Dr. Nasir Mahmood FAME EDUCATION CONSULTANTS (PVT .) LIMITED www.fameconsultants.org EXTERNAL EVALUATION CHILDRENS (ESPECIALLY GIRLS AGED 2-12) ACCESS TO QUALITY EDUCATION WITH IMPROVED INFRASTRUCTURE AND A SAFE LEARNING ENVIRONMENT

description

WORLDWIDE IN IT EXPERT.

Transcript of Presentationn ita study

Page 1: Presentationn ita study

Dr. Nasir Mahmood

FAME EDUCATION CONSULTANTS (PVT.) LIMITED

www.fameconsultants.org

EXTERNAL EVALUATIONCHILDREN’S (ESPECIALLY GIRLS AGED 2-12) ACCESS TO QUALITY EDUCATION WITH

IMPROVED INFRASTRUCTURE AND A SAFE LEARNING ENVIRONMENT

Page 2: Presentationn ita study

Presentation Overview

2. Objectives

4. Sample, Data Collection Instruments / Respondents

6. Nature of Data, Analysis and Findings

8. Evaluation of Construction work

3. Approach to study

1. Background and Project Information

5. Instrument

7. Early Childhood Development Centers

Page 3: Presentationn ita study

Background & Project Information

www.fameconsultants.org

• Inspired by the learning and good practices from thesuccessful Dubai Cares WSIP for enhancement ofgirls’ enrolment and retention in South Punjab.

• covering 302 schools showcases the tremendouspossibilities of creating conducive learningenvironment in government schools with communityengagement, inculcating positive attitudinal changeamongst teachers and parents as duty bearers.

• Made up of high impact educational inputs in boththe immediate and longer term for an intensive andstrategic initiative resulting in high outcomesaligned to dominant policy and sector reforms.

Page 4: Presentationn ita study

Project Components

Component I: School Rehabilitation

o Extending the already successful Dubai Cares, Whole School

Improvement Program cluster approach in 3-4 districts of

South Punjab/Upper Sindh reaching out to 75,000 children.

o Training support for life skills; Disaster Risk Reduction

(DRR)/ Emergencies and quality learning to teachers and

school councils

o Catch Up Program: 1000 out of school recently drop out

children to be provide with an accelerated second chance

program for mainstreaming into primary/elementary

schools.

www.fameconsultants.org

Page 5: Presentationn ita study

Project Components

Component II: Back to School Kits for Children & Schools

Targeting 3000 children in the flood affected districts of Punjab

and Sindh (minimum 20 schools) with essential basic school and

educational materials to enable quality learning.

Component III: ECD Day Care Centres in affected districts

Establishing 15 comprehensive early childhood development

(ECD) community based centres catering to 3000 children (Ages:

2 year to 5 years) and their mothers. The interventions include

support for maternal and child health and nutrition, learning

stimulation, good parenting and strong social supports for care

givers making a case for a stronger sustainable schooling cycle.

www.fameconsultants.org

Page 6: Presentationn ita study

Objectives of TPE

1) the impact of strengthening infrastructural capacity of

schools and providing academic resource material to

children on their learning levels,

2) the impacts of ECD Centers on the learning levels of

Children that are being mainstreamed through ECD

Centers.

www.fameconsultants.org

Page 7: Presentationn ita study

Expected Outcomes of the Project

Component 1

Outcome1: Children have access to improved

infrastructure, safe learning environment with catch-up

program

Outcome 2: Issues relating to quality of education are

addressed

Outcome 3: Catch Up program for out of school

children

www.fameconsultants.org

Page 8: Presentationn ita study

Component 2

Outcome 4: Quality learning made possible for

both students and teachers in affected areas.

Component 3

Outcome 5: 15 ECD Community LearningCenters (CLC’s) established for Mother andchild support with health and learning readinessskills provided for children aged 2-5, enablingthem to be nurtured, kept healthy, and preparingthem to enroll and persist in local schools.

www.fameconsultants.org

Page 9: Presentationn ita study

Methodology

www.fameconsultants.org

Page 10: Presentationn ita study

Sample

A total of 41 schools (i.e. 13.57% of thetotal project schools);

• Twenty four (24) WSIP school in whichconstruction is completed/on-going.

• Seventeen (17) WSIP schools being providedwith support other than construction work.

www.fameconsultants.org

Page 11: Presentationn ita study

www.fameconsultants.org

Sam

ple

Page 12: Presentationn ita study

Instruments

1. Checklist

2. Questionnaire for Teachers

3. Structured Interview for Parents

4. Focus Group Discussion Tool

5. Performa for Early Childhood Development Center (ECDC)

www.fameconsultants.org

Page 13: Presentationn ita study

Data

www.fameconsultants.org

Qu

anti

tati

ve D

ata

The data was collected through questionnaire for teachers, structured interview

for parents, checklist, structured interview for students and Performa for Early

Childhood Development Center (ECDC).

The volume of the data is as;

1. Teachers (98)

2. Parents (108)

3. Students (216)

4. School Checklist (41)

Qu

alit

ativ

e D

ata

Focus Group Discussion:

Four FGDs were held, one in each district. There were 8-10 participants in

each FGD. The participants included parents, teachers, students, community

leaders, political leadership and officials from Department of Education.

Researcher Field Notes

Fifteen research assistants took field notes about their observation and field

work experiences to supplement the information collected through

structured tools.

Page 14: Presentationn ita study

Findings

www.fameconsultants.org

Facility

Current Status of Rehabilitation Process by District

R Y Khan

N=8

Shikarpur

N=9

Kot Adu

N=8

Boundary Wall 100 77.8 50

Toilets 87.5 88.9 25

Furniture 87.5

0% steel Almirah

40.7%

Benches and white board provided in

66.7% and77.8%

12.5

School Sign board 100 44.4 50

School white Wash 75 22.2 0

Para Teachers 100 44.4 87.5

Teaching Learning Material

Reading Kit

62.5 0 25

Sports Kit 25 0 37.5

Science Kit 25 11.1 12.5

Health Kit 87.5 0 87.5

First Aid Kit 87.5 0 87.5

ECE Kit 75 0 67.5

Teachers Training/Capacity Building 75 33.3 100

Participation of ITA EP in SC/SMC Meeting 75 33.3 100

Training of selected SC/SMC members 75 22.2 75.0

Visit Register 100 66.6 87.5

Monthly Art Material 50.0 0 62.5

Summer School 75 33.3 87.5

ECE Enrichment Material 37.5 0 12.5

Display of health message 62.0 0 75.0

Site based school support by ITA’s Education Promoters 62.0 11.1 100

Organizing/Celebration of international Advocacy Day 37.5 0 25.0

Page 15: Presentationn ita study

Current Status of Physical Facilities in Sampled SchoolsMinor repaired and kits distribution

www.fameconsultants.org

Facility

Current Status of Rehabilitation Process by District

Rahim Yar Khan

N=4

Shikarpur

N=3

Kot Adu

N=4

Multan

N=5

Para Teacher 75.0 33.3 25.0 80.0

Teaching Learning Material

Reading Kit

25.0 33.3 0 100

Sports Kit 75.0 66.7 0 100

Science Kit 0 0 0 100

Health Kit 75.0 33.3 50.0 100

First Aid Kit 100 33.3 25.0 100

ECE Kit 75 0 75.0 100

Teachers Training/ Capacity Building 75 0 75.0 60.0

Participation of ITA EP in SC/SMC Meeting 75 66.7 75.0 60.0

Training of selected SC/SMC members 100 66.7 50.0 60.0

Visit Register 100 66.7 25.0 0

Monthly Art Material 25.0 33.3 0 0

Summer School 50.0 33.3 50.0 0

ECE Enrichment Material 25.0 0 50.0 0

Display of health message 50.0 33.3 50.0 40.0

Site-based school support by ITA s Education Promoters 0 33.3 75.0 40.0

Organizing/Celebration of international Advocacy Day 0 33.3 0 40.0

Page 16: Presentationn ita study

Teacher Self-reported Satisfaction withEducational Facilities

www.fameconsultants.org

Code: 1 = Strongly Disagree; 2 = Disagree; 3 = Agree; 4 = Strongly Agree.

Page 17: Presentationn ita study

The provision of infrastructure related facilities isreasonably complete in most of the schools in all fourselected districts

Quality of teaching and learning- teachers’ approval about suitability of the change

in physical environment,- sufficiency of space in school,- suitability of provided furniture for class

activities,- airiness and brightness of classrooms, decoration

of classroom,- availability and appropriateness of supplementary

reading material and celebration of internationaldays.

www.fameconsultants.org

Page 18: Presentationn ita study

Facilities in WSIP schools without constructionas reported by teachers

www.fameconsultants.org

Code: 1 = Strongly Disagree; 2 = Disagree; 3 = Agree; 4 = Strongly Agree.

Page 19: Presentationn ita study

Construction Vs. Without Construction

Teachers’ satisfaction with these provisions asper item mean score was 2.84/4.0 which reflectsteacher’s agreement on provision and quality of thefacilities.

The teachers in schools with construction clearlyenjoy better access to infrastructure facilities, feel moresecure/ safe learning environment and exercisesuperior teaching and learning condition.

www.fameconsultants.org

Page 20: Presentationn ita study

Type of training attended by teachers in sampledistricts

www.fameconsultants.org

N=6, 30%

N = 7, 39%

N=13, 31%

N=1, 14%

N=3, 30%

N= 4, 27%

N=8, 40%

N = 5, 28%

N=18, 43%

N=4, 57%

N=2, 20%

N= 4, 27%

N=2, 10%

N = 2, 11%

N=1, 2%

N=2, 29%

N=3, 30%

N= 1, 7%

N=2, 10%

N = 1, 6%

N=3, 7%

N=1, 10%

N= 2, 13%

N=2, 10%

N = 3, 17%

N=7, 17%

N=1, 10%

N=4, 27%

0 10 20 30 40 50 60 70 80 90 100

Rahim Yar Khan (N=20)

Shikarpur (N=18)

Kot Adu (N=42)

Rahim Yar Khan (N=7)

Shikarpur (N=10)

Kot Adu (N=15)

Co

nst

ruct

ion

Wit

ho

ut

Co

nst

ruct

ion

Use of Reading and Science Kit Use of Sports Kit Early Childhood Education Health and Hygiene Teaching of Different Subjects

Page 21: Presentationn ita study

Comparison of Facilities Provided in Construction andWithout Construction Schools

www.fameconsultants.org

Facility Type of School N Mean SD t df Sig.

Quality of Education

Construction 66 2.71 .6181.358 90 .178

Without Construction 26 2.53 .332

Safe Learning Environment

Construction 66 2.89 .519.592 93 .555

Without Construction 29 2.82 .443

Access to Improved Learning Environment

Construction 67 2.69 .705

2.635 95 .010Without Construction30 2.32 .455

Page 22: Presentationn ita study

Parents’ Self-reported Satisfaction with Educational Facilities

www.fameconsultants.org

46

13

18

4

23

2 House Wife

Teacher

Worker/ Mazdoor

Shopkepeer/Tailor

Farmer

Self Employed

108 parents surveyedand majority of themwere mothers

79 female and 29 maleparents in the sample

The average income ofthe surveyed familywas Rs. 2414 permonth.

Page 23: Presentationn ita study

Facilities in WSIP schools with construction asreported by parents

www.fameconsultants.org

Page 24: Presentationn ita study

www.fameconsultants.org

Facilities in WSIP schools without constructionas reported by parents

Page 25: Presentationn ita study

www.fameconsultants.org

Construction Vs. Without Construction

The parents sending their children toschools in which construction work wasprovided seems more satisfied in terms ofsafety of the learning environment and accessto improved infrastructure.

Page 26: Presentationn ita study

Students’ Self-reported Satisfaction with EducationalFacilities

www.fameconsultants.org

9

60

56

56

10

1112 2

Number of studentsClass II

Class III

Class IV

Class V

Class VI

Class VII

Class VIII

Class Nursery

Page 27: Presentationn ita study

Facilities in WSIP schools with construction asreported by students

www.fameconsultants.org

Page 28: Presentationn ita study

Facilities in WSIP schools without construction asreported by students

www.fameconsultants.org

Page 29: Presentationn ita study

Early Childhood Development (ECD) Center-Concept

ITA introduced innovative idea of developing ““Sanjha Verah” (SV) in Seraiki and “PahnjoVehro” (PV)”. This idea had its uniqueness in bringing mothers, children and community under one roof. The centers cater to children (Ages: 6 month to 5 years) and their mothers, embedding maternal and child health, nutrition, learning stimulation, good parenting, and strong social support.

www.fameconsultants.org

Page 30: Presentationn ita study

Early Childhood Development (ECD) Center -Purpose

The purpose of establishing these centers wasmultipronged. The idea was to involve community andencourage them to send their girls to schools. The parentsusually don’t send their girls to school because they lookafter the younger siblings at home and assist mothers intheir domestic work. The centers were developed with anaim to provide alternative to parents where they can sendtheir young children and they will be looked after by thestaff at the ECDC and in return parents will send their girlchildren to school. On completion of pre-requisite periodin ECDC these children will be sent to regular primaryschools associated under this project and increase theprobability of their continued schooling.

www.fameconsultants.org

Page 31: Presentationn ita study

Evaluation of Early Childhood Development (ECD) Centers

The interview schedule developed for thispurpose focused on evaluating information about;

1. staff appointed in various responsibilities,

2. sufficiency of staff considering the amount ofwork and size of ECD Centre

3. quality of the nutrition provided to children, and

4. related facilities in ECD Centre

www.fameconsultants.org

Page 32: Presentationn ita study

Parents Background InformationECD Centres Staffing

A typical ECD Centre was staffed with a head ofECD Centre responsible for management of the center, atleast one teacher, assistant teachers, lady health visitorand maids for minor duties. There was no specificinformation provided for the pre-requisite qualification ofthe staff to be employed against these posts. It wasobserved that some of the staff employed was notprofessionally qualified and inconsistent qualificationswere also found among the staff recruited for the sameposition. Parents respond that the staff of ECD center wassufficient for children’s needs and they perform their jobsincerely. They were satisfied with teaching activities andcooperation of ECD Centre staff.www.fameconsultants.org

Page 33: Presentationn ita study

Contribution of ECD Centres in empowerment of children and mothers

• It observed that parents were satisfied with facilitiesprovided in ECD centers

• Facilities which provided in ECD centres are good butnot sufficient according to number of kids.

• Need of expansion of ECD Centre

• Quality of class furniture, learning material andphysical set up was suitable for child development

• Parents involvement in the form of managing orhelping in maintaining kitchen garden, gettingawareness training about rearing children, simple skillsto earn livelihood and awareness about child’s qualityof life made them part of the ECD center.

www.fameconsultants.org

Page 34: Presentationn ita study

Nutrition

• Food provided to children once/twice a week.

• Parents were satisfied that their kids werenourished properly in ECDC centers.

• Children enjoy cooking activities when teacherprepared food for them

www.fameconsultants.org

Page 35: Presentationn ita study

Evaluation of Construction Work

Three schools were selected for complete inspection of the procedures followed for construction. Record, interview with related staff and ITA revealed that following steps were followed for construction work.

1. Selection of school for rehabilitation in close coordination with District education Department;

2. Need assessment (Base Line) of school

3. Hopes & fear session with community, school staff, and students at school during broad base stakeholders meeting

4. Hold of school council meeting to prepare the school development plan (SDP)

5. Preparation of cost estimation/ measurements and preparation of bill of quantities (BOQs);

www.fameconsultants.org

Page 36: Presentationn ita study

Evaluation of Construction Work

6. Advertisement, and selection of successful bidders through tendering process including the community participation;

7. Formation of construction committees (CCs) comprising 5-7 community members including school’s staff

8. Orientation of CC members on quality construction work;

9. Sign the agreement on affidavit papers with contractor

10. Issuance of work order to contractor

11. Handing over the site to contractor involving the CC members and school staff

12. Provision of copy of BOQs, work order, and agreement to schools

www.fameconsultants.org

Page 37: Presentationn ita study

Evaluation of Construction Work13. Regular monitoring of rehabilitation work by CCs, ITA’s

engineer, other ITA’s representative from of head and line departments as well;

14. Payment will be done on work done basis at the completion of sufficient (30%) work, the contractor submit the request for payment

15. Verification of bill by ITA Engineer and signed by Engineer and District Manager

16. Verification of work by ITA’s Engineer and CC members before issuance of any payment

17. The payment will be made in cross check through head office.

18. School inauguration by District Education Officials involving the community and other stakeholder

19. School handing over to school’s staff and school council www.fameconsultants.org

Page 38: Presentationn ita study

Thanks

www.fameconsultants.org