    Introduction:

    What is Penang Undersea Tunnel?

    -A new tunnel under purposal in Penang, Malaysia.

    -The 6.5 km tunnel connects Butterworth, Seberang Perai in the east to

    George Town, Penang Island in the west.

    -Will become the first undersea tunnel in Malaysia and the second in

    Southeast Asia. The project is undertaken by the State Government of

    Penang and a main contractor Consortium Zenith BUCG Sdn Bhd a member

    of Zenith Group.

    - Construction will start on 2016 and completed on 2025.

    -The planned Penang Undersea Tunnel will be the largest privately funded

    public works project in Penang. There will be a toll plaza at the undersea

    tunnel.

  • 8/10/2019 Presentation Analysis

    4/17

  • 8/10/2019 Presentation Analysis

    5/17

  • 8/10/2019 Presentation Analysis

    6/17

  • 8/10/2019 Presentation Analysis

    7/17

    OBJECTIVES PROJECT

    1. Reduce Congestion.

    Traffic congestion is a condition on road networks that occurs inslower speeds, longer trip times, and increased vehicular queuing. Ifthe undersea tunnel managed to set up, the customers have threechoices road to use (Penang Bridge, Sultan Abdul Halim Muadzam

    Shah Bridge and Penang Undersea Tunnel).

    2. Improve equality in society.

    Middle of Seberang Perai and South of Seberang Perai alreadygiven two bridges that can help to improve the degree of

    accessibility and enhance economic development in Georgetown,Penang. But this equality left out the north of Seberang Peraibehind. So, the third hub routes will also ensure a balanceddevelopment at north of Seberang Perai .

  • 8/10/2019 Presentation Analysis

    8/17

    PROBLEM STATEMENT

    Penang Bridge and Sultan Abdul Halim MuadzamShah Bridge, traffic congestion still happenespecially during peak times such as in the morningand evening.

    The purpose of this tunnel is to balance out theinequality at north of Seberang Perai.

    But, theres also have a lot of issues about the costof the construction and environmental effect if thistunnel build up.

  • 8/10/2019 Presentation Analysis

    9/17

  • 8/10/2019 Presentation Analysis

    10/17

    1. Construction costThe cost of Penang undersea tunnel is

    estimated around RM 6.3 billion about 6.5-

    kilometre.

    2. Maintenance cost

    Maintenance cost is estimated around RM1.6billion

  • 8/10/2019 Presentation Analysis

    11/17

    1. Construction noise

    Construction noise has the potential to disturb people athome in their residences, in office building, retailbusinesses or public institutional buildings

    May affect peoples quality life

    2. Non-human species

    affect non-human species such as aquatic life, land andairborne animals in a variety of ways.

    3. Social effect

    impact on fisheries

    the price of seafood hurts ordinary people

  • 8/10/2019 Presentation Analysis

    12/17

    Direct Benefits

    1) Time saving

    - Enables the traveller to save time

    - This can sometimes be of direct monetary benefit as when aquicker journey

    - Help to ease traffic congestion dan reduce dwell times

    2) Cost saving

    - Time saving leads to cost saving

    - Peoples daily activity will goes smoothly

    3) Reduce congestion

    - The number of vehicles on the road can be reduced

  • 8/10/2019 Presentation Analysis

    13/17

  • 8/10/2019 Presentation Analysis

    14/17

    Estimate Cost:

    Construction cost + maintenance cost+ New road construction

    cost + Environmental cost + Maritime loss cost + others.

    = 6.3 bil + 1.6 bil + 1.2 bil + Environmental cost*+ Maritime

    loss cost* + others

    = 9.1 bil + Environmental cost*+ Maritim loss cost* + others

    Estimate Benefits:

    Toll payment x number of vehicles per year + others

    = RM 9.4 + 1 mil + others

    = RM 9.4 mil + others

    After 10 years = (RM 9.4 mil x 10) = 9.4 bil + others

  • 8/10/2019 Presentation Analysis

    15/17

    Because:

    1) The costs to make the tunnel is too high andtake a long time to be completed.

    - Include a lot of costs like cost of construction,

    security, maintenance, and environmental cost.- Can use the money to upgrade the facilities at

    north of Seberang Perai.

  • 8/10/2019 Presentation Analysis

    16/17

    2) Not the best way to improve congestion.

    - Already have two bridge but still face congestion problem.

    - so, must find other alternative: improve public transport

    system.

    - Campaign: promote usage of public transport.

    4) Disturb maritime logistics development .- Fishermen and cargo ships will be interrupt during the

    construction.

    - decrease income of the maritime.

    3) Environmental effect

    - Water and soil pollution.

    - Marin ecosystem will die.

  • 8/10/2019 Presentation Analysis

    17/17

    Conclusion

    Penangs 2ndbridge just completed, and

    making another tunnel in 2016 might to

    earlier and this rushing decision also might

    drag our country to a loss. So, its better for

    the Government to think for the second time

    and find another alternative to develop the

    north of Seberang Perai than take a risky andhigh cost solution.