The concept of Electronic Energy meters are introduced in the power sector to effectively Monitor the billing faults and minimize the losses

Prepaid Energy meter is a multipurpose project which can integrate all the functions like billing and automatic message response to user

Abstract

Page 3: Prepaid Energy Meter

3

Motivation Objectives Project Work Scope of project

Outline

Page 4: Prepaid Energy Meter

4

Motivation

Page 5: Prepaid Energy Meter

5

UP is the country’s biggest center for the country’s most inefficient power sector failures

The state is also blamed for overdrawing electricity from the national grid through illegal means

According to the World Bank estimates, ignoring bill payement reduces India’s GDP by around 1.5% (Smith, 2012)

Page 6: Prepaid Energy Meter

6

A study by NDTV also concluded that 40% of the electricity in India is unpaid

Of all the power generated in the country, around 1/4th is either stolen or lost in transmission

Level of electricity losses and the economic growth rate are inversely related.

Page 7: Prepaid Energy Meter

7

Objective of the project Developing energy meter that informs

consumption

Informing consumption via SMS

Prepaid paying of electricity bills

Minimize losses

Page 8: Prepaid Energy Meter

8

Block diagramLCD

LED

Micro-controller

ATmega16

Power

Supply

GSM

Buzzer driver Buzzer

RelayBulb

ULN2003a

Pushbuttons

Page 9: Prepaid Energy Meter

9

Project Work

Page 10: Prepaid Energy Meter

10

Making a proper billing system-from shifting post paying into pre-paying system

Device would help notify amount of power consumed

LCD screen displays the power consumed and remaining balance

Inform user about prepaid recharge

Load would cutoff when balance is null

Page 11: Prepaid Energy Meter

11

Atmel ATMEGA16A Transformer LCD:16 x 2 LEDs Switches Buzzer GSM module Relay Bulb

Components used in Project

Page 12: Prepaid Energy Meter

12

Pushbuttons and buzzer

Page 13: Prepaid Energy Meter

13

Load connection

Page 14: Prepaid Energy Meter

14

GSM module

Page 15: Prepaid Energy Meter

15

Screen shot of messages received

Page 16: Prepaid Energy Meter

16

Components description

Page 17: Prepaid Energy Meter

17

Narrow operating voltage: 1-16V. Low current consumption: 3-100mA

Buzzer

Page 18: Prepaid Energy Meter

18

Supply voltage; 5V (4.7V – 5.3V) Vcc Contrast adjustment; through a variable

resistor

LCD

Page 19: Prepaid Energy Meter

19

The term GSM usually means the GSM standard and protocols in the frequency spectrum around 900MHz

The MS is the physical equipment used by a subscriber, most often a normal hand-held cellular telephone

The BTS comprises the radio transmission and reception devices, and also manages the signal processing related to the air interface

GSM COMMUNICATION

Page 20: Prepaid Energy Meter

20

This project could also be used for water usage management

These projects will help cut technical and commercial losses and improve collection efficiency

It would reduce human efforts

Scope