Pr©sentation ARCADIS

download Pr©sentation ARCADIS

of 56

  • date post

    24-Jan-2015
  • Category

    Technology

  • view

    4.042
  • download

    2

Embed Size (px)

description

Brève présentation d'ARCADIS Belgium

Transcript of Pr©sentation ARCADIS

  • 1. Presentation of ARCADIS Creating BalanceImagine the result

2. What Keeps YouAwake? 3. Time andKnowledgeare ScarceEngineers, environmental experts, permitexperts of ARCADIS relieve you ofwork 4. The Rules andRegulations areComplexARCADIS, an expert in environmentalimpact reports, building, environmentaland other permits, rules and laws,procedures 5. The Surroundingsare ComplexAuthorities, local residents,environmental groups, employeesARCADIS has an understanding of thestakeholders 6. Energy isExpensiveARCADIS, Energy Specialist 7. The Future isValuableARCADIS is committed to sustainablesolutions: a win-win situation for yourorganisation, for mankind and for theenvironment 8. Crystal- Advice on Planning Advice on Environmental Economic PlanningClear Advice Advice on Sustainability Advice on the Environment Advice on Soil Advice on Energy Strategic Advice Product Advice (REACH) Transaction Advice 9. We Know Planning Certificates Town & Country Implementation PlanOur Way Suitable Assessment (impact on nature)Around Mobility Impact ReportProcedures Environment Impact Report Environmental Permits Urban Development Permits Water Test 10. Guiding Feasibility Studies Construction StudiesStudies Energy Studies Infrastructure Studies Soil Studies Water Studies Environmental Studies Sound Studies Product Risk Assessments 11. Design and All possible structures in all sectors Planting of greeneryEngineering Industrial estate Wind farms Total energy and biomass installations Air and water purification plants Soil decontamination Noise control Infrastructure, roads and sewerage 12. Execution Clear specifications Construction supervisionand Budget controlMaintenance Multidisciplinary construction managers forexecution monitoring Technical or total facility management,enriched with knowhow from design andengineering stage Decontamination according to GRIP (guaranteed remediation programme) 13. Legal MonitoringVarious Customers inBelgiumImagineAlways being up-to-date withthe latest environmentallegislationFacing government inspectionsfree of worriesThe ResultNo environmental infractions orviolations Customer: Industry Assignment: monitoring ofenvironmental legislation,regular reporting and earlywarning system Proprietary softwareARCALEX 14. HAtric Office BuildingHasseltImaginePerfect combination ofeconomy, ecology and emotioninto one officeThe ResultHighly sustainable, energy-efficient and comfortable officewith striking veiled front faade Customer: Reiger II Investment: 4 mio Architect: HolisticArchitecture 50|5 Timing: 2007-2008 Assignment: consultancy onsustainable construction andtechnical support duringconstruction 15. REACHImplementationWorldwideImagineTo take on the REACHchallenges in an adequate andcost-effective mannerThe ResultCustomised REACH solutionsto implement rules andregulations effectively and toremain compliant with REACHin the future Customer: from varioussectors Assignment: various REACHImplementation Projectsusing our integrated servicerelated to Global ProductStewardship 16. Diverting of the RiverWitte NeteDesselImagineA natural river with a rich plantand animal lifeThe ResultWinding river Witte Nete withrepair of protected habitats;Inbev-Latour prizeEnvironment 2007. Customer: S.C.R. Sibelco Timing: 2005-2008 Assignment: proposal fordiverting and monitoring ofbiological repair 17. DecontaminationVilvoordeImagineResidential quarter on healthysoilThe ResultDecontamination techniqueswith innovative injectiontechniques ad natural products(molasses + persulphate) Customer: Akzo Nobel Timing: trial runs and designof decontamination project2006-2007 l launch andmonitoring ofdecontamination 2008 Assignment: environmentalsupervision ofdecontamination 18. BeverdonkGrobbendonkImagineWater-bound industrial estateof 60 ha with nature designproject as a full componentThe ResultCO2-neutral industrial estatewith a container terminalalongside the Albert Canal Customer: nv DeScheepvaart Investment: 3 mio Timing: 2008-ongoing Assignment: complete pathfrom concept, mobility andenvironmental impactassessment, layout anddesign to constructionmonitoring, projectmanagement and subsidysupervision 19. Permit Renewal forBekaertZwevegemImagineLaunch and discussion ofdossiers and studies inpreparation for the applicationfor an environmental permit.The ResultA new environmental permit for20 years Customer: Bekaert NV Timing: 2008-2009 Assignment: exemption note,water test, technicalpreliminary studies(emissions, waste,wastewater, ), dossier,negotiation, 20. New STEG Plant forEssentGenkImagineA new gas-fired power plantsupplying energy to 600,000families.The ResultLicense to Produce Customer: Essent (RWE) Timing: 2009 - 2014 Assignment: MER,environmental permit, energystudy, civil engineering,urban development permit 21. Energy ProjectsBelgiumImagineLower energy bill and a seriesof incentives from the FlemishGovernmentThe ResultEnergy audit resulting in anenergy plan with measures toenhance energy efficiency Customer: Alural, CargilMalt, Daf Trucks, Dow,Plastal, Praxair, Sara Lee, Assignment: draw up energyplans within the framework ofthe Order concerning EnergyPlanning and Audit Covenant 22. Reception BuildingGeelImagineStylish, multifunctional andenergy-efficient receptionbuildingThe ResultSustainable reception buildingwith underground energyrecovery using energy poles, afirst in Belgium. Customer: JanssenPharmaceutica Investment: 7,95 mio Architectural firm Van Acker& Partners Timing: 2005-2008 Assignment: study of founda-tions and structure, design oftechnical installations,project management 23. Consultancy onSustainable ConstructionZaventemImagineState-of-the-art sustainablecorporate building andindustrial estateThe ResultUsing rating tools such asBREEAM, a sustainablecomplex is mapped out and theadditional cost compared to atraditional design is calculated Customer: Toyota MotorEurope Timing: 2006-ongoing Assignment: consultancy onsustainable construction,facility managementcoordination 24. Residential CareCentre Ter BleekeMalleImagineNew residential care centre withsufficient rest home rooms andassisted housing placesThe Result60 rest home rooms, 20 assistedhousing places, a services centreand a large-scale kitchen,existence of indoor gardens, apatio and parking places Client: OCMW Malle Investment: 10,5 mio Timing: 2002 2010 Architect: AMV architects Assignment: studies stabilityand techniques, work on thesurroundings, EPB andguidance during theprocurement and execution 25. Investment ZonePetroleum SouthAntwerpImagineNew use for historiccontaminated site of 75 haThe ResultDecontamination subject toredevelopment ofcontaminated city cancer intohigh-quality industrial estatewith space for recreation and afootball stadium Customer: PMV, City ofAntwerp, GemeentelijkHavenbedrijf, AG Vespa Timing: 2008-2009 Assignment : detailed soilanalysis and soildecontamination project,including trial runs 26. Water Loop Closurefor Energy and WaterKalloImagineZero discharge for wastewaterin one of the most modern andenergy-efficient gypsumcardboard lines in the world.The ResultDischarge of wastewaterreorganized into reuse of waterand energy. No investment inwater purification, butsubstantial annual savings. Customer: Saint-GobainGyproc Belgium Timing: 2004 2006 Assignment: choice ofconcept, guidance ofcustomer during processconversion 27. Shell Service stationsMotorwaysBeLuxImagineGreen and energy-friendlyservice station perfectlyintegrated into the environmentThe ResultCompletely redesignedmotorway service station.Sustainable buildings with Excellent score in Breamreassessment. Customer: Stramoine Timing: 2009-ongoing Assignment: detailengineering, design, projectmanagement, EPB 28. New Production Sitewith OfficeZutendaalImagineProduction process as adominant factor in designingthe plantThe ResultNew site for the production offloor slabs at a carefullyselected location based onspecific parameters. Customer: Echo Investment: 21 mio Architect: Archiles Timing: 2008-2010 Assignment: location study,environmental permit path,construction study, stability,study techniques, detailengineering of machinery 29. New AdministrativeCentreHouthalen-HelchterenImagineNew administrative centre thatneeds as little energy as possibleand generates that energyefficiently.The resultThis sustainable building housesthe local authority services, apolice office, a public socialwelfare centre, a day-care centre,a library and an office area forthird parties Customer: AGB Houthalen-Helchteren Investment: 50 mio Architect: Holistic Architecture50|5 Timing: 2009-2012 Assignment: study of stability &techniques, consultancy onsustainable construction 30. Town Square, Libraryand Underground Car-Park GenkImagineA place where living, relaxing,shopping and experiencingculture can be easily combinedThe ResultA single large promenade areafrom town hall to the GrandSquare connects the two partsof town. Customer: FlemishGovernment Investment: 10,4 mio Architect: a2o-architecten Timing: 1998-2006 Assignment: completeproject 31. Business Centre forthe Space IndustryTransinneImagineEcology and distinctarchitecture brought togetherinto one buildingThe ResultNew ecological businesscentre made of solid wood witha faade of photovoltaic panels Customer: Idelux Investment: 4 mio Architect: Philippe Samynand Partners Timing: 2008-2009 Assignment : study of(sustainable) techniques,stability, HVAC, electricity,sanitary facilities 32. PartnershipBelgiumImagineAutonomous working out ofvarious paths by experiencedpartnerThe ResultFrom network modificationsand expansions for high-voltage substations to cablepaths, everything is worked outaccording to the customersstandards Customer: Elia Engineering Timing: frameworkagreement Assignment: autonomousworking out of variousassignments from roughdraft to constructionmonitoring 33. Headquarters in SteelAlongside the RiverMeus