WELCOME
![Page 2: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/2.jpg)
What is Fabric Ducting?
- New technology on cool air distribution replacing conventional G.I
- Carries 2 in 1 function as a ducting & diffuser
- Made from 100% polyester fabric with few choices color to suit on the design
![Page 3: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/3.jpg)
What is Fabric Ducting?
![Page 4: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/4.jpg)
4 Major Air Side Problem
1 - Short Circuit Problem2 - Condensation3 - Need proper balancing4 - Heavy
![Page 5: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/5.jpg)
Advantages Fabric Duct
1 – Even distribution2 – No Condensation3 – No need proper balancing4 - Lightweight
![Page 6: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/6.jpg)
Short Circuit problems
![Page 7: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/7.jpg)
Lecture Hall FF4 Uitm Puncak Alam
Cooling Load Factor : 40Btu/hr/ft2
3 unit 30 HP Packaged DX SystemAchievement : Temperature during TnC is 20oCCLF 40 is almost same with bedroom.
![Page 8: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/8.jpg)
![Page 9: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/9.jpg)
Common Problem in Conventional GI Ducting
- Reduce Productivity- Stress- MC Leave Increase- Customer unhappy- Lost customer trust- Drop branding image- Lost Focus in Class / Mosque- Bad Result scoring
Short Circuit Problem
- Draft Air Flow- Discomfort room condition - Extra cooling load
- Unit Oversize- high electricity bills - High maintenance cost- Loss profit- Wasting Government money- Noisy sound
![Page 10: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/10.jpg)
Fabric Duct Solutions
![Page 11: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/11.jpg)
Condensation
- Required Insulation- Spotted mark on the ceiling- Dirty space- Bad smell- Additional repair cost- Impact Company Image- Loss customer trust
Common Problem in Conventional GI Ducting
![Page 12: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/12.jpg)
Puncak Alam Mosque
Cooling Load Factor : 80Btu/hr/ft2
2 unit 90 HP Air Cooled Dx System with double Cooling CoilsAchievement : • No Condensation at duct, not required insulation.• Entering air 32oC, Outlet air From fabric duct 19oC• First ever project centralized system used at open space
![Page 13: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/13.jpg)
Need crazy balancing works
- Required skills workers- Extra Cost rent test equipment- The Test Not perform well- Risk of Short Circuit- Inefficient overall Air- Conditioning performance- Waste initial spending cost- Project Delay- Bad Company reputation
Common Problem in Conventional GI Ducting
![Page 14: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/14.jpg)
Spot Cooling
![Page 15: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/15.jpg)
Imtiaz Terengganu School Hall
Cooling Load Factor : 115Btu/hr/ft2
2 unit 100HPResult : * Testing & Commissioning Temp : 18oC* Hand Over ceremony only one unit on.
![Page 16: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/16.jpg)
UIA Gambang Library
Achievement : Only 2 days complete 4 lines of fabric duct installation, compare to almost 2 weeks for GI duct
![Page 17: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/17.jpg)
The Result
![Page 18: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/18.jpg)
Heavy (30-60kg/m2 )
- Need strong structure- Extra cost for structure strengthen- Required Strong Lifting Equipment- Longer time to install- Skills Workers Required - More workers needed- Project delay- Risk to Death
Common Problem in Conventional GI Ducting
![Page 19: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/19.jpg)
Audi Showroom Shah Alam
Cooling Load Factor : 80Btu/hr/ft2
2 unit 30 HP Packaged DX SystemAchievement : No need high cost structure strengthening works.
![Page 20: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/20.jpg)
BENEFITS – End User• Even cooling distribution• Comfort working environment• Increase productivity• Increase Sales & profit• Good branding Image• Save electricity bill • Quiet operation• Save space• Nice & unique design• Easy Maintenance• 10 years Warranty
![Page 21: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/21.jpg)
Fabric Ducting Parts of the design
![Page 22: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/22.jpg)
Fabric Ducting Parts of the
design
![Page 23: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/23.jpg)
GI DUCT VS FABRIC DUCT• Spot cooling
• Noisy (high velocity)
• Required balancing
• Heavy (30 - 60kg/m2)
• High running cost
• Required Diffusers
• Difficult to clean
• On Site assembly
• Skill installer
• Even distribution
• Quite operation (Laminar Flow)
• Self balancing
• Light Weight 4 - 8kg/m2
• Low running cost
• No Diffusers (2 in 1)
• Easy to clean
• Ready to install
• D.I.Y
![Page 24: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/24.jpg)
Local Projects
![Page 25: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/25.jpg)
HELP University
![Page 26: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/26.jpg)
Lecture Hall Uitm Puncak Alam
![Page 27: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/27.jpg)
Section 7, Shah Alam Mosque
![Page 28: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/28.jpg)
Subang Air-Port
![Page 29: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/29.jpg)
UMP GAMBANG
![Page 30: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/30.jpg)
Puncak Alam Mosque
![Page 31: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/31.jpg)
DBKL Batu Muda Hall
![Page 32: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/32.jpg)
Masjid Kuantan
![Page 33: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/33.jpg)
Da-Men Mall USJ
![Page 34: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/34.jpg)
Kayaku Factory
![Page 35: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/35.jpg)
Masjid Hasanah Bangi
![Page 36: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/36.jpg)
Masjid Atas Tol Terengganu
![Page 37: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/37.jpg)
Kompleks PKNS
![Page 38: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/38.jpg)
Dewan Bomba Penang
![Page 39: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/39.jpg)
Ecoworld Puncak Alam
![Page 40: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/40.jpg)
Oversea Project
![Page 41: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/41.jpg)
Offices
![Page 42: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/42.jpg)
Lecture Hall
![Page 43: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/43.jpg)
Temporary Space
![Page 44: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/44.jpg)
SPORTS
![Page 45: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/45.jpg)
FITNESS
![Page 46: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/46.jpg)
![Page 47: Presentation Prihoda Malaysia Sdn Bhd](https://reader035.fdocuments.net/reader035/viewer/2022081417/58cfb99f1a28ab223a8b5ef1/html5/thumbnails/47.jpg)
The End