Presentation on Audit Project
-
Upload
vidhi-parmar -
Category
Documents
-
view
220 -
download
0
Transcript of Presentation on Audit Project
-
8/3/2019 Presentation on Audit Project
1/12
By :
Ankita
Vidhi
Pooja
-
8/3/2019 Presentation on Audit Project
2/12
philosophy
We believe
In people and their unlimited potential. In content and focusin problem solving. In teams for effective performance. In
intellect & its power.
We endeavour
To select, train and coach people to obtain higherresponsibilities. To nurture talent to build leaders fortomorrow's corporation. To reward, celebrate and activateall intellectual business contributions.
-
8/3/2019 Presentation on Audit Project
3/12
Businesses
Fabric
Denim
Shirting
KhakisKnitwear
Voiles
Garment export
Shirting
Jeans
Arvind Brands (owned)
Flying machine
Newport
Ruf &
Tuf
Excalibur
Arvind Brands (licensed)
Arrow
Lee
Wrangler
-
8/3/2019 Presentation on Audit Project
4/12
HR audit
-
8/3/2019 Presentation on Audit Project
5/12
Alignment with top management
Organizational focus
Select, train and coach
people
Effective performance
Company believes in
intellect and power of
people
HR practices
Regular training programs
Effective teams and
motivation
Retained and maintained
workforce, satisfaction,
freedom for taking
decisions.
-
8/3/2019 Presentation on Audit Project
6/12
Creating developments and motivation
Regular training programs (Conducted from
both insiders and outsiders).
Giving the employees freedom for takingdecision. Incidence
Stability in the employees because of freedom
and proper guidance
-
8/3/2019 Presentation on Audit Project
7/12
Health and safety
Giving workers proper safety measures to
work, like masks and ear plugs
Providing hygienic canteen facility, subsidizedrate for the employees
Health insurance
-
8/3/2019 Presentation on Audit Project
8/12
Work place environment and
atmosphere
Regular cleanliness
Old construction but proper ACs for the
employees Necessary facilities like computers and other
equipments in sufficient manner
Regu
lar breaksfor the workers
for meal and
breakfast
-
8/3/2019 Presentation on Audit Project
9/12
Corporate social responsibility
Utilizing the waste water in pond for fishes
Explain
-
8/3/2019 Presentation on Audit Project
10/12
Limitations and suggestions
Limitations
No proper grievance
(handling Scolding workers for
the fault in front of all inmeeting).
Lay out problem (More lead
time in processes, more labor
movement and more costbecause of old construction
faults ).
Suggestions from our side
There should be propermethod to make aware about
individual mistakes.
If they cannot change thelayout, then there must besome facility for easy
movement within the factoryarea (like automatic loadingshifting machines, practiced ingood manufacturingcompanies).
-
8/3/2019 Presentation on Audit Project
11/12
Cont
No proper supervision (the
workers do not use safety
measures as per theguidance, and supervisors do
not bother impose the norms)
Resistance to change (as the
workers and employees areold and are not open to work
in new methods).
Supervisors must inform and
guide the workers about the
hazardous effect if they donot use safety measures.
They should develop the
acceptance and they shouldinduce training and other
practices for easy acceptance
Limitations Suggestions from our side
-
8/3/2019 Presentation on Audit Project
12/12