) 696-3351 Fax: (703) 696-2710 [email protected]

Presented toPresented to2005 MINWARA Conference on 2005 MINWARA Conference on

Sea Mine WarfareSea Mine Warfare

2323--26 May 200526 May 2005

Page 36: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

BZ Lane Clearance DemoNAWC-CL Flight Test - 13 Jan 2004

After Back

Page 37: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

Joint Direct Attack Munition (JDAM)Unitary Warhead

Back

Page 38: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

BZ 3

Back

Page 39: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

JABS SZ Flight Test

BACK

Page 40: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

3 FT Fill

BACK

Page 41: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

BACK

Model

Page 42: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

Back

JABS BZ/SZ Lane Clearance DemoNAWC-CL Flight Test - 9 Sept 2004

Page 43: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

SZ Field Test vs. Threat Laydown (Static)

Back

Page 44: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

Chemical Dart vs. Mine in Water

Back

Page 45: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

HE Dart Test

Back

Page 46: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

MODS Sled Test

Back

Page 47: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

Back

NGFS Timed Tangential Release

Page 48: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

NGFS Timed Tangential ReleaseDarts on Target

Back

Page 49: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

MODS First Flight TestDecember 16, 2004

Back

Page 50: Presented to 2005 MINWARA Conference on Sea Mine … · Presented to 2005 MINWARA Conference on ... tanglefoot, triple standard concertina (TSC) wire, ... 4-STRAND BARBED WIRE FENCE

MINWARA Conference_Breaching 2-5May05.ppt

HYDRA-7 Dart Test

Back