  • PREQUALIFICATION DOCUMENT

    Industrial Group for Control Systems LLCP.O. Box 112011

    Abu Dhabi, United Arab EmiratesTel: +971 2 658 1356 , Fax: +971 2 658 1365

    E-mail: [email protected]: www.igcs.ae

  • INDUSTRIAL GROUP FOR CONTROL SYSTEM L.L.C

    ABOUT

    IGCS

  • About IGCS

    Established In Abu Dhabi In The Year 2008 IGCS Is a Sister Company of ODASCO which is A Leader in Engineering

    Innovation, Global In Electronics And Electrical Engineering. We are specialize in turnkey solutions for the design, supply,

    installation, commissioning and maintenance of all systems and equipments in the following activity sectors:

    Water and Sewer Projects Power Generation and distribution Food Industries Animal Feed and Grain Industries

    Services:

    Distribution Control Systems (DCS) SCADA And Telemetry Systems Instrumentation Plc Based Control Systems Process And Field Instrumentation Fiber Optical Cables & Networks All Related Electro-mechanical Activities

    Our Clients Odasco / IGCS

    Abu Dhabi Water and Electricity Authority ADWEA. (UAE) Dubai Electricity and Water Authority DEWA. (UAE) Federal Electricity and Water Authority FEWA. (UAE) Gulf Industrial Investment Co. (Bahrain) Jordan Phosphate Mining Company. (Jordan) Mobarakeh Steel Complex. (IRAN) Kahrama, Qatar Electricity & Water Authority (Qatar) Abu Dhabi Municipality. (UAE) Al Khaleej Sugar AKS. (UAE) Emirates - Emirates Engineering. (UAE)

  • INDUSTRIAL GROUP FOR CONTROL SYSTEM L.L.C

    ADWEA REGISTRATION

  • INDUSTRIAL GROUP FOR CONTROL SYSTEM L.L.C

    IGCS

    LICENSES

  • INDUSTRIAL GROUP FOR CONTROL SYSTEM L.L.C

    ODASCO

    PROFILE

  • PAGE 1

    Odeh Asalem Automation Systems

    ODASCO is a business organization, which instituted its operation one

    decade ago in focusing and catering to the requirements of the Water, Oil, Gas,

    Power, Steel and other industries mainly in Automation and Instrumentation and

    related fields as fiber cable technology. The renewed focus on our basic

    business objective will be achieved by ensuring a dedicated, committed technical

    staff that is available to serve existing and prospective clients with maximum

    efficiency and competitive prices.

    To attain the best possible performance up to the satisfaction of our clients, we

    have a local setup and a most modernized workshop, which contains all the

    necessary hardware and software components and well trained technical staff in

    order to cope with our Clients specific requirements.

    ODASCO main branch has been established in Dubai with offices in the region. We

    are also established in Amman as ODASCO Automation to provide local

    engineering and project management facilities of industrial automation. In Qatar,

    ODASCO in partnership with a local partner AL JABER CONTRACTING CO., a

    major Qatari contracting company, has been active in many areas doing

    Automation projects.

    ODASCO services include Design, Supply, Inspection, Installation, Commissioning,

    Training and maintenance support. Accordingly ODASCO has the capability to

    undertake turnkey contracts for industrial/Infra-structure automation applied

    solutions covering small, medium and large-scale projects. Our wide range of

    activities has covered so far many countries in the region including Saudi-Arabia,

    Kuwait, Bahrain, Qatar, UAE and Iran.

  • PAGE 2

    Odeh Asalem Automation Systems

    ODASCO is continually interested in business opportunities and can offer our

    services in the following fields.

    DCS systems

    SCADA and Telemetry Systems

    MIS systems

    PLC and DCS Based control systems with all related fields as

    Industrial Communication and Human- Machine Interface HMI

    Building Management systems

    Process and field Instrumentation

    Fiber Optical Cables & Networks

    ODASCO has the resources and capabilities to offer its customers integrated solutions and would therefore undertake and cover all basic steps as:

    Design/ Engineering

    Installation and commissioning

    Material procurement

    Project management

    Technical and operational Documentation

    Training

    Maintenance Inspection and troubleshooting

    After sales services

    ODASCO Clients vary from small factories with limited machinery to large industrial

    plants and organizations as Steel, cement and oil industries. ODASCO wide

    spectrum of experience has so far covered the following industries:

    Infra-Structure covering Water and Sewage plants

    Water distribution treatment and pumping stations

  • PAGE 3

    Odeh Asalem Automation Systems

    Steel plants as rolling mills, palletizing plants, direct reductions, furnaces and

    others

    Cement Plants

    Phosphate Industries.

    Power generation and distribution

    Oil Industries

    Plastic Industries (both blowing and injection molding)

    Food industries

    Animal Feed and Grains industries

    ODASCO engineers are well trained and have so far wide experience in designing,

    installing and commissioning the following automation systems:

    Single and multi PLC systems ranging from limited number of I/O signals up to

    multi thousand signals. PLC systems could be single CPU, multiple parallel or in

    Hot-Standby mode for simple and complicated applications.

    Simple operator panels and complicated multi stations computer based Human

    Machine Interface systems.

    Industrial Communication systems as PROFIBUS and ETHERNET LAN

    networks

    Wide Area Networks for telemetry systems

    Intrinsic safe and fail-safe systems

    Visualization systems for industrial quality control and remote visualization

    monitoring

  • PAGE 4

    Odeh Asalem Automation Systems

    Process Instrumentation

    In order to provide a complete solution in the field of Process control that covers

    Instrumentation and Control (I&C), ODASCO is also specialized in providing

    complete solution for the specific customer requirements in the field of process

    instrumentation. By combing Automation solutions together with the field

    instrumentation, the customer could enjoy a complete I/C solution from one

    supplier.

    We do supply instrumentation components from different suppliers to meet

    customer requirements. However, we do work closely with different instrumentation

    manufacturers covering the full range of process instrumentation as

    - Siemens with their specialized line of high accuracy products

    - Enderss + Hauser from Germany supplier of general instrumentation products.

  • PAGE 5

    Odeh Asalem Automation Systems

    Electrical Works

    ODASCO is committed to providing complete automation solution and in line with

    our commitments we do offer services for complete electrical works related to

    automation solutions. ODASCO has the capacity to execute turnkey projects in the

    low voltage to medium voltage domain.

    We have very good experience and skilled Electrical engineers, most reliable

    products, services and knowledge to cater to the demands of electrical projects and

    to provide overall customer satisfaction.

    We do supply, design, engineering, modification and installation of power

    distribution panels for low voltage to medium voltage solutions. We provide highly

    reliable and efficient solutions to meet the power requirements of fixed and variable

    speed 3-phase pumps upto 415 Volts, motorized valves, field instrumentation and

    control panels. Additionally, we carryout complete RTU panel wiring design, panel

    manufacturing and installation. We also supply and install uninterruptible power

    supplies and redundant power sources to ensure the smooth running of critical

    operations.

    To meet with the highest standards of safety, our team of skilled engineers can

    devise schemes and provide solutions for the proper earthing of distribution panels,

    control panels and instrumentation. Moreover, we provide complete solution for

    routing, laying and termination of single-phase and three-phase power cables upto

    415 Volts.

  • PAGE 6

    Odeh Asalem Automation Systems

    Building Management Systems

    ODASCO has expanded its services in the field of Building Management systems

    to maximize comfort, productivity, safety and energy efficiency for commercial,

    residential, institutional, government buildings, hospitals, schools, museums,

    libraries, sports complexes and more.

    We have very good experience and skilled BMS engineers, most reliable products,

    services and knowledge to create building solutions that will help customers meet

    their business goals.

    Dedication to exceeding customer expectations, its the proven plan for continued

    success for ODASCO. We focus on innovation & commit to continuous

    improvements for quality, service, productivity and time compression.

    With our combined experience in-depth analyses and comprehensive services, we

    believe that we provide networked, efficient, secured, scaleable and integratable

    BMS solutions.

    We do Supply, Design, Installation & Commission of complete BMS systems that

    manage energy use, heating, lighting, security and fire management for residential

    and non-residential buildings.

    We use the most reliable equipment from SIEMENS. We can develop a

    customized energy plan to optimize your facilities and reduce your

    costs..guaranteed.

    We are committed to the exceeding customer expectations.

  • PAGE 7

    Odeh Asalem Automation Systems

    FIBRE OPTIC Systems and Cables

    INTRODUCTION:

    ODASCO as a fast growing organization in Instrumentation and Control has

    expanded its services to include providing Fiber Optic (F.O.) technology to

    accommodate the ever-growing demand for Data communication & Networking

    solutions through Optical Fiber cable.

    To realize the objective of having the best standard in F.O. technology ODASCO

    personnel have gone through extensive training with the instructions from qualified

    instructors and experienced engineers from Corning & Pirelli Cable Systems, the

    worlds leaders in Fiber cable technology.

    SCOPE OF SERVICES:

    ODASCO can offer consultancy, LAN and WAN solutions, F. O. cable installations,

    Remote access solutions, Testing and Diagnostics and Training

    We supply, Design, Install and Commission all F.O. related equipment.

    We do have in-house capabilities to design and implement the latest Fiber optical

    techniques used in LANs and WANs, where we use the state of the art techniques

    in Switching techniques to reach very high speeds in Industrial Ethernet networks

    with speeds up to 100Mbit/sec and highly redundant Networks.

    Additionally, ODASCO has developed its own team of engineers and supervisors to

    carry out turn key solutions for fiber cable project including cable pulling, laying,

    testing, commissioning, etc.

  • PAGE 8

    Odeh Asalem Automation Systems

    TOOLS and EQUIPMENT:

    To accommodate our project demands in different locations simultaneously

    ODASCO has acquired adequate number of state of the art equipment such as

    OTDR (Optical Time Domain Reflect meter), Fusion Splicers, Pulling winches etc.

    and other wide range of components to assist in Cable Pulling, splicing, testing and

    commissioning.

  • PAGE 9

    Odeh Asalem Automation Systems

    Company Data

    Name of the Company: Odeh Asalem Corporation

    Addresses: P.O. Box 261, Safot 19378 Amman-Jordan

    Contact Numbers: Main Office, Amman Tel # +962 6 4655659

    Fax # +962 6 4618649

    E-mail [email protected]

    Name of the Company: Odeh Asalem Automation Systems

    Addresses: P.O. Box 31261, Dubai - UAE

    Contact Numbers Main office, Dubai Tel # +971 4 2623 466

    Fax # + 971 4 2623 608

    E-mail [email protected]

    Authorized / Key contact names and Position

    Mr. M.Sultan Al Jaber Chairman

    Mr. Sad Odeh General Manager

  • PAGE 10

    Odeh Asalem Automation Systems

    Reference List, Projects

    1 -OMAN

    - Ministry of Housing, Electricity and Water (MHEW) of the Sultanate of Oman, Water supply schemes and construction of transmission pipelines, pumping stations at Al Sharqiya region, 2007

    Main Contractor: M/s. Societe Egyptienne Dentreprises (S.E.D.E.)Complete Control and Instrumentation package including design, engineering, supply, installation, commissioning and training for the complete scope. The SCADA system involves 5 Master RTUs using Siemens dual redundant S7-400H PLCs and 18 Mini RTUs using Siemens S7-200 PLCs for remote control and monitoring of 10 pump stations, several reservoirs and motorized valves. The Mini RTUs are connected with the Master RTUs through Multi Point Interface Network at a speed of 187.5kbits/s. The Master RTUs are linked with each other and the Central SCADA Center via 400 Km redundant fiber optic ring network at a speed of 100Mbits/s. The system also uses Leak detection software for detecting faults in pipelines. ODASCOs scope also includes power distribution panels and all associated electrical works for RTUs and instruments.

    2 -United Arab Emirates

    - Federal Electricity & Water Authority (FEWA), Puming stations at various locations in Northern Emirates, 2007Main Contractor: M/s. Bin Ham Electromechanical Ent. Co, 2006Complete SCADA and Control package includes design, supply, installation,commissioning and training for the complete scope. The SCADA system involved four pumping stations utilizing Siemens SIMATIC S7-300 dual redundant PLCs and WinCC Flexible HMI system for process control and monitoring.

    - Dubai Water and Electricity Authority (DEWA). DEWA Pumping Station, 2007Working as a subcontractor for M/s Ghantoot Gulf for the complete scope of engineering, design and supervision of the installation works.

  • PAGE 11

    Odeh Asalem Automation Systems

    - Dubai Water and Electricity Authority (DEWA). Najmah Pumping Station Phase IV, 2007Working as a subcontractor for M/s Ghantoot Gulf for the complete scope of engineering, design and supervision of the installation works.

    - Sharjah Electricity and Water Authority (SEWA), Water Transmission from Tap Off-04 to Hamdah P.S and Bedai P.S., 2007Main Contractor: M/s. Bin Ham Electromechanical Ent. Co., 2007Complete SCADA design and supply of hardware components for two remote stations with one utilizing Hot redundant S7-400H PLCs and the other utilizing software redundant S7-300 PLCs to provide a highly available redundant system. The two remote stations are linked through GPRS and a back-up ISDN line, and have a fiber optic connection with the existing stations. In order to have seamless integration with the FWTS the software for the TapOff-04 is done by OEM.

    - Abu Dhabi Water and Electricity Authority (ADWEA). Irrigation Pipe Lines from Sweihan to Al Maha Forest & Ajban farm.Complete SCADA and Control package includes design, supply, installation, commissioning, and training for the complete scope. Scope of work includes supply, installation and commissioning of four RTU panels, 65 Km F.O cable, instrumentation and SCADA software. Complete RTU panel wiring design, modification of LV distribution panels and power cable routing and terminationwork. Modifications for the SCADA (LSX) was carried out by OEM.

    - Abu Dhabi Water and Electricity Authority (ADWEA). Shuweihat Water Transmission Scheme.600 Km of fiber optic cable connecting four pumping stations for communicating data between the same stations.

    - Abu Dhabi Water and Electricity Authority (ADWEA). Shuweihat Water Transmission Scheme.Complete control package including design, supply, installation, commissioning and training for the complete scope. The control system involved using S7-300 with software redundant software. The SCADA parts cover 10 RTUs connected to four pump stations using redundant fiber optic cable and OTN devices. The complete system runs at 600 Mbit/s speed.

  • PAGE 12

    Odeh Asalem Automation Systems

    - Abu Dhabi Water and Electricity Authority (ADWEA). Shuweihat Water Transmission Scheme. ( Installation)Complete installation work for the instruments, RTU panels, UPS panels, main distribution panel and fiber optic patch panes.

    - Abu Dhabi Water and Electricity Authority (ADWEA). DN 1200 Transmission Pipe line from Taweelah to Unit III.Supply and installation of one RTU, communication equipments and F.O. Cable, the RTU will control the instruments on the same pipeline at Unit III location, F.O cable is connecting between the new RTU and the existing PLC panel at unit III control room. Modification in the existing power distribution panels and automatic changeover mechanism at LV panel is also incorporated. SCADA software modification at Unit III control room is done to incorporate all instruments connected to the new RTU.

    - Abu Dhabi Water and Electricity Authority (ADWEA). Al Yaif Well Water Transmission Scheme. Main contractor ASTRACO Construction.Complete SCADA and Control package includes design, supply, installation, commissioning and training for the complete scope. The SCADA system involved using Siemens SIMATIC S7-400H Dual redundant system and WinCC MMI system. The SCADA part covers 18 RTUs connected to the master station using fiber optical connection. The Complete SCADA system runs at 100Mbit/sec speed.

    - Abu Dhabi Water and Electricity Authority (ADWEA). Seih Gharabah Well Water Transmission Scheme. Main contractor ASTRACO Construction.Complete SCADA and Control package includes design, supply, installation, commissioning and training for the complete scope. The SCADA system involved using Siemens SIMATIC S7-400H Dual redundant system and WinCC MMI system. The SCADA part covers 14 RTUs connected to the master station using fiber optical connection with 3 major braches. The Complete SCADA system runs at 100Mbit/sec speed.

  • PAGE 13

    Odeh Asalem Automation Systems

    - Abu Dhabi Water and Electricity Authority (ADWEA). Water Supply to Bahya and Sadar Ring main. Main contractor Egyptian Contracting Company, SEDE.Complete I/C package includes design, supply, installation, commissioning and training for the complete control and Instrumentation. The SCADA system involved using Siemens SIMATIC S7-400H Dual redundant system and WinCC MMI system.

    - Abu Dhabi Municipality, Construction and Maintenance of 193 farms at Al Faya AreaAbu Dhabi, 2004 Main Contractor, IMECO Abu DhabiSupply, installation and maintenance of the SCADA and control system for a 193 farms. The system is based on Siemens latest PLC control system, and utilizes the latest techniques in industrial communications using fiber optic technology.

    - Abu Dhabi Municipality, Construction and Maintenance of 100 farms at Al Wafeea AreaAbu Dhabi, 2004 Main Contractor, IMECO Abu DhabiScope of works includes complete instrumentation, control, for the SCADA works for remote monitoring and control of up to 100 farms.

    - Abu Dhabi Municipality, Construction and Maintenance of 100 farms at Bahya ExtensionAbu Dhabi, 2002. Main Contractor, IMECO Abu DhabiScope of works includes complete instrumentation, control, for the SCADA works for remote monitoring and control of up to 100 farms.

    - Abu Dhabi Municipality, Construction and Maintenance of 140 farms at Bahya ExtensionAbu Dhabi, 2002. Main Contractor, IMECO Abu DhabiComplete control Package including design, supply, installation, commissioning and training for the complete scope. The control system involved using S7-200 with text display. The control system covers stand alone RTUs with the needed instrumentations.

    - AbuDhabi Municipality, Plantation and Irrigation Network for Al Jarf Area-

  • PAGE 14

    Odeh Asalem Automation Systems

    Phase I.Abu Dhabi, 2005. Main Contractor: IMECO, Abu DhabiScope of work includes Automation system design, programming, fiber optic cable supply, installation, commissioning and training. The SCADA system consists of 16 remote RTUs using S7-200 PLCs for remote monitoring and control of the water distribution in farms. The remote RTUs are connected with master RTUs and the central station via a fiber optic profibus network.

    - Abu Dhabi Water and Electricity Authority (ADWEA). Unit IV W63 Pumping station 2000. Main contractor KSB and Masoud Abu Dhabi.Complete I/C package includes design, supply, installation, commissioning and training for the complete control and Instrumentation. The SCADA system involved using Siemens SIMATIC S7-400H Dual redundant system and WinCC MMI system.

    - Abu Dhabi Water and Electricity Authority (ADWEA). Unit IV W52 pumpingstation 2000. Main contractor Electro-Mechanical Siemens.

    Scope of supply includes Automation system design, programming and commissioning.

    - Al Khaleej Sugar Plant/ Jebel Ali Dubai Distributed Control SystemReplacement of existing ABB DCS with Siemens PCS 7 distributed control system. New system includes 4500 signals. Includes 4 major Dual redundant S7-400H automation systems, 2 Servers at Hot-Standby and 7 clients. The system support @glance system software with 50 clients plus many other features.

    - GIC, Abu Dhabi. AlEin Cement Plant. Main contractor, Siemens France, 1999

    Phase II Upgrade of Automation System for the plantResponsible for the complete Engineering and design works of the project, design and manufacture of all control panels and control rooms, installation of the system.

    - Dubai Water and Electricity Authority (DEWA). Najmah Pumping Station 1999

  • PAGE 15

    Odeh Asalem Automation Systems

    Working as a subcontractor for M/s Alia Electrical Company for the complete scope of Instrumentation. Covering Design, procurement, Installation and commissioning.

    - Emirates Docking System, Dubai Airport, Emirates Engineering 1998Automation and instrumentation package for automating the mechanical docking system used for repairing the aircraft as Boeing 777 and Airbus 300

    In UAE we are currently in the stage of finalizing many projects covering process instrumentation and automation of several plants.

    3 - JORDAN

    - Jordan Phosphate Company/Al-Shedia - Jordan 2000Replacement of existing Philips SCADA system with the latest SINAUT ST7 CcL from Siemens system includes 30 RTU's, Master Station, 2 Redundant Servers and 5 Clients

    - Wadi Mousa Water Authority, main contractor Sadiq Nayef, 1999Supply, Installation and commissioning of TWO Telemetry systems for the monitoring and control of Water wells, reservoirs and distribution lines for the area of Wadi Mousa

    - Jordan Phosphate Company/ Al-Shedia-Jordan 1999System maintenance and detailed training for the water bore wells covering SCADA, telemetry and field process instruments.

    - Jordan Phosphate Company/ Al-Shedia-Jordan 1998-1999 **System maintenance, modification contract with on site round the clock training package for the complete control and instrumentation systems at Al-Shediyah mines plant.

    - Ministry of supply/ AlAqaba Silos-Jordan 1998 Upgrading the electromechanical packaging system to electronic system using the latest SIMATIC S7, SIWAREX and MMI system from Siemens.

    - Amman Food Industries / Amman-Jordan 1994Automation of Wafer line using PLC S5-115U

  • PAGE 16

    Odeh Asalem Automation Systems

    - United Industries Group / Ma'daba-Jordan 1995Automation of BEKUM-Two stations blow molding Plastic Machine using PLC S5-95U.Automation of RUSSIAN Two stations blow molding plastic machine using PLC S5-95U.

    - Universal Industrial Plastic Co. / Muwagger-Jordan 1996Automation of BEKUM-two stations plastic machine using PLC S7-200 & TD200.

    - Al-Hawamdeh Corp. for Construction / Amman-Jordan 1996Automation of Bricks production lines using PLC S5-100U.

    - Al-Maraai Establishment For Food Industries (project nr.1) / Marka-Jordan 1996,1997

    Automation of French Oven using S7-200 and TD-200.

    - Al-Maraai Establishment For Food Industries (project nr.2) / Marka-Jordan 1997,1998

    Automation of French Oven using S7-200 and TD-200.

    - Al-Maraai Establishment For Food Industries (project nr.3) / Marka-Jordan 1998.

    Automation of French Oven using S7-200 and TD-200.

    4 - BAHRAIN **

    - Gulf Industrial Investment Co. (GIIC)/ Hidd-Bahrain 1998-1999 (under design)PLC Upgrade Project, Phase IIIIntroducing closed loop control into the system, further upgrading of the PROFIBUS network and introducing the SIEMENS latest SIMODRIVE variable speed drives

    - Gulf Industrial Investment Co. (GIIC)/ Hidd-Bahrain 1998-1999 (under design)PLC Upgrade Project, Phase IIWork included introducing new network between PLC, Upgrading the Man-Machine System in addition to 2 years 24 hours/day maintenance contract.

  • PAGE 17

    Odeh Asalem Automation Systems

    - Gulf Industrial Investment Co. (GIIC) / Hidd-Bahrain 1997PLC Upgrade Project, Phase IWork included Design and Commissioning of an up-to-date control and monitoring system to replace the old primitive PLC system. The new system is based on SIMATIC S7-400, SINEC L2 and WinCC.

    5 - QATAR

    - Ministry of Electricity and Water, RAFF B Water Pipeline. Main contractor MABANI contracting company 1998-1999 Customer: Ministry for Electricity and Water (MEW)

    SCADA System for the largest water pipeline in Qatar with 4 local mini control stations serving the line. Work includes also Dual Redundant Fiber Optic communication link for 10 Km for one of the remote stations. Additionally, ODASCO has been responsible for the complete field instrumentation.

    - Aljabor Grains and Feed Co. / Umsaeed - Qatar 1997 **Overall supervisory control and monitoring for the plantWork included Design and commissioning of an automated weighing system, centralized control and monitoring, and remote supervisory monitoring.

    - Qatar National Cement Co. (QNCC)/ DOHA 1996 **Main contractor SIEMENS/FranceWork included the design and commissioning of the control and monitoring systems in the plant, which were based on SIMATIC S5-155U, SINEC H1, and COROS-LSB (CEMAT CS).

    - New Salwa Road Reservoir/ DOHA 1995Commissioning of Automation function at New Salwa Road reservoir in Doha.System was based on SIEMENS techniques and included: -

    - Automatic operation mode using PLCs.- Variable Speed & fixed speed drives system.

  • PAGE 18

    Odeh Asalem Automation Systems

    6 - IRAN

    - Kermanshah Water SCADA Project, 2001 onwardsIn design phase Main Contractor OMRAB Contracting, IranSCADA project using Radios. No. Of RTU 63

    - Mobarakeh Steel Complex / Isfahan - Iran, 1991-1992Main Contractor SIEMENS/GermanyAutomation for Cold Tandem MillProcess Automation and Direct Automation with PLC.

    - Mobarakeh Steel Complex / Isfahan - Iran, 1992-1994Main Contractor SIEMENS/GermanyPower & Fluid Control CenterSCADA & TELEMETRY.

    7 - KUWAIT

    - National Control Center/ MEW, 1987-1990Main Contractor SIEMENS/Germany.Work included the participation in the software commissioning of SCADA system, system maintenance and client assistance, and training courses and continuous maintenance.

    Note: All references with (**) have been executed by IGCS Qatar where ODASCO is a partner.

  • PAGE 19

    Odeh Asalem Automation Systems

    BMS Projects Executed by ODASCO Engineer

    Using Siemens Product

    - Lake Terrace Towers (Dubai, UAE)

    Supply, installation supervision, and commissioning for HVAC controllers

    including 792 FCU controllers and 5 conventional controllers to provide the

    perfect climate control within the towers project status: in progress.

    - Electrical Utility monitoring and control system at three different location;

    H.R.H SHK Zayeds Villa, H.R.H SHK Tahnoons Villa and H.R.H SHK

    Khalifas cow farm (Al Ain, UAE)

    Supply, installation, and commissioning for three remote monitor and control

    with communication systems at the three locations, and one central

    monitoring system at AADC at Al Ain.

    - Variable Water-Jet for swimming pools at three Palaces of H.R.H SHK

    Zayed (Abu Dhabi & Dubai Road, UAE)

    Supply, installation, and commissioning for three local control panels at three

    locations, providing a controllable variable span and pressure for water Jets,

    in order to maintain the optimized flow of showers as required.

    - Aqaba Royal Palace, BMS VAV intelligent controller (Aqaba, Jordan)

    Supply, installation supervision, and commissioning for BMS system. VAV

    intelligent controller has been utilized to provide the perfect climate control,

    energy savings and meet visitors satisfaction. Equipment installed includes

    S600 Apogee, 2000 data point, as well as hardwired integration.

  • PAGE 20

    Odeh Asalem Automation Systems

    - Al Yarmook General Hospital BMS (Irbid, Jordan)

    Supply, installation supervision, and commissioning for complete BMS

    system for monitoring and controlling hospital facilities, such as chillers,

    boilers, air hanging units, as well as fan coil units. Special application

    program has been implemented to control temperature, humidity, and air

    pressure inside the medical operation rooms. Equipment installed includes

    S600 Apogee, 4000 data point, as well as hardwired integration.

    - Rama Hotel, BMS - FCU intelligent LON work controller (Amman, Jordan)

    Supply, installation supervision, and commissioning for BMS system to

    monitor and control 200 rooms, 2 restaurants, and 3 conference rooms.

    Hotel surface area is 10,000m2. Equipment installed includes S600 Apogee,

    3000 data point, as well as intelligent LON fan coil unit controllers.

    - Crown Plaza Hotel, BMS FCU intelligent LON work controller (Petra,

    Jordan)

    Supply, installation supervision, and commissioning for complete BMS

    system to monitor the hotel facilities which include 160 rooms, 20 beach

    houses, 2 restaurants and 2 conference rooms. Equipment installed includes

    S600 Apogee, 2500 data point, as well as intelligent LON fan coil unit

    controllers as well as hardware integration with other control systems such

    as fire alarm system, fire fighting system, and submersible pump system.

    - Al Yarmouk University central library, BMS (Irbid, Jordan)

    Supply, installation supervision, and commissioning for complete BMS

    system for monitoring and controlling library facilities, such as chillers,

  • PAGE 21

    Odeh Asalem Automation Systems

    boilers, air hanging units, as well as LON intelligent fan coil units. Equipment

    installed includes S600 Apogee, 1100 data point, as well as hardwired

    integration.

    - Arab Medical Centre, BMS (Amman, Jordan)

    Supply, installation supervision, and commissioning for complete BMS

    system for monitoring and controlling medical clinic facilities. Special

    application program has been implemented to control temperature, humidity,

    and air pressure inside the medical operation rooms. Equipment installed

    includes S600 Apogee, 800 data point, as well as hardwired integration.

  • PAGE 22

    Odeh Asalem Automation Systems

    Reference Projects Fiber Cable

    Item Client Project Length Notes

    1 MHEW Water supply schemes and construction of transmission pipelines, pumping stations at Al Sharqiya region

    400 Km Project includes transfer of data between five Main locations; pump stations and reservoirs.

    2 ADWEA Shuweihat Water Transmission Scheme

    600 Km Project includes transfer of data between four main pumping stations

    3 ADWEA Irrigation Pipe Lines from Sweihan to Al Maha Forest & Ajban farm.

    65 Km Project includes transfer of data between five Main locations; pump stations and reservours.

    4 ADWEA Al Bahya & Al Sadar 40 Km Project includes 15 RTU branches with two main stations connected through WAN and LAN

    5 ADWEA Unit III and Unit IV extension

    26 Km Project includes Transfer of data between two main stations connected through WAN and LAN

    6 ADWEA Seih & Gharabah Water Transmission Scheme

    28 Km Project includes Transfer ofdata and control of 18 Wells and two main stations connected through WAN and LAN

    7 ADWEA Al-Yaif Water Transmission Scheme

    25 Km Project includes Transfer of data and control of 14 Wells and a pumping station with main stations connected through WAN and LAN

  • PAGE 23

    Odeh Asalem Automation Systems

    Reference List, Training

    1- JORDAN

    - Jordan Phosphate Company/ AlShedia Jordan 1999

    1. SCADA and telemetry training2. Process instrumentation3. VMS computer system4. Basic and Advance computer training

    - Jordan Phosphate Company/ AlShedia Jordan 1998

    1. SIMATIC S5 System 1 (Basic)2. SIMATIC S5 System 2 (Advanced)3. SIMATIC S5 Communication Course

    May, June and July 98

    - Coca-Cola East. / Madaba Jordan 1994

    1. Introduction to STEP52. Troubleshooting and Maintenance for SIMATIC S5

    2 Weeks Intensive Training

    - Al Maraai / Amman Jordan 1998

    1. Introduction to Programming Using STEP72 Weeks Normal Training

    2- UAE

    - Al-Ain Coca-Cola / AlAin UAE 1997

    1. System Handling and Troubleshooting, SIMATIC S5 PLCCovering S5-95U, S5-100U and S5-115.

    2. Programming of SIMATIC S5 Using STEP5 Language.One Week Intensive Training.

  • PAGE 24

    Odeh Asalem Automation Systems

    - Union Cement Co. (UCC) / Ras Al Kheimah UAE 1997

    1. SIMATIC S5 Sys1 (Basic Course) 1 Week2. SIMATIC S5 Sys2 (Advanced Course) 1 Week

    - Dubai Aluminum Co. LTD (DUBAL). / Dubai UAE 1998

    Intensive Training on Programming Using STEP5 1 weekAnd Troubleshooting of SIMATIC S5

    3- BAHRAIN**

    - Gulf Industrial Investment Co. (GIIC) / Hidd-Bahrain 1997-1998

    Intensive Training Program for.120 Days on SIMATIC S7Covering the Following Subjects.1. MS DOS and WINDOWS95 Operating Systems.2. SIMATIC S7 System Handling and troubleshooting.3. SIMATIC S7 Programming (Level 1).4. SIMATIC S7 Advanced Programming (Level 2).5. WinCC.6. SINEC L2 with FDL Connections.

    4- Qatar**

    - Qatar General Petroleum Corporation (QGPC)/ Dukhan Qatar 1998

    1. SIMATIC S5-SYS1( Basic Course) 2Weeks2. SIMATIC S5-SYS2 (Advanced Course) 2 Weeks

    - Qatar Liquefied Gas Co. LTD./ Ras Laffan Qatar 1998

    1. SIMATIC S5-SYS1 Basic Course (Group 1). 1 Week2. SIMATIC S5-SYS1 Basic Course (Group 2). 1 Week

    Note: All references with (**) have been executed by IGCS Qatar where ODASCO was a partner.

  • INDUSTRIAL GROUP FOR CONTROL SYSTEM L.L.C

    SEWER PROJECTS

    EXPERIENCE

  • ---------------------------------------------------------------------------------------------------------------------------------

    Track-record

    Laying FOC inside Sewerage Network

    Project : Design, Construction & Maintenance of an enterprise wide fiber optic data network in Abu Dhabi Island Project No(G-5719)

    Client : Abu Dhabi Water and Electricity Authority ADWEA

    Main Contractor: IGCS Project Period : 2008 - 2010 Project Concept: The concept of this project depend

    using sewerage network as duct to connect ADWEA premises and stations together in one network.

    IGCS and our UK partner H2o networks Ltd is working together to apply this technology in Abu Dhabi

    H2O Networks, the pioneer of providing fibre connectivity via the UK's 360,000 miles of sewers, has been doing this for more than three years, has recently announced its fibrecity concept and will be announcing the first city imminently. www.h2o-networks.uk.net

    Scope Of Work:

    Supply and Installation of 500 Km fibre Optic Cables inside sewerage network in Abu Dhabi Island

    http://www.h2o-networks.uk.net/

  • ---------------------------------------------------------------------------------------------------------------------------------

    Track-record

    Projects Handed Over by ODASCO in the last 3 yearsPump Stations

    Contract: Irrigation pipelines from Swiehan to Al Maha forest and Ajban farms (Bida Khalifa).

    Project Description Water transmission from Sweihan reservoir to Al Maha reservoir, Bida Khalifa 1 and 2 pumping stations. Water transmission is established through 1000mm dia Pipeline.Control and monitoring of the water transmission network is established from the existing SCADA control center in Ajban Pumping Station.

    ..ODASCO Scope: Complete Control, Instrumentation package covering design,

    supply, installation, commissioning and training. Scope includes; Supply of Siemens SCADA system based on S7-300/S7-

    400H redundant PLC controllers. Supply and installation of E&H Pressure switches. Redundant OTN (Open Transport Network) for

    communication between Sweihan Reservoir, Ajban, Bida Khalifa 1 and 2 pumpng stations.

    Fiber cable interface between all pumping stationsthrough 65 Km Fiber optic network. Scope of work included supply, installation, testing and commissioning of the FOC network.

    Electrical works for all RTUs and instruments.

    Modification for the existing SCADA (LSX) was carried out by OEM.

    Main Contractor: ASTRACO Construction.Client: Abu Dhabi Water and Electricity Authority (ADWEA).Consultant: Montgomery Watson HarzaCompleted: 2007

  • ---------------------------------------------------------------------------------------------------------------------------------

    Contract: Unit IV Pump Station (W63 Shubaisee)Project Description Pump station with 9 pumps fixed speed 1.25 MW fully

    equipped with all necessary Vibration, temperature monitoring system, soft starter, etc..

    ODASCO Scope: Complete control, Instrumentation package covering design, supply, installation, commissioning and training. Scope includes; Supply of Siemens DCS system based on hot dual

    redundant PLC controllers with all LAN networks, servers, Remote terminal units, switches. The DCS system supplied by ODASCO was responsible for the complete operation of all pump station components. No third party control system were existent.

    Full scope of Field instruments from E+H Complete operational stand alone Vibration and

    Monitoring system for the pumps from SKF with multiple vibration and temperature sensors for each pump.

    Pump Monitoring Panels for direct control of pumps. Same shall operate the pumps either by receiving direct commands from the DCS system or independent control in case of DCS failure.

    Fiber cable interface with other main pumping station through dual redundant Fiber links with distance up to 26KM (unit III) and 250KM Shuweihat desalination plants. Both joints were supplied and connected by ODASCO Automation.

    Main Contractor KSB-MasoudClient: ADWEA - AbuDhabiConsultant: TEBODIN Middle east.Completed: 2004

    Contract: Unit IV Pump Station (W52 Shubaisee)Project Pump station with 8 pumps fixed speed 1.25 MW fully

    equipped with all necessary Vibration, temperature monitoring system, soft starter, etc..

    Scope of supply includes Automation system design, programming and commissioning for the Control system. Equipment supplied by others. System design looks similar to Unit IV W63 pump station

  • ---------------------------------------------------------------------------------------------------------------------------------

    Main Contractor GCC Construction Company.Client: ADWEA - AbuDhabiConsultant: Mott-MacDonald.Completed: 2004

    Contract: Shuweihat Water Transmission including modifications at Mirfa and Musafah Pump Stations

    Scope: Complete control package including design, supply, installation, commissioning and training for the complete scope. The control system involved is based on dualredundant PLC Systems. The SCADA part covered 10 SCADA locations connected to 4 main Pump stations (mirfa, Musafah, Unit IV and UnitIII) using 500km dual redundant FOC with high speed OTN based communication system;running at 600Mbit/sec.

    Contractor TAISEI CORPORATIONClient: ADWEAConsultant: TEBODIN Consultants & Engineers / Maunsell Consultancy

    Services Ltd.Completed: 2005

    Contract: Al Yaif Pump Station and Water WellsProject Description Pump station with 8 variable speed pumps equipped with all

    necessary Vibration, temperature monitoring system. Water pumped to reservoir from 18 remote sites

    Scope: Complete SCADA and Control package includes design, supply, installation, commissioning and training for the complete scope. The SCADA system involved using Siemens SIMATIC S7-400H dual redundant system and WinCC SCADA system. The SCADA part covers 18 remote sites connected to the master station using fiber optical network. The Complete SCADA system runs at 100Mbit/sec speed.

    Contractor ASTRACO_ MATRIX ConstructionClient: ADWEAConsultant: TEBODIN Consultants & Engineers.Project Value: AED 2,100,079.00Completed: End of 2004

  • ---------------------------------------------------------------------------------------------------------------------------------

    Contract: Seih Gharabah Pump station, Water Transmission Scheme

    Project Description Pump station with 7 variable speed pumps equipped with all necessary Vibration, temperature monitoring system. Water pumped to reservoir from 13 remote sites

    Scope: Complete SCADA and Control package includes design, supply, installation, commissioning and training for the complete scope. The SCADA system involved using Siemens SIMATIC S7-400H dual redundant system and WinCC SCADA System. The SCADA part covers 18 remote sites connected to the master station using fiber optical network. The Complete SCADA system runs at 100Mbit/sec speed.

    Contractor ASTRACO_ MATRIX ConstructionClient: ADWEAConsultant: TEBODIN Consultants & Engineers.Completed: End of 2004

    Contract: Ajban Pump Station and 10 MG Reservoir Project Description Pump station with 5 fixed speed pumps and 10MG water

    reservoir

    Scope: Complete SCADA and Control package includes design,supply, installation, commissioning and training for the complete scope. The SCADA system involved using Siemens SIMATIC S7-300 redundant and WinCC SCADA system.

    Contractor Ghantut construction companyClient: Private departmentCompleted: End of 2004

    Contract New Salwa Road Reservoir/ DOHASCOPE Commissioning of Automation function at New Salwa Road

    Pump Station & Reservoir in Doha - Qatar. System was based on SIEMENS hardware and included: -

    Dual redundant PLCs for the automatic control of 6 Variable Speed 0.8 MW pumps.

  • ---------------------------------------------------------------------------------------------------------------------------------

    Contractor Al Waha ConstructionClient: Kahrama QatarCompleted: End of 2002Contract: Water Supply to Bahya and Sadar Ring main with

    modifications at Unit III and Taweelah A1 pump StationScope: Complete Instrument and Control package includes design,

    supply, installation, commissioning and training. The SCADA system involves two main SCADA centers interconnected by 72km FOC with 14 main branches at remote locations.

    Contractor SEDEClient: ADWEAConsultant: TEBODIN Consultants & Engineers.Completed 2004

    Running Projects: Pumping Station

    - Water supply schemes and construction of transmission pipelines, pump stations at Al Sharqiya Region, Oman (10 pump stations all interconnected with redundant FOC link)

    - Northern Emirates Pump Stations (5 pump stations all interconnected with FOC link. Under current construction)

    - Modification to Um-Al-Nar Pump Station ( part of Umm-AlNar Desalination Plant)

    1PROF.pdf2ABOUT.pdf3About IGCS.pdf4ADWEA REGISTRATION.pdf5AD REG.pdf6IGCS.pdf7TL.pdf8PROFI.pdf9takeover.pdf10ODASCO Company Profile_June 2007.pdf11SEWER PROJECTS.pdf12Track record for FOC.pdf13Track record for pump stations.pdf