PRESENTATION PREPARED & PRESENTED BY
ER. PRAKASH NAKATE. D.E.E., D.C.O.
JUNIOR ENGINEER ( Maha Discom ), Section Office,
Kandgaon,
Tq.Karaveer,Dist. Kolhapur.
OFFICER ON SPECIAL DUTY, Turn Key Projects, Circle
Office, Kolhapur.
PREAMBLE We all know, the Power crisis are serious, due to huge demand
in the State, especially after monsoon .
Ultimately, the demand in the area of MAHAVITARAN is increasing day by day, beyond expectations. Power scenario at a glance, is as follows :
Year Demand Availability 2003 – 2004 11357 MW 9315 MW May 2004 Peak 10796 MW2004 – 2005 12749 MW 9704 MW May 2005 Peak 12987 MW
After the monsoon Demand has Increased very rapidly . In Oct.2005 12200 MW 9500 MW within 7 days addition of 2200 MW In Nov.2005 13500 MW to 14000 MW ( expected)
how to meet the demand of 13500 to 14000 MW or more, through the available Generation of 9500 MW .
The general answer is ‘ Generate More Power ’. The logical answer is ‘ Restrict the Load ’.
For restrictions of Load general phenomena is
This is the Herculean task before
40 YEARS OF GOLDEN DAYS IN POWER SECTOROF
MAHARASHTRA STATE1960 TO 1990
PLANNED INVESTMENT IN POWER SECTOR PLANNED POWER GENERATION
RESULTS
POWER HAS BECOME BACK BONE OF DEVELOPMENT
AMPLE POWER - HUGE DEVELOPMENT
40 YEARS OF GOLDEN DAYS IN IN POWER SECTORPOWER SECTOR OF OF
MAHARASHTRA STATEMAHARASHTRA STATE
1960 TO 19901960 TO 1990
DEMAND = GENERATION
GRADUAL GROWTH OF :
UP TO 1990’S
POWER GENERATION INFRASTRUCTURE DEVELOPMENT DISTRIBUTION NETWORK
SUPPLY SIDE MANAGEMENT COULD BE ADOPTED.
CHANGE IN POLICIES & ITS RESULTS HAVE THEIR OWN EFFECTS ON
POWER SECTOR
TECHNICAL SIDE EFFECTS
COMMERCIAL SIDE EFFECTS
SOCIAL SIDE EFFECTS
TECHNICAL SIDE EFFECTS
RESTRICTED ADDITION, NON DEVELOPMENT AND
NON STRENGTHNING OF INFRASTRUCTURE
FORCED TO OVERLOAD THE INFRASTRUCTURE BEYOND CAPACITY
RESULTING INTO INCREASE IN (I2 R) LOSSES.
INCREASE IN INTRRUPTION DUE TO OVER LOAD
INCREASE IN EQUIPMENT FAILURE.
TECHNICAL AND COMMERCIAL LOSSES REDUCE SUBSTANTIAL REVENUE.
COMMERCIAL SIDE EFFECTS
FAILURE OF EQUIPMENT CAUSES FINANCIAL LOSS.
DUE TO NO POWER DURING BREAKDOWN & PLANNED LOAD SHEDDING WE HAVE TO FACE REVENUE LOSS .
FREQENT INTRRUPTIONS DUE TO OVERLOADING RESULTS IN UNREST AMONGST CONSUMERS.
FREQUENT FAILURE OF EQUIPMENTS DUE TO SUBSTANDARD SUPPLY CONDITIONS RESULTS IN PUBLIC UNREST.
PLANNED / FORCED LOAD SHEDDING RESULTS IN ANNOYANCE TO THE COMMON PUBLIC.
THIS HAS DEMOLISHED THE FAITH AND CONFIDENCE FROM THE PUBLIC MINDS.
SERVICE SATISFACTION HAS ENDED.
SOCIAL SIDE EFFECTS
ANNOYANCE OF PUBLIC
CHALLENGE OF MEETING THE DEMAND
TECHNICAL & ECONOMICAL LIMITATIONS
ADD
GENERATION : NOT POSSIBLE IN SHORT TERM
IMPORT
POWER :
CONSTRAINTS OF POWER SHORTAGE
WILL CONTINUE
SATISFACTION IS ONLY POSSIBLE
IF “DEMAND IS FULFILLED”
POWER AVAILABLE IS LESS THAN DEMAND
WHAT IS THE SOLUTION ?
AVAILABLE POWER
REQUIRED GENERATION
WHICH IS NOT POSSIBLE AT THIS STAGE.
SHORTAGE OF ABOUT = 3500 TO 4000 MW(13500 – 9700 MW = 3800 MW)
CONSTRAINTS OF POWER SHORTATGE WILL CONTINUE
WHAT ARE THE PRINCIPLES OF
DEMAND SIDE MANAGEMENT ?
MINIMISING DEMAND BY LIMITING USE OF POWER
MAXIMISING THE EFFICIENCY
DEMAND SIDE MANAGEMENT
MINIMISING LOSSES REACTIVE COMPENSATION POWER FACTOR IMPROVEMENT EFFICIENT EQUIPMENTS
REQUIRES……………………………
FINANCIAL AID / FUNDING
MAXIMISING THE EFFICIENCY BY ……..
DEMAND SIDE MANAGEMENT
REQUIRES ……… NO MONEY ONLY PUBLIC AWARENESS &
CONSUMERS SATISFACTION NEEDED
HOWEVER, MINIMISING DEMAND BY …. REMOVAL OF UNAUTHORISED LOADS
ENCOURAGING FOR REDUCTION IN LOAD
RESTRICT USE OF POWER AS PER REQUIREMENT .
PLANNED USAGE OF AVAILABLE POWER
TQ. KARVEER DIST. KOLHAPUR
STARTED AT KANDGAON SECTIONWITH 3 FEEDERS & 8 VILLAGES ON 20.1. 2005.
SPREAD OVER TO COMPLETE SUB-DN., PHULEWADI
FOR 11 FEEDERS & 47 VILLAGES.
FURTHER SPREAD OVER IN KOLHAPUR CIRCLEFOR 33 FEEDERS & 135 VILLAGES.
20 20 20 20 20
0 0 0 0 0 0
50 50
40
50 50
60 60 60 60 60
40 40 40
30 30 30 30 30 30
40 40 40 40 40 40 40 40 40 40 40
1 1 1 1 1 1
40
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs.
Am
ps.
5
12
19
21
23
25
27
28
Load Chart for Devale FeederFor 24.00 Hrs.
Load Chart for Devale Feederfor maximum & minimum between 17.15 TO 23.00 HRS.
98% load is cut off
2% load is used
Unique Achievement of Akshay Prakash for Fulewadi Sub - Division
in agreegate for maximum and minimum between 17.15 to 23.00 HRS.
As on 18/03/2005.
13% load is used
87% load is cut off
Load used : Kandagaon Feeder : 20% Dewale
Feeder : 2% Washi Feeder : 3%
Kuditre Feeder : 16%Wakare Feeder : 7%
Bahireshwar Feeder : 6%Sangrul Feeder : 23%Mahe Feeder : 17%Khupire Feeder : 3%
Nagdeowadi Feeder : 0%Tulasi Feeder : 14%
TOTAL AGGRE. % = 13%.Load cut off :
Kandagaon Feeder : 80% Dewale Feeder : 98% Washi Feeder : 97%Kuditre Feeder : 84%Wakare Feeder : 93%
Bahireshwar Feeder : 94%Sangrul Feeder : 77%Mahe Feeder : 83%
Khupire Feeder : 97%Nagdeowadi Feeder : 100%
Tulasi Feeder : 86%TOTAL AGGRE. % = 87%.
TALUKA FEEDERSNO. OF
VILLAGESMAX.LOAD REACHED
AMP.USED (AVERAGE)
% RELIFEMW
RELIFE
1)Kandagon 06 75 25 77%2)Devale 02 70 01 98%3)Vashi -- 65 01 97%4)Kuditre 07 185 30 83%5)Wakare 01 60 04 98%6)Sangrul 15 154 36 77%7)Bahireshwar 02 64 04 94%8)Mahe 07 120 30 75%9)Khupire 03 70 10 86%10)Tulsi 02 70 10 86%11)Phulewadi 04 86 -- --12)Padali 01 60 -- --13)Hirawade 02 90 05 95%
14)Collage 03 140 20 86%
TOTAL A 14 Feeders 55 1309 176 88% 22.21
1)Yavaluj 01 75 08 89%
2)Mazgaon 02 70 14 80%
TOTAL B 2 Feeders 03 145 22 88% 2.41
1)Umalwad 01 70 12 836%
2)LIS 01 112 06 95%
TOTAL C 2 Feeders 02 182 18 90% 3.21
Karveer
Panhala
Shiroli
RELIEF OF LOAD BY SELF DISCIPLINE IN EVENING
UNDER " AKASHY PRAKASH YOJANA"
DURING PEAK OF 17.00HRS TO 23.00 HRS.
TALUKA FEEDERSNO. OF
VILLAGESMAX.LOAD REACHED
AMP.USED (AVERAGE)
% RELIFEMW
RELIFE
1)Kumbhoj 01 40 08 80%2)Warana 01 30 10 67%3)Bahubali 01 20 10 50%4)Bhendwade 02 124 16 87%5)Khochi 02 76 18 76%6)Narande 01 124 18 86%7)Ambap 04 54 24 45%8)Bhadole 01 150 42 73%9)Ghunaki 03 123 35 72%10)Patgaon 04 100 38 61%
TOTAL D 10 Feeders 20 841 219 74% 12.2
1)Bhadvane 13 70 35 50%
2) Gavase 25 100 30 70%
TOTAL E 2 Feeders 38 170 65 60% 2.05
1)Talewadi 10 120 30 75%
2)Nesari 03 90 25 73%
TOTAL F 2 Feeders 13 210 55 90% 3.03
Chandgad* 1)Koawd 04 60 20 67%
TOTAL G 1 Feeders 04 60 20 67% 0.77
2917 575
57.20 MW 11.27 MW
Ajara *
Gadhinglaj
RELIEF OF LOAD BY SELF DISCIPLINE IN EVENING
UNDER " AKASHY PRAKASH YOJANA"
DURING PEAK OF 17.00HRS TO 23.00 HRS.
Hatkangale
45.8880%33 Feeders
Kolhapur Dist.Grand Total
135
ACHIEVEMENTS
AKSHAY PRAKASHSTARTED AT
KANDGAON SECTIONWITH 3 FEEDERS & 8 VILLAGES
W.E.F. 20.1. 2005.
ACHIEVED 91.67% LOAD RELIEF BETWEEN 17.00 HRS. TO 23.00 HRS
BY SELF DECIPLINE FROM AG & IND. CONSUMERSUP TO 20.6.2005
( 6 MONTHS )
ACHIEVEMENTS
IS FURTHER SPREAD OVER IN KOLHAPUR CIRCLEFOR 33 FEEDERS & 135 VILLAGES.
AKSHAY PRAKASHSTARTED AT KANDGAON SECTION
ACHIEVED 80% LOAD RELIEF OF 45.88 MWBETWEEN 17.00 HRS. TO 23.00 HRS
BY SELF DECIPLINE FROM AG & IND. CONSUMERSUP TO 20.6.2005
(STEP BY STEP IN 6 MONTHS )
ACHIEVEMENTS
3 T/F ADDED IN INFRASTRUCTURE TO IMPROVE LOW VOLTAGE POCKETS
22 SPANS 11 KV RECONDUCTORING CARRIED OUT TO IMPROVE SYSTEM
ALL PAID & PENDING INDUSTRIAL AND AGRI. CONNECTIONS ARE RELEASED ON PRIORITY
ABOUT 70 POLES LT LINE IS ERECTED DEPARTMENTLLY
TRANSFORMER FAILURE : 0%
Nos %Load
( MW)%
R+C+Street Light 120767 84.48 61.275 27.10
Industrial LT 3863 41.57
PWW L.T. 957 3.954
LT Industarial Total 4820 3.37 45.524 20.13
Industrial HT 32 14.368
PWW H.T. 3 0.168
HT Industrial Total 35 0.02 14.536 6.43
AG L.T. (Metered ) 6812 23.46
AG L.T. ( Unmetered) 10392 55.1
AG. LT. Total 17204 12.03 78.56 34.74
AG H.T. (Metered ) 135 26.247
AG H.T. (Unmetered) 0 0
AG HT Total 135 0.09 26.247 11.61
GRAND TOTAL 142961 226.142
FOR PROPOSED " AKSHAY PRAKASH YOJANA"
FORNO OF CONSUMERS & % LOAD IN (MW)
Category
Existing as on 31.03.05
R-I DIVISION, KOLHAPUR
R-I DIVISION, KOLHAPUR
No. of Consumers
0.02% HT Ind.
85% R C Street Light
12% AG. LT
3% LT Ind.
0.09% AG. HT
1
2
3
4
5
% Load in MW
6% HT Ind.
27% RC Stree Light
20% LT. Ind.
12% AG.HT
35% AG. LT
12345
“ WHAT WE HAVE TO DO FURTHER ?”
• INITIATE THE CONSUMER FOR PLANNED USAGE OF AVAILABLE POWER
• FINANCIAL LOSS DUE TO FAILURE OF LINE / EQUIPMENT TO BE REDUCED.
• ENCOURAGE THE CONSUMERS FOR MINIMUM USE OF POWER.
• TRAIN THE USER FOR EFFICIENT USE.