Simplex Infrastructures Limited Grasim Cement Plant Project, Kotputli Sulabh Tiwari Sr. Proj. Engg. Mechanical Planning Simplex Infrastructures Ltd.

Transcript of Presentation1.Ppt(Sulabh).Ppt(2003)

Page 1: Presentation1.Ppt(Sulabh).Ppt(2003)

Simplex Infrastructures Limited

Grasim Cement Plant Project, Kotputli

Sulabh TiwariSr. Proj. Engg.Mechanical Planning

Simplex Infrastructures Ltd.

Page 2: Presentation1.Ppt(Sulabh).Ppt(2003)

Plant view from main gate(Wednesday, August 06, 2008)Capacity : 8000 TPD

Simplex Infrastructures Ltd.

Page 3: Presentation1.Ppt(Sulabh).Ppt(2003)

Plant view from Top (mining area)Capacity of the Cement Plant : 800 Tonnes per day.

Simplex Infrastructures Ltd.

Page 4: Presentation1.Ppt(Sulabh).Ppt(2003)

Major Structures• Pre-heater • Blending Silo • Clinker Silo• Clinker cooler house• Clinker duct support• Kiln piers-1,2 & 3• Raw mill bag house• Raw mill cyclone• Coal mill house• Raw mill hopper• Raw mill house• Raw mill stack• Limestone crusher

Simplex Infrastructures Ltd.

Page 5: Presentation1.Ppt(Sulabh).Ppt(2003)

Major Structures• Main plant sub station• Stacker rail• Dump hopper• Packing plant• Central control room• Fly ash silo• Cement silo-1 & 2• Cement mill house• Water treatment plant• Boiler• Chimney(CPP)• T.G.Building

Simplex Infrastructures Ltd.

Page 6: Presentation1.Ppt(Sulabh).Ppt(2003)

Pre-Heater• Total Quantity : 18902 m3• Total Height of civil structure : 129 m• Status : civil structure completed.• Concrete Equipment : HBT 60C SANY Concrete Pump.

Simplex Infrastructures Ltd.

Page 7: Presentation1.Ppt(Sulabh).Ppt(2003)

Major concrete equipment for Pre-HeaterHBT 60C SANY Concrete pump (Hired)Capacity : 75 m3/hr

HBT 60C SANY Concrete pump (Owned)Capacity : 75 m3/hr

Simplex Infrastructures Ltd.

Page 8: Presentation1.Ppt(Sulabh).Ppt(2003)

Concreting of final slab (height = 129 m ) of Pre Heater .

Simplex Infrastructures Ltd.

Page 9: Presentation1.Ppt(Sulabh).Ppt(2003)

Other views of Pre-Heater

Simplex Infrastructures Ltd.

Page 10: Presentation1.Ppt(Sulabh).Ppt(2003)

Blending Silo

• Total Quantity : • Total Height of civil structure : 84 m• Status : civil structure completed.• Concrete Equipment : Boom Placer, BT 40C Concrete Pump.Simplex Infrastructures Ltd.

Page 11: Presentation1.Ppt(Sulabh).Ppt(2003)

Major Concrete Equipment for Blending SiloBoom Placer (Schwing Stetter)OwnedCapacity : 30 m3/hr

HBT 40C SANY Concrete pump OwnedCapacity : 48 m3/hr

Simplex Infrastructures Ltd.

Page 12: Presentation1.Ppt(Sulabh).Ppt(2003)

Concreting in Blending Silo

Through SANY BOOM PLACER in the starting stage of around 3 m height from ground level.

Simplex Infrastructures Ltd.

Page 13: Presentation1.Ppt(Sulabh).Ppt(2003)

Concreting going on through SANY-VOLVO Boom Placer at Blending Silo

Simplex Infrastructures Ltd.

Page 14: Presentation1.Ppt(Sulabh).Ppt(2003)

Concreting at Blending Silo

Through HBT 40C(SANY) Concrete pump at the height of 55m from ground level.

Simplex Infrastructures Ltd.

Page 15: Presentation1.Ppt(Sulabh).Ppt(2003)

Clinker SiloClinker Silo• Total Quantity : 12582 m3• Total Height of civil structure : • Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO),HBT 40C Concrete Pump.

Simplex Infrastructures Ltd.

Page 16: Presentation1.Ppt(Sulabh).Ppt(2003)

Clinker Silo

Top view of Clinker Silo including Tunnels inside the structure.

Simplex Infrastructures Ltd.

Page 17: Presentation1.Ppt(Sulabh).Ppt(2003)

Major Concrete Equipment for Clinker SiloBoom Placer (SANY-VOLVO) OwnedCapacity : 120 m3/hr

HBT 40C (SANY) OwnedCapacity : 48 m3/hr

Simplex Infrastructures Ltd.

Page 18: Presentation1.Ppt(Sulabh).Ppt(2003)

Clinker Cooler HouseClinker Cooler House• Total Quantity : 2290 m3• Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO),Boom Placer(Schwing Stetter)

Simplex Infrastructures Ltd.

Page 19: Presentation1.Ppt(Sulabh).Ppt(2003)

Clinker Cooler House & Cooler E.S.PClinker Cooler House & Cooler E.S.P• Total Quantity (cooler esp) : 882 m3• Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO)

Simplex Infrastructures Ltd.

Page 20: Presentation1.Ppt(Sulabh).Ppt(2003)

Concrete Equipment for Clinker Cooler House & Cooler E.S.P. Structure

Boom Placer(Schwing Stetter)OwnedCapacity : 30 m3/hr

Boom Placer(SANY-VOLVO) OwnedCapacity : 120 m3/hr

Simplex Infrastructures Ltd.

Page 21: Presentation1.Ppt(Sulabh).Ppt(2003)

Kiln Piers• Total Quantity : 5916 m3• Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO)

Simplex Infrastructures Ltd.

Page 22: Presentation1.Ppt(Sulabh).Ppt(2003)

Concrete Equipment for Kiln Piers 1,2 & 3

Simplex Infrastructures Ltd.

Page 23: Presentation1.Ppt(Sulabh).Ppt(2003)

Completed Kiln Piers 1,2 & 3.

Simplex Infrastructures Ltd.

Page 24: Presentation1.Ppt(Sulabh).Ppt(2003)

KP-IKP-II

KP-III

Simplex Infrastructures Ltd.

Page 25: Presentation1.Ppt(Sulabh).Ppt(2003)

Raw Mill Bag House• Total Quantity : 3278 m3• Total Height of civil structure : • Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO),HBT 40C Concrete Pump.

Raw mill bag house

Simplex Infrastructures Ltd.

Page 26: Presentation1.Ppt(Sulabh).Ppt(2003)

Raw Mill Cyclone• Total Quantity : 12682 m3• Total Height of civil structure : • Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO),HBT 40C Concrete Pump.

Simplex Infrastructures Ltd.

Page 27: Presentation1.Ppt(Sulabh).Ppt(2003)

Raw Mill Hopper• Total Quantity : 12682 m3• Total Height of civil structure : • Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO),HBT 40C Concrete Pump.

Simplex Infrastructures Ltd.

Page 28: Presentation1.Ppt(Sulabh).Ppt(2003)

Simplex Infrastructures Ltd.

Page 29: Presentation1.Ppt(Sulabh).Ppt(2003)

Coal Mill House• Total Quantity : 12682 m3• Total Height of civil structure : • Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO),HBT 40C Concrete Pump.

Simplex Infrastructures Ltd.

Page 30: Presentation1.Ppt(Sulabh).Ppt(2003)

Simplex Infrastructures Ltd.

Page 31: Presentation1.Ppt(Sulabh).Ppt(2003)

Raw Mill House• Total Quantity : 12682 m3• Total Height of civil structure : • Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO),HBT 40C Concrete Pump.

Raw mill house

Simplex Infrastructures Ltd.

Page 32: Presentation1.Ppt(Sulabh).Ppt(2003)

Raw Mill House

Concreting at Raw Mill House(column & beam), through SANY Boom Placer.

Simplex Infrastructures Ltd.

Page 33: Presentation1.Ppt(Sulabh).Ppt(2003)

Raw Mill House

Simplex Infrastructures Ltd.

Page 34: Presentation1.Ppt(Sulabh).Ppt(2003)

Raw Mill Stack• Total Quantity : 12682 m3• Total Height of civil structure : • Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO),HBT 40C Concrete Pump.Simplex Infrastructures Ltd.

Page 35: Presentation1.Ppt(Sulabh).Ppt(2003)

Starting stage of Raw Mill Stack through SANY-VOLVO Boom Placer

Simplex Infrastructures Ltd.

Page 36: Presentation1.Ppt(Sulabh).Ppt(2003)

Raw Mill Stack

Raw mill stack

Simplex Infrastructures Ltd.

Page 37: Presentation1.Ppt(Sulabh).Ppt(2003)

Concreting at Raw Mill Stack through Hoist Winch

Simplex Infrastructures Ltd.

Page 38: Presentation1.Ppt(Sulabh).Ppt(2003)

Limestone Crusher• Total Quantity : 12682 m3 • Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO),HBT 40C Concrete Pump.

Simplex Infrastructures Ltd.

Page 39: Presentation1.Ppt(Sulabh).Ppt(2003)

Simplex Infrastructures Ltd.

Page 40: Presentation1.Ppt(Sulabh).Ppt(2003)

Main Plant Sub Station(MPSS)

• Total Quantity : 12682 m3 • Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO),HBT 40C Concrete Pump.

MPSS

Simplex Infrastructures Ltd.

Page 41: Presentation1.Ppt(Sulabh).Ppt(2003)

Stacker Rail

• Total Quantity : 12682 m3• Status : civil structure completed.• Concrete Equipment : Schwing Stetter (BP-350) Concrete Pump.

Simplex Infrastructures Ltd.

Page 42: Presentation1.Ppt(Sulabh).Ppt(2003)

Simplex Infrastructures Ltd.

Page 43: Presentation1.Ppt(Sulabh).Ppt(2003)

Simplex Infrastructures Ltd.

Page 44: Presentation1.Ppt(Sulabh).Ppt(2003)

Dump Hopper

• Total Quantity : 12682 m3• Total Height of civil structure : • Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO),HBT 40C Concrete Pump.Simplex Infrastructures Ltd.

Page 45: Presentation1.Ppt(Sulabh).Ppt(2003)

Dump Hopper

Simplex Infrastructures Ltd.

Page 46: Presentation1.Ppt(Sulabh).Ppt(2003)

Simplex Infrastructures Ltd.

Page 47: Presentation1.Ppt(Sulabh).Ppt(2003)

Packing Plant• Total Quantity : 12682 m3• Total Height of civil structure : • Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO),HBT 40C Concrete Pump.

Simplex Infrastructures Ltd.

Page 48: Presentation1.Ppt(Sulabh).Ppt(2003)

Central Control Room(CCR)• Total Quantity : 12682 m3• Total Height of civil structure : • Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO),HBT 40C Concrete Pump.

CCR

Simplex Infrastructures Ltd.

Page 49: Presentation1.Ppt(Sulabh).Ppt(2003)

Simplex Infrastructures Ltd.

Page 50: Presentation1.Ppt(Sulabh).Ppt(2003)

Fly Ash Silo

• Total Quantity : 12682 m3• Total Height of civil structure : • Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO),HBT 40C Concrete Pump.

Fly ash silo

Simplex Infrastructures Ltd.

Page 51: Presentation1.Ppt(Sulabh).Ppt(2003)

Simplex Infrastructures Ltd.

Page 52: Presentation1.Ppt(Sulabh).Ppt(2003)

• Total Quantity : 12682 m3• Total Height of civil structure : • Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO),HBT 40C Concrete Pump.

Simplex Infrastructures Ltd.

Page 53: Presentation1.Ppt(Sulabh).Ppt(2003)

Cement Silo – 1 & 2

Concreting at Cement Silo through SANY Boom Placer.

Simplex Infrastructures Ltd.

Page 54: Presentation1.Ppt(Sulabh).Ppt(2003)

Chimney(Captive power plant)

• Total Quantity : 12682 m3• Total Height of civil structure : • Status : civil structure completed.• Concrete Equipment : Boom Placer(SANY-VOLVO),HBT 40C Concrete Pump.Simplex Infrastructures Ltd.

Page 55: Presentation1.Ppt(Sulabh).Ppt(2003)

Simplex Infrastructures Ltd.

Page 56: Presentation1.Ppt(Sulabh).Ppt(2003)

Concreting of Slab at T.G.Building through Concrete Pump(HBT 60C)

Simplex Infrastructures Ltd.

Page 57: Presentation1.Ppt(Sulabh).Ppt(2003)

Thermal Generator Building

Simplex Infrastructures Ltd.

Page 58: Presentation1.Ppt(Sulabh).Ppt(2003)

Simplex Infrastructures Ltd.

Page 59: Presentation1.Ppt(Sulabh).Ppt(2003)

Simplex Infrastructures Ltd.

Page 60: Presentation1.Ppt(Sulabh).Ppt(2003)

Main Workshop

Tried to manage the space (area) in front of our workshop also we got enough area for maintenance and repairing at same time.

Simplex Infrastructures Ltd.

Page 61: Presentation1.Ppt(Sulabh).Ppt(2003)

Site Office(mechanical)

Simplex Infrastructures Ltd.

Page 62: Presentation1.Ppt(Sulabh).Ppt(2003)

Site OfficeWe make plans for concreting and requirements of

equipments with the help of site layout(by finding the minimum path or way to save time)

Simplex Infrastructures Ltd.

Page 63: Presentation1.Ppt(Sulabh).Ppt(2003)

Tried to distribute workload properly among all engineers and mechanics also utilizing the talent of everyone.

Simplex Infrastructures Ltd.

Page 64: Presentation1.Ppt(Sulabh).Ppt(2003)

Equipments

• Batching Plant-1 (Schwing Stetter) 30 m3/hr 01• Batching Plant-2 (MACONS) 45 m3/hr 01• Batching Plant-3 (MACONS) 45 m3/hr 01• Placer Boom-1 (SANY-VOLVO) 120 m3/hr 01• Placer Boom-2 (Schwing Stetter) 30 m3/hr 01• Concrete Pump (HBT 60C,SANY) 75 m3/hr 01• Concrete Pump (HBT 40C,SANY) 48 m3/hr 01• Concrete Pump (Greaves) 30 m3/hr 01• Tower Crane-1 (Jianglu) 08 ton 01• Tower Crane-2 & 3 (Jianglu) 10 ton 02• Loader cum Backhoe (JCB) 02• Hydra (ACE) 11 ton 07• Transit Mixer

Equipments Make Capacity Quantity(N0s)

Simplex Infrastructures Ltd.

Page 65: Presentation1.Ppt(Sulabh).Ppt(2003)

Simplex Infrastructures Ltd.

Page 66: Presentation1.Ppt(Sulabh).Ppt(2003)

Simplex Infrastructures Ltd.

Page 67: Presentation1.Ppt(Sulabh).Ppt(2003)

Production Plant

Simplex Infrastructures Ltd.

Batching Plant – 1 : SCHWING STETTER

Capacity : 30 m3/hr

Batching Plant – 2 : MACONS

Capacity : 45 m3/hr

Batching Plant – 3 : MACONS

Capacity : 45 m3/hr

Page 68: Presentation1.Ppt(Sulabh).Ppt(2003)

Laying Equipment

Simplex Infrastructures Ltd.

Transit MixerCapacity : 6 m3

Page 69: Presentation1.Ppt(Sulabh).Ppt(2003)

Pouring Equipment

Capacity : 120 m3/hr

With 4(four) boom of 27 m height

Simplex Infrastructures Ltd.

Placer Boom – 1 : SANY-VOLVO

Page 70: Presentation1.Ppt(Sulabh).Ppt(2003)

SANY-VOLVO Placer Boom with Skilled Operators.

Simplex Infrastructures Ltd.

Page 71: Presentation1.Ppt(Sulabh).Ppt(2003)

SANY Boom Placer in working condition

Simplex Infrastructures Ltd.

Page 72: Presentation1.Ppt(Sulabh).Ppt(2003)

Boom Placer – 2 (Schwing Stetter)

Simplex Infrastructures Ltd.

Capacity : 30 m3/hr

With 4(four) boom of 22 m height.

Page 73: Presentation1.Ppt(Sulabh).Ppt(2003)

Concrete Pump (SANY - HBT 60 C)

Capacity Capacity : 75 m3/hr

Simplex Infrastructures Ltd.

Page 74: Presentation1.Ppt(Sulabh).Ppt(2003)

Concrete Pump (SANY – HBT 40 C)

Simplex Infrastructures Ltd.

CapacityCapacity : 48 m3/hr

Page 75: Presentation1.Ppt(Sulabh).Ppt(2003)

Concrete Pump (GREAVES)

Capacity Capacity : 30 m3/hr

Simplex Infrastructures Ltd.

Page 76: Presentation1.Ppt(Sulabh).Ppt(2003)

Hand Mixer

Simplex Infrastructures Ltd.

Page 77: Presentation1.Ppt(Sulabh).Ppt(2003)

Major Equipment for Material Lifting, Concreting & Erection

Tower Crane -01 Tower Crane -01 : JIANGLU

Capacity Capacity : 08 ton

Tower Crane – 02 Tower Crane – 02 : JIANGLU

Capacity Capacity : 10 ton

Tower Crane -03 Tower Crane -03 : JIANGLU

Capacity Capacity : 10 ton

Tower Crane -04 Tower Crane -04 : LIBHERR

Capacity Capacity : 05 ton

Simplex Infrastructures Ltd.

T.C-2

T.C-01

T.C-03

Page 78: Presentation1.Ppt(Sulabh).Ppt(2003)

Shifting & Helping Equipments

Hydra – 1 Hydra – 1 : ACECapacity Capacity : 11 ton

Hydra – 2 Hydra – 2 : ACECapacity Capacity : 11 ton

Simplex Infrastructures Ltd.

Page 79: Presentation1.Ppt(Sulabh).Ppt(2003)

Both Hydra engaged in loading

Simplex Infrastructures Ltd.

Page 80: Presentation1.Ppt(Sulabh).Ppt(2003)

Loader cum Backhoe

Simplex Infrastructures Ltd.

Loader cum Backhoe Loader cum Backhoe : JCB

Page 81: Presentation1.Ppt(Sulabh).Ppt(2003)

Some Important equipments have major roles in critical situations.

Simplex Infrastructures Ltd.