Presentation to CSMC – HFA - MoHUA

129
Presentation to CSMC Ashwini Kumar, I.A.S. Secretary (Housing) Urban Development & Urban Housing Department Govt. of Gujarat 17-03-2016

Transcript of Presentation to CSMC – HFA - MoHUA

Page 1: Presentation to CSMC – HFA - MoHUA

Presentation to CSMC

Ashwini Kumar, I.A.S. Secretary (Housing)

Urban Development & Urban Housing Department Govt. of Gujarat

17-03-2016

Page 2: Presentation to CSMC – HFA - MoHUA

Action Taken by GoG

Affordable Housing Mission is declared as the State Level Nodal Agency (SLNA) in the state of Gujarat.

MoA signed by the Principal Secretary, UD & UHD, GoG with MoHUPA, GoI.

State Level Sanctioning and Monitoring Committee (SLSMC) was constituted under the chairmanship of Chief Secretary.

State Level Appraisal Committee (SLAC) constituted with the Chief Engineer of Gujarat Housing board for verification and clearance of the Detailed Project Reports received from the ULBs.

171 Cities are selected from Gujarat for Housing For All Mission (HFA) by MoHUPA, GoI It includes 8 Municipal Corporations & 163 Nagar Palikas.

GoI had approved 44 projects of 32311 DUs of EWS category in 3rd CSMC & 4th CSMC.

Page 3: Presentation to CSMC – HFA - MoHUA

The Abstract of The Projects Proposed

Component No of

Projects Project

Cost No of Dus

GoI Share

GoI 1st Installment

@ 40%

In-situ slum redevelopment

(PPP) 15 69099.83 12646 12646 5058.40

Affordable Housing in

Partnership (AHP)

19 166879.00 22442 33663 13465.20

Total 34 235978.83 35088 46309.00 18523.60

(Rs. In Lacs)

Page 4: Presentation to CSMC – HFA - MoHUA

Funding Pattern

Component GoI Share GoG Share ULB Share Beneficiary

Share

In-situ slum redevelopment

(PPP)

1.00 Lakh per DU

1.00 Lakh per DU + Land as

Resource

- -

Affordable Housing in

Partnership (AHP)-

Greenfield

1.5 Lakh Per DU

1.5 Lakh Per DU

Physical & Social Infra.

+ Land

EWS-I 3.0 Lakh per

DU

EWS-II 5.5 Lakh per

DU

Affordable Housing in

Partnership (AHP)-

Untenable slum

1.5 Lakh Per DU

4.0 Lakh per DU

Physical & Social Infra.

+ Land

Maximum 0.5 to 1.0 Lakh

per DU

Page 5: Presentation to CSMC – HFA - MoHUA

Component wise Details of Projects Proposed

In-situ slum rehabilitation (PPP projects) (Rs. In Lacs)

Sr. No.

Implementing Agency

No of projects

Project cost No of DUs

GOI share per unit

Rs.1.0 lakh

GOI 1st installment

@ 40%

1 Ahmadabad Municipal

Corporation 8 38975.00 7795 7795.00 3118.00

2 Rajkot Municipal

Corporation 3 4871.35 935 935.00 374.00

3 Vadodara Municipal

Corporation 2 20110.48 3276 3276.00 1310.40

4 Bhavnagar Municipal

Corporation 2 5143.00 640 640.00 256.00

Total 15 69099.83 12646 12646.00 5058.40

Page 6: Presentation to CSMC – HFA - MoHUA

Component wise Details of Projects Proposed

Affordable Housing in Partnership (AHP Projects) (Rs. In Lacs)

Sr. No.

Implementing Agency

No of projects

Project cost

No of DUs

GOI share per unit

Rs.1.0 lakh

GOI 1st installment

@ 40%

1 Ahmadabad Municipal

Corporation 1 21635.77 3472 5208.00 2083.20

2 Vadodara Municipal

Corporation 1 1779.69 416 624.00 249.60

3 Vadodara Urban

Development Authority

1 4151.50 490 735.00 294.00

4 Surat Municipal

Corporation 2 44072.87 5017 7525.50 3010.20

5 Surat Urban

Development Authority

1 20699.92 2400 3600.00 1440.00

Page 7: Presentation to CSMC – HFA - MoHUA

Component wise Details of Projects Proposed

Affordable Housing in Partnership (AHP Projects) (Rs. In Lacs)

Sr. No.

Implementing Agency

No of projects

Project cost

No of DUs

GOI share per unit

Rs.1.0 lakh

GOI 1st installment

@ 40%

6 Bhavnagar Municipal

Corporation 1 15003.63 2501 3751.50 1500.60

7 Jamnagar Municipal

Corporation

4 10337.00 1504 2256.00 902.40

8 Jamnagar Area Development

Authority

1 7100.16 1008 1512.00 604.80

9 Junagadh Municipal

Corporation

1 6866.20 882 1323.00 529.20

10 Chorwad

Nagarpalika 1 5808.57 792 1188.00 475.20

Page 8: Presentation to CSMC – HFA - MoHUA

Component wise Details of Projects Proposed

Affordable Housing in Partnership (AHP Projects) (Rs. In Lacs)

Sr. No.

Implementing Agency

No of projects

Project cost

No of DUs

GOI share per unit

Rs.1.0 lakh

GOI 1st installment

@ 40%

11 Unja

Nagarpalika 1 2900.80 360 540.00 216.00

Untenable Slums covered in AHP

12 Rajkot Municipal

Corporation 4 26523.29 3600 5400.00 2160.00

Total 19 166879.40 22442 33663 13465.2

Page 9: Presentation to CSMC – HFA - MoHUA

Highlights of various projects

Very high demand received as per the previous demand survey assessment

Higher demand is expected as per New Income criteria.

i.e. In Ahmedabad City 43,000 applications received against 4000 DUs.

In Surat City also good response from applicants.

Along with houses social infrastructure i.e. Anganwadi, Health center, etc. will be provided by respective ULBs.

Respective ULBs provide their land as resource for the projects.

ULC land is being used for Housing projects by Rajkot Municipal Corporation.

Around 10,000 DUs with carpet area 31–40 Sq.mt allotted to beneficiaries with their maximum contribution of Rs 7.50 lacs per DU.

We have taken care of beneficiaries and select location where they can get

“Livelihood.”

Selected sites are situated at “prime location” in the city.

Page 10: Presentation to CSMC – HFA - MoHUA

Ahmadabad Municipal Corporation

Affordable Housing in partnership

Page 11: Presentation to CSMC – HFA - MoHUA

Ahmedabad Project details

• 9-Locations : TP-110 -Nikol -FP-108, TP-37-Thaltej- FP-201

TP 32-Gota- FP-171, TP – 21- Motera-FP - 396

TP-39 -Thaltej FP-52, TP 42- Thaltej-FP-255

TP - 44,Chandkheda-FP - 233/2

TP - 2,Thaltej FP - 100/P, TP - 42-Thaltej- FP –278

• Project Cost : 21635.768 Lakh

• No of DUs : 3472 (EWS-I)

• Carpet Area : 26.92 Sq.mt

• Structure Type : P+7

• Cost per DU : 6.23 Lakh

• Total plot Area : 59757.00 Sq.mt

• Trunk infrastructure : Available near vicinity

Page 12: Presentation to CSMC – HFA - MoHUA

Ahmedabad Project Locations snapshots

TP-37-THALTEJ- FP-201 TP - 44,Chandkheda-FP - 233/2

Page 13: Presentation to CSMC – HFA - MoHUA

Ahmedabad - Project cost breakup

Housing Cost Infrastructure cost Other Cost Total

19290.53 1715.07 630.16 21635.76

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 21635.76

Central Share

(RS.150000 per Dwelling Unit) 5208.00

State Share

(RS.150000 per Dwelling Unit) 5208.00

ULB Share

(RS.23150 per Dwelling Unit)

Social Infrastructure +

803.77 + land

Beneficiary Share

(RS.300000 per Dwelling Unit) 10416.00

Page 14: Presentation to CSMC – HFA - MoHUA

Ahmedabad - Layout

Sr.

No. Area Size in Mts

1 Hall 3.14 X 2.80

2 Room 3.00 X 2.80

3 Kitchen 2.00 X 3.15

4 Bath 1.2 X 1.00

5 W.C 1.00 X 1.00

Carpet

Area 26.92 Sq. Mt

EWS-I

Page 15: Presentation to CSMC – HFA - MoHUA

Vadodara Municipal Corporation

Affordable Housing in partnership

Page 16: Presentation to CSMC – HFA - MoHUA

Vadodara - Project details

• 2 - Locations : T.P No-1 , FP-119 ,Sayajipura ,

T.P No-1 , FP-124 , Sayajipura

• Project Cost : 1779.69 Lakh

• No of DUs : 416 (Rental DU)

• Carpet Area : 16.00 Sq.mt

• Structure Type : P+4/ G+4

• Cost per DU : 4.27 Lakh

• Total plot Area : 5425.49 Sq.mt

• Trunk infrastructure : Available near vicinity

Project needs :

To provide slum dwellers temporary clean & pucca house during

Transit period and the scheme will focus on housing for industrial workers,

labors, slum dwellers.

Page 17: Presentation to CSMC – HFA - MoHUA

Vadodara - Project Locations snapshots

TP-1, FP-119

TP – 1,FP - 124

Page 18: Presentation to CSMC – HFA - MoHUA

Vadodara - Project cost breakup

Housing Cost Infra. cost Other Cost Total

1365.4 195.65 218.57 1779.69

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 1779.69

Central Share

(RS.150000 per Dwelling Unit) 624.00

State Share

(RS.150000 per Dwelling Unit) 624.00

ULB Share

(RS.127000 per Dwelling Unit) 531.69 + Land

Beneficiary Share -

Page 19: Presentation to CSMC – HFA - MoHUA

VADODARA - Layout

AREA STATEMENT

Sr.

No. Area Size in Mts

1 Bedroom 3.00x3.00

2 Kitchen 2.16x1.60

3 Bath 1.05x1.15

4 W.C 1.00x1.00

CARPET AREA 16.00 S.Mtr.

Page 20: Presentation to CSMC – HFA - MoHUA

Vadodara Urban Development Authority

Affordable Housing in partnership

Page 21: Presentation to CSMC – HFA - MoHUA

VUDA - Project details

• Location : TP No 1, FP No 75, Sevasi

• Project Cost : 4151.55 Lakh

• No of Dus : 490 (EWS – II)

• Carpet Area : 36.14 Sq.mt

• Structure Type : G + 7

• Cost per DU : 8.47 Lakh

• Total plot Area : 8625.48 Sq.mt

• Trunk infrastructure : Available near vicinity

Page 22: Presentation to CSMC – HFA - MoHUA

VUDA - Project cost breakup

Housing Cost Infra. cost Other Cost Total

3789.69 164.17 197.69 4151.55

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 4151.55

Central Share

(RS.150000 per Dwelling Unit) 735.00

State Share

(RS.150000 per Dwelling Unit) 735.00

ULB Share Land

Beneficiary Share

(RS.550000 per Dwelling Unit) 2681.55

Page 23: Presentation to CSMC – HFA - MoHUA

VUDA - Layout

AREA STATEMENT

Sr.

No. Area Size in Mts

Sq.

Mtr

1 Bedroom 3.00 X 3.20 9.50

2 Kitchen 2.05 X 2.60 5.33

3 Bath 1.06 X 1.51 1.6

4 W.C 1.06 X 1.12 1.17

5 Living Area 4.43 X 3.03 13.42

6 Wash Area 2.06 X 0.80 1.65

7 Balcony 1.50 X 1 1.50

CARPET AREA 36.14

EWS-II

Page 24: Presentation to CSMC – HFA - MoHUA

Rajkot Municipal Corporation

Affordable Housing in partnership

Page 25: Presentation to CSMC – HFA - MoHUA

Rajkot Project details

•Location : TPS-28, FP-49/C, Mavdi

• Project Cost : 4966.47 Lakh

• No of DUs : 616 (EWS-I)

• Carpet Area : 30.00 Sq.mt

• Cost per DU : 7.16 Lakh

•Structure Type : G + 7

• Trunk infrastructure : Available near vicinity

Project highlight

The project aims to relocate 616 slum dwellers from

Jungleshwar slum which is an ‘Untenable slum’ as located in low lying

area of Aji river for feasibility of Lake Development Project.

Page 26: Presentation to CSMC – HFA - MoHUA

Rajkot - Project cost breakup

Housing Cost Infra. cost Other Cost Total

4173.67 533.91 258.92 4966.47

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 4966.47

Central Share

(RS.150000 per Dwelling Unit) 924.00

State Share

(RS.400000 per Dwelling Unit) 2464.00

ULB Share

(RS.260000 per Dwelling Unit)

Land + 1270.47

Beneficiary Share

(RS.50000 per Dwelling Unit) 308.00

Page 27: Presentation to CSMC – HFA - MoHUA

Rajkot - Layout

Sr.

No.

Area Size in Mts

1 Bedroom 2.75 X 2.90

2 Kitchen 1.75 X 2.13

4 W.C 1.00 X 1.00

5 Living Area 3.75 X 2.90

6 Wash Area 1.75 X 0.90

CARPET AREA: 30.00 Sq.mt

EWS-I

Page 28: Presentation to CSMC – HFA - MoHUA

Rajkot Project details

•Location : TPS-28, FP-12/A, Mavdi

• Project Cost : 9133.06 Lakh

• No of DUs : 1176 (EWS-I)

• Carpet Area : 30.00 Sq.mt

• Cost per DU : 7.36 Lakh

•Structure Type : G + 7

• Trunk infrastructure : Available near vicinity

Project highlight

The project aims to relocate 1176 slum dwellers from

Jungleshwar slum which is an ‘Untenable slum’ as located

in low lying area of Aji river for feasibility of Lake Development

Project.

Page 29: Presentation to CSMC – HFA - MoHUA

Rajkot - Project cost breakup

Housing Cost Infra. cost Other Cost Total

7912.30 744.63 476.13 9133.06

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 9133.06

Central Share

(RS.150000 per Dwelling Unit) 1764.00

State Share

(RS.400000 per Dwelling Unit) 4704.00

ULB Share

(RS.176000 per Dwelling Unit) Land + 2077.06

Beneficiary Share

(RS.50000 per Dwelling Unit) 588.00

Page 30: Presentation to CSMC – HFA - MoHUA

Rajkot - Layout

Sr.

No.

Area Size in Mts

1 Bedroom 2.75 X 2.90

2 Kitchen 1.75 X 2.13

4 W.C 1.00 X 1.00

5 Living Area 3.75 X 2.90

6 Wash Area 1.75 X 0.90

CARPET AREA: 30.00 Sq.mt

EWS-I

Page 31: Presentation to CSMC – HFA - MoHUA

Rajkot Project details

• Location : TPS-6, Rajkot FP-160, Laludi

Vokdi

• Project Cost : 8716.11 Lakh

• No of Dus : 1264 (EWS-I)

• Carpet Area : 27.00 Sq.mt

• Cost per DU : 6.53 Lakh

• Structure Type : G + 3

• Trunk infrastructure : Available near vicinity

Project highlight

The project aims to relocate 1264 slum dwellers from which is

an ‘Untenable slum’ as located in low lying area of Aji river for

feasibility of Lake Development Project.

Page 32: Presentation to CSMC – HFA - MoHUA

Rajkot - Project cost breakup

Housing Cost Infra. cost Other Cost Total

6899.43 1362.29 454.39 8716.11

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 8716.11

Central Share

(RS.150000 per Dwelling Unit) 1896.00

State Share

(RS.400000 per Dwelling Unit) 5056.00

ULB Share

(RS.89500 per Dwelling Unit) Land + 1132.11

Beneficiary Share

(RS.50000 per Dwelling Unit) 632.00

Page 33: Presentation to CSMC – HFA - MoHUA

Rajkot - Layout

Sr. No. Area Size in Mts

1 Hall 3.75 X 3.0

2 Room 2.85 X 2.85

3 Kitchen 1.74 X 2.18

4 Bath 0.91X 1.10

5 W.C 0.91X 1.00

6 Wash 1.47 X 0.90

Carpet Area 30.00 Sq.mt

EWS-I

Page 34: Presentation to CSMC – HFA - MoHUA

Rajkot Project details

• Location : TPS-14, Rajkot, FP-3/B,

• Project Cost : 3707.65 Lakh

• No of Dus : 544 (EWS-I)

• Carpet Area : 27.18 Sq.mt

• Cost per DU : 6.44 Lakh

• Structure Type : G + 3

• Trunk infrastructure : Available near vicinity

Project highlight

The project aims to relocate slum dwellers of Sagarnagar & Bet

Dwarka slums as located in ‘Untenable’ low lying area of lake Randarda

for feasibility of Lake Development Project.

Page 35: Presentation to CSMC – HFA - MoHUA

Rajkot - Project cost breakup

Housing Cost Infra. cost Other Cost Total

3156.72 357.64 193.29 3707.65

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 3707.65

Central Share

(RS.150000 per Dwelling Unit) 816.00

State Share

(RS.400000 per Dwelling Unit) 2176.00

ULB Share

(RS.81500 per Dwelling Unit) Land + 443.65

Beneficiary Share

(RS.50000 per Dwelling Unit) 272.00

Page 36: Presentation to CSMC – HFA - MoHUA

Rajkot - Layout

Sr. No. Area Size in Mts

1 Hall 3.75 X 3.0

2 Room 2.85 X 2.85

3 Kitchen 1.74 X 2.18

4 Bath 0.91X 1.10

5 W.C 0.91X 1.00

6 Wash 1.47 X 0.90

Carpet Area 30.00 Sq.mt

EWS-I

Page 37: Presentation to CSMC – HFA - MoHUA

Suart Municipal Corporation

Affordable Housing in partnership

Page 38: Presentation to CSMC – HFA - MoHUA

Surat Project details

•3 - Locations : T.P. 25 (Mota Varachha) F.P. 147,

T.P.27 (Utran- Kosad) F.P. 190, and

T.P.35 (Katargam) F.P. 120)

•Project Cost : 13623.44 Lakh

• No of Dus : 1896 (EWS-I)

• Carpet Area : 26.07 Sq.mt

• Structure Type : P+8 @ 1 site, P + 11 & P+12

combined @ 1 site & P + 13 @ 1 site

• Plot area : 23278.00 Sq.Mt

• Cost per DU : 7.05 ,7.32 Lakh

• Trunk infrastructure : Available near vicinity

Page 39: Presentation to CSMC – HFA - MoHUA

Surat - Project cost breakup

Housing Cost Infra. cost Other Cost Total

12581.89 644.75 396.79 13623.43

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 13623.43

Central Share

(RS.150000 per Dwelling Unit) 2844.00

State Share

(RS.150000 per Dwelling Unit) 2844.00

ULB Share

(RS.118000 per Dwelling Unit)

Land+ Social Infrastructure + 2247.44

Beneficiary Share

(RS.300000 per Dwelling Unit) 5688.00

Page 40: Presentation to CSMC – HFA - MoHUA

Surat - Layout

Sr. No. Area Size in Mts

1 Hall 3.14 X 2.80

2 Room 3.00 X 2.80

3 Kitchen 2.00 X 3.15

4 Bath 1.20 X 1.00

5 W.C 1.00 X 1.00

Carpet Area 26.07 Sq. Mt

EWS-I

Page 41: Presentation to CSMC – HFA - MoHUA

Surat Project details

• 9 - Locations : T.P. 25 (Mota Varachha) F.P. 165, T.P. 11 (Puna - Simada) F.P. 68, T.P. 19 (Katargam),F.P. 205, T.P.25 (Siganpore - Tunki) F.P. 74, T.P.25(Siganpore - Tunki) F.P. 97, T.P.27(Utran - Kosad) F.P.167, T.P.27(Utran -Kosad) F.P.180, T.P.27(Utran - Kosad) F.P.191 T.P.49(Katargam) F.P 269)

• Project Cost : 30449.43 Lakh • No of Dus : 3121 (EWS-II) • Carpet Area : 32.93 Sq.mt

• Structure Type : P + 5 @ 2 sites, P + 8 @ 4 sites, P + 10, P +11 & P +12 @ 1 site

• Plot area : 49059 Sq.Mt • Cost per DU : 9.88 Lakh • Trunk infrastructure : Available near vicinity

Page 42: Presentation to CSMC – HFA - MoHUA

Surat - Project cost breakup

Housing Cost Infra. cost Other Cost Total

27580.87 1981.69 886.88 30449.44

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 30449.44

Central Share

(RS.150000 per Dwelling Unit) 4681.50

State Share

(RS.150000 per Dwelling Unit) 4681.50

ULB Share

(RS.125000 per Dwelling Unit)

Land+ Social Infrastructure +3920.94

Beneficiary Share

(RS.550000 per Dwelling Unit) 17165.50

Page 43: Presentation to CSMC – HFA - MoHUA

Surat - Layout

Sr. No. Area Size in Mts

1 Hall 3.90 X 3.0

2 Room 3.25 X 2.75

3 Kitchen 2.25 X 2.38

4 Bath 1.12 X 1.00

5 W.C 1.00 X 1.10

Carpet Area 32.93 Sq. Mts

EWS-II

Page 44: Presentation to CSMC – HFA - MoHUA

Suart Urban Development Authority

Affordable Housing in partnership

Page 45: Presentation to CSMC – HFA - MoHUA

SUDA Project details •2 - Locations : FP No -384, T.P.S NO-35 (Kumbharia - Saroli - Saniya Hemad - Devedh)

FP-NO 192 OF TP NO 34 Pali – Sachin - Kansad

• Project Cost : 20699.93 Lakh

• No of DUs : 2400 (EWS-I + EWS-II)

EWS-I : 1376 (992+ 384),

EWS-II : 1024

• Carpet Area : EWS-I- 27.86, 28.88, 29.13

EWS-II- 33.11 Sq.mt

• Structure Type : EWS – I - P + 4 & P + 10,

EWS – II P + 11

• Plot area : 53067.54 Sq. Mt

• Cost per DU : EWS-I- 6.79 ,8.51 Lakh

EWS-II- 9.41 Lakh

• Trunk infrastructure : Available near vicinity

Page 46: Presentation to CSMC – HFA - MoHUA

SUDA - Project cost breakup

Housing Cost Infra. cost Other Cost Total

18553.81 1160.41 985.71 20699.93

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 20699.93

Central Share

(RS.150000 per Dwelling Unit) 3600.00

State Share

(RS.150000 per Dwelling Unit) 3600.00

ULB Share

(RS.155000 per Dwelling Unit)

Land + 3739.33

Beneficiary Share

(EWS-I: Rs.300000 per Dwelling Unit

EWS-II Rs.550000 per Dwelling Unit)

9760.00

Page 47: Presentation to CSMC – HFA - MoHUA

SUDA - Layout

Sr. No. Area Size in Mts

1 Hall 3.90 X 3.0

2 Room 3.25 X 2.75

3 Kitchen 2.25 X 2.38

4 Bath 1.12 X 1.00

5 W.C 1.00 X 1.10

Carpet Area 33.11 Sq. Mts

EWS-II

Page 48: Presentation to CSMC – HFA - MoHUA

Bhavnagar Municipal Corporation

Affordable Housing in partnership

Page 49: Presentation to CSMC – HFA - MoHUA

Bhavnagar Project details

• 9 - Locations : TP-12 – Tarsamiya , FP-48

TP-12 – Tarsamiya, FP- 51

TP-12 – Tarsamiya, FP- 47

TP-12 – Tarsamiya ,FP- 46 TP-3 – Ruva, FP-104

TP-3- Ruva, FP- 98

TP-2-A Fulsar, FP-30

TP-8- Ruva, FP-29

TP-8- Ruva, FP-28

• Project Cost : 21635.768 Lakh

• No of Dus : 2501 (EWS-I)

• Carpet Area : 28.00 Sq.mt

• Structure Type : Two site P+5, Seven site P+7

• Cost per DU : 5.89 to 6.44 Lakh

• Total plot Area : 42583.12 Sq.mt

• Trunk infrastructure : Available near vicinity

Page 50: Presentation to CSMC – HFA - MoHUA

Bhavnagar - Project cost breakup

Housing Cost Infrastructure cost Other Cost Total

12223.72 2057.35 722.62 15003.63

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 15003.63

Central Share

(RS.150000 per Dwelling Unit) 3751.5

State Share

(RS.150000 per Dwelling Unit) 3751.5

ULB Share Land

Beneficiary Share

(RS.300000 per Dwelling Unit) 7500.63

Page 51: Presentation to CSMC – HFA - MoHUA

Bhavnagar - Layout Plan & DUs Plan

Sr. No. Area Size in Mts Sq Mtrs

1 Hall 2.85 x 2.98 8.49

2 Room 3.0 x 2.75 8.25

3 Kitchen 1.95 x 2.30 4.49

4 Bath 1.00 x 1.85 1.85

5 W.C 1.00 x 1.00 1

6 Wash 1.82 X 0.90 1.64

7 C.B. 1.87 X 0.45 0.84

Carpet Area 28 Sq. Mts

EWS-I

Page 52: Presentation to CSMC – HFA - MoHUA

Jamnagar Municipal Corporation

Affordable Housing in partnership

Page 53: Presentation to CSMC – HFA - MoHUA

Jamnagar Project details

•Location : F . P. No. 70, T. P. Scheme No.

3A, B/h Gold Star Battery,

Hapa Road

• Project Cost : 1538.91Lakh

• No of Dus : 256 (EWS-I)

• Carpet Area : 29.35 Sq.mt

• Structure Type : P+8

• Plot area : 3440.00 Sq.Mt

• Cost per DU : 6.01 Lakh

• Trunk infrastructure : Available near vicinity

Page 54: Presentation to CSMC – HFA - MoHUA

Jamnagar - Project cost breakup

Housing Cost Infra. cost Other Cost Total

1297.55 320.95 0 1538.91

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 1538.91

Central Share

(RS.150000 per Dwelling Unit) 384.00

State Share

(RS.150000 per Dwelling Unit) 384.00

ULB Share

(RS.1100 per Dwelling Unit)

2.91 + Land

Beneficiary Share

(EWS-I: Rs.300000 per Dwelling Unit) 768

Page 55: Presentation to CSMC – HFA - MoHUA

Jamnagar - Layout

Sr.

No.

Area Size in Mts

1 Hall 505 X 2.75

2 Room 3.03 X 3.05

3 Kitchen 1.90 X 2.00

4 Bath 1.05 X 1.10

5 W.C 1.07 X 1.00

6 Wash 0.91 X 1.95

Carpet Area 29.35 Sq. Mts

EWS-I

Page 56: Presentation to CSMC – HFA - MoHUA

Jamnagar Project details

• Location : F. P. No. 71, T. P. Scheme No.

3A, B/h Gold Star Battery,

Hapa Road

• Project Cost : 4048.20Lakh

• No of Dus : 672 (EWS-I)

• Carpet Area : 29.35 Sq.mt

• Structure Type : P + 8

• Plot area : 9122.00 Sq.Mt

• Cost per DU : 6.02 Lakh

• Trunk infrastructure : Available near vicinity

Page 57: Presentation to CSMC – HFA - MoHUA

Jamnagar - Project cost breakup

Housing Cost Infra. cost Other Cost Total

3197.13 819.46 31.61 4048.20

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 4048.20

Central Share

(RS.150000 per Dwelling Unit) 1008.00

State Share

(RS.150000 per Dwelling Unit) 1008.00

ULB Share

(RS.2400 per Dwelling Unit)

16.20 + Land

Beneficiary Share

(EWS-I: Rs.300000 per Dwelling Unit) 2016

Page 58: Presentation to CSMC – HFA - MoHUA

Jamnagar - Layout

Sr.

No.

Area Size in Mts

1 Hall 505 X 2.75

2 Room 3.03 X 3.05

3 Kitchen 1.90 X 2.00

4 Bath 1.05 X 1.10

5 W.C 1.07 X 1.00

6 Wash 0.91 X 1.95

Carpet Area 29.35 Sq. Mts

EWS-I

Page 59: Presentation to CSMC – HFA - MoHUA

•Location : F. P. No. 88, T. P. Scheme No. 2,

B/h Lalwadi Primary School

• Project Cost : 2270.87 Lakh

• No of Dus : 288 (EWS-II)

• Carpet Area : 39.85 Sq.mt

• Structure Type : P+8

• Plot area : 6001.00 Sq.Mt

• Cost per DU : 7.88 Lakh

• Trunk infrastructure : Available near vicinity

Jamnagar - Project details

Page 60: Presentation to CSMC – HFA - MoHUA

Jamnagar - Project cost breakup

Housing Cost Infra. cost Other Cost Total

2142.94 127.92 0 2270.87

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 2270.87

Central Share

(RS.150000 per Dwelling Unit) 432.00

State Share

(RS.150000 per Dwelling Unit) 432.00

ULB Share Land

Beneficiary Share

(EWS-II: Rs.550000 per Dwelling Unit) 1407.00

Page 61: Presentation to CSMC – HFA - MoHUA

Jamnagar - Layout

Sr.

No.

Area Size in Mts

1 Hall 3.05 X 4.17

2 Room 3.31 X 3.20

3 Study Room 2.60 X 2.75

4 Kitchen 1.80 X 2.24

5 Store 0.88 X 0.92

6 Bath 1.00 X 1.20

7 W.C 1.00 X 1.07

8 Wash 0.92 X 2.33

Carpet Area 39.85 Sq. Mts

EWS-II

Page 62: Presentation to CSMC – HFA - MoHUA

• Location : F. P. No. 96, T. P. Scheme No. 1,

B/h Police Head Quarters,

• Project Cost : 2479.02 Lakh

• No of Dus : 288 (EWS-II)

• Carpet Area : 39.85 Sq.mt

• Structure Type : P+8

• Plot area : 8610.00 Sq.Mt

• Cost per DU : 8.61 Lakh

• Trunk infrastructure : Available near vicinity

Jamnagar - Project details

Page 63: Presentation to CSMC – HFA - MoHUA

Jamnagar - Project cost breakup

Housing Cost Infra. cost Other Cost Total

2142.94 252.66 83.40 2479.02

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 2479.02

Central Share

(RS.150000 per Dwelling Unit) 432.00

State Share

(RS.150000 per Dwelling Unit) 432.00

ULB Share

(RS.10700 per Dwelling Unit)

31.02 + Land

Beneficiary Share

(EWS-II: Rs.550000 per Dwelling Unit) 1584.00

Page 64: Presentation to CSMC – HFA - MoHUA

Jamnagar - Layout

Sr.

No.

Area Size in Mts

1 Hall 3.05 X 4.17

2 Room 3.31 X 3.20

3 Study Room 2.60 X 2.75

4 Kitchen 1.80 X 2.24

5 Store 0.88 X 0.92

6 Bath 1.00 X 1.20

7 W.C 1.00 X 1.07

8 Wash 0.92 X 2.33

Carpet Area 39.85 Sq. Mts

EWS-II

Page 65: Presentation to CSMC – HFA - MoHUA

Jamnagar Area Development Authority

Affordable Housing in partnership

Page 66: Presentation to CSMC – HFA - MoHUA

•Location : T. P. Scheme No. 1, F.P. No. 66,

Nr. Mohannagar, Jamnagar

• Project Cost : 7100.16 Lakh

• No of Dus : 1008 (EWS-I)

• Carpet Area : 26.86 Sq.mt

• Structure Type : P + 7

• Plot area : 29219.91 Sq.Mt

• Cost per DU : 5.81 Lakh

• Trunk infrastructure : Available near vicinity

JADA - Project details

Page 67: Presentation to CSMC – HFA - MoHUA

JADA -Project cost breakup

Housing Cost Infra. cost Other Cost Total

5865.70 877.08 357.36 7100.16

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 7100.16

Central Share

(RS.150000 per Dwelling Unit) 1512.00

State Share

(RS.150000 per Dwelling Unit) 1512.00

ULB Share

(RS.104000 per Dwelling Unit)

1052.16 + land

Beneficiary Share

(EWS-I: Rs.300000 per Dwelling Unit) 3024.00

Page 68: Presentation to CSMC – HFA - MoHUA

JADA - Layout

Sr. No. Area Size in Mts

1 Hall 3.00 X 3.06

2 Bed Room 3.00 X 2.7

3 Kitchen 1.93 X 1.95

4 Bath 1.08 X 1.8

5 W.C 0.9 X 1.18

6 Wash 1.5 X 0.9

Carpet Area 26.86 Sq. Mts

EWS-I

Page 69: Presentation to CSMC – HFA - MoHUA

Junagadh Municipal Corporation

Affordable Housing in partnership

Page 70: Presentation to CSMC – HFA - MoHUA

• Location : Zanzarda Road, Survey no.

4/1 part

• Project Cost : 6866.20 Lakh

• No of DUs : 882 (EWS-I + EWS-II)

EWS–I : 210, EWS–II : 672

• Carpet Area : EWS–I : 29.98 Sq.mt

EWS–II : 39.77 Sq.mt

• Structure Type : P + 7

• Cost per DU : EWS–I : 5.50 Lakh &

EWS–II : 8.50 Lakh

• Total plot Area : 20000 Sq.mt

• Trunk infrastructure : Available near vicinity

Junagadh - Project details

Page 71: Presentation to CSMC – HFA - MoHUA

Junagadh - Project cost breakup

Housing Cost Infrastructure cost Other Cost Total

6086.85 779.35 0.00 6866.20

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 6866.20

Central Share

(RS.150000 per Dwelling Unit) 1323.00

State Share

(RS.150000 per Dwelling Unit) 1323.00 + Land

ULB Share 0

Beneficiary Share

(EWS-I :RS.300000 per Dwelling Unit

EWS-II :RS.550000 per Dwelling Unit)

4220.20

Page 72: Presentation to CSMC – HFA - MoHUA

Junagadh - Layout Plan

EWS – I

Sr. No. Area Size in Mts

1 Hall 3.05 X 3.89

2 Bed Room 3.20 X 2.76

3 Kitchen 2.30 X 1.80

4 Bath 1.03 X 1.26

5 W.C 1.00X1.07

6 Wash 0.8 X 1.80

Carpet Area 29.98 Sq. Mts

Page 73: Presentation to CSMC – HFA - MoHUA

Junagadh - Layout Plan

EWS – II

Sr. No. Area Size in Mts

1 Hall 2.70X4.21

2 Bed Room 1 2.70X3.68

3 Bed Room 2 3.00 X 2.70

4 Kitchen 1.9 X 2.10

5 Bath 1.23 X 1

6 W.C 1.03 X 0.9

7 Wash 0.8 X 2.1

Carpet Area 39.77 Sq. Mts

Page 74: Presentation to CSMC – HFA - MoHUA

Chorwad Nagarpalika

Affordable Housing in partnership

Page 75: Presentation to CSMC – HFA - MoHUA

• Location : Bandar Road – Survey no

130/p, Chorwad

• Project Cost : 5808.57 Lakh

• No of Dus : 792 (EWS-I + EWS-II)

EWS-I : 280, EWS-II : 512

• Carpet Area : EWS-I -29.94 Sq.mt

EWS-II- 39.77 Sq.mt

• Structure Type : G + 3

• Plot area : 31000.00 Sq.Mt

• Cost per DU : EWS-I -5.50 Lakh

EWS-II- 8.34 lakh

• Trunk infrastructure : Available near vicinity

Chorwad - Project details

Page 76: Presentation to CSMC – HFA - MoHUA

Chorwad - Project cost breakup

Housing Cost Infra. cost Other Cost Total

4993.80 814.77 0.00 5808.57

(Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 5808.57

Central Share

(RS.150000 per Dwelling Unit) 1188.00

State Share

(RS.150000 per Dwelling Unit) 1188.00

ULB Share Land

Beneficiary Share

(EWS-I: Rs.300000 per Dwelling Unit,

EWS-II: Rs.550000 per Dwelling Unit)

3432.57

Page 77: Presentation to CSMC – HFA - MoHUA

Chorwad - Layout

Sr. No. Area Size in Mts

1 Hall 3.05 X 3.89

2 Bed Room 3.20 X 2.76

3 Kitchen 2.30 X 1.80

4 Bath 1.03 X 1.26

5 W.C 1.00X1.07

6 Wash 0.8 X 1.80

Carpet Area 29.94 Sq. Mts

EWS-I

Page 78: Presentation to CSMC – HFA - MoHUA

Chorwad - Layout

Sr. No. Area Size in Mts

1 Hall 2.70X4.21

2 Bed Room 1 2.70X3.68

3 Bed Room 2 3.00 X 2.70

4 Kitchen 1.9 X 2.10

5 Bath 1.23 X 1

6 W.C 1.03 X 0.9

7 Wash 0.8 X 2.1

Carpet Area 39.77 Sq. Mts

EWS-II

Page 79: Presentation to CSMC – HFA - MoHUA

Unja Nagarpalika , Dist-Mahesana

Affordable Housing in partnership

Page 80: Presentation to CSMC – HFA - MoHUA

• Location : F.P.-270, atT.P.-7, Near Unja

city Ring Road

• No of DUs : 360 (EWS-II)

• Project Cost : 2970.81 Lakh

• Structure Type : P + 3

• Plot area : 31000.00 Sq.mt

• Carpet Area : 40.00 Sq.mt

• Cost per DU : 8.25 Lakh

• Trunk infrastructure : Available near vicinity

Unja - Project details

Page 81: Presentation to CSMC – HFA - MoHUA

Unja - Project cost breakup (Rs. In Lacs)

Cost Mechanism

Component Amount in Rs. Lakh Project Cost 2970.81

Central Share

(RS.150000 per Dwelling Unit) 540.00

State Share

(RS.150000 per Dwelling Unit) 540.00

ULB Share Land

Beneficiary Share

(RS.550000 per Dwelling Unit) 1890.72

Housing Cost Infra. cost Other Cost Total

2521.68 307.67 141.46 2970.81

Page 82: Presentation to CSMC – HFA - MoHUA

Unja - Layout Plan

EWS – II

Sr. No. Area Size in Mts

1 Hall 4.07 X 3.15

2 Bed Room 1 2.70X3.00

3 Bed Room 2 3.05 X 3.00

4 Kitchen 2.10 X 2.00

5 Toilet 1.20 X 1.67

6 Wash 0.9 X 2.0

Carpet Area 40.00 Sq.mt

Page 83: Presentation to CSMC – HFA - MoHUA

Unja - 3D Layout Plan

Page 84: Presentation to CSMC – HFA - MoHUA

Ahmedabad Municipal Corporation In-situ Slum Redevelopment

Page 85: Presentation to CSMC – HFA - MoHUA

Ahmedabad - Projects selected for “In-situ” Slum Redevelopment Projects under PMAY

Sr

No. Zone Ward Slum Name

TP

Scheme

FP

Number

No of

Huts

1 West Juna Vadaj Rohidasnagar 28 562 480

2 West Sabarmati Kailasnagar 23 453 to 460 80

3 West Juna Vadaj Ramapir no Tekro 28 330, 331,

413, 415,

416, 537/1,

537/2,563/

1, 563/2,

564, 713/1,

713/2/1 &

713/2/2

1210

4 West Juna Vadaj Ramapir no Tekro 28 800

5 West Juna Vadaj Ramapir no Tekro 28 1430

6 West Juna Vadaj Ramapir no Tekro 28 1540

7 West Juna Vadaj Ramapir no Tekro 28 1375

8 West Juna Vadaj Ramapir no Tekro 28 880

Total 7795

Page 86: Presentation to CSMC – HFA - MoHUA

Ahmedabad - Package 1: “In-situ” Slum Redevelopment under PMAY

Sr No.. Zone Ward Slum Name TP Scheme FP Number No of

Huts

Package 1 West Juna Vadaj Rohidasnagar 28 562 480

Page 87: Presentation to CSMC – HFA - MoHUA

Ahmedabad - Package 2: “In-situ” Slum Redevelopment under PMAY

Sr No.. Zone Ward Slum Name TP Scheme FP Number No of

Huts

Package 2 West Sabarmati Kailasnagar 23 453 to 460 80

Page 88: Presentation to CSMC – HFA - MoHUA

Ahmedabad: Package 3

Sr No.. Zone Ward Slum Name TP Scheme FP Number No of

Huts

Package 3 West Juna Vadaj

Ramapir No Tekro 28

330, 331,

413, 415,

416, 537/1,

537/2,563/

1, 563/2,

564, 713/1,

713/2/1 &

713/2/2

1210

800

1430

1540

1375

800

Total 7295

Project Highlights : Sabarmati area of Ahmedabad city is considered to develop under

“Smart City” so slums near around this area will be Re-Developed under this project.

Ramapir No Tekro-Slum is locate at opposite Mahatma Gandhi Ashram, Sabarmati.

This slum is located at Transit oriented Zone there fore eligible for

development with 4.0 FSI as per local GDCR.

Page 89: Presentation to CSMC – HFA - MoHUA

Ahmedabad: Package 3: “In-situ” Slum Redevelopment

Page 90: Presentation to CSMC – HFA - MoHUA

Sr.

No.

Tender

Package

Qualified

Agency

SRS Cost

(In Rs.)

SRS

Area (in

Smt.)

SRS Cost

(in Smt.)

Land Premium

(in Rs.)

Free

Sale

Plot

Area (in

Smt.)

Land

Premiu

m (per

Smt.)

Jantri

Price

(per

Smt.)

Proposed

DUs

1 Package-1

Siddhi

Developers

&Builders

380000000.00 5012.00 19188.59 1111111111.00 11353.00 97,869.39 15250.00 480

2 Package-2

Nila

Infrastructure

s Limited

68000000.00 1373.27 18922.53 75000000.00 2792.73 26855.44 10250.00 84

3

Package-3

Tender invited 1210

4 Tender invited 800

5 Tender invited 1430

6 Tender invited 1540

7 Tender invited 1375

8 Tender invited 800

Ahmedabad: Qualified Agency: Bidding Process

Page 91: Presentation to CSMC – HFA - MoHUA

Vadodara Municipal Corporation In-situ Slum Redevelopment

Page 92: Presentation to CSMC – HFA - MoHUA

Vadodara: Projects selected for “In-situ” Slum Redevelopment Projects

Sr

No. Zone Ward Slum Name

TP

Scheme

FP

Number

No of

Huts

1 West 6 Sahakar nagar 22 234 1428

2 East 9 Ektanagar 44 287 1848

Total 3276

Page 93: Presentation to CSMC – HFA - MoHUA

Vadodara: Package 1: “In-situ” Slum Redevelopment

Sr No.. Zone Ward Slum Name TP Scheme FP Number No of

Huts

1 West 6 Sahakar nagar 22 234 1428

Page 94: Presentation to CSMC – HFA - MoHUA

Vadodara: Package 2: “In-situ” Slum Redevelopment

Sr No.. Zone Ward Slum Name TP Scheme FP Number No of

Huts

1 East 9 Ektanagar 44 287 1428

Page 95: Presentation to CSMC – HFA - MoHUA

Sr.

No.

Tender

Package

Project Cost

( in Lakhs) Qualified Agency

Proposed

DUs

1 Package-1 8500.51 Tender shall be invited shortly. 1428

2 Package-2 11609.97 Tender shall be invited shortly.

1848

Vadodara: Qualified Agency: Bidding Process

Page 96: Presentation to CSMC – HFA - MoHUA

Rajkot Municipal Corporation In-situ Slum Redevelopment

Page 97: Presentation to CSMC – HFA - MoHUA

dwsht< Mjb henucejexuNl vtujeme- veveve- 2013.... xuLzh bkswhebtk Rajkot: Projects selected for “In-situ” Slum Redevelopment Projects

Sr No. Ward Slum Name TP

Scheme

FP

Number

No of

Huts

1 7 Sitaramnagar 7 132, 133 130

2 10 Hingalajnagar 2 475 145

3 17 Bharatnagar,

Bharatnagar-2

R.S. No.

193

C.S. No.

4463, 4464,

4434

660

Total 935

Page 98: Presentation to CSMC – HFA - MoHUA

Rajkot: Sitaram Nagar, Ward 07- PPP-02 Nr. Rajmoti Oil Mill, Bhavnagar Road

TPS 07 Rajkot FP No. 132+133 Total Area 2168+2136Sq. Mt. Total= 4304 Sq. mt. Approx. HH & Shops = 92+8 = 100

Page 99: Presentation to CSMC – HFA - MoHUA

Rajkot: Sitaram Nagar, Ward 07- PPP-02 Nr. Rajmoti Oil Mill, Bhavnagar Road

Layout Plan

Page 100: Presentation to CSMC – HFA - MoHUA

Rajkot: Hinglajnagar, ward No. 10, PPP-14 Saurashtra High School, Near kalawad road

TPS 02 Rajkot FP No. 475 (Shopping & Community hall)

Total Area – 7928 Sq. Mt. Approx. HH & Shops = 135 &10

F.P- 475

Page 101: Presentation to CSMC – HFA - MoHUA

Rajkot: Hinglajnagar, ward No. 10, PPP-14 Saurashtra High School, Near kalawad road

Layout Plan

Page 102: Presentation to CSMC – HFA - MoHUA

City Survey No. 4463,4464,4434 Revenue Survey No. 193 Total Area = 29,087 +6,204 Total Area = 35,291 Sq mt.

Approx. HH & Shops = 625 & 35

Rajkot: Bharatnagar- ward 17 East Zone PPP-16 Ring Road NH 8B, near Aji Chowkdi, Bhavnagar Road

Page 103: Presentation to CSMC – HFA - MoHUA

Projects Finalized under SRS-PPP

S No Slum Name Qualified Agency Land Premium (in Rs.

lacs) Plot Area (in

sq. mt.) Jantri Price (Per

Sq. Mt) DUs

1 Sitaramnagar, Ambika

nagar

JP Kheradia Construction Pvt.

Ltd. Rajkot 63.00 4304 5250 130

2 Hinglajnagar,

Amin Marg road JP Structure Pvt. Ltd 4050.00 7928 14500 145

3 Bharat Nagar-

Aji chowkdi - - 35291 8000 660

Total 47523 935

103

Rajkot: SRS-PPP under PMAY & MMGY-Rajkot- Summary

Page 104: Presentation to CSMC – HFA - MoHUA

Bhavanagar Municipal Corporation In-situ Slum Redevelopment

Page 105: Presentation to CSMC – HFA - MoHUA

Bhavnagar: Projects selected for “In-situ” Slum Redevelopment Projects

Sr No. Pacakage Ward Slum Name CS No/R.S.

No. No of Huts

Proposed

DUs

1 Package-I 3

Janta Nagar Slum,

Manek Nagar Slum

1595/96/97,

4667

170 192

2 Package-II 14, 15 Sardar Nagar Slum,

Sindhu Nagar Slum 4015/11 434 448

Total 604 640

Page 106: Presentation to CSMC – HFA - MoHUA

Bhavanagar CS No. : 1595/96/97 & 4667 Total Area : 6545 sq.mt. Approx. HH : 192 Number of storey’s : G+7 (8) No of Blocks : 3 Minimum carpet area of DU proposed:30 sq.mt.

Bhavnagar: Pacakge-I Jantanagar & Maneknagar

Location- ward 3 Near shishu vihar circle , Bhavanagar

Page 107: Presentation to CSMC – HFA - MoHUA

Layout Plan

Bhavnagar: Jantanagar & Maneknagar- ward 3 Residential Zone PPP Near shishu vihar circle , Bhavanagar

Page 108: Presentation to CSMC – HFA - MoHUA

Bhavanagar CS No. = 4015/11 Total Area= 9312 + 24324 sq.mt. Total= 33,636 sq.mt. Approx. HH & Shops = 448 & 46 Number of storey’s : P+7 (7) No of Blocks: 8 Minimum carpet area of DU proposed : 30 sq.mt.

Bhavnagar: Pacakge-II: Sardarnagar & Sindhunagar

Location: ward 15 & 14 Residential Zone PPP Near Sardarnagar circle, Bhavanagar

Page 109: Presentation to CSMC – HFA - MoHUA

Layout Plan

Bhavnagar: Sardarnagar & Sindhunagar- ward 15 & 14

Page 110: Presentation to CSMC – HFA - MoHUA

Projects Finalized under SRS-PPP

S No Slum Name Qualified Agency Plot Area

(in sq. mt.) Jantri Price (Per Sq. Mt)

DUs

1 Janta Nagar Slum /

Manek Nagar Slum Tender shall be invited. 6545.00 10,000 192

2 Sardar Nagar Slum /

Sindhu Nagar Slum Tender shall be invited.

33636.00 10,000 448

Total 40181.00 - 640

110

Bhavnagar: SRS-PPP Summary

Page 111: Presentation to CSMC – HFA - MoHUA

THANK YOU

Page 112: Presentation to CSMC – HFA - MoHUA

Approved Projects under PMAY

112

Page 113: Presentation to CSMC – HFA - MoHUA

Affordable Housing in Parternership

Total No. of Projects : 14

Total Dwelling Units : 14731

ULBs : AMC, SMC, JMC and RMC, VUDA,

SUDA, RUDA , MORBI, KALOL and

GHB

Total Project Cost : 930.19 crore

Page 114: Presentation to CSMC – HFA - MoHUA

Affordable Housing in Partnership – Approved on 18/11/2015 Rs. In Crore

No. ULB Name of the Project No. of

EWS

Project

Cost

Central

Share

W.I.P.

Dus

1 SMC Project for 704 EWS houses at 2

locaitons of SMC area 704 45.85 10.56 704

2 SMC Project for 744 EWS houses at 3

locaitons of SMC area 744 44.17 11.16 744

3 SMC Project for 848 EWS houses at 3

locaitons of SMC area 848 53.16 12.72 848

4 SUDA Project for 275 EWS houses at 4

locaitons of SUDA area 275 59.17 4.12 275

5 JMC Project for 512 EWS houses at

Mayurnagar of JMC area 512 100.3 7.68 512

6 VUDA Project for 520 EWS houses at 5

locaitons of VUDA area 520 60.44 7.8 520

7 GHB Project for 256 EWS houses at

Sahyog Society, Mehmadabad area 256 13.43 3.84 192

8 RMC Project for 1266 EWS houses at 5

locations of RMC area 1266 84.54 18.99 1266

Total 5125 461.1 76.87 5061

Page 115: Presentation to CSMC – HFA - MoHUA

115

Affordable Housing in Partnership – Approved on 21/12/2015

Rs. In Crore

Sr.

No. ULB Name of the Project

Project

Cost

No. of

Dus

GOI

share (@

Rs.1.5 lakh)

GOG

share (@

Rs.1.5 lakh)

W.I.P.

Dus

1 AMC

DPR Under AHP for EWS

(4369) at 9 Locations in AMC

Area

225.07 4369 65.53 65.535 4369

2 GHB DPR Under AHP for EWS-728

at Hathijan Area 43.61 728 10.92 10.92 728

3 RMC DPR Under AHP for EWS-352

at RMC Area 27.13 352 5.28 5.28 352

Total-A 295.81 5449 81.73 81.735 5449

4 RUDA DPR Under AHP for EWS 136

in RUDA Area 6.942 136

2.04 2.04 136

5 Morbi DPR Under AHP for EWS-1600

in Morbi Area 67.758 1600

24.00 24 1600

6 Kalol DPR Under AHP for EWS-2421

in Kalol Area 98.577 2421

36.31 36.315 2421

Total-B 173.27 4157 62.35 62.355 4157

Grand Total (A+B) 469.09 9606 144.09 144.09 9606

Page 116: Presentation to CSMC – HFA - MoHUA

116

Slum Re-Development in Public Private Parternership under PMAY

Total No. of Projects : 30

Total Dwelling Units : 17580

ULBs : AMC, RMC, SMC, VMC

Total Project Cost : 1418.34 crore

These Projects have been already approved in the 4th CSMC on dated

21.12.2015 by Central Government.

Page 117: Presentation to CSMC – HFA - MoHUA

117

Slum Re-Development in Public Private Parternership under PMAY

Rs. In Crore

No. ULB Project Name Project

Cost

No of

DUS GOI share (@ Rs.1.0 lakh)

W.I.P. Dus

1 AMC

Development of Integrated Group

Housing Facility at Slum Behind B

Colony, Girdharnagar On

PPP/Turnkey Basis (Package -1)

25.90 518 5.18 518

2 AMC

Development of Integrated Group

Housing Facility at Slum at Odhav

On PPP/Turn key Basis (Package -2)

75.00 1500 15.00 1500

3 AMC

Development of Integrated Group

Housing Facility at(1) Suryanagar, (2)

Chandranagar (3) Bhilvas, Vejalpur

On PPP/Turn key Basis (Package -3)

27.70 554 5.54 554

4 AMC

Development of Integrated Group

Housing Facility at Bhill Vasna

Chapra, Bhudarpura On PPP/Turn

key Basis (Package -4)

6.00 120 1.20 120

Page 118: Presentation to CSMC – HFA - MoHUA

118

Slum Re-Development in Public Private Parternership under PMAY

Rs. In Crore

No. ULB Project Name Project

Cost

No of

DUS GOI share (@ Rs.1.0 lakh)

W.I.P. Dus

5 AMC

Development of Integrated Group

Housing Facility at Chunaravas

Ramgali, Maningar On PPP/Turn

key Basis (Package -5)

20.00 400 4.00 400

6 AMC

Development of Integrated Group

Housing Facility at Fakira tank na

Chhapara, Potaliya On PPP/Turn

key Basis (Package -6)

3.30 66 0.66 66

Total-A 157.90 3158 31.58 3158

7 SMC

Redevelopment of Slums at

Gandhinagar, Chimni Tekro, Juno

Depo and Islampura near Textile

Market, Ring Road, Anjana

120.00 1500 15.00 Tender

invited.

Page 119: Presentation to CSMC – HFA - MoHUA

119

Slum Re-Development in Public Private Parternership under PMAY

Rs. In Crore

No. ULB Project Name Project

Cost

No of

DUS GOI share (@ Rs.1.0 lakh)

W.I.P. Dus

8 SMC

Redevelopment of Slums at Jawahar

Nagar, Nehrunagar, Salimnagar and

Gausiya Masjid near Textile Market,

Ring Road, Anjana

96.00 1200 12.00

Tender

invited.

9 SMC

Redevelopment of Slums at

Ambedkar Nagar behind Textile

Market, BRTS Road, Anjana

48.00 600 6.00 Pending

Due to PIL

10 SMC

Redevelopment of Slums at

Anvarnagar Behind Textile Market,

BRTS Road, Anjana

68.00 850 8.50 Pending

Due to PIL

11 SMC

Redevelopment of Slums at

Umiyanagar Behind Textile Market,

BRTS Road, Anjana

112.00 1400 14.00 Pending

Due to PIL

12 SMC

Redevelopment of Slums at

Vivekanand Nagar Behind Textile

Market, BRTS Road, Anjana

240.00 3000 30.00 Pending

Due to PIL

Page 120: Presentation to CSMC – HFA - MoHUA

120

Slum Re-Development in Public Private Parternership under PMAY

Rs. In Crore

No. ULB Project Name Project

Cost

No of

DUS GOI share (@ Rs.1.0 lakh)

W.I.P. Dus

13 SMC

Redevelopment of Slums at

Halpatiwas Behind Textile Market,

BRTS Road, Anjana

64.00 800 8.00 Tender

invited.

14 SMC

Redevelopment of Slums at Khwaja

Nagar Behind Textile Market, BRTS

Road, Anjana

68.00 850 8.50 Tender

invited.

Total-B 816.00 10200 102.00 0

15 RMC

‘In-situ’ Slum Redevelopment Project

on PPP basis by RMC at

Ghanshyam Nagar/Sahkar Main

Road (PPP-5)

8.14 120 1.20 120

16 RMC

‘In-situ’ Slum Redevelopment Project

on PPP basis by RMC at Raiya Dhar,

Nr. Ramapeer Chowkdi (PPP-6)

41.45 265 2.65 165

Page 121: Presentation to CSMC – HFA - MoHUA

121

Slum Re-Development in Public Private Parternership under PMAY

Rs. In Crore

No. ULB Project Name Project

Cost

No of

DUS GOI share (@ Rs.1.0 lakh)

W.I.P. Dus

17 RMC

‘In-situ’ Slum Redevelopment Project

on PPP basis by RMC at Bharat

Nagar, Mavdi (PPP-7A)

14.57 105 1.05 105

18 RMC

‘In-situ’ Slum Redevelopment Project

on PPP basis by RMC at Bharat

Nagar, Mavdi (PPP-7B)

34.55 470 4.70 470

19 RMC

‘In-situ’ Slum Redevelopment Project

on PPP basis by RMC at Jaybhim

Nagar, Nana Mauva (PPP-8)

95.3 445 4.45 445

20 RMC

‘In-situ’ Slum Redevelopment Project

on PPP basis by RMC at Besides

Bishop House, University Road

(PPP-9)

37.19 72 0.72 72

21 RMC

‘In-situ’ Slum Redevelopment Project

on PPP basis by RMC at Velnath

Para, Morbi Road (PPP-11A)

26.69 320 3.20 320

Page 122: Presentation to CSMC – HFA - MoHUA

122

Slum Re-Development in Public Private Parternership under PMAY

Rs. In Crore

No. ULB Project Name Project

Cost

No of

DUS GOI share (@ Rs.1.0 lakh)

W.I.P. Dus

22 RMC

‘In-situ’ Slum Redevelopment Project

on PPP basis by RMC at Velnath

Para, Morbi Road (PPP-11B)

20.29 269 2.69 169

23 RMC

‘In-situ’ Slum Redevelopment Project

on PPP basis by RMC at Velnath

Para, Morbi Road (PPP-11C)

21.6 263 2.63 163

24 RMC

‘In-situ’ Slum Redevelopment Project

on PPP basis by RMC at

Machchhunagar, Nr. Ramapeer

Chowkdi (PPP-13)

67.33 300 3.00 300

Total-C 367.11 2629 26.29 2629

Page 123: Presentation to CSMC – HFA - MoHUA

123

Slum Re-Development in Public Private Parternership under PMAY

Rs. In Crore

No. ULB Project Name Project

Cost

No of

DUS GOI share (@ Rs.1.0 lakh)

W.I.P. Dus

25 VMC Sama - Sanjay nagar-1,2& Indira

nagar 35.89 771 7.71 771

26 VMC Manjalpur - Bajaniyavas 6.30 128 1.28 128

27 VMC Sayajigunj - Jamwadi 6.55 130 1.30 130

28 VMC Chhani- Soniya Nagar 6.35 137 1.37 137

29 VMC Danteshwar-Sainath nagar 3.29 67 0.67 67

30 VMC Sama - Driver Faliya, Bhathuji

Nagar, Marwadi Mahollo. 18.95 360 3.60 360

Total-D 77.34 1593 15.93 1593

Grand Total (A+B+C+D) 1418.35 17580 175.80 7380

Page 124: Presentation to CSMC – HFA - MoHUA

124

Capacity Building Proposal -

Proposal submitted vide letter No “Projects/Capacity Building Proposal

Submission/AHM/2016/1504, dated 19/02/2016”

Page 125: Presentation to CSMC – HFA - MoHUA

Approval of Capacity Building Proposal under PMAY

Sr. No Particulars Central

Share

State

Share

Total in

Rs. In

Lakhs

1 Establishment of SLTC* 119.4 39.8 159

2 Establishment of CLTC*

a Funds required(central share)til the date of

discontinuation of CLTC under RAY

60.66 0 60.66

b Annual funds required for CLTC under HFA 1592 531 2,122

Total funds required under CLTC (a+b) 1652 531 2183

Sub Total-A 1772 570 2342

3 Training/Workshops

i National Level 10 0 10

ii Regional Level 12 0 12

iii State Level 10 0 10

iv City Level 200 0 200

v Thematic and Training of Trainers 207 0 207

Sub Total-B 439 0 439

Page 126: Presentation to CSMC – HFA - MoHUA

Approval of Capacity Building Proposal under PMAY

Sr. No Particulars Central

Share

State

Share

Total in Rs.

In Lakhs

4 Translation of Training Module 20 0 20

5 Exposure/Study Visits (in country) 72 0 72

6 Documentation of Case Studies/Research Studies 25 0 25

Sub Total -C 117 0 117

New CB activities proposed

7 Preparation of HFAPoA for All Cities 1113 371 1484

8 Third Party Quality Monitoring Agencies (TPQMA) 1303 434 1737

9 Hand Holding Support to States and Cities 15 0 15

10 Social Auditing & Documentation 910 0 910

11 I-E-C Activities 1,620.62 0 1621

Sub Total-D 4961 805 5767

Grand Total (A-D) 7,289.02 1,375.58 8,664.60

Page 127: Presentation to CSMC – HFA - MoHUA

127

Issues

Capacity Building Proposal

Proposal submitted vide letter No “Projects/Capacity Building

Proposal Submission/AHM/2016/1504, dated 19/02/2016” and

need approval of GoI.

Grant of HFAPoA –

1st Installment received only for 30 cities other remaining cities

which are included afterwards for them Grant is not received.

Grant of Projects:-

Sr.No Vertical Approved GoI share

1st installment

@ 40%

Released by GoI

Remaining Amount

1 AHP 14409.00 5763.60 2480.64 3282.96

2 In-situ PPP 11730.00 4692.00 2019.36 2672.64

Total 26139 10455.60 4500.00 5955.60

Rs. In Lacs

Page 128: Presentation to CSMC – HFA - MoHUA

બી.એસ.ય.ુપી.

SR NO ULB NO OF DUs

APPROVED NO OF DUs

COMPLETED NO OF DUs

ALLOTTED NO OF DUs

OCCUPIED

NO OF DUs

COMPLETED

BUT NOT

OCCUPIED

1 AMC 20160 20113 16579 16579 3534

2 SMC 46856 45288 42037 41370 3918

3 VMC 21696 17664 12920 12920 4744

4 RMC 6488 4976 4558 4558 418

TOTAL 95200 88041 76094 75427 12614

5 AUDA 13664 13664 13565 13565 99

TOTAL 13664 13664 13565 13565 99

6 PORBANDAR 2448 2448 0 0 2448

TOTAL 2448 2448 0 0 2448

TOTAL 111312 104153 89659 88992 15161

BSUP Scheme

Page 129: Presentation to CSMC – HFA - MoHUA

THANK YOU