Preparing the brick works

7
PREPARE THE BRICK WORKS

Transcript of Preparing the brick works

Page 1: Preparing the  brick works

PREPARE THE BRICK WORKS

Page 2: Preparing the  brick works

USE OF TOOLS -

Khore

Palm bob Right angle

Ghamela

Page 3: Preparing the  brick works

Measuring tape

Trowels

bucket

Page 4: Preparing the  brick works

PROCEDURE : First step is to finalize the construction place

vaaLU isamaoMT

Bricks

Page 5: Preparing the  brick works

Cement + sand mixing

Mix Sand , Cement and Water

Mmix well the cement sand mixture

Page 6: Preparing the  brick works

LAYING BRICKS As per the given video, lay the bricks

Please click here for the video link

From this video link, we will know how to lay bricks and cement them by using the bonding techniques

The next job is to sprinkle water on it for few days

Page 7: Preparing the  brick works

STRENGTH INCREASES WITH CURING :

Time required for curing Strength of concrete

0 Days 50 %

1 Days 61 %

7 Days 85 %