Present asi power point
-
Upload
abdul-fatah -
Category
Documents
-
view
12 -
download
0
description
Transcript of Present asi power point
-
PENGARUH PERANAN AUDIT INTERNAL TERHADAP PENERAPAN GOOD CORPORATE GOVERNANCE PT. PERTAMINA (PERSERO)
FAKULTAS EKONOMIPROGRAM STUDI AKUNTANSI2015USULAN PENELITIANABDUL FATAH043061121006
-
PENGARUH PERANAN AUDIT INTERNAL TERHADAP PENERAPAN GOOD CORPORATE GOVERNANCE PT. PERTAMINA (PERSERO)
FAKULTAS EKONOMIPROGRAM STUDI AKUNTANSI2015USULAN PENELITIANABDUL FATAH043061121006
-
HISTORY OF GEOTHERMAL ENERGY DEVELOPMENT IN INDONESIALAW No. 8/1971Pres. Decree No. 22/1981And No 45/1991LAW No. 22/2001Govt RegulationNo.31/2003LAW No. 27/2003Minister DecreeNo. 76/2003
PERTAMINA was given the authorization to explore and develop geothermal in Indonesia
PERTAMINA already conduct geothermal survey in abaout 50 geothermal areas with a total resource of 9,076 MW
PERTAMINA has been given the authorization to develop 33 Working AreasPERTAMINA was renamed to PT PERTAMINA (PERSERO)
The foundation of PT Pertamina Geothermal Energy (PGE) on 12 December 2007 through Decision of the Minister of Justice and Human Rights No.017.00089 HT 01.01 dated 3 January 2007, as a Geothermal Business UnitThe Govt has revoked Pertaminas monopoly on geothermal development
PERTAMINA has to return working areas that are not yet to be develop until 2010
PERTAMINA returned 18 Working Areas from 33 Areas authorized.PERTAMINA has 15 Working Areas :
6 Working Areas are jointly exploited through JOC and Joint Venture
9 Working Areas are Own Operation.
LAW No. 22/2001PP No. 31/2003PT PGE
-
File:hen/srt/master Grafik-2.pptFile:hen/srt/master Grafik-2.ppt
INDONESIAS GEOTHERMAL ENERGY POTENTIAL Geothermal location
File:hen/srt/master Grafik-2.pptFile:hen/srt/master Grafik-2.ppt
SHORT TERM POTENTIALLY OF GEOTHERMAL DEVELOPMENTSungai Penuh (Jambi)1x55 MWSteam FieldHululais (Bengkulu) 2x55 MWSteam FieldKaraha (West Java )1x30WTotal Project
File:hen/srt/master Grafik-2.pptFile:hen/srt/master Grafik-2.ppt
About Pertamina Geothermal EnergyPGE is part of Pertamina, which was the first developer of geothermal energy in Indonesia Based on Law 22/2001 & PP 31/2003, PGE is established in December 2006 as a subsidiary specializing in geothermal activitiesPGE currently controls 15 working areas and is committed towards developing all these areas inline with the government energy policy
File:hen/srt/master Grafik-2.pptFile:hen/srt/master Grafik-2.ppt
9. Kamojang -PETA WKP GEOTHERMAL - PERTAMINA1235467891011131314151. Sibayak-Sinabung (12 MW)2. Sibualbuali3. Sungaipenuh4. Tbg. Sawah-Hululais5. Lumutbalai6. Waypanas Ulubelu7. Cibereum-P-bakti (375 MW)8. Pengalengan10. Karaha-Cakrabuana11. Dieng (60 MW)12. Iyang-Argopuro13. TabananPatuhaW. Windu (220 MW)Kamojang (200 MW)Darajat (255 MW) DarajatDasar :Keppres RI No. 22 / 1981Keppres RI No. 45 / 1991Keppres RI No. 49 / 1991Keppres RI No. 76 / 2000UU Panasbumi No 27/200315 WKP : 2349,59 hektar14. Lahendong (60 MW)15. KotamobaguPertaminaKOBJoint VentureTotal kapasitas PLTP terpasang (2008) : 1172 MW12
File:hen/srt/master Grafik-2.pptFile:hen/srt/master Grafik-2.ppt
2012202020082012201620203442 MW4600 MW6000 MW(target)1442 MWExisting WKP1158 MW Existing WKP+ New WKP1400 MWNew WKPGeothermal Road - map(GSDM, 2008)Geothermal Road-map by 20251000 Mwe for30 years465 Juta Barrel oil9000 MW(target)202520082016202520071052 MWExisting WKP1193 MWEXIST.WKP20103500 MWNew WKP1189 MW4733MW3381.5 MW (Existing WKP)2000 MW807 MW(2004)
File:hen/srt/master Grafik-2.pptFile:hen/srt/master Grafik-2.ppt
THE NATIONAL ENERGY POLICY
DIVERSIFICATION, EFFICIENCY ENERGY, PRICING POLICYTo secure the national energy supplyTo reduce the oil import To create job for peopleTo generate / to boost the local economicTo add the value of social life and the environment
File:hen/srt/master Grafik-2.pptFile:hen/srt/master Grafik-2.ppt
RESOURCES OPTIMATIONENVIRONMENTAL VIEW SUSTAINABLE & RENEWABLE RESOURCES SHOULD BE DEVELOPED IN ACCORDANCE TO THE KYOTO PROTOCOL RATIFICATION
TECHNOLOGY HIGHLY COMMERCIAL OIL AND GAS AND INLINE THE TECHNOLGYIN ORDER TO INCREASE THE COMMERCIAL VALUE OF LIQUIDIZED COAL MINDSET EMPOWERMENT THE LOCAL GOVERNMENT POTENTIAL FOR RESOURCE OPTIMATAIONKeywords : ECONOMIC, ENVIRONENTAL RELATIONSHIP, EMPOWERMENT THE LOCAL RESOURCES
File:hen/srt/master Grafik-2.pptFile:hen/srt/master Grafik-2.ppt
Comparison the generating cost and selling price of the electricitySynchronized of the RUKN and RUPTLEnergy priring policyLegal centaintyConsistency of the commitment to imply to energy policyTransparantApplicableAcceptableOverlapping of the landuseClean and clearRetail to consumen (PLN : 2008)Fuel Cost 2088Generation cost, PLN 2008Retail (consumen) PLN 2008Economic geothermal pricingEFISIENSI
Chart3
279.67343.79131.07
334.55377.89165.73
448.03601.06206.19
550.74617.83237.48
581.76596.53244.67
590.91710.29349.01
628.14934.45563.02
629.20919.70540.74
629.581,317.27884.98
Sales
Production Cost
Fuel cost
Rp/KWh
subsidi
2001200220032004200520062007RKAP 2008
asset79,906,517,178,497213,898,603,669,628207,615,629,547,301211,793,596,772,989220,842,734,624,434247,917,818,000,000273,479,935,000,000310,228,503,573,417
Power Sales28,275,982,649,67839,018,461,721,49349,809,637,097,88958,232,002,384,55563,246,221,322,06570,735,151,000,00076,286,195,000,00079,231,695,653,834
Govt Subsidy6,735,209,866,8864,739,073,653,2164,096,633,014,2673,469,919,795,84312,510,960,000,00032,909,148,000,00036,604,751,000,00086,001,644,446,841
Total Revenue35,359,957,516,53244,183,353,244,79954,430,777,801,40862,273,061,847,81276,543,324,268,702104,726,536,000,000114,042,687,000,000166,337,565,930,100
Fuel14,007,295,529,40317,957,261,628,79821,477,867,200,89024,491,052,475,39537,355,450,093,31263,401,080,000,00065,559,977,000,000111,374,328,009,523
depreciation3,404,113,925,84115,626,762,571,07012,745,047,489,4599,547,554,658,1249,722,315,303,68910,150,985,000,00010,716,237,000,00011,207,909,463,958
total operastion cost31,939,386,838,67952,345,591,638,28855,877,204,898,10959,710,766,963,82976,023,600,793,446105,228,150,000,000111,505,955,000,000165,777,979,286,039
Operation profit (loss)3,420,570,677,853(8,162,238,393,489)(1,446,427,096,701)2,562,294,883,983519,723,475,256(501,614,000,000)2,536,732,000,000559,586,644,061
Net Income (loss)180,118,757,412-6,059,558,206,771(3,558,348,465,582)(2,021,966,569,295)(4,920,594,146,809)(1,927,856,000,000)-5,645,107,000,00045,848,000,000
Kwh sales84,520,000,00087,089,000,00090,441,000,000100,097,000,000107,032,000,000112,609,838,260121,242,245,019.00125,849,450,330
Rp kwh sales334.55448.03550.74581.76590.91628.14629.20629.58
BPP377.89601.06617.83596.53710.29934.45919.701,317.27
Subsidy79.6954.4245.3034.67116.89292.24301.91683.37
subsidi
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
Rp/Kwh Sales
BPP/kwh
subsidi/kwh
Trend BPP, Rp/kwh Sales dan Subsidi
BPP vs HJR
TahunHarga Jual Rata-rataBPPGAPFuel costFuel cost
SalesProd CostFuel
1995163.01131.4031.612,969,99559.7029.70
1996165.43134.2431.193,361,08059.0433.61
1997169.13146.9422.194,338,83667.4743.39
1998210.94257.56(46.62)9,408,965144.1794.09
1999219.68301.45(81.77)9,691,813135.8796.92
2000279.67343.79(64.12)10,375,827131.07103.76
2001334.55377.89(43.34)14,007,296165.73140.07
2002448.03601.06(153.03)17,957,262206.19179.57
2003550.74617.83(67.09)21,477,867237.48214.78
2004581.76596.53(14.77)24,491,052244.67244.91
2005590.91710.29(119.38)37,355,450349.01373.55
2006628.14934.45(306.31)63,401,080563.02634.01
2007629.20919.70(290.49)65,559,977540.74655.6
RKAP 2008629.581,317.27(687.70)111,374,328884.981,113.7
BPP vs HJR
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
Rp/Kwh Jual rata2
BPP
Rp/kwh Bahan bakar
Trend Rp/kwh Jual Vs BPP dan RP/Kwh Bahan bakar
Laba Rugi 94-05
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
Sales
Production Cost
Fuel cost
Rp/KWh
Sheet3
199419951996199719981999200020012002200320042005200620072008 (RKAP)20012002200320042005200620072008
PENDAPATAN OPERASI
- Penjualan Tenaga Listrik2,979,351.008,109,711.369,418,269.0010,877,278.0013,766,222.0015,670,551.6822,139,883.4628,275,982.6539,018,462.0049,809,637.0058,232,002.0063,246,221.0070,735,151.0076,286,195.0079,231,695.6528.2839.0249.8158.2363.2570.7476.2979.23
- Biaya Penyambungan48,954.00143,275.51170,034.00200,754.00206,869.00222,222.55241,698.45265,857.73302,308.00342,257.00387,083.00439,917.00479,991.00535,269.00405,200.290.270.300.340.390.440.480.540.41
- Subsidi Pemerintahan-------6,735,209.874,739,074.004,096,633.003,469,920.0012,510,960.0032,909,148.0036,604,751.0086,001,644.456.744.744.103.4712.5132.9136.6086.00
- Lain-lain19,663.0053,004.1957,690.0048,068.0062,924.00104,343.41175,081.3382,907.27123,510.00182,251.00184,057.00346,226.00602,246.00616,472.00699,025.540.080.120.180.180.350.600.620.70
14.0117.9621.4824.4937.3663.4065.56111.37
Jumlah Pendapatan Operasi3,047,968.008,305,991.069,645,993.0011,126,100.0014,036,015.0015,997,117.6422,556,663.2435,359,957.5244,183,354.0054,430,778.0062,273,062.0076,543,324.00104,726,536.00114,042,687.00166,337,565.93
BIAYA OPERASI
- Pembelian Tenaga Listrik46,859.0030,679.0077,096.06325,162.001,885,963.005,082,702.819,395,365.458,717,140.5411,168,843.0010,833,999.0011,970,810.0013,598,167.0014,845,421.0016,946,723.0019,151,583.17
- Bahan Bakar & Minyak Pelumas1,193,343.002,969,994.863,361,080.004,338,836.009,408,965.009,691,812.9710,375,827.0014,007,295.5317,957,262.0021,477,867.0024,491,052.0037,355,450.0063,401,080.0065,559,977.00111,374,328.01
- Pemeliharaan352,142.00808,935.24911,267.00965,397.00924,840.001,497,830.541,610,254.212,630,359.603,588,828.004,827,606.005,202,146.006,511,004.006,629,065.007,269,142.009,726,987.89
- Kepegawaian281,792.00758,291.49886,229.001,068,055.001,018,858.001,335,615.911,802,391.742,086,329.982,583,290.003,827,686.005,619,384.005,508,067.006,719,746.007,064,316.0010,155,528.47
- Penyusutan Aktiva Tetap519,240.001,566,471.861,886,972.002,250,725.003,074,149.003,224,331.493,229,592.683,404,113.9315,626,763.0012,745,047.009,547,555.009,722,315.0010,150,985.0010,716,237.0011,207,909.46
- Lainnya159,572.00356,355.15413,726.00501,578.00495,998.00670,384.46802,390.171,094,147.261,420,607.002,165,000.002,879,819.003,328,598.003,481,853.003,949,560.004,161,642.27
Jumlah Biaya Operasi2,536,768.006,537,144.667,642,510.009,449,753.0016,808,773.0021,502,678.1927,215,821.2531,939,386.8452,345,592.0055,877,205.0059,710,767.0076,032,601.00105,228,150.00111,505,955.00165,777,979.29
LABA RUGI OPERASI511,200.001,768,846.402,003,483.001,676,347.00(2,772,758.00)(5,505,560.55)(4,659,158.02)(3,314,639.19)(8,162,238.00)(1,446,427.00)25,562,295.00519,723.00(501,614.00)2,536,732.00559,586.64
EBITDA1.033.343.893.930.30-2.28-1.436.827.4611.3012.1110.239.6513.2511.77
Sheet3
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Trilyun
EBITDA 1994 - 2007
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EBITDA
Trilyun
EBITDA 1994 - 2002
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
&A
Page &P
Pendapatan Penjualan
Subsidi
Biaya BBM
Trilyun Rupiah
TahunPenjualan kWhBiaya operasiBIAYA OPERASI
1,99549,749,000,0006,537,144,660,000Pembelian Tenaga Listrik16,946,723.00
1,99656,932,000,0007,642,510,000,000Bahan Bakar & Minyak Pelumas65,559,977.00
1,99764,312,000,0009,449,753,000,000Pemeliharaan7,269,142.00
1,99865,261,000,00016,808,773,000,000Kepegawaian7,064,316.00
1,99971,332,000,00021,502,678,190,000Penyusutan10,716,237.00
2,00079,165,000,00027,215,821,250,000Administrasi lain3,949,560.00
2,00184,520,000,00031,939,386,838,679
2,00287,089,000,00052,345,591,638,288Jumlah Biaya Operasi111,505,955.00
2,00390,441,000,00055,877,204,898,109
2,004100,097,000,00059,710,766,963,829
2,005107,032,000,00076,023,600,793,446
2,006112,609,838,260105,228,150,000,000
2,007121,242,245,019111,505,955,000,000
2,008125,849,450,330165,777,979,286,039
0.00
0.00
0.00
0.00
0.00
0.00
File:hen/srt/master Grafik-2.pptFile:hen/srt/master Grafik-2.ppt
2014 20132012 20112010 2009 20082007GEOTHERMAL DEVELOPMENT PLAN OF PT PGEPT PGE OWN OPS
CADANGANPLTP59016210202521220272152027215603471560752197091719701342
KAMOJANG300140300200300200300200300200300260300260300260
LAHENDONG802010040200602006020080200127,5200127,5200127.5
SIBAYAK401240124012401240124019,54019,54019.5
ULUBELU140-350-350-300-30055300110300165300220
LUMUTBALAI200-300-300-300-30055300110300220
HULULAIS--150-150-15055250110250110
KOTAMOBAGU100-100-100401504015080
SUNGAI PENUH100-100-1005515055150110
KARAHA30-30-30-30-70-703018030180140
IYANG ARGOPURO*) 100-10055
File:hen/srt/master Grafik-2.pptFile:hen/srt/master Grafik-2.ppt
SHORT TERM POTENTIALLY OF GEOTHERMAL DEVELOPMENTSungai Penuh (Jambi)1x55 MWSteam FieldHululais (Bengkulu) 2x55 MWSteam FieldKaraha (West Java )1x30WTotal Project
File:hen/srt/master Grafik-2.pptFile:hen/srt/master Grafik-2.ppt
GEOTHERMAL DEVELOPMENT PROGRAM OF PT PGE UP TO 2014GEOTHERMAL PROGRAM AND PROJECTED CERS (MM TONNE CER (e), CUMM.)IN PROGRESS KAMOJANG UNIT 4 (60 MW)ECOSECURITAS
AN ADDITION CAPACITY OF ABOUT 1100 MW (2014) , CONSERVE OF ABOUT 42,000 BOEPD.
AND POTENTIAL GETTING CARBON CREDIT OF ABOUT USD 55 MM/YEAR ( ?)
Sheet1
YEARDEV. PROGRAMCAPaCITY * MM Tonne CER e/yearREMARKS
MWGWh
2009201580.11
2010---
2011755910.14
20123532,7831.95
20131651,3010.95
20144253,3502.34
1,0388,1835.49
* Ref. Darajat (Unit-3) CER (e) ~ 0.7 Tonne/MWh
File:hen/srt/master Grafik-2.pptFile:hen/srt/master Grafik-2.ppt
THE EMPOWERMENT OF GEOTHERMAL ENERGY TO REPLACE FOSSIL FUEL IN ACHIEVING ENERGY SECURITY HAS BECOME A NATIONAL COMMITMENT
ENERGY RESOURCES EMPOWERMENT WITH FOCUS ON OPTIMIZING THE ECONOMIC VALUES WOULD GIVE AN OPPORTUNITY FOR GEOTHERMAL DEVELOPMENT, WHICH CAN NOT BE STORED OR TRANSPORTED (ONSITE UTILIZATION) AND HAS LIMITED MARKET SHARE IN A SINGLE BUYER UTILIZATION
WITH THE INCREASING TREND IN PRICE OF OIL AND GAS, NATURALLY FOLLOWED BY OTHER FOSSIL BASED ENERGY, THERE IS A STRONGER BUSINESS RATIONAL FOR ACCELERATING GEOTHERMAL DEVELOPMENT
IN 2014, THE NATIONAL TARGET OF GEOTHERMAL UTILIZATION IS 4733 MW, WHICH CAN BE CONVERTED TO OIL AT ABOUT 180,000 BARREL OIL EQUIVALENT PER DAY (BOEPD). PERTAMINAS OWN OPERATION CONTRIBUTES ABOUT 1342 MW, ( ~ 51,000 BOEPD)
CONCLUSION
File:hen/srt/master Grafik-2.pptFile:hen/srt/master Grafik-2.ppt
****