Presentation outline Presentation to the Portfolio Committee on Energy Solar Water Heating Programme Progress Report 17 April 2012 Ms Mokgadi Modise 1 -Confidential-

description

Presentation outline. Presentation to the Portfolio Committee on Energy Solar Water Heating Programme Progress Report 17 April 2012 Ms Mokgadi Modise. Strategic Plan - Intermediate Outcome 1 of 2: Demand side, efficiency and diversified energy mix programmes implemented. - PowerPoint PPT Presentation

Transcript of Presentation outline

Page 1: Presentation outline

Presentation outlinePresentation to the Portfolio Committee on Energy

Solar Water Heating Programme

Progress Report

17 April 2012

Ms Mokgadi Modise

1-Confidential-

Page 2: Presentation outline

Presentation outlineStrategic Plan - Intermediate Outcome 1 of 2: Demand side, efficiency and diversified energy mix programmes implemented

– In her 2009 budget vote speech, the Minister of Energy, Ms Dipuo Peters announced a target of 1 million Solar Water Heaters (SWH) to be installed by 2014 /2015.

– The overall programme focused on both tariff and fiscal funded programmes in residential and commercial sectors.

– Initially, the SWH programme took off very slowly till mid 2010.

– The fiscal funded SWH were rolled out through both Schedule 6 (i.e. Direct transfer to the municipalities) and through Schedule 7 – (i.e. Transfer to Eskom as an implementing agent) of the Division of Revenue Act (DoRA) .

– During the 2012 SONA, the President mentioned that we have installed 220 000 units. This figure then did not include the February and March 2012 status reports.

2-Confidential-

Page 3: Presentation outline

Presentation outlineStrategic Plan - Intermediate Outcome 1 of 2: Demand side, efficiency and diversified energy mix programmes implemented

– In 2011/2012 financial year, the SWH programme started on a baseline of 55,000 units installed, with a target of 250, 041 units.

– There was an overlap on implementation from 2010/2011 for completion of a roll out with: Tshwane, Naledi and Sol Plaatjie municipalities.

– In all the three municipalities implementation was through Schedule 7 of the Division of Revenue Act (DoRA).

3-Confidential-

Page 4: Presentation outline

Presentation outlineImplementation overlap from 2010/2011 to 2011/2012

Municipality Approved project value (m)

Planned Units

MW GWh Status Actual Units Installed

Naledi (i.e. Stella and Vryburg)

R54,450 7 837 2.2 5.9 Incomplete 1 362

Sol Plaatjie R54, 450 7 837 2.2 5.9 Installationcompleted

7837

Tshwane R74 15 094 4.2 11.9 Installationcompleted

15094

Total R182,900 30 868 8.6 22.7

Jobs created per municipality: Sol Plaatjie – 156 persons appointed; Naledi: 9 persons; Tshwane: 130 persons

4-Confidential-

Page 5: Presentation outline

Presentation outlineImplementation challenges in Naledi Municipality

– In July 2011, water quality challenges were experienced in Naledi

Municipality:

• Some beneficiaries had no water connected directly to the

households and this is one of the fundamental requirements for SWH

installation – this challenge was resolved by providing the required

funds for water reticulation (connection and maintenance);

• Bad roof structures and old pipes that cannot be tapped into;

• Hard water – the prevalence of hard water could have a severe

impact on the direct functionality of SWH and its lifespan;

• Naledi Municipality later confirmed the hard water condition for the

entire area;

5-Confidential-

Page 6: Presentation outline

Presentation outlineImplementation challenges in Naledi Municipality Cont’

• Two solutions were presented:

• Solution 1: Removing calcium and iron mass;

• Solution 2: Chemically treat the water through reverse Osmosis;

• Cost breakdown for solution 1: the budget cost per SWH was R1 195

and the cost of 7 837 SWH was R 9 365 215. 00

• Maintenance for solution 1: the filter needs to be changed as soon

as it is visibly blocked and the replacement depends on the solids

present in the raw feed to the geyser (i.e. at most within six months);

• Cost breakdown for Solution 1: Cost for filter at R25.00 and Cost of

NanoPhos at R125.80 per kg = R7 837 every six months, or to R 1 2m

• After analysing all the project challenges, it was clear that the cost

associated with water quality would make the project unviable and

that systems would need to be replaced on a regular basis.

6-Confidential-

Page 7: Presentation outline

Presentation outlineImplementation challenges in Naledi Municipality Cont’

• Cost breakdown for solution 2: Reverse Osmosis (operates at high pressure and removes all irons, bacteria, viruses, etc).

• Solution 2 excludes maintenance and running costs.

Areas Daily Consumption Remedial Costs

Stella 6 M l R15, 000, 000.00

Huhudi 9 Ml R18, 600,000.00

Vryburg & Coldridge

18 Ml R45, 000,000.00

Dithakwaneng 2 Ml R6, 200, 000.00

Devondale 1 Ml R3, 100,000.00

Total R88, 400,000.00

7-Confidential-

Page 8: Presentation outline

Presentation outlineRecommendations to resolve water quality problem

• Based on an analysis of all the costs presented above, projects are moved

to a new and more suitable area. All SWH Units for Naledi had already

been procured when the project was terminated.

• Selection of a new area: Relocation from Naledi to Maluti-a-Phofung.

• Free State Province had already engaged the DoE on a Business Plan to

roll out SWH Units.

• Maluti-a-Phofung was then approved to take over the roll out from Naledi

Municipality .

• Eskom has submitted a report confirming that a feasibility study is

underway prior to the start of the actual installations.

8-Confidential-

Page 9: Presentation outline

Presentation outline2011/2012 SWH Fiscal update

• Emfuleni (Sedibeng) , Musina and Umsobomvu were approved for 2011/2012

financial year. An allocation of R54,400m was approved for each under schedule

7 of DoRA, whilst the R60 million was allocated to Umsobomvu municipality, in

terms of schedule 6.

• 1st and 2nd Quarters of the financial year focused on the finalisation of the

business plans and contracts.

• A feasibility study is necessarily undertaken in each municipality to allow clear

remedial actions prior to the start of the roll out.

• Musina Municipality has appointed Roschcon to undertake the feasibility study

and Umsobomvu has also finalised the appointment of a service provider for a

feasibility study.

• Sedibeng is undertaking the feasibility study itself instead of appointing the

Service Provider. Eskom has provided the municipality with the ToR for a

feasibility so that it is in line with all that is required.

9-Confidential-

Page 10: Presentation outline

Installations to date

Above graph represents total installations to date, including installations received but not yet processed. This includes Eskom funded (rebate and contracts) and DoE funded (Tshwane, Sol Plaatje and Naledi).

10-Confidential-

Page 11: Presentation outline

Presentation outlineStandard Offer Model Update

Installation to date

SHW Type Number of Units installed (Rebate)

Fiscal Total

LP 171 730 24 293 196023

HP 48 941 48 961

Total 220 671 24 293 244 964

Jobs created: For 24 Suppliers – 640 Jobs created/persons employed and 70 Distributors – 1462 Jobs created. Note: Final number of job creation will be

provided once the re-registration of suppliers and Distributors is finalised. Eskom is currently in the process of re-registration.

Jobs created: For 24 Suppliers – 640 Jobs created/persons employed and 70 Distributors – 1462 Jobs created. Note: Final number of job creation will be

provided once the re-registration of suppliers and Distributors is finalised. Eskom is currently in the process of re-registration.

11-Confidential-

Page 12: Presentation outline

Presentation outlineStandard Offer Model Recap

• The Standard Offer Concept is based on the energy savings to be

derived from an initiative, irrespective of the technology applied to

achieve such savings.

• It is an intervention that is outcome based with the incentive flowing

after delivery of the intervention, and subject to verification of the

savings. The solar water heating system will have a deemed savings

value.

• It is envisaged that the rebate will be attractive initially, in order to

kick-start the market. Over time, it is predicted that costs will be

reduced through economies of scale.

Standard Offer Model Recap

12-Confidential-

Page 13: Presentation outline

Standard Offer Model Recap

• Concept of the Standard Offer (SO)

Model has been finalised;

• A one year Business Plan for SWH

Pilot phase has been completed and

ready for approval and implementation

in the current financial year;

• It still has to be decided through the

SWH PSC whether to implement the

SO Model with the roll out of the

allocated R1 billion.

• Concept of the Standard Offer (SO)

Model has been finalised;

• A one year Business Plan for SWH

Pilot phase has been completed and

ready for approval and implementation

in the current financial year;

• It still has to be decided through the

SWH PSC whether to implement the

SO Model with the roll out of the

allocated R1 billion.

Continuation of Standard Offer Model Recap

13-Confidential-

Page 14: Presentation outline

Pool of funding required to service

debt

Funding requirements

Fiscal

Carbon Credit

MYPD

Grants

Owner /user

Source of immediate

funding

Commercial Debt

Concessionary Debt

To be obtained

from

Total funding required for Solar

Water Heating units

Cost of installed

units (making allowance for reduced cost

due to volume)

Interest on debt

To be serviced

by

14-Confidential-

Page 15: Presentation outline

Presentation outlineSWH: Localisation

• Government and its social partners signed a Green Economy Accord on

17 November 2011, as an outcome of social dialogue on the New Growth

Path.

• The Accord has been signed on behalf of Organised Labour, Business,

Community and Government.

• The Green Economy Accord recognise that the installation of SWH

systems can help with climate-change goals and increase the number of

South Africans who have access to hot water while creating jobs in

manufacturing and installation.

• Business committed to working with Government to develop, establish and

then publicise a sustainable funding plan to support the installation of 1

million SWH systems.

• It should be noted that the success of localisation within the Green

Economy Accord depends on its implementation together with other

Accords such as Local Procurement Accord, National Skills Development

Accord and Basic Education Accord because of cross cutting elements. 15-Confidential-

Page 16: Presentation outline

Presentation outlineSWH: Localisation

• The following localisation issues are addressed under

Commitment One (Green Economy Accord):

• Increase the rollout to one million units: In order to

achieve the targets for SWH installations, it will require

financing, enterprise development, training and policy

coordinated across all stakeholders. Business committed to

working with Government to develop, establish and then

publicise a sustainable funding plan to support the installation

of 1 million SWH systems

16-Confidential-

Page 17: Presentation outline

Presentation outlineSWH: Localisation

• Improve localisation of the components: All parties

commit to the drive to increased localisation of the

components of the SWH systems. Government committed to

ensure that incentives and regulatory measures are in place

to promote greater local manufacturing of components of the

SWH systems. Specific opportunities for localisation to be

identified and support localisation accordingly

• Secure support from the industry for replaced units:

Approximately 200 000 electric geysers are replaced annually

by householders through payments via the insurance

industry, to promote the use of locally-manufactured SWH for

the replacement of damaged electric hot-water geysers

17-Confidential-

Page 18: Presentation outline

Presentation outlineSWH: Localisation...

• Secure support from the industry for replaced units :

Business will work with the insurance industry to approve a

manageable selection of suitable systems to be used by

insurers. Business will implement a pilot by 2012 followed by

a wider SWH roll-out by the insurance industry in 2013.

• Secure guarantees on installed units: The parties identified

a potential risk with the guarantees on the SWH units,

particularly i.r.o start up companies who may no longer be in

business when warranties needed to be honoured. Business,

government and various funding institutions including Eskom

are engaging to develop proposals on warranty systems,

standards and funding mechanisms to address this risk.

18-Confidential-

Page 19: Presentation outline

Presentation outlineSWH: Localisation...

• Promote the marketing of SWH systems: The parties

recognise that it is imperative that consumers embrace the

technological shift to SWH. Business therefore committed to

develop with Government as well as organised labour and

community organisations, national communication campaign,

linked to local community initiatives and campaigns like Lead

SA, Proudly SA and 49m, to educate South Africans about

SWH and its benefits. Note: Energy Efficiency Campaign

Strategy has been completed and signed at NEDLAC in

December 2011 and currently resources are being

mobilised.

19-Confidential-

Page 20: Presentation outline

Presentation outlineSWH: Localisation...

• The following localisation issues are addressed under

Commitment One of the Green Economy Accord:

• Promote uniform technical and performance standards

for SWH: The parties recognised that given South Africa’s

unique climate conditions, the need to develop local

standards for the different component parts of SWH, in order

to not only support local technological development, but to

also ensure that we can facilitate the introduction of imported

technologies for local manufacturers. Government committed

to develop the standards for the different components that

make SWH units, through SABS. Business undertook to

support the development of local standards for SHW at

component level.

20-Confidential-

Page 21: Presentation outline

Presentation outlineProgress to date

• Solar Water Heating Project Steering Committee:

• Solar Water Heater Designation Study: The DTI/IDC has

appointed a service provider to undertake a SWH designation

study. The objective of the study is to designate the SWH

Industry or certain SWH products in terms of the Preferential

Procurement Policy Framework Act (PPPA).

• Sector designation means a sector, sub-sector or industry

that has been designated by the DTI in line with national

development and industrial policies for local production,

where only locally produced services, works or goods or

locally manufactured goods meet the stipulated minimum

threshold for local production.

21-Confidential-

Page 22: Presentation outline

Presentation outlineProgress to date cont’

• It is anticipated that the study will be completed in June 2012.

• Funding Models for SWH: IDC/DBSA/Eskom has been

exploring various funding models in an effort to get the most

appropriate funding model for both LP and HP systems. IDC

has already funded companies to the tune of approximately

R150 million to date in support of the sector.

22-Confidential-

Page 23: Presentation outline

Presentation outlineProgress to date

• Solar Water Heating Project Steering Committee:

• Accreditation and Training: Accreditation work is in progress

through the Department of Higher Education and Training in

collaboration with the SETAs. This is to ensure that all work is done

within the approved accredited requirements.

• Work in progress and to be finalised soon :

• How the allocated funding would be used taking in to account

all of the above;

• Identification of beneficiaries;

• Service Level Agreement (DoE & Eskom);

• Possible solution for CDM (Maintenance & sustainability);

• Phase handover from rebate programme to contract (rebate to

continue until September 2012);

• Continuation of new registrations for LP rollout

23-Confidential-

Page 24: Presentation outline

Presentation outlineSWH Allocation for 2012/13 – 2014/2015

• An amount of R4.7 billion has been allocated to achieve 1 million SWH

units by 2014/2015Financial Year Amount (R)

2012/2013 1 billion

2013/2014 1.7 billion

2014/2015 2 billion

24-Confidential-

Page 25: Presentation outline

Presentation outlineConclusion

• PPC to note:

• Progress made to date on the Solar Water Heating programme,

challenges encountered and how they are being resolved;

• That from the above figures, it is evident that the cumulative target of

250, 041 installations for the current financial year is still in sight

given that about 244 964 of the targeted units have been installed.

• Budget allocated to achieve 1 million SWH units by 2014/2015.

• Commitments already made with respect to the Green Economy

Accord to address the localisation issues to create more jobs and

work already undertaken.

• That work is in progress with all stakeholders to intensify the

operationalisation of all identified key factors to localisation.

• Energy savings will only be improved through penetration of high end

market, through the Standard Offer Concept

25-Confidential-

Page 26: Presentation outline

Presentation outline

Thank you