Lays down min safety requirements for PNG distribution in cityand town.
It covers equipments, pipelines, accessories installedbetween up-stream inlet isolation valve of CGS and Consumer meter for commercial and industrial consumers
First isolations valve downstream of consumer meter for domestic
consumer
It is necessary to comply with statutory regulations such as State Pollution
Board, Factories Act, Indian Explosives Act, Municipal Authorities etc as
applicable and requisite approvals shall be obtained from the relevant
competent authorities for the PNG distribution system.
-
8/7/2019 Presentation on OISD-STD-220
3/14
(CGS & PRI) Min distance of 6 mtrs from other installation
Min distance of 2 mtrs from building structure
Min 2 safety device and 1 OPSO for installation whereOP is greater than 4 bar
Min 3 gas leak detectors at the strategic locations in the
CGS to cover entire facility
Vent Line min height of 3 mtrs above the equipment for above
ground installations and 3 mtrs above the ground level
for under ground installations
ISOLATION OF CGS Quick acting isolation valves shall be provided at CGS
for emergency isolation purpose.
-
8/7/2019 Presentation on OISD-STD-220
4/14
STEEL PIPING All the pipes and fittings need to confirming to ASME B 31.8 or
equivalent. CI pipe not allowed for PNG.
piping shall be designed for max operating pressure of 19.0barg. at temperature ranging between (-) 30 Deg. C to (+)55 Deg. C.
The above ground mains shall be painted yellow foridentification
POLY ETHYLENE (PE) PIPING
The PE piping, tubing, fitting and other components shallconform to requirement of ASME B 31.8 or equivalent asapproved by statutory authority. The PE piping shall bedesigned for maximum operating pressure of 4.0 barg. Attemperature ranging between (-) 20 Deg. C to (+) 55 Deg. C.PE piping shall not be used for major water/ rail crossing.
-
8/7/2019 Presentation on OISD-STD-220
5/14
STRATEGIC VALVES 3 KM for steel pipelines.
1KM for PE Pipelines of dia more than 63 mm
For PE Pipelines less than 63 mm dia, the distancebetween strategic valves shall be based upon risk
analysis Such valves shall also be provided on each riser,
upstream of each meter and at both ends of river &
railway crossing
-
8/7/2019 Presentation on OISD-STD-220
6/14
The isolation valve down stream of consumer meter
shall be easily accessible
Meters duly certified by competent authority shall beused
The pressure regulator shall be capable of shutting
down the downstream gas supply in case of low orhigh pressure in the system
The pressure ranges for different consumers shall be as
under:
a) Domestic Consumer : 21- 30 mbarb) Commercial Consumer : 21- 100 mbar
c) Industrial Consumer : 21 500 mbar
-
8/7/2019 Presentation on OISD-STD-220
7/14
The PNG pipeline route should avoid;
Areas congested with other underground utilities likepower, water, telephone etc
Close proximity to unstable structures or where constructioncould lead to damage to pipeline
Close proximity to highly populated buildings such asschools, public places etc
Ground areas of running sand, gravel or flood risk, waterbodies
Areas of known or suspected aggressive soil conditions
Landfill sites
Steel Pipe should avoidx Close proximity to existing CP systems, particularly groundbed
locations
x High stray direct current, typically near DC traction systems
x Long runs parallel to high voltage overhead conductors
-
8/7/2019 Presentation on OISD-STD-220
8/14
shall be placed on the entire pipeline at a distance not
exceeding 50 meter and also at bends in the city
Additional sign/ markers shall be installed to indicate thepresence of a pipeline at road, highway, railroad, streamcrossings and locations where there is a probability ofdamage or interference
A marker shall be marked in easily readable locallanguage with at least the following :
Name of PNG distribution company Contact telephone number(s) in emergency
Location code
Warning- High Pressure Gas Line and Other Utilities to takepermission from PNG distribution company before digging etc.
-
8/7/2019 Presentation on OISD-STD-220
9/14
The pipeline laying shall conform to the provisions asspecified in ASME B 31.8 or equivalent as approved bystatutory authorities. In addition, safety provisions
under OISD-GDN-192 (Safety Practices DuringConstruction) shall be complied
Following shall also be complied;
Road signs, warning lamps and barrier systems shall beprovided on highway or other work locations whichare accessed by pedestrians or vehicles
Electricity cables shall be treated as "Live, unless theowner certifies them as "Dead
Min distance of 250 mm shall be maintained from anyother utility
Warning mate to be used in open cut, difference in
elevation of pipe and warning mate shall be 200 mm
-
8/7/2019 Presentation on OISD-STD-220
10/14
As built drawing and pipe book shall be maintained
Trench width min 300 mm, pipe bed shall be free from
sharp objects, padding of soft soil / sand of min 100
mm below pipe
Min cover shall be as below
Location Min. Cover
in meter
Industrial, Commercial Residential Areas 1. 0
Stream, Canal and other minor water crossings 1. 5
Drainage ditches at roadways and railroads 1.0
Rocky Areas 1. 0Road Crossings 1. 2
Railroad Crossings 1. 7
Inside the building premises 1. 0
-
8/7/2019 Presentation on OISD-STD-220
11/14
TESTING OF INSTALLATIONS
HYDROSTATIC TESTING Steel pipe shall be tested at 1.5 times of max OP
Duration of the test shall not be less than 24 hrs.
Design Pr.(bar)
StrengthTest Pr.(bar)
DurationHydro.(H)/Pneu. (P)
Up to 0.1 0.3 P (5 Min.)
From 0.1 to 1.0 2.0 P (5 Min.)
From 1.0 to 2.0 3.0 P P (5 Min.)
From 2.0 to 7.01.5 DP
P or H
(30 Min.)
From 7.0 to 100.0 H (30 Min.)
-
8/7/2019 Presentation on OISD-STD-220
12/14
PNEUMATIC TESTING
Pneumatic testing of PE PIPELINE complywith the following:x For services with OP less than 75 mbar, air /
inert gas at min 100 mbar
x For services with OP in excess of 75 mbar, testpressure shall be 1.5 times of OP
x Pipelines operated above 2 bar, test pressureshall be 1.5 times of OP max
x Risers and laterals shall be tested at 350 mbar
Min duration of the test shall not be less than10 min.
-
8/7/2019 Presentation on OISD-STD-220
13/14
All fire protection and detection facilities
shall be in place before commissioning
All facilites i.e. CGS, PRI, Pipelines etc.
shall be purged and commissioned as per
approved procedure after due checks andcertification by the authorized personnel
-