Presentation fwt en
-
Upload
yuri-shevchenko -
Category
Engineering
-
view
171 -
download
2
Transcript of Presentation fwt en
![Page 1: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/1.jpg)
Ukraine, Kramatorsk, 2012.
![Page 2: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/2.jpg)
World Wind Energy, GW
![Page 3: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/3.jpg)
Fuhrlander AG and Fuhrlander windtechnolodgyin world
![Page 4: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/4.jpg)
Wind potential map of Ukraine
Average wind speed :
V < 4,5 m/s
V = 4,5 m/s
V < 5,0 m/s
V = 5,0 m/s
![Page 5: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/5.jpg)
Production workshop
Production of the nacelle :
• length - 114 m
• width - 24 m
• area - 2736 sq.m.
Production of rotor hub :
• length - 30 m
• width - 24 m
• area - 720 sq.m.
Main warehouse :
• length - 18 m
• width - 48 m
• area - 864 sq.m.
Additional warehouse :
• length – 24,5 m
• width - 18 m
• area - 441 sq.m.
![Page 6: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/6.jpg)
Wind turbine capacity 2,5 MW FL2500
Technical characteristics :
1. Rated power - 2500 kW.
2. Height to the rotor axis - 98,2 m.
3. Rotor diameter, – 100 m.
4. Starting wind speed - 3,5 m/s.
5. Rated wind speed - 11,5 m/s.
6. Shutdown at speed of a wind– 25 m/s.
7. Operation at t from -20°С to +40°С.
8. Sound power - 104,5±2 dBA.
9. Range of number of turns - 9,4 - 16,5 rpm.
10. Rated number of turns of a rotor - 14,4 rpm.
11. The angle of the nacelle - 5°.
12. Transfer number of a gear box - 79,2.
Ø 100 m
98,2 m
![Page 7: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/7.jpg)
Production of wind turbine
FoundationTower94,2 m
Hub34 000 kg
Nacelle95 000 kg
![Page 8: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/8.jpg)
Blades
Wind turbine capacity 2,5 MW
![Page 9: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/9.jpg)
Logistics, freight scheme
Kramatorsk
Parts of wind turbines
ServiceTransportation
to the wind park
Suppliers
![Page 10: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/10.jpg)
Logistics
![Page 11: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/11.jpg)
Logistics
![Page 12: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/12.jpg)
Erection
![Page 13: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/13.jpg)
Erection
![Page 14: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/14.jpg)
Centers of service support
![Page 15: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/15.jpg)
Service staff
Composition of service staff
South region:• 15 peoples (in 2012);• 33 peoples (in 2013).Eastern region:• 15 peoples (in 2012);• 35 peoples (in 2013).
![Page 16: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/16.jpg)
Warehouse of spare parts andconsumables
The high-tech warehouse:• more then 300 titles of part;• consumables;• fuels and lubricants ;• crane and loading equipment.
![Page 17: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/17.jpg)
Dispatching office
Workplace
Workplace
WorkplaceReporting
Dispatcher on duty
Server SQL/VPN
Wind park 1 Dispatcher on duty
Wind park 2
Wind park n+1
![Page 18: Presentation fwt en](https://reader034.fdocuments.net/reader034/viewer/2022042522/55ab7d2a1a28abc4048b4633/html5/thumbnails/18.jpg)