Presentation goldlay 13 12 17

57
13 - 12 - 17

Transcript of Presentation goldlay 13 12 17

Page 1: Presentation goldlay 13 12 17

13 - 12 - 17

Page 2: Presentation goldlay 13 12 17
Page 3: Presentation goldlay 13 12 17
Page 4: Presentation goldlay 13 12 17
Page 5: Presentation goldlay 13 12 17
Page 6: Presentation goldlay 13 12 17
Page 7: Presentation goldlay 13 12 17
Page 8: Presentation goldlay 13 12 17
Page 9: Presentation goldlay 13 12 17
Page 10: Presentation goldlay 13 12 17
Page 11: Presentation goldlay 13 12 17
Page 12: Presentation goldlay 13 12 17
Page 13: Presentation goldlay 13 12 17
Page 14: Presentation goldlay 13 12 17
Page 15: Presentation goldlay 13 12 17
Page 16: Presentation goldlay 13 12 17

Final Design Document

 Full details of all elements of the work including materials, finishes,

size etcDetails of all elements of the work including materials, finishes, size 

and construction of elements can be found within Documents titled materials and finishes - FINAL DESIGNS 01 designs of panels with units and numbersFINAL DESIGNS 05 make up and position of individual modulessize - FINAL DESIGNS 03 sizefinishes - FINAL DESIGNS 04 fixings and surface finish 

Page 17: Presentation goldlay 13 12 17

FINAL DESIGNS 01 designs of panels with units and numbers

Page 18: Presentation goldlay 13 12 17

a

Page 19: Presentation goldlay 13 12 17

b

Page 20: Presentation goldlay 13 12 17

c

Page 21: Presentation goldlay 13 12 17

d

Page 22: Presentation goldlay 13 12 17

e

Page 23: Presentation goldlay 13 12 17

f

Page 24: Presentation goldlay 13 12 17

g

Page 25: Presentation goldlay 13 12 17

FINAL DESIGNS 05 make up and position of individual modules

Page 26: Presentation goldlay 13 12 17

001

Page 27: Presentation goldlay 13 12 17

002

Page 28: Presentation goldlay 13 12 17

003

Page 29: Presentation goldlay 13 12 17

004

Page 30: Presentation goldlay 13 12 17

005

Page 31: Presentation goldlay 13 12 17

006

Page 32: Presentation goldlay 13 12 17

007

Page 33: Presentation goldlay 13 12 17

008

Page 34: Presentation goldlay 13 12 17

009

Page 35: Presentation goldlay 13 12 17

010

Page 36: Presentation goldlay 13 12 17

FINAL DESIGNS 03 size

Page 37: Presentation goldlay 13 12 17

Final Design Document

 Location of all elements of the work including orientation

Details of location and orientation can be found within Document titled FINAL DESIGNS 02 positioning of pieces

 

Page 38: Presentation goldlay 13 12 17

FINAL DESIGNS 02 positioning of pieces

Page 39: Presentation goldlay 13 12 17

001

Page 40: Presentation goldlay 13 12 17

002

Page 41: Presentation goldlay 13 12 17

003

Page 42: Presentation goldlay 13 12 17

004

Page 43: Presentation goldlay 13 12 17

005

Page 44: Presentation goldlay 13 12 17

006

Page 45: Presentation goldlay 13 12 17

007

Page 46: Presentation goldlay 13 12 17

008

Page 47: Presentation goldlay 13 12 17

009

Page 48: Presentation goldlay 13 12 17

010

Page 49: Presentation goldlay 13 12 17

Final Design Document

Fixing details

Details of fixings were created in agreement with support from the group and can be found within Document titled FINAL DESIGNS 04 fixings

Page 50: Presentation goldlay 13 12 17

FINAL DESIGNS 04 fixings and surface finish

Page 51: Presentation goldlay 13 12 17
Page 52: Presentation goldlay 13 12 17
Page 53: Presentation goldlay 13 12 17

Final Design Document

Care and maintenance requirements In line with the requirements of the Design Brief, discussion at

interview and my specific intention and approach to the making and

siteing of public art the work will require no care or maintenance.

The intention is that the work is to change with age, the patina and

marks that the work will carry over time are to be recognised as

welcomed and will add to the narrative of the pieces.

Page 54: Presentation goldlay 13 12 17
Page 55: Presentation goldlay 13 12 17
Page 56: Presentation goldlay 13 12 17

Final Design Document Schedule for delivery of the workThe work will be delivered in relation to the agreed schedule set out in section 3.1 of the Artists Agreement

Initial Meeting with the Commissioner June 2017completedDevelopment of preliminary designs July / August 2017completedPresentation of initial proposal to Steering Group September 2017completedDetailed design development September / December 2017completedApproval of detailed design and supporting information (see 2.5) by Essex Housing December 2017

Fabrication commences January 2018

Installation on Site July 2018

Project completed/Installed August 2018

The physical work will be delivered to the site and installation will take place immediately over 1 - 2 days so that the work is not at risk of theft or vandalism.

Page 57: Presentation goldlay 13 12 17

Final Design Document

Confirmation of costs within budgetI can confirm that the work will be completed within the allocated budget of £34,000 (excluding VAT) set out in point2.1 Artists Agreement.

2.1The fee will be paid in five instalments:(a) On signing of the Agreement£1,000

(b) On agreement of the initial proposal by the Steering Group and instruction to produce detailed design

£3,000

(c) On agreement of the detailed designs by the Commissioner and instruction to proceed with the fabrication of the Work

£10,000

(d) On completion of 50% of the Work to the satisfaction of the Commissioner£14,000 It is anticipated that evidence to this point will be available mid March 2018

(e) On completion, delivery and installation of the Work and following acceptance of the Work by the Commissioner

£6,000Total

£34,000