Preparation of TIF Hall for Production Andrey Marinov On behalf of GEMs for CMS Collaboration

description

Preparation of TIF Hall for Production. Andrey Marinov On behalf of GEMs for CMS Collaboration. TIF – bldg. 186. Plan of the working space. Part of the Working area. Possible Scenarios. Scenario 1 – Gluing procedure, assembly and QC at the TIF hall. - PowerPoint PPT Presentation

Transcript of Preparation of TIF Hall for Production

Page 1: Preparation of TIF Hall for Production

Preparation of TIF Hall for Production Andrey MarinovOn behalf of GEMs for CMS Collaboration

Page 2: Preparation of TIF Hall for Production

2

TIF – bldg. 186

Page 3: Preparation of TIF Hall for Production

3

Plan of the working space

Page 4: Preparation of TIF Hall for Production

4

Part of the Working area

Page 5: Preparation of TIF Hall for Production

5

Possible ScenariosScenario 1 – Gluing procedure,

assembly and QC at the TIF hall.Scenario II – Using the self

stretching method and assembly at CERN’s workshop. The TIF will be used only for QC of the final detectors.

Page 6: Preparation of TIF Hall for Production

6

Scenario I – Using the Gluing procedure and thermo stretching method.

TIF hall will be used for assembly and QC.

Page 7: Preparation of TIF Hall for Production

7

Production Flow High Eta CMS MPGDs in TIF by Using the Thermo Stretching and Gluing Method

HV test of the GEM

Foil

Heating the GEM foil in

the oven up to 37C

Gluing the foil with the

frame

Storage Foils

HV test of the GEM Frame

Storage Frames

Assembly and Gluing

Assembly the electronics and

servicesQC tests certification

cleaning

Gas tight test

Page 8: Preparation of TIF Hall for Production

8

Scenario IIUsing self stretching method

◦The detectors will be fully assembled at CERN workshop. The TIF will be used only as QC facility

Page 9: Preparation of TIF Hall for Production

9

Gas Setup

Ar

CO2

CF4

OutsideGas Zone at bldg.186

InsideBldg 186 – GEM Lab

premixed

Open/Close Valves

Exhaust LinePatch Panel

Safety ValvePressure reducer

Page 10: Preparation of TIF Hall for Production

10

Outside Gas Zone

Very Big Gas zone – enough for the production project

Page 11: Preparation of TIF Hall for Production

11

TIF Hall – Gas Infrastructure

GASMixer

8m

6m

13.2m

2.3m

7.2m

GAS access points

Mainpanel

Page 12: Preparation of TIF Hall for Production

12

QC StandsCosmic Telescope

◦Possibility to test up to 10 detectors together

X-ray stand for uniformity scan and gain calibrations.

Long Term HV test stand

Page 13: Preparation of TIF Hall for Production

13

Cosmic Telescope

Testing the GE 1/1 detectors with cosmic rays

•Time distribution• Strip Profile• Efficiency• Cluster Size

• Reconstruction of the tracks

GEM detectors

Scintilator Counters

Page 14: Preparation of TIF Hall for Production

14

X-ray Stand

Gain Calibration of the Detector

Precise Uniformity Scan

Page 15: Preparation of TIF Hall for Production

15

Long Term HV stand

GAS Supply

HV SupplyEvery detector is on independent HV channel

GAS Return

Fully monitored environmentT, H and Atmospheric pressure need to be continuously recorded

Page 16: Preparation of TIF Hall for Production

16

Plan of ActivitiesPreparing the internal gas

infrastructure◦Placing cable trays for the pipes and

cables – Ongoing, should be finished next week. 28.06.2011

◦Planning the main gas mixer based on the production and test processes requirements

Preparing the external gas setup.

Page 17: Preparation of TIF Hall for Production

17

Thank You