PRESENT AND FUTURE DEVELOPMENT IN TRENTINO · PRESENT AND FUTURE DEVELOPMENT IN TRENTINO Projet de...
Transcript of PRESENT AND FUTURE DEVELOPMENT IN TRENTINO · PRESENT AND FUTURE DEVELOPMENT IN TRENTINO Projet de...
GREEN TECH PIPELINEPRESENT AND FUTURE DEVELOPMENT IN TRENTINO
Projet de village Eco-Solaire Zarzis-Djerba
Paolo Gurisatti PRESIDENT
PROVINCIA AUTONOMA DI TRENTO
Zarzis June 27-28, 2009
CONSORTIUM: A PUBLIC-PRIVATE SINERGY
2
8.000 EMPLOYEES
164 PRIVATE MEMBERSMORE THAN 300 COMPANIES
REPRESENTED IN TOTAL
15 PUBLIC MEMBERS
UNIVERSITY - RESEARCH
CENTRES-DEVELOPMENT AGENCY..
AGEmuniciplatiesNCY-
1 Bln €TURNOVER
MEMBERS COMPOSITION per INDUSTRY
3
45 % Constructions
15 % MobilityICT
30 % Energy
10 % others
HABITECH’s objectives in a long run perspective
4
TERRITORY
ENERGY
INDEPENDENCEMANAGING
ENVIRONMENTAL
RESOURCES
GREENBUILDING
LOCAL RENEWABLE
SOURCES
HIGH QUALITY
MOBILITY SERVICE
2010 ………… 2015 ……….. 2020 ……………. 2030
RATING RENEWABLE
SOURCES(cooperative
management)
HABITECH’s “GREEN” PIPELINE
5
Green
Building
Energy
Efficiency
RATING ENERGY SAVING INVESTMENTS (EPC / ESCO)
RATING SUSTAINABLE
MOBILITY
ACTIONS AIMING AT CREATING NEW “MARKET SYSTEMS”
Energy
ProductionMobility
RATINGLEED
GREEN BUILDINGS
LEED MEETS TRENTINO
6
Leadership
in
Energy
&
Environmental
Design
LEED: Leadership in Energy and Environmental Design
7
LEED Green Building Rating System™
encourages and accelerates
Global adoption of sustainable green building and
development practices
Creation and implementation of universally understood and
accepted tools and performance criteria.
WHY WE CHOOSE LEED
8
rigourous and measurable rating system
voluntary and consensus system
active community
marketplace
MUSE TRENTO
9
ITCLab BERGAMO
10
ITCLab Innovation and Technology Central Laboratory is Italcementi’s new research & innovation center. The center, designed by the American architect Richard Meier, is set in the Kilometro Rosso Science & Technology Park, which is strategically located on the outskirts of Bergamo and parallel to the nearby Milan-Venice highway.
In the ITCLab building, 7,500 m2 out of a total of 11,000 m2 surface area will be exclusively reserved for research laboratories. ITCLab will be home to employees and researchers who are currently working at other Italcementi Group sites.
PROJECTS ARE GROWING
11
LEED PROJECTS
NUMBER STRONG
GROWTH FROM
2006
FUTURE OUTLOOK
12
Total LEED
registered
projects
ITALY
26
TRENTINO 12
LEED
ITALIA
2009
January 2009 End 2009
WHAT WE KNOW…
…WHAT WE DON’T
ENERGY EFFICIENCY: THE GOAL
15
ENERGY EFFICIENCY FACTS
16
A clear political and administrative
framework
(guidelines, legislation, incentives)
A chain of certified competences
(technologies, energy audit, energy management)
Financial and law system
(innovative financial instruments )
Information and data infrastructure
Bold action on citizens
ENERGY EFFICIENCY TOOLS
17
• TPF (Third-Party Financing)a contractual arrangement involving a third party — in addition to the energy supplier and the beneficiary of the energy efficiency improvement measure —that provides the capital for that measure and charges the beneficiary a fee equivalent to a part of the energy savings achieved as a result of the energy efficiency improvement measure. That third party may or may not be an ESCO
• EPC (Energy Performance Contracting)•a contractual arrangement between the beneficiary and the provider (normally an ESCO) of an energy efficiency improvement measure, where investments in that measure are paid for in relation to a contractually agreed level of energy efficiency improvement
• ESCO (Energy Service Companies) companies delivering energy services whose payment is based either wholly or partly on the energy savings achieved and accepts some degree of financial risk in so doing.
•Boost energy efficiency market and the creation of new ESCo
•spread energy efficiency applications creating innovative financial
schemes based on EPC as guarantee
•develop and disseminate technical skills (energy audit, energy
management, M&V procedure)
•foster exchanges of best practices between public-sector bodies on
energy-efficient public procurement
ENERGY EFFICIENCY: KEY ACTIONS 2009
18
Energy Efficiency plan for Public buildings and infrastructures
DTTN is involving the Public Administration, Financial Institutions, local
companies and professional resources to define shared standards for EPC
for public sector and test them on pilot applications
ENERGY DISTRICT
19
•Oil Free ValleyTo transform a touristic mountain valley in an “Oil Free Zone” or in a zone
where all energy is produced by renewable sources :
- hydroelectric and photovoltaic (electric power )- Solar , wood biogas ( heating)- hydrogen and biomethan (mobility)
•District Heating and Cooling in mountain- 11 Systems working in Trentino ( cogeneration tri-generation )
•Distributed generation of renewable energy from greebuildings
Efficient combination of local available renewable resources:- Solar- Biomass- Geothermal,- Energy efficient greenbuildings
MOBILITY
20
SYSTEMIC PROJECT: GREEN VALLEY
21
RE-POSITIONING SYSTEMHOW PRIMIERO IS MOVING TO HIGH LEVEL OF ENVIRONMENTAL AND ENERGY EFFICIENCY
LOCAL COMMUNITY PROJECT Valley logistics Community pact for envirnmental/energyInnovationLocal system for production and consumption
REAL OIL FREE ZONE
INNOVATION R&D for energetic system H2 and biogas resources
Distretto Tecnologico Trentino Società Consortile a r.l.Via Fortunato Zeni, 8 – 38068 Rovereto (TN) - ITALY+ 39 0464 [email protected]
22