Background
○ 20-year old apartment
○ 48 units – 32 2BHK & 16 3BHK
○ 150 number of residents
4
Waste Management System
• 4 Aagha 550 compost bins supplied by PBK WasteSolutions, Bangalore. Two are used at a time for collectionfor about 25 days. The composting time required is about40-45 days.
• Generate about 25 kg wet waste per day which is mixedwith coco peat and microbes and left for 45 days forcompost making. No rodents, mosquitoes or any insectsare seen around the drums. At the end of 45 days, thecompost collected is filtered, dried and saved for our owngarden use and also used with coco peat for makingcompost again. Excess compost is distributed tointerested people.
• Dry and sanitary waste also is segregated and collectedseparately 3 days in a week.
5
Key Needs
1. Options for collection of excess compost produced
2. Options for collection of non-wet waste streams (dry/sanitary etc.).
3. Otions for collection of electronic waste on a monthly basis
© 2012 Veda Corporate Advisors Private Limited
66
PRESENTATION TOMEDIUM CATEGORYWHITEHOUSE APARTMENTS-RT NAGAR
3rd November, 2018
7
Beginnings: Segregation Awareness campaign
○ Displayed notices, calling for volunteers○ Door-to-door campaigns by a dedicated set of volunteers
explained the issue○ Set internal deadlines and published results of best
segregating blocks ○ Set up collection schedules for dry waste with Full circle,
our NGO partner at that time○ Smaller team of volunteers continued to handhold for
about 6 months○ HK staff were authorised to operate on their own
8
Gaining momentum : Processing wet waste in house
Main motivation and guiding principles• Waste is a resource - generate energy for local
requirements with relatively minimal capital investment• At least reduce the carbon footprint of about 2000 urban
residentsOther factors
• Repeated notifications to BG to manage waste in situ; • Lack of clarity on who the BG vendors were
Challenges• Physical blocks - Lack of space and infrastructure• Various mental blocks – on bugs, odours, flies, snakes,
diseases• Longest incubation time (nearly two years to convince MC
members)
9
Home-grown model which combines the crates (Shoba Althea) and the open tank system (Kalyan nagar RWA
Home-grown model which combines the crates (ShobaAlthea) and the open-tank system (Kalyan nagar RWA)
2 dedicated male staff; 200 odd crates; 1 shredder; a locally designed tank system;Total capex approx 1.25 lakhs; About 0.25 tonnes processed per day, rest to MSGP
10
Grateful to
○ Mr NS Ramakant, Ms Anjana and Mr Ravi for the introduction
○ Manoj from Pelican biotech for the gyan on getting started at home
○ MK associates for the shredder○ Meenakshi Bharat for some sane advice on the pit vs tank
dilemma○ Kamal Raj from Reap benefit for importance of aerobics○ Riteways composting for bacterial mix○ A few neighbouring milkmen for cow dung supplies○ Whitehouse MC for the support
© 2012 Veda Corporate Advisors Private Limited
1111
PRESENTATION TOLARGE CATEGORYPURVA VENEZIA - YELAHANKA
3rd November, 2018
12
STATISTICS ON PURVA VENEZIA
○ Total number of Flats : 1332○ Follow 3 way segregation○ Wet waste generated per day: 800–1100 Kgs○ Manure sold so far – 200 tonnes
13
Composting Method
○ Aerobic method using crates stacked vertically○ Basic machinery used○ Training to Hk staff ○ Constant monitoring to check air and moisture
levels in the compost pile
14
Challenges
○ Leachate managementMake sure that adequate brown matter is added to the wet waste
○ Fly menaceProvide proper aerobic conditions for microbial matter to thrive and not let flies prosper
○ Odour issuesWith proper aerobic conditions and leachate management, odour issues get plugged.
15
Value of Compost
○ 25 to 30 days required to get compost out○ Selling compost to farmers nearby○ Manure sold so far 200 tonnes○ Happy farmer shares some fruits he grows
16
Plate bank
○ REFUSE disposables is the mantra○ Started in August 2018 ○ All items made available ‘free of
rent’○ Only maintenance charge
applicable○ Figures so far -- 20,000 plates /
items saved from reaching landfills in <3 months
© 2012 Veda Corporate Advisors Private Limited
1717
PRESENTATION TOISSUE HIGHLIGHTBLACK SPOTS – KAGGADASAPURA GROUP
3rd November, 2018
18
© 2012 Veda Corporate Advisors Private Limited
1919
PRESENTATION TOSUMMARYBAF – KEY SWM FOCUS AREAS
3rd November, 2018
20
BAF Engagement with BBMP : Key Areas of Focus
1. Clear and consistent interpretation andimplementation of regulations
1. Transparency and improved options in theempanelled vendor listing
1. Elimination of black spots and bettermanagement of waste transfer process