Coal Handling PlantSASAN ULTRA MEGA POWER PROJECT
6*660MW Singrauli,Madhya Pradesh
Presented By:-ANINDYA BARAN
GHOSH Payroll No- 41016163
Dated- 23.02.2015
Confidential Slide
OBJECTIVES OF CHP OPERATION
1. To maintain healthy bunker level to ensure continuous operation of the coal-mills.
2. To see that the coal that is going into the mill is free of scrap materials ,boulders for safe operation of mill.
3. To stack coal in coal yards for future use and reclaiming purpose.
2
Confidential Slide
REQUIRED COAL CONSUMPTION :- As per Boiler Design Coal Consumption :-
Daily Coal Requirement = 49,500 TPD For Six Unit. = 343 TPH Per Unit(Approx.) Design Capacity = 1950 TPH Capacity for Three
Units. Bunker = 42 Nos. Each Unit = 07 Nos. ( 05 Nos. in Operation at a time). Bunker Capacity = 1100 MT (Approx) coal.
3
Confidential Slide
SILO
OLCU#3
MILL
MILL
Conv 6A/6B
Transfer Points
INTERNAL CHP LAYOUT
TP-3
TP-3A TP-18
TP-17
TP-4
Conv 16A/16B
Conv 4A/4B
Conv 1A/1B
TP-10
TP-16
Coal Stock Yard
Stacker cum
Reclaimer
Conv 14A/14B
TP-5
TP-6
TP-7
TP-8
TP-9
U#1
MILL
MILL
U#2
MILL
MILL
U#6
MILL
MILL
U#4
MILL
MILL
U#5
MILL
MILL
TP-1
TP-2B
TP-1A
TP-2C
TP-1B
TP4A
TP-19
TP-20TP-21TP-11
TP-12 TP-13 TP-14
TP-15
Confidential Slide
C.H.P LAYOUTCoal from Mines is brought to the SUMPP via OLC & then it is transferred to the INPLANT CHP area via COAL SILO and then fed to bunker through various conveyors.
OVER VIEW OF OVER LAND CONVEYORCapacity 4500 TPHLength 14.25 KMBelt Width 1800 mmSpeed 5.6 Mtr./SecThickness 22 mmNumber of Drives 6 (4 Head End,2 Tail End)Stand By drives 2(1 Head End, 1 Tail End)Motor 3 Phase Induction Motor of 1700 KW with 1493 RPM
5
Confidential Slide
Internal CHP Details :-Number of transfer point - 26.Number of Conveyors – 41. Speed of the Conveyor - 4 Mtr/Sec. Conveyor capacity - 1950 TPH.Number of Coal Silo - 1.Number of Belt Feeder - 4.Number of stacker cum reclaimer - 3.Number of Travelling Tripper – 12.Number of Belt weigher - 4.Number of Metal Detector - 4.Number of Coal Sampling Unit - 2.
Slide No 6
Confidential Slide Slide No 7
ACTIVITIES OF CHP OPERATION TEAM
• CONTINUOUS MONITORING OF ALL THE EQUIPMENTS TO SEE WHETHER THEY ARE IN WORKING CONDITION AND TO FIND OUT ABNORMALITY IF ANY .
2• STARTING AND STOPPING OF DIFFERENT
CONVEYORS,OIL-COOLERS,PUMPS,DS SYSTEM,DE SYSTEM AFTER TAKING CLEARANCE FROM FIELD OPERATORS.
• CONTROLLING FIRE AT ANY PLACE IN CHP.
Confidential Slide Slide No 8
4 • CREATING BREAKDOWN NOTIFICATIONS IN SAP AND INFORMING MAINTENANCE PEOPLE TO CORRECT ANY PROBLEM.
5• ENSURING ISOLATION OF EQUIPMENTS
AND ISSUE PERMITS THROUGH SAP TO MAINTENANCE ENGINEERS.
6 •EMPLOYING HOUSE-KEEPING MANPOWER TO KEEP ALL THE PLACES AND EQUIPMENTS CLEAN FOR SMOOTH OPERATION AND MAINTENANCE.
7 •THROUGH CHP CONTROL ROOM INFORMATION OF THE ON GOINGS IN CHP IS COMMUNICATED TO CCR,OLC HEAD-END ,MINES 24 *7
8• TAKING READINGS OF DIFFERENT
EQUIPMENTS AND BELT-WEIGHERS AND CALCULATE COAL-CONSUMPTION ,UTILIZATION DATA.
Confidential Slide Slide No 9
Mechanical System1) Belt-conveyor .2) Belt feeder.3)Traveling tripper.3)In Line Magnetic Seperator.3) Stacker-cum-Reclaimer.4) Motor.5) Gear-boxes.6) Fluid-coupling.7) Rigid-coupling.8) Pulley.9) Idlers.10) Rollers.
11)Oil Cooler.12) DS System.13) DE System.
DIFFERENT EQUIPMENTS IN CHP
Confidential Slide Slide No 10
ELECTRICAL SYSTEM1) HT Switchgear2) LT Switchgear3) Transformers
DIFFERENT EQUIPMENTS IN CHP
Confidential Slide
Choking of chutes by coal(specially in rainy season )
Mis-alignment of conveyors with pulleys and rubbing of belt with frames and folding of conveyors
Abnormal vibration in drive system due to misalignment between different parts
Fire hazard in coal yard Damage of rollers and
idlers in continuous operation
11
MAJOR PROBLEMS FACED BY SASAN OPERATION TEAM
Chute puncture due to continuous operation.
Oil leakage from fluid coupling/gearbox in high temperature operation
Heating up of equipments in continuous operation
Faulty operation of actuator operated flap-gates.
Confidential Slide
Conclusion Proper Communication
Work Load
Technical Training
Slide No 12
Confidential Slide
Experiences… Biggest platform to start my career with Reliance Power Ltd.
Working in India’s one of the biggest CHP.
Facing lots of challenges during my work .
13