Preparedness Planning
Campus Utility System
RMA WebinarFeb 28, 2013
![Page 2: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/2.jpg)
Presenters:
Henry Johnstone PE Director Mechanical Engineering
Ted Moeller PEDirector Electrical Engineering
John McGann PEDirector Civil Engineering
![Page 3: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/3.jpg)
Our ExperienceCampus Utility Systems
TroubleshootingPlanning Design Commissioning
Higher EducationUA, NAU, ASU, UNM, NMSU, UW, UAF…..Utility Development PlansPlant and Distribution DesignSystem Commissioning
Health CareDepartment of Veterans AffairsFacility Condition AssessmentHurricane Preparedness EvaluationPhysical Security Design ManualCritical Operations Electrical Analyses
![Page 4: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/4.jpg)
Campus Utility System Preparedness Planning
•Review characteristics of campus systems and interfaces with external utilities
•Consider vulnerabilities that could lead to major unplanned campus utility outages
•Review campus utility system reliability metrics
•Discuss campus utility system reliability enhancements
•Learning Objectives
• Gain an understanding of campus utility system reliability from an engineering perspective
• Gain insight and tools that can be applied to your specific campus situation
![Page 5: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/5.jpg)
5
Utility Gas Distribution
CityGate B
LPG
HPG
CampusSubstation
13.8kV46kV
4160V
480V
Power Generation
Gas Turbine Generator SteamGeneration
GAS
CityGate A
Utility Substation A
Utility Substation B
50,000lb/ hr 50,000lb/ hr 50,000lb/ hr 50,000lb/ hr
125 HP
3000T
125 HP
125 HP
3000T
125 HP
125 HP
3000T
125 HP
125 HP
3000T
125 HP
7300 Tonhr
2000T 2000T2500 T
2000T2500 T
850 T
Public Utilities Plant Campus Utilities
Cooling Towers
Legend
Water
Electric Power
Steam
Chilled Water
Well
Storage Tank
Gas TurbineGenerator
Ice Storage
Pump
Boiler
Cooling Tower
Chiller
Switchgear
Transformer
Sewer
To WWTP
Campus Utility Systems Preparedness Planning
![Page 6: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/6.jpg)
6
Utility Gas Distribution
CityGate B
LPG
HPG
CampusSubstation
13.8kV46kV
4160V
480V
Power Generation
Gas Turbine Generator SteamGeneration
GAS
CityGate A
Utility Substation A
Utility Substation B
50,000lb/ hr 50,000lb/ hr 50,000lb/ hr 50,000lb/ hr
125 HP
3000T
125 HP
125 HP
3000T
125 HP
125 HP
3000T
125 HP
125 HP
3000T
125 HP
7300 Tonhr
2000T 2000T2500 T
2000T2500 T
850 T
Public Utilities Plant Campus Utilities
Cooling Towers
Legend
Water
Electric Power
Steam
Chilled Water
Well
Storage Tank
Gas TurbineGenerator
Ice Storage
Pump
Boiler
Cooling Tower
Chiller
Switchgear
Transformer
Sewer
To WWTP
Campus Utility Systems Preparedness Planning
![Page 7: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/7.jpg)
7
Campus Utilities Mission
Subject to capital and operating cost constraints (enterprise mentality)
• Establish & maintain plant, infrastructure and services for a safe, healthy, and productive campus environment• Maintain services to on-campus residence community• Support special requirements of funded research• Meet medical and patient care environmental standards
![Page 8: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/8.jpg)
8
![Page 9: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/9.jpg)
9
![Page 10: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/10.jpg)
10
![Page 11: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/11.jpg)
11
Preparedness• A set of contingency plans or
processes that enable ongoing operation of utilities through unplanned system disruption
• Internal• External• Forces of Nature
![Page 12: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/12.jpg)
12
![Page 13: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/13.jpg)
13
Internal Disruptions
• Distribution Pipe Breaks
• Electrical Breaker Trips
• Prime Equipment Failures
• Unexpected Consequences: Cascading, Compounding Failures
![Page 14: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/14.jpg)
14
![Page 15: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/15.jpg)
External Disruptions
• Utility Outages
•Water Line Break• Electrical Substation Failure•Natural Gas Outage
15
![Page 17: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/17.jpg)
17
![Page 18: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/18.jpg)
18
![Page 19: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/19.jpg)
19
Acts of Nature
• Fire• Flood• Earthquake• Extreme Temperature
geographically remote causes
![Page 20: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/20.jpg)
20
![Page 21: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/21.jpg)
21
![Page 22: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/22.jpg)
22
Grid Reliability
Source: IEEE
![Page 23: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/23.jpg)
23
Other External Vulnerabilities
• Water System Contamination• Electric Grid Instability• Vandalism• Cyber Attack – web access
Geographically Remote Causes
![Page 24: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/24.jpg)
24
![Page 25: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/25.jpg)
25
![Page 26: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/26.jpg)
26
Murphy’s Law
Everything that can fail, shall fail
• What could go wrong with the system or process?
• How badly might it go wrong?
• What needs to be done to prevent (or accommodate) failures
![Page 27: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/27.jpg)
27
Failure Mode and Effects Analysis
• FMEA : a systematic analysis of the system to whatever level of detail required to demonstrate that no single failure will cause an undesired event
![Page 28: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/28.jpg)
28
Failure Mode and Effect Analysis Simple Approach
• Risk Priority Number• Severity x Occurrence x Detection =
RPN– Severity
• Rates the severity of the potential effect of the failure.– Occurrence
• Rates the likelihood that the failure will occur.– Detection
• Rates the likelihood that the problem will be detected before it reaches the end-user/customer.
– RPN rating scales range from 1 to 5 or from 1 to 10, with the higher number representing the higher seriousness or risk.
![Page 29: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/29.jpg)
RPN Considerations
• Rating scale example:– Severity = 10 indicates that the effect is very
serious and is “worse” than Severity = 1.
– Occurrence = 10 indicates that the likelihood of occurrence is very high and is “worse” than Occurrence = 1.
– Detection = 10 indicates that the failure is not likely to be detected before it reaches the end user and is “worse” than Detection = 1.
1 5 10
![Page 30: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/30.jpg)
30
Block Diagram
![Page 31: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/31.jpg)
31
![Page 32: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/32.jpg)
![Page 33: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/33.jpg)
33
![Page 34: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/34.jpg)
34
Single Chiller Plant Example
![Page 35: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/35.jpg)
35
Single Chiller Plant Example
![Page 36: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/36.jpg)
36
Utility Gas Distribution
CityGate B
LPG
HPG
CampusSubstation
13.8kV46kV
4160V
480V
Power Generation
Gas Turbine Generator SteamGeneration
GAS
CityGate A
Utility Substation A
Utility Substation B
50,000lb/ hr 50,000lb/ hr 50,000lb/ hr 50,000lb/ hr
125 HP
3000T
125 HP
125 HP
3000T
125 HP
125 HP
3000T
125 HP
125 HP
3000T
125 HP
7300 Tonhr
2000T 2000T2500 T
2000T2500 T
850 T
Public Utilities Plant Campus Utilities
Cooling Towers
Legend
Water
Electric Power
Steam
Chilled Water
Well
Storage Tank
Gas TurbineGenerator
Ice Storage
Pump
Boiler
Cooling Tower
Chiller
Switchgear
Transformer
Sewer
To WWTP
Campus Utility Systems Preparedness Planning
![Page 37: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/37.jpg)
37
Campus Utility PreparednessElectrical Concepts
• System Drawings• Operational Knowledge• Know Your Loads– Load priorities– Metering
• Spare Parts– Breakers– Electronic components
• Standby Generation
![Page 38: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/38.jpg)
38
Radial System
Source: IEEE Redbook
![Page 39: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/39.jpg)
39
Primary Selective System
Source: IEEE Redbook
![Page 40: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/40.jpg)
40
Primary Loop System
Source: IEEE Redbook
![Page 41: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/41.jpg)
41
EMERGENCYLOADS
COMBINED HEAT AND POWER ENGINE(S)
Campus Power Concept
![Page 42: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/42.jpg)
42
Utility Gas Distribution
CityGate B
LPG
HPG
CampusSubstation
13.8kV46kV
4160V
480V
Power Generation
Gas Turbine Generator SteamGeneration
GAS
CityGate A
Utility Substation A
Utility Substation B
50,000 lb/ hr 50,000 lb/ hr 50,000 lb/ hr 50,000 lb/ hr
125 HP
3000T
125 HP
125 HP
3000T
125 HP
125 HP
3000T
125 HP
125 HP
3000T
125 HP
7300 Tonhr
2000T 2000 T2500 T
2000 T2500 T
850 T
Public Utilities Plant Campus Utilities
Cooling Towers
Legend
Water
Electric Power
Steam
Chilled Water
Well
Storage Tank
Gas TurbineGenerator
Ice Storage
Pump
Boiler
Cooling Tower
Chiller
Switchgear
Transformer
Sewer
To WWTP
Campus Utility Systems Preparedness Planning
Central Water and Sewer Concepts
Multiple Municipal Feeds
Networked Distribution
On-Site Production
On-Site Storage
Lift Stations
Back Up Power
Bypass Pumping
EPA Table Top Tools
![Page 43: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/43.jpg)
43
Utility Gas Distribution
CityGate B
LPG
HPG
CampusSubstation
13.8kV46kV
4160V
480V
Power Generation
Gas Turbine Generator SteamGeneration
GAS
CityGate A
Utility Substation A
Utility Substation B
50,000 lb/ hr 50,000 lb/ hr 50,000 lb/ hr 50,000 lb/ hr
125 HP
3000T
125 HP
125 HP
3000T
125 HP
125 HP
3000T
125 HP
125 HP
3000T
125 HP
7300 Tonhr
2000T 2000 T2500 T
2000 T2500 T
850 T
Public Utilities Plant Campus Utilities
Cooling Towers
Legend
Water
Electric Power
Steam
Chilled Water
Well
Storage Tank
Gas TurbineGenerator
Ice Storage
Pump
Boiler
Cooling Tower
Chiller
Switchgear
Transformer
Sewer
To WWTP
Campus Utility Systems Preparedness Planning
Central Heating and Cooling Concepts
Parallel Process Trains
Looped Distribution
Satellite Plants
Dual Fuel Sources
![Page 44: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/44.jpg)
44
Utility Gas Distribution
CityGate B
LPG
HPG
CampusSubstation
13.8kV46kV
4160V
480V
Power Generation
Gas Turbine Generator SteamGeneration
GAS
CityGate A
Utility Substation A
Utility Substation B
50,000 lb/ hr 50,000 lb/ hr 50,000 lb/ hr 50,000 lb/ hr
125 HP
3000T
125 HP
125 HP
3000T
125 HP
125 HP
3000T
125 HP
125 HP
3000T
125 HP
7300 Tonhr
2000T 2000 T2500 T
2000 T2500 T
850 T
Public Utilities Plant Campus Utilities
Cooling Towers
Legend
Water
Electric Power
Steam
Chilled Water
Well
Storage Tank
Gas TurbineGenerator
Ice Storage
Pump
Boiler
Cooling Tower
Chiller
Switchgear
Transformer
Sewer
To WWTP
Campus Utility Systems Preparedness Planning
Central Heating and Cooling Concepts
Parallel Process Trains
Looped Distribution
Satellite Plants
Dual Boiler Fuel Sources
Thermal Storage
Standby Water
Standby Power
![Page 45: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/45.jpg)
45
Utility Gas Distribution
CityGate B
LPG
HPG
CampusSubstation
13.8kV46kV
4160V
480V
Power Generation
Gas Turbine Generator SteamGeneration
GAS
CityGate A
Utility Substation A
Utility Substation B
50,000 lb/ hr 50,000 lb/ hr 50,000 lb/ hr 50,000 lb/ hr
125 HP
3000T
125 HP
125 HP
3000T
125 HP
125 HP
3000T
125 HP
125 HP
3000T
125 HP
7300 Tonhr
2000T 2000 T2500 T
2000 T2500 T
850 T
Public Utilities Plant Campus Utilities
Cooling Towers
Legend
Water
Electric Power
Steam
Chilled Water
Well
Storage Tank
Gas TurbineGenerator
Ice Storage
Pump
Boiler
Cooling Tower
Chiller
Switchgear
Transformer
Sewer
To WWTP
Campus Utility Systems Preparedness Planning
Combined Heat and Power Concepts
Island from Utility
Load Shedding Scheme
Generate Power & Heat
Dual Fuel Sources
![Page 46: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/46.jpg)
46
![Page 47: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/47.jpg)
47
Hurricane SandyPrinceton University
• 4 day Public utility outage• Load switching strategy• Campus CHP provides 15 MW power and heat
to campus• Campus utility meets its mission– Establishes emergency response center– Offers food and shelter– Provides cell phone charging site
![Page 48: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/48.jpg)
48
Questions?
![Page 49: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/49.jpg)
49
![Page 50: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/50.jpg)
BE PREPARED
![Page 51: Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.](https://reader036.fdocuments.net/reader036/viewer/2022062619/5516f142550346f5558b4ae9/html5/thumbnails/51.jpg)