  • 7/31/2019 Presentatio VMW

    1/19

    Presented By: T.M.S.S. Tennakoon

    11/S/D/BSc/09

  • 7/31/2019 Presentatio VMW

    2/19

    Project Objectives

    The objectives of the (E311)expansion road construction

    listed below:-

    Reduced traffic congestion in day time.

    Improve time efficiency to reach other

    destination very quickly.

    Improved access for pedestrians and cyclistswith safety.

  • 7/31/2019 Presentatio VMW

    3/19

    Value Management Workshop Objectives

    Identify and clarify the evaluation criteria

    Review and clear about project based

    parameters

    Clearly recommended access Plan

    Inspect the development options and suggest.

  • 7/31/2019 Presentatio VMW

    4/19

    Agenda

    The two days VMW successfully carried out with relevant formulated

    strategic analyzed. Agenda of the workshop shown below

    Technically qualified appropriate professionals were participated to the

    VMW to made perfect decision. The workshop participants were split

    into groups to assist the progress of the workshop

  • 7/31/2019 Presentatio VMW

    5/19

    Strategic Diagnosis Agenda

    Introduction of the project by client.

    Introduction to participants role

    Explain the project scope and objective Workshop

    Final report of the value management.

  • 7/31/2019 Presentatio VMW

    6/19

    Limit of the Expansion Road

    Geographical Parameters

    Topographical Parameters

    Financial Parameters

  • 7/31/2019 Presentatio VMW

    7/19

    Evaluation Methodology

    Participants were involved during the VMW to

    assessment criteria under three categories,

    which most important issues for assessing

    best option. The summary of the assessment

    criteria provided by participants were

    categorised under function, Social and

    Economic, Cultural and Environment

  • 7/31/2019 Presentatio VMW

    8/19

  • 7/31/2019 Presentatio VMW

    9/19

  • 7/31/2019 Presentatio VMW

    10/19

  • 7/31/2019 Presentatio VMW

    11/19

    There were two options (option A & B) presented by the Participants of the

    workshop. Each group assessed by the group qualitatively against weighted criteria.

    A result of the options according to qualitative matrix exposed in bellow and rated

    Excellent (E), Very Good (VG), Good (G), Fair (F), Poor (P) against each assess criteria.

  • 7/31/2019 Presentatio VMW

    12/19

    The Quantitative and Qualitative information collected by the

    VMW team members

  • 7/31/2019 Presentatio VMW

    13/19

    After review the quantitative and qualitative

    information finalized they recommended which

    option would be preferred.

    Group 1:-

    Option B was recommended for further

    development; Better supported to the community.

    More easy to construct.

    Better environment available.

    High safety.

  • 7/31/2019 Presentatio VMW

    14/19

    Group 2:-

    Option B was recommended for furtherdevelopment;

    There are not that much change to the previousgroup recommended.

    Better curve to construct near Dubai Autodrome.

    Good community feedback support.

    For 6 lanes construction cost will be less.

    Easy to construct.

  • 7/31/2019 Presentatio VMW

    15/19

    Group 3:-

    Group No.3 also recommended Option B for

    further development;

    Better safety ranking.

    Cyclist and Pedestrians get proper area for

    drive and walk.

    Traffic impacts appear to be manageable.

    Better value for money solution.

  • 7/31/2019 Presentatio VMW

    16/19

    Group 4:-

    This group also recommended Option B only

    suitable for further development;

    Safety is good

    Control noise impact. Visually better due to motor race.

    Confirmed as a easy option to construct this

    expansion

  • 7/31/2019 Presentatio VMW

    17/19

    When we were analysed all recommendation, the all groups

    identified Option B is the best construction way from the value

    and quality. Finally identified approximately 25 objectives could

    be met in this VMW

    Improve Safety.

    Minimise disturbance during the construction.

    Improve pedestrian friendliness.

    Reduce traffic jams.

    Reduce noise.

    Improve live ability

    Facilitate gateway.

    Pedestrians and cyclists satisfaction.

    Provide Service roads.

    Direct path to join sub ways

  • 7/31/2019 Presentatio VMW

    18/19

    Protect heritage.

    Good environment for race track. Improve landscaping.

    Maximise and extend public transport.

    Develop business opportunities.

  • 7/31/2019 Presentatio VMW

    19/19

    Map of Extension Road (E311)