Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG...

124
998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z7221 01 fax: 0352722058 Premier Oil Australasia To: Victolia Minerals & Petroleum Ops, Attn: Ahmed Nadji From: Thomas Jobin Mineral Resources Tasmania, Attn: Carol Bacon BoraI, Energy Resources I Attn: A. Guthrie l Ross Naumann CalEnergy. Attn: Jane Duncan Fax: Date: July 3, 1998 Phone: Pages: 3 Re: Ibis 1 Daily Drilling Reports cc: o Urgent o For Review o Please Comment 0 Please Reply o Please Recycle -Comments: Drilling Superintendent Please find attached the final OOR for White Ibis-1. Thomas Jobin

Transcript of Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG...

Page 1: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03

Premier Oil AustralasiaGeelong Operations BasePhone: 035Z722101fax: 0352722058

Premier OilAustralasia

To: Victolia Minerals & Petroleum Ops, Attn: Ahmed Nadji From: Thomas Jobin

Mineral Resources Tasmania, Attn: Carol Bacon

BoraI, Energy Resources I Attn: A. Guthriel Ross Naumann

CalEnergy. Attn: Jane Duncan

Fax: Date: July 3, 1998

Phone: Pages: 3

Re: ~ite Ibis 1 Daily Drilling Reports cc:

o Urgent o For Review o Please Comment 0 Please Reply o Please Recycle

-Comments:

Drilling Superintendent

Please find attached the final OOR for White Ibis-1.

Reg~

~~Thomas Jobin

Page 2: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

03/07/1998 11:54 0352722058 PREMIER OIL GEELONG PAGE 02/03

PremierOil AustralasiaReport Date: 02.07.98

DAILY DRILLING REPORT # 34

White Ibis 1

Well DataCOUNTRY Australia T.D. (m RT): 0.0 CUR. HOLE SIZE ("): DAILY COST $ : $181,699FIELD Bass Basin PROGRESS (m); CSGOO("): 13.38 CUM COSTS: $10,793,373DRILL CO. : Northern Offshore DAYS FROM SPUD: 31.21 SHOE TVD (m RT); 863 AFE COST $ : $7.321,212RIG; Northern EXl'lol'er III DAYS +1- CURVE: LEAK·OFF EMW(ppg) 14.16 AFE BASIS: P&AMUD CO: DowellRT ABOVE MSL (m) : 12.5 CURRENT OP @ 0600 :

WATER DEPTH @MSL (m) ; 61.9 PLANNED OP.;RT TO SEABED em) : 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops· This report only

N/D BOP stack and secure in storage position. Retrieve wear bushing, set I FORMATION ITOP(mBRT) Icorrosion cap. Retrieve anchors. Rig off location 00:30hrs 3/7/98.

ACTIVITY FOR PERIOD 00:00 HRS TO 24:00 HRS ON 02.07.98IFROM TO HRS DEPTH ACTIVITY DESCRIPTION

01:30 1.50 o Continue to nipple down BOP stack. Remove tr27 clamp.01:30 02:00 .50 o Fire in laundry on deck 5 • haults operations. Tumble dryer caused fire. Fire

controlled I extinguished. Back to normal operations.02:00 06:00 4.00 o Continue to nipple down BOP stack. layout ball joint. Move BOP stack into

storage postion and secure. Start to move rig back over location.06:00 06:45 .75 o Moved rig over location. Jump ROV to observe internal profile of wellhead, prior

to pulling wear bushing. No obstruction was observed inside wear bushing.06:45 07:45 1.00 o M/U wear bushing RfT001 onto HWDP and run in wi utilty guide frame attached

to guide wires & HWDP.07:45 08:30 .75 o Observe latch of Rltool into the wear bushing with ROV. Pull wear bushing to

surface.08:30 09:00 .50 o Stab wear bushing Rltool into the corrosion cap profile. Function test release.

Attach supply hose to the short piece of hose on corrosion cap.09:00 09:30 .50 o Lower corrosion cap on HWDP, taping supply hose to the running string. Land

corrosion cap on the wellhead.09:30 10:15 .75 o Pump 1 bbJ of Stack Magic oil ( red colour) with barrel pump and displace with 6.

3 gal of 1:8 Stack Magic oil mix, using Koomey unit pump. Observe operationwith ROV.

10:15 10:45 .50 o ROV cut Guide Wires No's 3-2-1-410:45 13;30 2.75 a Continue anchor pulling operation, while POOH and laying out HWDP, reeling in

hose and laying out wear bushing running tool. Brute Tide working #8 anchor,Commander working #3 anchor.

13:30 16:00 2.50 a Commander proceeding to work #6 anchor. Brute Tide still busy working #8, until15:30hrs.

16:00 17:45 1.75 o Commander coming alongside rig, to make room for chain on its deck ( lockersare full) NEill taking 2 anchors, 3 penants and 1 buoy. Brute Tide workinganchor #7.

17:45 19:15 1.50 0 Brute Tide completed #7 anchor, re-arranging deck, then on stanby until NEill enroute to Geelong. Commander finished off loading onto NElli to clear her decks.

19:15 24:00 4.75 0 Commander moved over to work final anchor #2, anchor on deck 20;15.Continue working chains and NEill heaving in on wire - problems reeling wireonto drums causing delays. Brute Tide standing by.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 03.07.98

FROM TO HRS DEPTH ACTIVI1Y DESCRIPTION

00:00 00:30 .50 o Continue with NEill heaving in on wire· problems reeling wire onto drumscausing delays. Brute Tide standing by.••• RIG RELEASED AT OO:30HRS"""'.Commander and Brute Tide released to sail to Geelong. NElli left for Geelong.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 02.07.98

Copyright IDS FJty Ltd. F<btof6 report Mar 16th 1998.1 Page Number: 1

Page 3: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

03/07/1998 11:54 0352722058 PREMIER OIL GEELONG PAGE 03/03

PremierOil AustralasiaReport Date: 02.07.98

DAILY DRILLING REPORT # 34

White Ibis 1

REMARK I OBSERVATION SOLUTION I RECOMMENDATION

Pipe Stripper 'lost' in hole was not observed in well boreafter removal of BOP stack. Stripper possibly still stuck instack cavity or dropped out onto seabed when surge ofseawater passed through BOP's when stack was pulled.

ROV seabed survey, 30m radius out from well,conducted while waiting for corrosion cap to be set.

Brute Tide requires 120,000 Ltr of fuel from Geelong priorto sailing to WA with anchors.

Pilots for 'Pacific Commander' & 'Brute Tidef required at09:00hrsPilot for NElli required for 09:30hrs

Bulk figure adjustments for NElli coming off hire.To come into line with off hire soundings the followingadjustments were made to bulk figures :-167sx more 'G' cement than previously reported79sx less Barite than previously reported

Mud Properties MUD COST FOR TODAY: $0 CUMULATIVE MUD COST TO DATE: $0

Type: VISCOSllY( sec / qt ): 0 API FLUID LOSS CI· (ppm): 0 SOUDS (%vol);PV {cps}: 0 (em3/30mln) 0 K+ (ppm): 0 H20 (%vol): 0.0FROM: API FILTER CAKE

TIME: YP (lb/100sq.ft); 0 (32nds inch 0 HARD/Ca (ppm) : 0 OIL (%vol): 0

WeiGHT (ppg): 0.00 GEL 10s/10m/30m HTHP FLUID LOSS MBT (ppb eq) : 0.0 SAND:

TEMP (C): 0 (lb/100sqft) : 0 0 0 (em3/30min) 0 PM: 0.0 PH: 0.0

FANN 3/61100 0 0 0 HTHP FILTER CAKE0 PF: 0.0 PHPA: 0.0(32nds inch)

Anchor Tension(kips)

A1:

A6:A2:

A7:A3:

AS:

A4:

AS:AS:A10 :

Workboats

P. CommanderBrute Tide

Location. Fuel Barite Dfwtr P~r Cmr Bent Heli(kltr) (sx) (bbl) (bbl) (sx) (SX) (kltr)

En rout 232 724 1.762En rout 149 2.233 516

Weather & Rig data @ 24:00 hI'S

WIND SP. (Ids) : 20.0 VISIB.{nm): 10WIND DIR (deg) :300 CEILING em) :2.500PRES.(mbars): 1025 WAVES (rn) : 2.5AIR TI;MP (C): 11.0 SWELL (m): 1.0

VDL (kips: 1,344.0RIS.TENS:HEAVE (m): 1.0ROLL (deg): 1.0PITCH (deQ): 2.0

ICOMMENTS: otCommander' & "Brute" en route Geelong: 1 helicopter flights· 3 PAX.on ri§J: S PAX off rig.

Bulk Stocks Used lin Stock Used lin Stock Used lin Stock Used I fn StockDRILL WATER (bbJ):O 4,036 FUEL (bbl): 14 1,133 GEL (sx): 0 -0 HEll-FUEL (kltT) :0.0 6.7

POT WATER (bbl) = 0 1.687 BARITE (sx) : 79 4,200 CEMENT (sx) : 0 915

Drills, Permits & InspectioneDRILL TYPE DATE INSPECTIONS DATE SAFETY DE:TAILS

TRIP DRILL 14/6 BOP TEST 26/6 LTI 22/6FIRE 21/6 NEXT TeST DUE DATE 1117 MTI 28/6PIT DRILL 14/6 RIG INSPECTION 18/6 JSA ongoingINCIDENT 2516 DAYS SINCe LTA 11 #PTVV ongoing

Safety Meeting 27/6

Pump DataPumD Data -last 24 hr'$ SlowF umD Dat:l

# TYPE LNR SPM EFF Flow Spp SPM spp DEPTH MW(") (%) {gpm (psi) (psi) (m RT) (ppg)

1 National 6.50 97 30 325 2216 1.12 National 6.50 97 40 425 2216 , .1

50 600 2216 1.1

Copyright IDS pty Ltd, RbtofB report Mar 16th 1998.1 Paga Numbar: 2

Page 4: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

02/07/1998 09:31 0352722058 PREMIER OIL GEELONG PAGE 01/03

Premier Oil AustralasiaGeelong Operations BasePhone: 0352122101Fax: 0352722058

Premier OilAustralasia

To:

Fax:

Phone:

Re:

Victoria Minerals & Petroleum Ops, Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Bacon

Boral Energy Resources I Attn: A. Guthrie, Ross Naumann

CalEnergy. Attn: Jane Duncan

White Ibis 1 Daily Drilling Reports

From: Thomas Jobin

Date: July 2,1998

Pages: 3

cc:

D Urgent

-Comments:

o For Review D Please Comment 0 Please Reply D Please Recycle

Please find attached the DDR for 2rr3 July 1998.

Regards

.~:;;?~Drilling Superintendent

Page 5: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

02/07/1998 09:31 0352722058 PREMIER OIL GEELONG PAGE 02/03

PremierOil AustralasiaReport Date: 01.07.98

DAILY DRILLING REPORT # 33

White Ibis 1

Well DataCOUNTRY Australia T.D. (m RT): 0.0 CUR. HOLE SIZE ("): CAllY COST $ : $199,414FIELD Bass Basin PROGRESS (m): -2.220.0 CSG 00 ("): 13.38 CUMCOST$: $10.611.674

DRill eo. : Northern Offshore DAYS FROM SPUD: 30.21 SHOE TVD (m Rn: 863 AFE COSTS: $7.321.212RIG: Northern Explorer III DAYS +/. CURVE; LEAK-OFF EMW(ppg) 14.16 AFE BASIS: P&AMUD co; DowellRT ABOVE MSL (m) : 12.5 CURRENT OP @ 0600: Moving rig back oyer location· preparing to jump ROV.

WATER DEPTH @MSL em) : 61.9 PLANNED OP.: Pull wear bushing. Set corrosion cap. Retrieve Primary anchors

RT TO SEABeD (m) : 74.4

Summary of period 00:00 to 24:00 hI'S: Formation Tops - This report only

UD 811 DC's. Run in and tag cement plug #2 at 1824m with 15,OOOlbs. I FORMATION ITOP(mSRr?]POOH to 150m laying out excess S"DP. Set cement plug #3. Flush BOPand riser with seawater. Pull stack and layout slip joint and riser.

ACTIVITY FOR PERIOD 00:00 HRS TO 24:00 HRS ON 01.07.98.1.FROM TO HRS· DEPTH ACTIVITY DESCRIPTION

00:00 01:15 1.25 2,220 Layout last 2 stands of S" drill collars.01:15 02:30 1.25 2,220 RIH with drill pipe, tag top of cement plug #2 at 1824m (54m above the casing

shoe) with 15,OOOlbs. Circulating with 200-300ps; pump pressure.02:30 11:15 8.75 2,220 POOH to 150m. Laying out all excess 5" driIJ pipe.11 :15 11:45 .50 2,220 Rig up cement head and liines. Pressure test to 2000psi.11:45 12:00 .25 2,220 Mix and pump cement plug #3 from 150m to 105m w/10.5bbls of 15.8ppg slurry(

50sx IG') with 5bbls freshwater ahead and 2 bbls freshwater behind to balance.No displacement required - plug underdisplaced by 4 bbrs.

12:00 12:30 .50 o Break off and layout cement head and lines. Pull back to 95m slowly.12:30 13:15 .75 o Circulate clean. Flush BOP stack and riser down through choke and kill lines

with seawater.13:15 14:45 1.50 o POOH. Layout 5" drill pipe. Break 95/8" New VAM box x Butt pin pup on top of

full bore casing running tool.14:45 17:00 2.25 o Rig up to pull stack. Pull mousehole, diverter and stroke out inner barrel of slip

joint.17:00 17:30 .50 o Make up riser landing joint onto inner barrel. Collapse inner barrel and secure.17:30 18:00 .50 o Unlatch stack· observe with ROV. Move rig 15m off location towards'starboard

side. No pipe wiper obstructing wear bushing.18:00 24:00 6.00 o Nipple down 6 x rucker tensioner wires, kill and choke line hose connections.

Layout riser landing joint, slip joint and riser joints. Stand BOP stack on beams-

I nipple down same.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 02.07.98

FROM TO HRS OEPTH ACTIVITY DESCRIPTION

00:00 01:30 1.50 o Continue to nipple down BOP stack. Remove #27 clamp.01:30 02:00 .50 o Fire in laundry on deck 5 - haults operations. Tumble dryer caused fire. Fire

controlled I extinguished. Back to normal operations.02:00 06:00 4.00 o Continue to nipple down BOP stack. Layout ball joint. Move BOP stack into

storage postion and secure. Start to move rig back over location.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 01.07.98

REMARK / OBSERVATION SOLUTION / RECOMMENDATION

For re-entry of White Ibis-1 it must be remembered thatthe 95/8" lock ring has been removed.

fBrute Tide" recovered Waverider buoy 16:00hrs. Thenstood down to rest crew before anchor handlingcommences. "Commander" arrived at 24:00hrs andimmediately started working secondary anchor #5. "BruteTide" joined operations at 01 :OOhrs 2fT/98 workinganchor #1. "Commander II winching in wire on anchor #4and "Brutell winching in wire on anchor #1 at 06;OOhrs217/98.

Copyright IDS Pty Ltd, RbtofB report Mar 16th 1998.1 Page Number: 1

Page 6: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

02/07/1998 09:31 0352722058 PREMIER OIL GEELONG PAGE 03/03

PremierOil A'ustralasiaReport Date: 01.07.98

DAILY DRILLING REPORT # 33

White Ibis 1

Mud Properties MUD COST FOR TODAY: $0 CUMULATiVE MUD COST TO DATE: $0

Type: VISCOSITY( sec Jqt ): 0 API F'LUID LOSS CI- (ppm) : 0 SOLIDS (%vol):PV (cps): 0 (c:m3130min) 0 K+ (ppm): 0 H20 (%vOI): 0.0FROM: API FILTER CAKE

TIME: VI=> (lbI100sqJt): 0 (32nds inch 0 HARD/Ca (ppm) : 0 OIL (%vOI); 0

WEIGHT (ppg); 0.00 GeL 1Os/1 OmJ30m HTHP FLUID LOSS M8T (ppb eq) : 0.0 SAND:

TEMP (C): 0 (lbJ1 OOs~ft) : 0 0 0 (cm3f30min) 0 PM: 0.0 PH: 0.0

FANN 3/6/100 0 0 0 HTHP FILTER CAKE PF: 0.0 PHPA: 0.0(32nds Inch) 0

Anchor Tension(kips)

A1 ; 60.0A6: 40.0

A2: 70.0

A1: 120.0

A3: 50.0

AS: 50.0

A4: 90.0

A9:

A5: 80.0

A10 :

"Commander' at rig: "Brute" at rig; 0 helicopter flights· 0 PAX on rig; 0 PAX off rig.

RigRig

Weather & Rig data @ 24:00 hrsWorkboats

P. CommanderBrute Tide

I[COMMENTS;

Location. Fuel Barite DIWtr P1wtr Cmt Bent Heli(kltr) (sx) (bbl) (bbf) (~) (~) (kltr)245 1,982 1.794155 2,233 541

WIND SP. (kts) : 20.0WIND DIR (deg) :210PRES.(mbars): 1019AIR TEMP (C): 11.0

VOL (kips: 1,150.0VISI8.(nm) : 1 RIS.TENS:CEILING (m) : 2.500 HEAVE (m) : 0.5WAVES (m): ROLL (deg): 1.0SWELL (m): 2.0 PlTCH (deg): 1.0

Bulk Stocks Used lin Stock Used / In StoeJ< Used lin Stock Used lin StockDRILL WATER (bbl) ;50 2,780 FUEL (bbl): 11 1.146 GEL (sx): 0 -0 HEll-FUEL (kltr): 0.0 6.7

POT WATER (bbl): 0 1,643 BARITE (sx) : 0 4,279 CEMENT (sx) : 50 748

Drills, Permits & Inspection~

DRILL TYPE DATE

TRIP DRILL 14/6FIRE 21/6PIT DRILL 14/6INCIDENT 25/6

INSPECTIONS

BOP TESTNEXT TEST DUE DATERIG INSPECT10NDAYS SINCE LTA

DATE SAFETY DETAILS

2616 LTI 22161"7 MTI 2816113/6 JSA ongoing10 #F'T'N ongoing

Safety Meeting 27/6

CasinCi Pump DataCSG LOT PHASE CSGSHOE CSG SHOE PJmo Da t.a • latot 24 hrs Slow PumtJ.Data00(") MD TVD (mBRT) 'if. TYPE LNR SPM EFF Flow Spp SPM Spp DEPTH MW

13.3/8 II 14.16 863 863 (") (%) (9pm (psi) (psi) (m RT) (ppg)

I TYPE1 National 6.50 97 30 325 2216 1.1

LNGTH CSG WT GRD THREAD 2 National 6.50 97 40 425 2216 1.1(m) 10 (") Ibslft 50 sao 2216 1.1

Shoe jt 12.5 12.4 68.0 LeO N.vAM1 x Bakerlok it 11.2 12.4 68.0 Leo N.vAM Personnel: on Site =82F/Coilar jt 12.3 12.4 68.0 LBO NVAM3 x Bakerlok jt 35.5 12.4 613.0 LSO N.VAM JOB TITLE NAME COMPANY NAME #20 jts 237.7 12.4 67.0 L80 eTC Drlg Supervisor H. Knobl Premier 240jts 466.9 12.4 6B.0 LBO N.VAM N. Drlg Supervisor S. Harrison Northern 67Pup 3.1 12.4 68.0 L80 N.vAM Dowell Cement 2Wellheadjt 10.7 12.4 68.0 LBO N.VAM

Asiatic ROV 3Northern Explorer P Julier & McLeod Dowell Mud 1

Schlumberger 4Smedvig Safety 1GeoseNlc:e 2

Survey MD TVD INCL ~ CORR. 'v DOGLEG N/S E/IN TOOL TYPE

last Tool Type: Anderdrift (mRn (m RT) DEG (deg) A2. SECT (mJ30m) (m) (m)(deg) (m)

Magnetic Declination : 12.41 1,422 1,422 0.50 Anderdrift

Survey method: Min Curvature ',479 1.479 0.50 Anderdrift1,594 1,594 0.00 Anderdrift:1.680 1.680 0.50 Anderdrfft1.768 1.768 0.50 Anderdrift1.852 1.1352 1.00 Anderdrift1.937 1,937 0.00 Anderdrift1.944 1.944 0.50 Anderdrift

Copyright IDS Pty Ltd, RbtofB report Mar 16th 1998.1 Page Number: 2

Page 7: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

01/07/1998 17: 25 . 0352722058 PREMIER OIL GEELONG PAGE 01

Premier Oil AustralasiaGeelong Operations BasePhone: 0352722101Fax:O~52122058

Fax

Premier OilAustralasia

To: Dr. A V (Tony) Brown From:

Fax: 0362338338 Date:

Phon: 0362338333 Pages:1'.-

Re: White Ibls-1 Temporary Suspensio,~ CC:

Thomas Jobin

01,07.98

3

A. Guthrie. B. Ulmer

o Urgent 0 For Review 0 Please Comment 0 Please Reply 0 Please Recycle

-Comments:

Dear Dr. Brown,

Please find attached for your review and consideration the final suspensionschematic of White Ibis-1 below the mudline and dimensions of the equipmentremaining above the seabed,

Upon completion of a seabed survey of the wellhead area copies of the producedvideo will be fOl"\Narded to you as soon as possible.

If you have any questions or concerns please do not hesitate to contact me at yourconvenience.

Yours sincerely,

1~ThomasJo

Page 8: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

01/07/1998 17:25 0352722058 PREMIER OIL" GEELONG PAGE 02

D. Planned Well Status After Suspension

--I CUT ICorrosion Cap

ISmeter I --------f-+---I-

I 30" Casing r-----.145 meters I 133 meters

105 meters

150 meters

'13-3/8" Casingl----.....---+-+----+-------f Corrosion-Inhibited Mud System

863 meters

9-5/8" Casing J---------l--tI

1808 meters

70m

1878 meters

30m

1908 meters

12 114" OH

1950 meters

l 200 m I

2150 meters

2220 rneters~ ID 5

Page 9: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

01/~7/1998 17:25 0352722058 PREMIER OIL GEELONG PAGE 03

Schematic: Well Status of White Ibis·1 after Suspension t view at Mudline

~sealevell

59.S7rn

j_ - , ..

r1.83m

O.5m

__1 -

13Cf' -G;&sing I

Corrosion Cap

Top PGBfGuide Post.......----IS9.57rn below mean sea level

2.33m above Mudline

Top 30" Wellhead Housing,14-----I61 .4m below mean sea levels

O.Sm above Mudline

Mudline,61.9m belowmean sea level

Page 10: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

01/07/1998 08:45 0352722058 PREMIER OIL GEELONG PAGE 01/03

Premier 011 AustralasJaGeelong Operations BasePhone: 0352722101Fax:OS52722058

Fax

Premier OilAustralasia

To:

fax:

Phone:

Re:

Victoria Minerals & Petroleum Ops, Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Bacon

BoraI Energy Resources, Attn: A. Guthrie, Ross Naumann

CalEnergy. Attn: Jane Duncan

White Ibis 1 Daily Drilling Reports

From: Thomas Jobin

Date: July 1, 1998

Pages: 3

CC:

o Urgent

-Comments:

D For Review o Please Comment D Please Reply D Please Recycle

Please find attached the DDR for 15% July 1998.

~~ThomasJobin~Drilling Superintendent

Page 11: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

01/07/1998 08:45 0352722058 PREMIER OIL GEELONG PAGE 02/03

PremierOil AustralasiaReport Date: 30.06.98

DAilY DRILLING REPORT # 32

White Ibis 1

Well DataCOUNTRY Australia T.O. (m RT); 2,220,0 CUR. HOLE SIZE ('1: 12,25 DAilY COST $ : $203,568FIELD Bass Basin PROGRESS (m): CSGOD("): 13.38 CUM COSTS: $10,412.260DRILL eo. : Northem Offshore DAYS FROM SPUD: 29.21 SHOE TVD (m RT): 863 AFE COST $ : $7,321,212RIG: Northern Explorer III DAYS +/- CURVE; LEAK·OFF EMW(ppg) 14.16 AFE BASIS; P&AMUD CO: DowellRT ABOVE MSL (m); 12.5 CURRENT OF' @ 0600; POOH laying out 5" drill pipe. 28 stands layed out.

WATER DEPTH @MSL(m): 61.9 PLANNED OP.: Set suspensIon plug #3. POOH. Pull BOP stack and riser.

RT TO SEABED (m) : 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops - This report only

Complete Schlumberger logging and rig down. RIH with 5" cement stinger I FORMATION ITOP{m8RT)Ito TD, circulate hole clean, Set cement plugs #1 & #2. Layout BHA, drillcollars and Hang-Off tool.

ACTIVITY FOR PERIOD 00:00 HRS TO 24:00 HRS ON 30.06.98FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 02:45 2.75 2.220 Continue to log as per programme with Array Sonic toot02:45 04:15 1.50 2,220 POOH and rig down Schlumberger.04:15 05:15 1.00 2,220 Rig up pipe handler prior to RJH with 5" bull nose cement stinger on 5" drill pipe.05:15 08:30 3.25 2 1220 RIH to TD with 5" bull nose cement stinger on 5" drill pipe.08:30 09:00 .50 2,220 Circulate hole clean. Total Gas 1.5%.09:00 09:30 .50 2,220 Spot 40bbl hi-vis mud ( to support cement plug). Displace with 129bbl mud.09:30 10:00 .50 2,220 Pull back to 2150m. Rig up cement lines. Pressure test lines to 2000psi.10;00 10:30 .50 2,220 Pump 39.9 bbls of freshwater ahead. Mix & pump 114.8 bbls of 15.8ppg slurry (

560sx 'GI) at 8,5-7.5 bpm. Initial pump pressure 750psi - 350psi towards end of

job. Pump 5.8 bbls fresh water behind to balance plug.10:30 10:45 .25 2,220 Displace with 108bbls mud ( -4 bbls under displaced) @ +/- 7 bpm and 170psi.10:45 11 :15 .50 2,220 Break out cement head and lines - no backflow. POOH to 1978m11:15 12:00 .75 2,220 Circulate hole clean - add corrosion inhibitor to mud system. Spot 40 bbls hi-vis

pill.12:00 12:30 .50 2,220 Displace with 115bbls of mud.12:30 13:00 .50 2,220 Pull back to 1908m. Rig up cement lines and pressure test to 2000psi.13:00 13:45 .75 2,220 Pump 15.2 bbls of freshwater ahead. Mix & pump 33.5 bbls of 15.8ppg slurry (

163sx 'Gl) at 8.5-7.5 bpm. Pump 5.8 bbls fresh water behind to balance plug.

13:45 14:00 .25 2,220 Displace with 99.5bbls mud ( 4.5 bbls under displaced) @ +/- 7 bpm and1500psi.

14:00 14:45 .75 2.220 POOH very slowly to 1750m.14:45 15:45 1.00 2,220 Circulate hole clean wI corrosion inhibited mud.15:45 17:30 1.75 2,220 POOH, laying out excess drill pipe.17:30 21:45 4.25 2,220 Layout BHA - 63/4" and 8" drill collars and hang off tool.21:45 22:15 .50 2.220 Pipe stripper noticed missing. Stripper went through rotary table when handling

collars. Pulled 4 stands DP in attempt to retrieve t no success. Stripper mostlikely jammed in BOP stack.

22:15 24:00 1.75 2y 220 Layout 8" drill collars.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 01.07.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 01:15 1.25 2,220 Layout last 2 stands of 8" drill collars.01:15 02:30 1.25 2,220 RIH with drill pipe, tag top of cement plug #2 at 1824m (54m above the casing

shoe) with 15.000Ibs. Circulating with 200-300ps; pump pressure.02:30 06:00 3.50 2.220 POOH laying out 5" drill pipe. 28 stands layed out.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 30.06.98

Copyright IDS Pty ltd, RbtofS report Mar 16th 1998.1 Page Number: 1

Page 12: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

01/07/1998 08:45 0352722058 PREMIER OIL GEELONG PAGE 03/03

PremierOil AustralasiaReport Date: 30.06.98

CAlLY DRILLING REPORT # 32

White Ibis 1

Mud Properties MUD COST FOR TODAY: $1,442 CUMULATIVe MUD COST TO DATE: $169,819

Type: VISCOSITY( sec I qt }; 48 API FLUID LOSS Cl. (ppm) = 43,000 SOL.IDS (%vol) ; 6

PHPA PV (cps): 14 (cm3f30min) 5 K+ (ppm): 31500 H20 (%vol): 91.0API FILTER CAKE

FROM: PitYP (lbI100sq.ft): 21 (32nds inch 1 HARD/Ca (ppm) : 762 OfL (%\101); 0

TIME; 18:00 GEL 1Os/1 Oml:30m HTHP FLUID LOSS MBT (ppb eq) ; 5.0 SAND. .1

WEIGHT (ppg): 1.15 (fb/100sqft) : 5 8 0 (em3/30min) 0 PM: 1.8 PH; 10,0

TEMP (C): 0 FANN 3/61100 5 8 0 HTHP FILTER CAKE0

PF: ,3 PHPA: 0.0(32nds Inch)

Anchor Tension(kips)

A1 ; 60.0

A6: 70.0

A2; 60.0

A7: 70.0

A3; 60.0

A8: 90,0

M:40.0

A9:

AS; 60.0

A10 :

"Commander" in Geelong: "Brute" at rig; 1 helicopter flights. 6 PAX on rig; 8 PAX off rig.

Workboats

P. Commander8rute Tide

iICOMMENTS :

Location. Fuel Barite OAYtr Plwtr Cmt Bent Hell(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltr)

Geelon 269 1,353 1.856Rig 159 2.233 566

Weather & Rig data @ 24:00 hrs

WIND SP. (kts): 14.0 VISIB.(nm): 7WIND DIR (deg) : 190 CEIL.ING (m) : 2,500PRES.(mbars): 1018 WAVES (m): 1.1AIR TEMP (e): 9.0 SWELL (m): 2.2

VOL (kips: 1,050.0RIS.TENS: 68HE;AVE (m): 0.5ROL.L (deg): 1.0PITCH (deg): 1.0

Bulk Stocks Used' lin Stock Used 1 In Stock Used lin Stoel<: Used lin Stock

DRILL WATER (bb!) :100 2,831 FUEL (bbl): 13 1,157 GEL (sx): 0 -0 HELl-FUEL (kltr) :0.0 6.7

POT WATER (bbl); a 1.580 BARITE (sx): 0 4,279 CEMENT (sx): 70a iSB

Drills, Permits & Inspection~

DRILL TYPE DATe

TRIP DRILL 14/6FIRE 21/6PIT DRIL.L. 14/6INCIDENT 25/6

Casina

INSPECTIONS

80PTESTNEXT TEST DUE DATERIG INSPECTIONDAYS SINCE LTA

DATE SAFETY DETAIL.S

26/6 LTI 22/61117 MTI 281618/6 JSA ongoing9 #PTW ongoing

Safety Meeting 27/6

Pump DataCSGODn

13.3/8 II

LOT PHASE CSG SHOE CSG SHOEMD TVD (mBRT)

14.16 863 863

PumD Dab -Ia~tt 24 hrs# TYPE LNR SPM EFF Flow SPP

(") (0/0) (gpm (psi)

SlowPumc Dat31SPM spp DEPTH MW

(psi) (m RT) (ppg)

68.0 L80 N,VAM68.0 L80 N.VAM Personnel: on Site = 8268.0 L80 N,VAM68.0 L80 N,VAM J08 TITLE NAME COMPANY NAME #67.0 L80 BTC Dng SupeNisor H. Knobl Premier 268.0 LBO N.VAM N. Drl9 SupervIsor S. Harrison Northern 6768.0 LSO N.VAM Dowell Cement 268.0 L80 NVAM

Asiatic ROV 3Northern Explorer P Julier & Mcl.eod Dowell Mud 1

Schlumberger 4Smedvlg Safety ,Geoservrce 2

I TYPE LNGTH CSG(m) [0 (")

ShoeJt 12.5 12.41 x Bakerlok jt 11.2 12.4F/Collar jt 12.3 12.43 x Bakerlok jt 35.5 12.420jts 237.7 12.440 jts 466.9 12.4Pup 3.1 12.4Wellheadjt 10.7 12.4

wr GRD THREADIbslft

1 National 6.50 972 National 6.50 97

30 325 2216 1.140 425 2216 1.150 600 2216 1.1

Survey MD TVD INCL /4Z. CORR. ·v DOGLEG NIS EM! TOOL TYPE

Last Tool Type : Anderdrift (mRn (m RT) DEG (deg) AZ. SECT (mf30m) em) em)(des) em)

Magnetic Declination : 12.41 1,422 1,422 0.50 Anderdrlft

Survey method: Min Curvature 1,479 1.479 0.50 Anderdrift1,594 1.594 0.00 Anderdrift1,6BO 1.680 0.50 Anderdrift1,768 1.768 0.50 Anderdrift1,652 1.852 1.00 Anderdrift1.937 1,937 0.00 Anderdrift1,944 1,944 0.50 Anderdrffl:

Copyright IDS Pty L.td. RbtofB report Mar 16th 1998.1 Page Number: 2

Page 13: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

30/06/1998 09:22 0352722058 PREMIER OIL GEELONG PAGE 01/03

Premier Oil AustralasiaGeelong Operations BasePhone: 0352722101Fax: 0352122058

Fmc

Premier OilAustralasia

To:

Fax:

Phone:

Re:

Victoria Minerals &Petroleum Ops. Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Bacon

Boral Energy Resources. Attn: A Guthrie, Ross Naumann

CalEnergy. Attn: Jane Duncan

White Ibis 1 Daily Drilling Reports

From: Thomas Jobin

Date: June 30.1998

Pages: 3cc:

o Urgent

•Comments:

o For Review D Please Comment 0 Please Reply o Please Recycle

Please find attached the DDR for 30mJune 1998.

Rega~

~~~~~II

Thomas Jobin

Drilling Superintendent

Page 14: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

30/08/1998 09:22 0352722058 PREMIER OIL GEELONG PAGE 02/03

PremierOil AustralasiaReport Date: 29.06.98

DAILY DRILLING REPORT # 31

White Ibis 1

Wen DataCOUNTRY Australia T.D. (mRn: 2.220.0 CUR. HOLE SIZE ("): 12.25 DAilY COST $ : $255,575FIELD Bass Basin ~ROGRESS (m): CSG 00 ("): 13.38 CUM COSTS: 510.208.692DRILL eo. : Northern Offshore DAYS FROM SPUD: 28.21 SHOE TVD (m RT): 863 AFE COSTS: $7,32',212RIG: Northern Explorer III DAYS +-1· CURVE: LEAK·OFF EMW(ppg) 14.16 AFE BASIS: P&AMUD CO: DowellRT ABOVE MSL (m) ; 12.5 CURRENT OP @ 0600: RIH to TO with 5" bull nose cement stinger on 5" drill pipe.

WATER DEPTH@MSL (m): 61.9 PLANNED OP.: Circulate hole clean, Set suspension plugs, Pull stack and riser.

RT TO SEASED (rn) : 74.4

Summary of period 00:00 to 24:00 hrs: Fonnation Tops· This report only

Complete CMR-NGT logging. Run CST tool- recover 100% of sidewall I FORMATION ITOP(mBRT) Icores. Rig up and run vSP - after several tool problems. Rig up and RIHwith Array Sonic tool. Start Array Sonic logging,

ACTIVITY FOR PERIOD 00:00 HRS TO 24:00 HRS ON 29.06.98IFROM TO HRS DEPTH ACTIVllY DESCRIPTION

00:00 01:30 1.50 2,220 Continue logging CMR-NGT as per programme.01:30 02:00 .50 2,220 Complete CMR-NGT logging - tune tool to check validity of data. POOH.02:00 03:00 1,00 2,220 Rig down CMR-NGT tool string. Rig up CST side wall coring tool. Radio silence.03:00 04:00 1,00 2,220 With CST tool still on drill floor, cable head repaired after loss of insulation on

power fine for caliper.04:00 06:00 2.00 2,220 RIH with CST tool string. Obtain sidewall cores.06:00 08:00 2.00 2,220 POOH with sidewall coring tool.08:00 10:45 2.75 2,220 Recover 30 sidewall cores· 100% recovel)'· Layout tools. Rig up VSP.10:45 11:15 .50 2,220 RIH with VSP to +/- 80m. Pull back to surface· change out tension compression

sub.11:15 12:15 1.00 2,220 RIH with VSP to 1500m, attempt to test tool function. Could not open caliper.12:15 13:30 1.25 2,220 POOH again wI VSP. Open and service tool. Caliper has diffiCUlty opening up

horizontaly while tool is laying on stands. Turning the tool 90deg so the caliperarm is facing downwards - caliper arm opens OK.

13:30 15:30 2.00 2,220 RIH with VSP. Start logging from bottom up. Complete 3 levels from 41. Havingdifficulties closing caliper arms prior to moving to next station.

15:30 16:15 .75 2,220 Further 4 levels VSP logged ( 7 from 41)16:15 22:00 5.75 2,220 Continue to POOH taking remaining 34 levels with VSP logging tool.22:00 22:30 .50 2,220 Layout VSP tool and pick up Array Sonic tool string.22:30 24:00 1.50 2,220 RIH and log as per programme with Array Sonic tool.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 30.06.98

FROM TO HRS DEPTH ACTIVITY DESCRJPTION

00:00 02:45 2.75 2,220 Continue to Jog as per programme with Array Sonic tool.02:45 04:15 1.50 2,220 POOH and rig down Schlumberger.04:15 05:15 1.00 2,220 Rig up pipe handler prior to RIH with 51r bull nose cement stinger on 5" drill pipe.05:15 06:00 .75 2,220 RJH to TO with 5" bull nose cement stinger on 5" driIJ pipe,

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 29.06.98

Mud Properties MUD COST FOR TODAY; $204 CUMULATIVE MUD COST TO DATE; $168,378

Type: VISCOSITY( sec / qt ): 52 AF'I FLUID LOSS Cl· (ppm): 43.000 SOUDS (%voJ) : 6PV (cps): 13 (cm3130mln) 5 K+ (ppm): 31500 H20 C%vol): 91.0PHPA API FILTER CAKE

FROM; Pit' Y? (lb/100sq.ft): 24 (32nds inch 1 HARD/Ca (ppm) : 882 OIL (%vol): 0

TIME: 21;00 GEL 10s/1Om/30m HTHP FLUID LOSS MBT (ppb eq) : 5.0 SAND: .1

WEIGHT (ppg); 1.16 (lb/100sqft) : 6 10 0 (cm3130min) 0 PM; 2.0 PH: 10.0

TEMP (C): 0 FANN 3/6/100 6 9 0 HTHP FILTER CAKE PF: .4 PHPA: 0.0(32nds inch) 0

Copyright IDS Ply Ltd. RbtofB report Mar 16th 1998.1 Page Number; 1

Page 15: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

30/05/1998 09:22 0352722058 PREMIER OIL GEELONG PAGE 03/03

PremierOil AustralasiaReport Date: 29.06.98

CAlLY DRILLING REPORT # 31

White Ibis 1

Anchor Tension(kips)

A1 : 50,0

A6: 70.0

A2: 60.0

A7: 70.0

A3; 70,0

A8: 90.0

A4; 50.0

A9:

AS: 60.0

A10 :

Workboats

F>. CommanderBrute TIde

Location, Fuel Barite DJlNtr PfMr Cmt Bent Hell(kltr) (sx) (hhl) (hhl) (sx) (sx) (kltr)

rig 269 ',353 1,856Geelon 178 2,233 327

Weather & Rig data @ 24:00 hrs

WIND SP. (kts): 13.0 VISIB.(nm): 8WIND DIR (deg) : 190 CEILING (m) : 2,500PRES.(mbars); 1012 WAVES (m) : .9AIR TEMP (C): 11.0 SWELL (m) : 2.0

VOL (kips: 890.0RIS.TENS: 68HEAVE (m): 0.8ROLL (deg): 1.5PITCH (deg): 1.0

ICOMME:NTS : "Commander" at rig; "Brute" in Geelong; 2 helicopter flights - 0 PAX on rig: 13 PAX off rig.

Bulk Stocks Used lIn Stock Used lIn Stock Used lIn Stock Used lin Stock

D~ILLWATE:R (bbl) :0 2,931 FUEL (bbl): 10 1,170 GeL (sx) : 0 -0 HE:L1-FUEL (kltr) : 0.0 6.7

POT WATER (hbl): 0 1.517 BARITE (sx): 0 4,279 CEMENT (sx) : 0 1,506

Drills, Permits & Inspection~

DRILL TYPE DATE

DRILL 14/6FIRE 21/6PIT DRILL 14/6INCIDENT 25/6

INSPECTIONS

BOP TESTNEXT TEST DUE DATERIG INSPECTIONDAYS SINCE LTA

DATE SAFETY

2616 LTI 221611n MTI 28/618/6 JSA ongoing8 #PTW ongoing

Safety MeetIng 27/6

DETAILS

Casina Pump DataCSG LOT PHASE CSG SHOE CSGSHOE Pum D Data· last 24 hrs Slow PumD Oata.00(") MD TVD (m6Rn # TYPE LNR SPM EFF Flow SPP SPM SPP DEPTH MW

13.3/8 " 14.16 863 863 (") (%) (gpm (psi) (psi) (m RT) (ppg)

National1 6.50 97 30 325 2216 1.1TYPE LNGTH CSG \NT GRD THREAD 2 National 6.50 97 40 425 2216 1.1

(m) 10(") Ibslft 50 600 2216 1.1

Shoe jt 12.5 12.4 68.0 L80 N.VAM1 x 8akerlok jt 11.2 12.4 68.0 LaO N.VAM Personnel : on Site = 84f/Collar it 12.3 12.4 68.0 L80 N.VAM3 x Bakerlok jt 35.5 12.4 68.0 L80 N.VAM Joe TITLE NAME COMPANY NAME #20 jts 237.7 12.4 61.0 L80 BTC Drlg Supervisor H. Knobl Premier 340 jts 466.9 12.4 68.0 LSO N.VAM N. Drlg Supervisor S. Harrison Northern S8Pup 3.1 12.4 68.0 L80 NVAM

Res. Engineer T. Fontaine Dowell Cement 2Wellheadjt 10.7 12.4 66.0 LSO N.VAMAsiaticROV 3

Northern Explorer P Julier & McLeod Dowell Mud 1Schlumberger 4Smedvig Safety 1Geoservice 2

Survey MD NO INCL J!.2. CORR. .V' DOGLEG N/S ENV TOOL TYPE

Last Tool Type: Anderdrift(m RT) em RT) DEG (deg) 1>2. SECT (m/30m) (m) em)

(deg) (m)

Magnetic Declination: 12.41 1,422 1,422 0,50 Anderdrift

Survey method: Min Curvature 1,479 1,479 0.50 Anderdrift1.594 1,594 0.00 Anderdrift1,680 1.680 0.50 Anderdrift1,76S 1,768 0.50 Anderdrift1.852 1,852 1.00 Anderdrift1,937 1,937 0.00 Anderdrlft1,944 1,944 0.50 Anderdrift

Copyright IDS Pty Ltd. RbtofB report Mar 16th 1995.1 Page Number: 2

Page 16: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

29/06/1998 09:20 0352722058 PREMIER OILGEELONG PAGE 01/

Premier Oil AustralasiaGeelong Operations BasePhone: 0352722101Fax: 0352722058

Fax

Premier OilAustralasia

To:

Fax:

Victoria Minerals & Petroleum Ops, Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Bacon

Boral Energy Resources, Attn: A. Guthrie, Ross Naumann

CalEnergy. Attn: Jane Duncan

From: Thomas Jobin

Date: June 29, 1998

Phone: :3Re: White Ibis 1 Daily Drilling Reports cc:

o Urgent .0 For Review

eComments:

o Please Comment 0 Please Reply o Please Reeyele

Please find attached the DDR for 29'tl June 1998.

Rega;;~'~...~

Thomas J .

Drilling SUp!rintendent

Page 17: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

29/05/1998 09:20 0352722058 PREMIER OIL GEELONG PAGE 02/03

PremierOil AustralasiaReport Date: 28.06.98

DAfLY DRILLING REPORT # 30

White Ibis 1

Well DataCOUNTRY Australia T.D. (m RT) : 2.220.0 CUR. HOLE SIZE {"}: 12.25 DAilY COST $ : $481,191FIELD Bass Basin PROGRESS (m): CSG 00 ("); 13.38 CUMCOST$: $9,953,117DRilL CO. : Northern Offshore DAYS FROM SPUD: 27.21 SHOE ND (m Rn: 863 AFECOST$: $7,321.212RIG: Northern Explorer III DAYS +/- CURVE; LEAK-OFF EMW(ppg) 14.16 AFE BASIS: F'&AMUD CO: DowellRT ABOVE MSL em) ; 12.5 CURRENT OP @ 0600: Performing wiretine sidewall coring.

WATER DEPTH @MSL(m): 61.9 PLANNED OP. : Complete sidewall coring, Perform VSP and Array sonie logs. P&A well.

RT TO SEABED (m) ; 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops .. This report only

Log MDT - 2 samples taken, POOH to change out packer element, Log I FORMATION ITOP(mBR1) IMDT - 2 samples & 3 further pressure points, POOH to change out packerelement, Log MDT 1 sample(water}. POOH Rig down MDT Rig up andRrH with CMR-NGT. Log with CMR-NGT

ACTIVITY FOR PERIOD 00:00 HRS TO 24:00 HRS ON 28.06.98FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 06:00 6.00 2.220 Continue logging with MDT logging suite. Complete pressure points as perprogram. Take fluid samples as per program. 2 Samples taken.

06:00 07:00 1.00 2,220 POOH with MDT - change packer element.07:00 11:15 4.25 2,220 RIH with MDT to take 2 more samples and 3 more pressure points. Seal failed

again attempting to take last sample (water sample).11 :15 12:30 1.25 2,220 POOH with MDT .. change packer element.12:30 16:30 4.00 2,220 RIH with MDT again and take last sample (water).16:30 18:00 1.50 2,220 POOH with MDT - open & drain first and last (water) sample. No H2S. Layout

MDT tool string.18:00 19:00 1.00 2,220 Rig up CMR-NGT logging suite.19:00 24:00 5.00 2 t 220 RIH with CMR-NGT. Log as per programme.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 29.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 01:30 1.50 2,220 Continue logging CMR-NGT as per programme.01:30 02:00 .50 2,220 Complete CMR-NGT logging - tune tool to check validity of data. POOH.02:00 03:00 1.00 2,220 Rig down CMR-NGT tool string. Rig up CST side wall coring tool. Radio silence.03:00 04:00 1.00 2,220 With CST tool still on drill floor, cable head repaired after loss of insulation on

104:00power line for caliper.

06:00 2,00 2,220 RIH with CST tool string. Obtain sidewall cores.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 28.06.98

REMARK I OBSERVATION SOLUTION I RECOMMENDATION

Order of logging runs adjusted to fit with weatherconditions and tools available on deck. Unable to runVSP fogs due to weather being still to rough to hang gunsover side with crane. Array sonic logging tools en routefrom Geelong to rig on board the Pacific Commander.

Mud Properties MUD COST ~OR TODAY: SO CUMULATIVE MUD COST TO DATE: $168.174

Type: VISCOSITY( sec I qt ): 52 API FLUID LOSS CI· (ppm): 43,000 SOUDS (%\101) : 6PV (cps): 13 (cI1'l3/30min) 5 K+ (ppm): 31500 H20 (%\101): 91.0PHPA A.PI FILTER CAKE

FROM: PitYP (lb/100sq.ft): 24 (32ndsinch 1 HARD/Ca (ppm) : 882 OIL (%vo[): 0

TIME: 21:00 GEL 1Os/1 Om130m HTHP FLUID LOSS MBT (ppb eq) : 5.0 SAND: .1

WEIGHT (ppg); 1.16 (lb/1 OOsqft) : 6 10 0 (em3130min) 0 PM: 2.0 PH: 10.0

TEMP (C): a FANN 3/6/100 6 9 0 HTHF' FILTER CAKE PF: .4 PHPA: 0.0(32nds inch) 0

Copyright IDS Pty Ltd. RbtofB report Mar 16th 1998.1 Page Number: 1

Page 18: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

29/05/1998 09:20 0352722058 PREMIER OIL GEELONG PAGE 03/03

PremierOil AustralasiaReport Date: 28.06.98

DAllY DRilliNG REPORT # 30

White Ibis 1

Anchor Tension(kips)

A1 : 45.0

A6: 75.0

A2: 50.0

A7: 80,0

A3: 80.0A8: 65.0

A4: 120.0

A9: 75.0

AS: 75.0

A10 :

Workboats

P. CommanderBrute Tide

Location, Fuel Barite Olwtr Pi\Ntr Cmt Bent Hali(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltr)

en roub 299 1,982 1,951rig 178 2,233 327

Weather & Rig data @ 24:00 hrs

WIND SP. (kts) ; 2a,0 VISIB.(nrn): 10WINO D"~ (deg) :310 CEILING (m) ;2.200PRES.(mbars): 1007 WAVES (m): 1.8AIR TEMP {Cl: 11.0 SWELL (m): 3.2

VDL (kips: 846.0RJS.TE;NS~ 68HEAVE (01): 2.2ROLL (deg): 4.0PITCH (deg): 1.5

ICOMMENTS: "Commander" en route rig: "Brute" at rig; 0 helicopter flights - 0 PAX on rig: 0 PAX off rig.

Bulk Stocks Used / In Stoek Used lin Stock Used lin Stock Used 1 In Stock

ORILLWATER{bbl):O 2,931 FUEL(bbl): 13 1,180 GEL{sx): 0 -0 HELI·FUEL(kIU):O,O 6.7

POT WATER (bbl): 0 1.391 BARITE (sx): 0 4.279 CEMENT (sx); 0 1.506

IDrills, Permits & InspectionsDRILL TYPE DATE

TRIP DRILL. 14/6FIRE 21/6PIT DRILL 14/6INCIDENT 2516

INSPECTIONS

BOP TeSTNEXT TEST DUE DATERIG INSPECTIONDAYS SINCE lTA

DATE

26/611/718/67

SAFETY

LTIMTIJSA#PlWSafety Meeting

22/628/6ongoingongoing27/6

DETAILS

CasinQ Pump DataPumD Data -last 24 hrseSG

oon13.3/8 rr

LOT PHASE eSG SHOE eSG SHOEMO NO (mBRT)

14,16 863 863'# TYPE LNR SPM EFF Flow

(U) (%) (gpmsPP SPM(psJ)

Slow PumD DataSpp DEPTH MW(psi) (m R.T) (PP9)

L80 N,VAMPersonnel: on Site =97LSO N,VAM

Leo N.VAMLao N.vAM JOB TITLE -NAME COMPANY NAME #L80 BTC Drlg Supervisor H. Knobl Premier 4l80 NVAM N. Drl9 Supel"t'isor S. Harrison Northern 68L80 NVAM Geologist K. Frankiewicz Dowell Cement 2L80 NVAM

Res. Engineer T. Fontaine Asiatic ROV 3Dowell Mud 1

Northern Explorer P Julier & McLeodSmedvig Safety ,Geoservice 2Schlumberger 12PCS 3Baker 1

TYPE

Shoe jt1 x Bakertok jtF/Collar jt3 x Bakerlok jt20 jts40 jtsPupWellheadjt

LNGTH eSG WT(m) 10 C1 Ibglft

12,5 12,4 68,011.2 12,4 68,012.3 12.4 e8.035,5 12.4 68.0

237.7 12.4 67,0466.9 12.4 68.0

3.1 12.4 68.010.7 12.4 68.0

GRD THREAD1 National 6.50 972 National 6,50 97

304050

325 2216 1,1425 2216 1.1600 2216 1.1

Survey MO TVO INCL AZ. CORR. ''1 DOGLEG N/S EJW TOOL TYPE

last Tool Type: Anderdrift (m RT) (mRT) DEG (deg) AZ. SECT (mf30m) (m) (m)(deg) em}

Magnetic Declination : 12.41 1,422 1,422 0.50 Anderdrift

Survey method : Min Curvature 1,479 1,479 0.50 Anderdrift1,594 1,594 0.00 Anderdrift1,680 1.680 0.50 Anderdrift1,766 1.166 0.50 Anderdrift',852 1,852 1.00 Anderdrift1,937 1,931 0.00 Anderdrift1,944 1,944 0.50 Anderdrift

Copyright IDS pty ltd. RbtofB report Mar 16th 1998.1 Page Number: 2

Page 19: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

28/06/1998 10:32 0352722058 PREMIER OIL GEELONG PAGE 01/03

Premier Oil AustralasiaGeelong Operations BasePhone: 0352722101Fax; 0352722058

Fax

Premier OilAustralasia

To:

Fax:

Phone:

Re:

Victolia Minerals & Petroleum Ops. Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Bacon

80ral Energy Resources, Attn: A. Guthrie, Ross Naumann

CalEnergy. Attn: Jane Duncan

White Ibis 1 Daily Drilling Reports

From: Thomas Jobin

Date: June 28, 1998

Pages;

cc:

D Urgent

-Comments:

o For Review o Please Comment 0 Please Reply D Please Recycle

Please find attached the DDR for 2Strl June 1998.

Reg,S

~~~~ThomasJO~{/ _ ..

Drilling Superintendent

Page 20: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

28/05/1998 10:32 0352722058 PREMIER OIL GEELONG PAGE 02/03

PremierOil AustralasiaReport Date: 27.06.98

DAILY DRILLING REPORT # 29

White Ibis 1

Well DataCOUNTRY Australia T.D. (m RT): 2.220.0 CUR. HOLE SIZE ("): 12.25 DAilY COST $ . $290.761FIELD Bass Basin PROGRESS (m): CSGOD(") : 13.38 CUM COSTS: $9,471,926

DRILL CO. : Northern Offshore DAYS FROM SPUD; 26.21 SHOE TVD (m RT): 863 AFE COSTS: $7.321.212

RIG: Northern Explorer III DAYS +/- CURVE: LEAK-OFF EMW(ppg) 14.16 AFE BASIS: P&AMUD CO: Dowell

RT ABOVE MSl (m) : 12.5 CURRENT OP @ 0600: Fluid sample gathering with MDT logging tool

WATeR DEPTH@MSl (m): 61.9 PLANNED OP.: Complete logging programme

RT TO SEABED (m) : 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops· This report only

Rig down PEX-CNL-GR. Rig up FMS-Array sonic. Array sonic failed during j FORMATION ITOP(mBRnl

surface test - replace with SHC sonic module. Log FMS • log SHC sonicup to 1975m - cable head failure. Replace cable head -complete sonic log.Rig up and run MDT logs.

ACTIVITY FOR PERIOD 00·00 HRS TO 24:00 HRS ON 27 06.98.FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 01:30 1.50 2,220 Continue to rig down logging suite #1 PEX-CNL·GR. Rig up logging suite #2FMS Array Sonic.

01:30 04:00 2.50 2,220 During surface testing of logging suite #2, Array Sonic module failure observed.Faulty module changed out for back up SHC sonic module.

04:00 07:00 3.00 2,220 RIH with FMS-BHC Sonic, logging suite #2. Log FMS from basement up to 95/8" shoe. Log SHe sonic up to 1975m.

07:00 08:30 1.50 2,220 POOH FMS -SHC sonic logging suite from 1975m due to cable head failure,08:30 10:45 2.25 2,220 Change cable head & tension compression sub.10:45 12:00 1.25 2,220 Run back in hole with BHC sonic logging tool. Log up from 1980m to casing

shoe. POOH12:00 13:00 1.00 2,220 Layout tools· pick up MDT.13:00 24:00 11.00 2,220 RIH with MDT Jogging tool, taking pressure points from 1976m - top down as per

program.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 28.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 06:00 6.00 2,220 Continue logging with MDT logging suite. Complete pressure points as perprogram. Take fluid samples as per program.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 27.06.98

Mud Properties MUD COST FOR TODAY: $0 CUMULATIVE MUD COST TO DATE: $168,174

Type: VISCOSliY( sec I qt ): 48 API FLUID LOSS cr- (ppm); 43.000 SOLIDS (%vol) : 6F'V (eps) : 13 (cm3!30mln) 5

K+ (ppm): 31500 H20 (%vol): 91.0PHPA API FILTER CAKEFROM: Pit

YP (lb/100sq.f1); 24 (32nds inch 1 HARD/Ca (ppm) ; 882 OIL ('%vol) : 0

TIME: 19:00 GEL 10$11 Om!30m HTHP FLUID lOSS MBT (ppb eq) ; 5.0 SAND: .1

WEIGHT (PP9): 1.16 (fb/100sqft) : 6 10 0 (cm3130min) 0 PM: 2.0 PH: 10.0

TEMP (C): 0 FANN 3/6/100 6 9 0 HTH? FILTE~ CAKE F'F: 3.5 PHPA: 0.0(32nds inch) 0

Anchor Tension A1 : 40.0 A2: 50.0 A3:110.0 A4: 120.0 A5: 130.0

(kips) AS: 100,0 A7: 60.0 A8: 70.0 A9: A10 :

Workboats Location. Fuel Barite DNAr PNltr Cmt Bent Heli Weather & RIg data @ 24:00 hrs(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltt) VOL (kips: 812.0

P. Commander en routl 299 1,982 1.951 WIND SF'. (kts) : 25.0 VISIB.(nm) : 7 RIS.TENS: 68Brute Tide rig 185 2.233 352 WIND DIR (deg) ; 0 CEILING (rn) ; 2.500 HEAVE (m): 1.0

PRES.(mbars): 1012 WAVES (m): 3.4 ROll (deg) : 2.0AIR T~MP (e) : 10.0 SWEL.L (m): .9 PITCH (deg): 1.0

ICOMMENTS; "Commander" en route Geelong: "Brute" at rig: 1 helicopter tlight1 - 5 PAX on rig; 4 PM off rig. I

Copyright IDS Pry Ltd, ~btofB report Mar 16th 1998.1 Page Number: 1

Page 21: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

28/05/1998 10:32 0352722058 PREMIER OIL GEELONG PAGE 03/03

PremierOil AustralasiaReport Date: 27.06.98

DAILY DRILLING REPORT # 29

White Ibis 1

Bulk Stocks Used lin Stock Used lin Stock Used lin Stock Used / In StockDRILL WATER (bbl):O 2.931 FUEL (bbl): 6 1,193 GEL (sx) : 0 -0 HEll-FUEL (kltr) : 0.3 6.7POT WATER (bbl): 0 1,327 BARITE (sx) : 0 4,279 CEMENT (sx) ; 0 1,506

Drills, Permits & Inspection~

DR1LL TYPE DATI; INSPECTIONS DATE SAFElY DETAILS

TRIP ORILL 14/6 BOP TEST 26/6 LTI 22/6FIRE 21/6 NexT TI;ST DUE DATE 11n MTI 216PIT DRILL 1416 RIG INSPECTION 18/6 JSA ongoingINCIDENT 25/6 DAYS SINCE LTA 6 #PTW ongoing

Safety Meeting 27/6

Casina Pump DataeSG LOT PHASE CSG SHoe CSGSHOE PumD Data .Ia t 24 hrs Slow PumD Data00(") MD 1VD{mBRT) # TYPE LNR SPM EFF Flow SPP SPM SPP DEPTH MW

13.3/S .. 14.16 863 B63 (") (%) (gpm (psi) (psi) (m R1) (ppg)

97 325 2216 1.1II. 1 National 6.50 30TYPI; LNGTH CSG WT GRD THREAD 2 National 6.50 97 40 425 2216 1.1

(m) 10 (IT) lbslft 50 600 2216 1.1

Shoe jt 12.5 12.4 68.0 L80 N.VAM1 x Bakerfok jt 11.2 12.4 68.0 L80 N.VAM Personnel: on Site =97F/Collar jt 12.3 12.4 68.0 LBO N.VAM3 x Bakerlok jt 35.5 12.4 68.0 L80 NVAM JOe TITLE NAME COMPANY NAME #20 jts 237.7 12.4 67.0 L80 BTC Drlg Supervisor H. Knobl Premier 440 jts 466.9 12.4 68.0 LBO NVAM N. Drig Supervisor S. Harrison Northern 68Pup 3.1 12.4 68.0 L80 NVAM

Geologist K. Frankiewicz Dowell Cement 2Wellheadjt 10.7 12.4 68.0 1..80 N.VAM

Res. Engineer T. Fonraine Asiatic ROV 3Dowell Mud 1

Northern Explorer P Julier & McleodSmedvig Safely 1Geoservice 2Schrumberger 12pes 3Baker 1

Survey MD TVD INCL AZ. CORR. .V' DOGLEG N/S Ef\N TOOL TYPE

Last Tool Type: Anderdrift(m RT) (mRn DEG (deg) Ai.. seCT (rn/30m) (m) (m)

(deg) (m)

Magnetic Declination : 12.41 1,422 1,422 0.50 Anderdrift

Survey method : Min Curvature 1,479 1,479 0.50 Anderdrift1,594 1,594 0.00 Anderdrift1,680 1,680 0.50 Anderdrift1.768 1,768 0.50 Anderdrjft',852 1,652 1.00 Anderdtlft1,937 1.937 0.00 Anderdrift1,944 1,944 0.50 Anderdrift

Copyrlght IDS Ply Ltd. RbtofB report Mar 16th 1998.1 Page Number; 2

Page 22: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

27/05/1998 09:45 0352722058 PREMIER OIL GEELONG PAGE 01

Premier Oil AustralasiaGeelong Operations BasePhone: 0352722101Fax: 0352722058

Fax

Premier OilAustralasia

To:

Fax:

Victoria Minerals & Petroleum Ops, Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Bacon

Boral Energy Resources, Attn: A. Guthrie, Ross Naumann

CalEnergy. Attn: Jane Duncan

From: Gordon Hunter

Date: June 27, 1998

Phone: Pagea: La(

Re: White Ibis 1 ~c:iIYw,~,_r_iII_jn-=-g_R_e-=-p_o_rts C_C_: ~ , _

o Urgent

-Comments:

o For Review o Please Comment 0 Please Reply o Please Recycle

Please find attached the DDR for 27~ June 1998.

Re-,s~/04/~

Thomas JObi#' I

Drilling Superintendent

Page 23: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

21/06/1998 09: 45 . 0352122058 PREMIER OIL GEELONG PAGE 02

PremierOil AustralasiaReport Date: 26.06.98

CAlLY DRILLING REPORT # 28

White Ibis 1

Well DataCOUNTRY Australia T.D, (m RT): 2.220.0 CUR. HOLE SIZE ("): 12.25 DAILY COST $ : $210,995FIELD Bass Basin PROGRESS (m): CSG 00 ("): 13.38 CUM COSTS: $9,181,165DRJLLCO. : Northern Offshore DAYS FROM SPUD: 25.21 SHOE TVD (m RT): 863 AFE: COST $: $7,321.212RIG: Northern Explorer III DAYS +/- CURVE: LEAK·OFF EMW(ppg) 14.16 AFE BASIS: P&AMUD CO: DowellRT ABOVE MSL (m) ; 12.5 CURRENT OP @ 0600: L.ogging with suite #2, FMS· Array Sonic

WATER DEPTH @MSL (m) : 61.9 PLANNED OP.: Complete logging programmeRT TO SEABED (m) : 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops· This report only

M/U 8 1/2" drilling assembly, tag TOC, drill out plugs and collar, drill out I ~ORMATION ITOP{mBRl) Ishoe track and shoe. Clean hole to 2216m, wiping ledge at 2176m.POOH, rig up and RIH with PEX·CNL·GR logs. Log and POOH wI loggingsuite #1.

ACTIVITY FOR PERIOD 00'00 HRS TO 24:00 HRS ON 26.06.98FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 00:30 .50 2,220 POOH wI BOP test plug.00:30 01:00 .50 2,220 RtH and set wear bushing.01:00 01:30 .50 2,220 POOH wI wear bushing running tool.01:30 05:15 3.75 2,220 MU new BHA #7, w/8 1/2" HTC JG-8 bit (w/3 x 20's), 6 x 6 314" DC, & 9 x

HWDP, &RIH to 1853m.05:15 06:00 .75 2,220 Tag TOe @ 1852m. MU TDS, Drill cement from 1852 • 1853.5m, with 600-

850gpm, 2000-3000psi, 40-80rpm; indications of spinning on top of plug.06:00 07:15 1.25 2,220 Drill through plugs & float from 1853.5m - 1854.5m07:15 09:15 2.00 2,220 Drilled cmt from 1854.5m and shoe at 1878m w/830gpm, 3100psi, 65-80rpm, 5-

15klbs WOB, 3.5-5k ftlbs torque. ROP 2 - 25m/hr firming up halfway down theshoe track to 6 - 1Om/hr wI 5 - 15klbs WOB.

09:15 09:45 .50 2,220 Wipe shoe at 18lam and circulate clean from 1884m. No cement drop out.09:45 10:30 .75 2,220 RIH stands from 1884m· 2176m. Tag resistance with 20klbs at 2176m10;30 11:30 1.00 2,220 M/U TDS • wash and ream from 2170m. No resistance observed rotating

through 2176m. Wash down stand, pull back and wipe stand twice until clean at2176m. ( Ledge - top of basement 2173m )

11:30 12:00 .50 2,220 Wash and wipe last stand from 2197m - 2212m. Wash and ream resistancefrom 2212m - 2216m wI 840gpm, 3200psi, 130rpm, up to 20klbs WOB, 3.5 -5 kft-Ibs torque.

12:00 13:30 1.50 2,220 Hard dig from 2216m wi parameters as before, but flat torq readings and veryslow ROP ( TD ). Circulate hole clean, boost riser, take torq readings @ 20-30-40-50 rpm off bottom, all 5k ft-Ibs - for 7" liner job. Flow check and pump slug.

13:30 17:45 4.25 2,220 POOH, to run Schlumberger wireline logs17:45 19:15 1.50 2,220 Rig up Schlumberger and RIH with PEX - CNL - GR - for logging run #119:15 23:45 4.50 2,220 Run in with logging suite #1 to 2210m loggers depth. Log PEX from 2210m to 9

5/8" shoe and GR· CNL from TO to 1040m. POOH with tools.23:45 24:00 .25 2,220 Rig down logging suite #1 PEX·CNL·GR

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 27.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 01:30 1.50 2,220 Continue to rig down logging suite #1 PEX-CNL-GR. Rig up logging suite #2FMS Array Sonic.

01:30 04:00 2.50 2,220 During surface testing of logging suite #2, Array Sonic module failure observed.Faulty module changed out for back up SHe sonic module.

04:00 06:00 2.00 2 1220 RIH with FMS-BHC Sonic1 logging suite #2. Log FMS from basement up to 95/81

' shoe. BHC Sonic across open hole section.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 26.06.98

Copyright IDS pty Ltd, RbtofB report Mar 16th 1998.1 Page Number: 1

Page 24: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

0352722058 PREMIER OIL GEELONG PAGE 03

PremierOil AustralasiaReport Date: 26.06.98

REMARK I OBSERVATION

Bottoms up sample from 2216m confirmed basementcuttings. 12 1/411 hole appears to be drilled 4m shallow.Loggers depth on run #1 showed TD to be 221 Om and 95/8" shoe to be at 1878m as expected.

Array Sonic module failed when tested on surface. thiswas replaced by a SHC sonic tool.

DAILY DRILLING REPORT # 28

White Ibis 1

SOLUTION I RECOMMENDATION

8 1/2" bit may have caught a ledge when washing tobottom and when rotation started this may have starteddrilling new hole from ledge - this could explain why thelogging tool will not get any deeper and we have aloggers TO 10m higher than the initial drillers TO.

CUMULATIVE MUD COST TO DATE: $168,114Mud Properties

Type:PHPAFROM:TIME:WEIGHT (ppg):TEMP (C):

FL10:00

1.1643

MUD COST FOR rODAY; $1.991

VISCOSITY( sec 1qt ): 48 API FLUID LOSSPV (cps) : 13 (cm3/30min)

API FILTER CAKEYP (lb/100sq.ft): 2.4 (32nds inch

GEL 1Os/1 Om/30m HTHP FLUID LOSS(lbI100sqft) ; 6 10 0 (cm3/30min)FANN 3/6/100 6 9 0 HTHP FILTER CAKE

(32nds inch)

CI • (ppm) : 43,000 SOUDS (%vol) :5 K+ (ppm) : 31500 H20 (%vol) :

1 HARDICa (ppm) : 802 OIL (%vol) :MBT (ppb eq) : 5.0 SAND:

o PM: 2.0 PH:

o PF: .4 PHPA:

691.0

o.1

10.5

0.0

AVE WOB (k-Ibs):

AVE RPM:

FLOW (9pm) :

PUMP PRESS. (psi):

HSI (np/sqi) :

Wear rr"lCQIJc::Q:JrTlEEB~ronnnD:JCIJ[}Yf]~ E CIJI NO II LOG'

Bit Data for Bit # 6

SIZE("):MANUFACTURER:

TYPE:

SERIAL#:

OEPTH IN (m RT) ;

OEPTH OUT (m RT);

8.50HU

ATJ G8

V11CL

1853

2216

IADC# 3 4 7

12

65840

3,100

o

NOZZLES

3 x20

XXxx

Drilled over the last 24 hrs

METERAGE (m) : 349

ON BOTTOM HRS : 5.3

IADC DRILL. HRS: 6.5TOTAL REVS; 20.553ROP (m/nr): 53,7

Calculated over the bit run

CUM.METERAGE (m) 349CUM. ON BOT. HRS : 5.3

CUM.IADC DRILL HRS: 6.5

CUM.TOT. REVS: 20,553Rap (m/hr): 53.7

BHA#7 Length (tt) :167.0 D.C. (1) ANN. VELOCITY (mpm): 197HRS ON JARS;

31 ISTRING WT(k-lbs) : 225

ITRQE MAX (ft-Ibs): 4,350 I D.C. (2) ANN VELOC1TY (mpm): 19i

wr BLW JAR(k-lbs): PICK UP v.lT(k·lbs) : TRQE ON (ft·lbs): 4,300 H.W.D.P. ANN VELOCITY (mpm): 165BHA WT(k-lbs) ; SLK OFF WT(k·lbs) : TROE OFF (ft-Ibs): 3,000 D.P. ANN VELOCITY (mpm) : 165

BHA DESCRIPTION: TOOL DESCRIPTION HRS SERIAL # COMMENT81/2" bit, bit sub, 6 x 63/4" DC·s. 12 x HWOP.

Hughes 8 1/2" bit 6.5 V11CL Orill out 9 5/8" shoe and cJeanout'2 114" hole

r

A.nchor Tension A1 : 60,0 A2: 60.0 A3: 70.0 A4: 60.0 A5: 80.0

(kips) AS: 80.0 A7: 70.0 A8: 90.0 A9; A10 :

Workboats Location. Fuel Barite D/wtr Pfwtr emt Bent Hell Weather & Rig data @ 24:00 hI'S(kltr) (sx) (bbl) (bbl) (sx) (sx) {karl VDL (kips: 836.0

P. Commander rig 299 1,982 1.951 WIND SP. (kts) : 20.0 VISIB.(nm) : 7 RIS.TENS: 666rute Tide rig 188 2,233 371 WIND DIR (deg) :310 CEILING (m) : 2.500 HEAVE (m): 0.5

PRES.(mbars); 1019 WAVES (m): 1.4 ROLL (deg) : 1.0AIR TEMP (C) : 11.0 SWELL (m): .8 PITCH (deg); 1.0

ICOMM~~T~,,; ; "C?mma~der" !!.~rute;" ~.!.,rig; 3 helicoeter fli9hts ' 27 PAX on rig; 28 PAX off rig.~~~~~~-'-:J

Bulk Stocks Used lIn Stock Used lin Stock Used lin Stock Used lin StockDRILL WATER (bbl) :2,27 2,931 FUEL (bbl) : 8 1.199 GEL (sx); ° -0 HEll-FUEL (kltr) : 0.5 7.0

POT WATER (bbJ) ; 38 1,264 BARITE (sx) : 0 4,279 CEMENT (sx) : 0 1.506

Drills, Permits & InspectionsDRILL TYPE DATE INSPECTIONS DATE SAFElY DETAILS

TRIP DRILL 14/6 BOP TEST 26/6 LTI 22/6FIRE 21/6 NEXT TEST DUE DATE 11f7 MTI 2/6PIT DRILL 14/6 RIG INSPECTION 18/6 JSA ongoingINCIDENT 25/6 DAYS SINCE LTA 5 #PTW ongoing

Safety Meeting 21/6

Copyright IDS pty Ltd, RbtofB report Mar 16th 1998.1 Page Number: 2

Page 25: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

27/06/1998 09:45 0352722058 PREMIER OIL GEELONG PAGE 04

PremierOil A'ustralasiaReport Date: 26.06.98

DAILY DRILLING REPORT # 28

White Ibis 1

Casing Pump DataCSG LOT PHASE CSGSHOE CSG SHOE PUI1lD Data -last 24 hrs00(") MD NO (mBRl) '# TYPE LNR SPM EFF Flow

13.3/8 .. 14.16 863 863 (") (%) (gpm

TYPE1 National 6.50 84 91 840

LNGTH eSG wr GRD THREAD 2 National 6.50 84 97(m) ID (") lbs/ft

Shoe jt 12.5 12.4 68.0 LSO N.VAMPersonnel: on Site =961 x Bakerlok jt 11.2 12.4 68,0 L80 NVAM

F/Coilar jt '2,3 12.4 68,0 LSO NVAM3 x Bakerlok jt 35,5 12,4 68.0 LSO NVAM JOB TITLE NAME20jts 237,7 12.4 67,0 LBO BTC Drlg Supervisor H. Knobl40jts 466,9 12.4 68.0 LBO NVAM N. Orlg Supervisor S. HarrisonPup 3,1 12.4 68.0 LBO NVAM Geologist K. FrankiewiczWellheadjt 10,7 12.4 68.0 LBO NVAM Res. Engineer T. Fontaine

Northern Explorer P Julier & Cox

Slow Pumo DahSPP SPM SPP DEPTH MW(psi) (psi) (m RT) (ppg)

3100 30 325 2216 1.140 425 2216 1.150 600 2216 1.1

COMPANY NAME 1#

Premier 4Northern 66Dowell Cement 2Asiatic ROV 3Dowell Mud 1

Smed\lig Safety 1Geoservloe 2Schlumberger 11PCS 6

Survey MD TVD INCL /J.Z CORR. '\/' DOGLEG N/S EPN TOOL TYF'E

Last Tool Type: Anderdrift (m RT) (m RT) OEG (deg) AZ. SECT (mI30m) (m) (m)(deg) (m)

Magnetic Declination : 12.41 1,422 1,422 0.50 Anderdrift

Survey method: Min Curvature 1,479 1,479 0.50 Anderdrift1.594 1.594 0.00 Anderdrift1,680 1.680 0.50 Anderdrift1,768 1.768 0.50 Anderdrift1,852 1.852 1.00 Anderdrift1,937 1,937 0.00 Anderdrift1,944 1.944 0.50 Anderdrift

Copyright IDS Ply Ltd, RbtofB report Mar 16th 1998.1 Page Number: 3

Page 26: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

25/05/1998 09:58 0352722058 PREMIER OIL GEELONG PAGE 01/04

Premier all AustralasiaGeelong Operations BasePhone: 0352722101Fax:03527220Sa

Fax

. ._.

Premier OilAustralasia

To:

Fax:

Phone:

Victoria Minerals & Petroleum Ops, Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Bacon

Boral Energy Resources, Attn: A Guthrie, Ross Naumann

CalEnergy. Attn: Jane Duncan

From: Gordon Hunter

Date: June 26, 1998

Pages: 4 inc. this one----------------._-_.,--._---------._-----------Re: White Ibis I cc:,,--._-_.._----._-------._--- ---,---

o Urgent

-Comments:

D For ReYiew o Please Comment D Please Reply o Please Recycle

Please find attached the Daily Drilling Summary Report for 2S1h June 1998.

Regards

Gordon Hunter

Drilling Superintendent

Page 27: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

25/05/1998 09:58 0352722058 PREMIER OIL GEELONG PAGE 02/04

PremierOil AustralasiaReport Date: 25.06.98

CAlLY DRILLING REPORT # 27

White Ibis 1

Well DataCOUNTRY . Australia T.D.(m RD: 2.220.0 CUR. HOLE SIZE ("): 12.25 DAILY COST $ : $240,407FIELD Bass Basin PROGRESS (m): 3.0 CSGODC'): 13.38 CUM COSTS : $8,766.153DR1LLeO. : Northern Offshore DAYS FROM SPUD: 24.21 SHOE lVD (m R1): 863 AFE COSTS; $7,321.212RIG' Northern Explorer III DAYS +/- CURVE; LEAK-OFF EMW(ppg) 14.16 AFE BASIS: P&AMUD CO: DowellRT ABOVE MSL (m) : 12.5 CURRENT OP @ 0600: Drilling plugs.

WATER DEPTH @MSL (m): 61.9 PLANNED OP. : Drill shoe track, clean out to TO, POH for logs.

RT TO SEABED (m) : 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops - This report only

RU for cementing. eire spacers. Start & abort cement job. Circ out I FORMATION ITOP(mBRT) Icement. Pump spacers. Cement 9 5/8" csg. RID rigfloor. Retrieve Hangerrunning tool. L/O landing string. RiD. Run seal ass'y. Run test plug. TestBOP's.

ACTIVITY FOR PERIOD 00:00 HRS TO 24'00 HRS ON 25 06 98':ROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 00;45 .75 2,220 Welder attempted to back out bolt end of lifting ring on cement head-unsuccessful. Lost +/- 90bbls mud while running casing.

00:45 01:30 .75 2,220 Rig sling harness for cement head to center it on landing jt while sending 2 menin riding belts plus 1 man on stabbing board to help MU. Rig pitch/roll plus weightof head cont to hamper operation. Successfully MU emt head.

01:30 02:15 .75 2,220 MU remainder of cementing & rig pump hoses to lTV" piece. Finished addition ofanti.-eorrosive to SIW &Chern Wash spacers. PITested Dowell lines to 3500psifor 10min - okay.

02:15 02:30 .25 21220 Washed landing jt. at 500gpm, 750psi, and landed out 9 5/8" casing wI shoe @1878m, Stick up above rigfloor @ +1- 4.5m tide corrected.

02:30 03:30 1.00 2,220 Circulated 1/2 casing contents (220bbls) wI mud at 500gpm. 800psi. Pumped60bbJs Dowell Chem Wash wI anti-corrosive. Pumped 250bbls seawater treatedwI anti-eorrosive at 500gpm, 800psi.

03:30 03:45 .25 2,220 Launched bottom cement plug.03:45 04:15 .50 2,220 Start 9 SIS" cementation. Pumped 16bbls Lead cement slurry @ 12.5ppg when

gate v/von surge tank froze shut- unable·to deliver cement from surge tank04:15 05;45 1.50 2,220 Pumped Dowell lines clear of cement. Circulated 16bbl cement out of

casing/annulus. while MU 60bbls Chern Wash & 250bbl seawater ~ both treatedwi anti-Gorrosive.

05:45 06:30 .75 2,220 Pumped 60bbls Chern Wash followed with 250bbls seawater - both treated wIanti-Gorrosive. Observed cement returns to surface (16bbls mixed & pumped)strung out over +/- 80bbls.

06:30 07:30 1.00 2,220 Mix & pump 103bbls of 12.5ppg Lead slurry (50% excess) & 33bbls of 15.8ppgTail slurry w/50% excess(tail to cover btm 100m). TOC @ 1400m. Reoccurringproblems wI Liq. Add Sys computer quitting. batch mixed as necessary.

07:30 08:15 .75 2,220 Launched Top Plug. Dowell pumped 10bbl DMJ to chase plug & clean lines.Displaced cmt wI 3565stk (96%= 3582) KCI mud @ 500gpm • plug bumped wI400psi @ 150gpm. Continued to pressure up from bump to 3000psi.

08:15 08:30 .25 2,220 P/tested casing @ 3000psi for 10min • okay. Apparently gained +/- 7bbls of mudduring the mixing-pumping/displacing phases.

08:30 09:30 1.00 2,220 Checked for backflow after bleeding off test pressure - floats held.. RID emthoses & lines.

09:30 11:30 2.00 2,220 Backed out Casing Hanger running tool w/4 1/2 turns - clean release. RiD cmthead, Spider elevators, & landing jt. Closed blind rams to reduce chances ofdownhole losses. Winds to 45kt f/ beam, sig. pitch & roll; cont wI thrusters.

11:30 14:15 2.75 2.220 POOH w/9 5/S" N. VAM landing string! UO 5 x jts plus yjover, & full bore csghanger running tool with tuggers onto catwalk (cranes shut down fl wind);process slow due to wind. ship's movement.

14:15 17:00 2.75 2,220 RJU standard size bails. UO stabbing board (again complicated by wind andvessel's movement).

17:00 18:30 1.50 2,220 MU Pack off ass'y & running tool. RIH w/2 x 8" DC + bumper sub + HWDP.Engaged casing hanger & pack off ass·y. Energized seal w/12 turns (1st 3 turnsOOF;~ihlv finrlinn ~t:::!lrt nf thrp';;l('f!'\ wi 1f1k ft-Ih~ tornop.

Copyright IDS Prt Ltd, RbtofB report Mar 16th 1998.1 Page Number: 1

Page 28: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

26/06/1998 09:58 0352722058 PREMIER OIL GEELONG PAGE 03/04

PremierOil AustralasiaReport Date: 25.06.98

DAILY DRILLING REPORT # 27

White Ibis 1

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

18:30 19:00 .50 2,220 P/tested pack off ass'y against ann. to 500/3500psifor 5/1 Omin - okay. Will re-test to 500psi wI test plug against rams.

19:00 20:15 1.25 2,220 Release pack off ass'y running/retrieving tool. POOH.20:15 20:45 ,50 2.220 MU BOP test plug. RIH & set.20:45 24:00 3,25 2.220 Tested BOP's: lower-upper annular, K line, to 250/3500psi for 5/10min,C line &

v/vs, rams 250/5000psi for 5/10 min - all okay ( P/tested Yellow pod, functiontested Blue pod).

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 26.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 00:30 .50 2,220 POOH wi BOP test plug.00:30 01:00 .50 2,220 RlH and set wear bushing.01:00 01:30 .50 2,220 POOH wI wear bushing running tool.02:00 05:15 3.25 2.220 MU new BHA #7, w/8 1/2" HTC JG-8 bit (w/3 x 20's), 6 x 6 3/4U DC, & 9 x

HWDP, & RIH to 1853m.5 06:00 .75 2,220 Tag TOC @ 1852m. MU TDS, Drill cement from 1852 -1853.5m, with 600-

I 850gpm, 2000-3000psi, 40-80rpm; indications of spinning on top of plug.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 25.06.98

Mud Properties MUD COST FOR TODAY: $0 CUMULATIVE MUD COST TO DATE: $166,182

Type: VISCOSllY( sec I qt ): 57 API FLUID LOSS CI- (ppm) : 43,000 SOLIDS (%vol) : 6PV (cps): 15 (cm3130min) 5 K+ (ppm): 31500 H20 (%vol); 94.0PHPA API FILTER CAKE

FROM: FL YP (lb/100sq.ft): 24 (32nds inch 1 HARD/Ca (ppm) : 882 OIL (%vol); 0

TIME: 21:00 GEL 1Os/1 Om130m HTHP FLUID LOSS MBT (ppb eq) ; 5.0 SAND: .1

WEIGHT (ppg): 1.16 (lb/1 OOsqft) : 6 10 0 (cm3130min) 0 PM: 1,1 PH: 9.4

TEMP (C) : 0 FANN 316/100 6 9 0 HTHP FILTER CAKE PF: .2 PHPA: 0.0(32nds inch) 0

BHA#7 length (ft) : D.C. (1) ANN. VELOCflY (mpm): 0HRSONJARS; STRING WT(k-lbs) : TRQE MAX (ft·lbs):

ID.C. (2) ANN VELOCllY (mpm): 0

WT BLW JAR{k-Ibs); PICK UP WT(k-lbs) : TRQE ON (ft·lbs): H.W.D.P. ANN VELOCllY (mpm): 0

BHA WT(k-lbs): SLK OFF WT(k-Ibs) : TROE OFF (ft·lbs): D.P. ANN VELOCITY (mpm) ; 0

BHA DESCRIPTION: ( TOOL DESCRIPTION ~ SERIAL # I COMMENT II

Anchor Tension A1 : 60.0 /t\2 : 70.0 A3: 70.0 A4: 50.0 A5: 75.0

(kips) A6: 70.0 A7: 80.0 AS: 100.0 A9: A10 ;

Workboats Location. Fuel Barite Dlwtr Plwtr Cmt Bent HeJi Weather & Rig data @ 24:00 hrs(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltr) VDL (kips: 844.0

P. Commander Geelon WIND SP. (Ids): 18.0 VISIB.(nm) : 8 RIS.TENS: 66Brute Tide rig 190 2.233 403 WIND DIR (deg) :190 CEILfNG (m) ; 2.500 HEAVE (m). 1,5

PRES,(mbars): 1018 WAVES(m): 1.7 ROLL (deg): 2.0AIR TEMP (C) : 9.0 SWELL (m); 1.3 PITCH (deg): 2.0

ICOMMENTS: "Commander" @ Geelong; "Brute" at rig. expected ETD 01 :OOhrs, 26/6; 0 helicopter flight (fits cancelled) .. 0 PAX on rig; 0 PAXoff rig.

Bulk Stocks Used lin Stock Used lIn Stock Used / In Stock Used lin Stock

DRILL WATER (bbl) ; 120 3.157 FUEL (bbl): 15 1,207 GEL (sx) : 0 -0 HELl-FUEL (kltr); 0.0 7.5

POT WATER (bbl): 0 1,302 BARITE (sx): 0 4.279 CEMENT (sx); 394 990

Copyright IDS pty Ltd, Rbtof6 report Mar 16th 1998.' Page Number: 2

Page 29: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

26/06/1998 09:58 0352722058 PREMIER OIL GEELONG PAGE 04/04

PremierOil AustralasiaReport Date: 25.06.98

DAILY DRILLING REPORT # 27

White Ibis 1

Drills, Permits & Inspection~

DRilL TYPe; DATE INSPECTIONS DATE SAFETY DETAILS

TRIP DRilL 14/6FIRE 21/6PIT DRILL 14/6INCIDENT 25/6

BOP TESTNEXT TEST DUE DATERIG INSPECTIONDAYS SINCE lTA

26/611f718/64

LTIMTIJSA#P1WSafety Meeting

22162/6ongoingongoing21/6

CasinCiCSG00(")

13.3/8 ..

LOT PHASE eSG SHOE eSG SHOEMD TVD{mBRn

14.16 a63 863

Pump DataPumD Data· Isst 24 1'1 rs

# TYPE lNR SPM EFF Flown (%) (gpm

SPP SPM(psi)

Slow PumD DataSPP DEPTH MW(psi) {m Rn (PP9)

TYPE LNGTH CSG WT( m ) ID (") Ibslft

GRO THREAD1 National 6.50 0 e7 02 National 6.50 0 97

o 304050

325 2216 1.1425 2216 1.1600 2216 1.1

COMPANY NAME #

Premier 4Northern 68Dowell Cement 2Asiatic ROV :3Dowell Mud 1

NAME

H. KnoblK. OubravaeK. FrankiewiczT. Fontaine

S~e~ 12~ 12A 6&0 ~O ~~MII~~~~~~~~~~~~~~~~~~~~~~~~1 x Bakerfok jt 11.2 '2.4 68.0 LSO N.VAM Personnel: on Site = 97flCollar jt 12.3 12.4 68.0 L80 N.VAM

x Bakerlokjt 35.5 12.4 68.0 L80 N'vAM JOB TITLE.lO jts 237.7 12.4 67.0 L80 BTC Drlg Supervisor40 jts 466.9 12.4 68.0 l80 N.VAM N. Orlg SupervisorPup 3.1 12,4 68.0 L80 NVAM GeologistWellhead jt 10.7 12.4 68.0 l80 N.VAM R l"" •

l....-__......_ ....... L--_.J...-_.J...-_...l.-__--' II es. r;;ng!neer

Northem E:.::plorer P Julier &CoxSmedvig SafetyGeoserviceVetcoSchJumbergerpes

12196

Survey MD TVD INCL AZ CORR. 'V' DOGLEG N/S EJW TOOL TYPE

last Tool Type: Anderdrift (mRn (mRn DEG (deg) AZ SECT (mJ'30m) (m) (m)(deg) (m)

Magnetic Declination : 12.41 1,422 1.422 0.50 Anderdlift

Survey method : Min Curvature 1.479 1,479 0.50 Anderdrift1,594 1.594 0.00 Anderdrift1.680 1.680 0.50 Anderdrift1,768 1,768 0.50 Anderdrift1,852 1.852 1.00 Anderdrtft1,937 1.937 0.00 Anderdrifl1,944 1.944 0.50 Anderdrift

I

Copyright IDS Ply Ltd, RbtofB report Mar 16th 1998.1 Paga Number: 3

Page 30: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

25/05/1998 09:22 0352722058 PREMIER OIL GEELONG PAGE 01/04

Premier Oil Australa~iaGeelong Operations BasePhcne:0352722101Fax: 0352722058

Fax

, . _. ,.

Premier OilAustralasia

To:

Fax:

Phone:

Re:

Victoria Minerals & Petroleum Ops, Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Bacon

Boral Energy Resources. Attn: A Guthrie. Ross Naumann

CalEnergy. Attn: Jane Duncan

VVhite Ibis I

From: Gordon Hunter

Date; June 25,1998

Pages: 4 inc. this one

cc:

[J Urgent

-comments:

o For Review o Please Comment 0 Please Reply o Please Recyc;le

Please find attached the Daily Drilling Summary Report for 24th June 1998.

Regards

Gordon Hunter

Drilling Superintendent

Page 31: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

25/05/1998 09:22 0352722058 PREMIER OIL GEELONG PAGE 02/04

PremierOil AustralasiaReport Date: 24.06.98

DAILY DRILLING REPORT # 26

White Ibis 1

Well DataCOUNTRY Australia T.D. (m ~T): 2,220.0 CUR. HOL.E SIZE ("); 12.25 DAIL.Y COST $ : $509,881FIELD Bass Basin PROGRESS (m): 3.0 CSGODC'): 13,38 CUMCOST$: $8.525.746DRILL CO. : Northern Offshore DAYS FROM SPUD: 23.21 SHOE TVD (m RD: 863 AFECOST$: $7.321.212RIG: Northern'Explorer III DAYS +/- CURVE: LEAK-OFF EMW(ppg) 14.16 AFE BASIS; P&AMUD CO: Dowell

RT ABOVE MSL (m) : 12.5 CURRENT OP @ 0600: Pump Chem Wash &seawater wI anti·corrosive.

WATER OEPTH@MSL(m); 61.9 PLANNEO OP.: Pump Chern Wash &seawater wI anti-corrosive. Cement 9 5/8" esg.

RT TO SEABED (m) : 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops· This report only

POOH. RU for casing. Run 9 5/8" casing, WOW. Run 9 5/8" casing. Land I FORMATION ITOP(mBRT) Iout casing. RU for cement.

ACTIVITY FOR PERIOD 00:00 HRS TO 24:00 HRS ON 24.06.98FROM TO HRS DEPTH ACTIVITY DESCRIPTION

100:00 06:00 6.00 2,220 Run 95/8" VAM Ace L-80 casing, Bakerloking 1st 6 jts, centralizing 1st 8 jts, asper program. Filled &checked shoe &FIC - okay. Cant RIH wI csg, filling each jtwI mud. Run in to 654m.

06:00 06:15 .25 2,220 Cont running 9 5/8" csg fl 645·678m. Wind continues to increase; casing jtsincreasing difficult to handle from catwalk & from stabbing board. Mud hosescontinue to swing into stabbing board/elevator, from wind &heave.

06:15 09:45 3.50 2,220 Shut down casing operations due to winds exceeding 40kts (max. permissiblelimit to handle jts is 3Skts). Seas, 3.5· 4m fl port beam, and roll of vesselcontinue to make it very difficult to handle swinging loads. WOW.

09:45 18:30 8.75 2,220 Wind back down below 30kts, able to resume casing running operations. Runtotal of 152 jts plus 1x pup, 1 x Xlover below casing Hanger. Vessle's movementcontinuing to hamper ops - hoses swinging into stabber, jts swinging free.

18:30 20:00 1.50 2,220 Make up pup joint &Hanger Ass'y. Back out running tool fl Hanger ass'y 1 1/2turns (of 4 1/2 turns needed to disengage) to check make up· okay. Make toolback up 1 1/2 turns.

20:00 20:30 .50 2,220 Repaired air connection on Spider elevators, knocked off by the swinging of therig hose bundle, due to continued> 25kt wind and movement of rig.

20:30 22:15 1.75 2,220 Continue to run 9 5/8" casing landing string (N. VAM). Weather worsening, withmax. sea heighUswell & winds increasing. Received gale warning flmeteorlogical service.

22:15 23:00 .75 2,220 Run landing string I casing to last jt (shoe depth 1866m). UD false rotary table.UO TAM packer, power tongs, etc. Prepare to RU cement head & lines tolanding jt.

23:00 23:45 .75 2,220 PU cementing head and attempt to M/U to landing jt (12m above rotary table).Rig's pitch & roll pronounced, very difficult fitting cmt head to top of landing jt.Broke lifting ring on top of cmt head - unable to center head on jt.

23:45 24:00 .25 2,220 Lower cementing head for repairs by welder to lifting ring.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 25.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 00:45 .75 2,220 Welder attempted to back out bolt end of lifting ring on cement head·unsuccessful.

00:45 01:30 .75 2,220 Rig sling harness for cement head to center it on landing jt while sending 2 menin riding belts plus 1 man on stabbing board to help MU. Rig pitch/roll plus weightof head cont to hamper operation. Successfully MU cmt head.

01:30 02:15 .75 2,220 MU remainder of cementing & rig pump hoses to "Y" piece. Finished addition ofanti-corrosive to sm & Chern Wash spacers. PfTested Dowell lines to 3500psifor 10min • okay.

02;15 02:30 .25 2,220 Washed landing jt, at SOOgpm, 750psi, and landed out 9 SIS" casing. Stick upabove rigfloor @ +/.. 4.5m tide corrected.

02:30 03:30 1.00 2,220 Circulated 1/2 casing contents (220bbls) wI mud at 500gpml 800psi. Pumped60bbls Dowell Chem Wash wI anti-corrosive. Pumped 250bbls seawater treatedwi anti·corrosive at 500gpm, 800psi.

03:30 03:45 .25 2,220 Launched bottom cement plug.

Copyright IDS Pty Ltd. RbtofB report Mar 16th 1998.1 Page Number: 1

Page 32: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

25/05/1998 09:22 0352722058 PREMIER OIL GEELONG PAGE 03,/04

PremierOil AustralasiaReport Date: 24.06.98

DAILY DRILLING REPORT # 26

White Ibis 1

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

03:45 04:15 .50 2,220 Start 95/8" cementation. Pumped 16bbls Lead cement slurry @ 12.5ppg whengate viv on surge tank froze shut- unable to deliver cement from surge tank

04:15 05:45 1.50 2.220 Pumped Dowell fines clear of cement. Circulated 16bbl cement out ofcasing/annulus, while MU 60bbls Chern Wash & 250bbl seawater· both treatedwI anti-corrosive.

05:45 06:00 .25 2,220 Pump 60bbls Chern Wash followed with 250bbls seawater - both treated wI anti·corrosive.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 24.06.98

Mud Properties MUD COST FOR. TODAY: $0 CUMUIJ\TIVE MUD COST TO DATE: $166,182

Type: VISCOSITY( see I qt ): 57 API FLUID LOSS Cl- (ppm) : 43.000 SOLIDS (%\101) : 4.4PV (cps); 16 (cm3!30min) 5 K+ (ppm): 31500 H20 (%vol): 95.6PHPA API FILTER CAKE:

FROM: FLYP (lbI100sq.ft): 25 (32ndS inch 1 HAROICa (ppm) ; 761 OIL (%vol): 0

TIME: 21:00 GEL 10s/10m/30m HTHP FLUrO LOSS MeT (ppb eq) : 5,0 SAND: .1

WEIGHT (ppg): 1.16 (lb/100sqft) : 7 12 0 (cm3130min) 0 PM; .8 PH: 8.8

(C) : 0 FANN 3/6/100 7 10 0 HTHP FILTER CAKE PF: .2 PHPA: 0.0(32nds inch) 0

BHA#7 Length (ft) : D.C. (1) ANN. VELOCITY (mpm): 0HRSONJARS:

ISTRING VVT(k-lbS) ;

ITROE MAX (ft-Ibs):

ID.C, (2) ANN VELOCITY (mpm): 0

WT BLW JAR(k·lbs): PICK UP WT(k-lbs} : TROE ON (ft-Ibs): H.W.D.P. ANN VELOCITY (mpm): 0BHA WT(k-lbs) : SLK OFF WT(k·lbs) : TROE OFF (ft·lbs): D.P. ANN VELOCITY (mpm) : 0

BHA DESCRIPTION: I TOOL DESCRIPTION IHRS I SERIAL # I COMMENT ,

Anchor Tension A1 : 100.0 A2: 80.0 A3: 60.0 A4: 60,0 A5: 80.0(kips) A6: 70.0 A7: 120.0 A8: 130.0 A9: A10 :

Workboats Location, Fuel Barite Dlwtr Plwtr Cmt Bent Heli Weather & Rig data @ 24:00 hrs(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltr) VOL (kips: 542.0

P. Commander Geelon WIND SP, (Ids) : 30.0 V1SIB.(nm) : 10 RIS.TENS; 68Brute Tide rig 197 2.233 428 WIND DIR (deg) : 180 CErLING (m) :2.500 HEAVE (m): 1.0

PRES.(mbal'$): 1005 WAVES (m): 2.4 ROLL (deg): 2.0AIR TEMP (C) : 9.0 SWELL (m): 1.2 PITCH (deg): 2.0

ICOMMENTS: "Commander" @ Geelong; "Srute" at rig, expected ETD 12:00hrs. 2516: 1 heHeopter flight - 9 PAX on rig; 10 PAX off rig. II

Bulk Stocks Used lIn Stock Used lin Stock. Used 1 In Stoek Used lin StockDRILL WATER (bbl) : 119 3,277 FUEL (bbl): 8 1.222 GEL (sx): 0 -0 HELl-FUEL (kltr) : 0.2 7.5POT WATER (bbl): 0 1,220 8ARITE (s.x); 902 4,279 CEMENT (sx) : 380 1,384

Drills, Permits & Inspection~

DRILL TYPE DATE INSPECTIONS DATE SAFETY DETAILS

TRIP DRILL 14/6 BOFTEST 9/6 LTI 22/6FIRE 21/6 NEXT TEST DUE DATE 23/6 MTI 2/6PIT DRILL 14/6 RIG INSPECTION 18/6 JSA ongoingINCIDENT 19/6 DAYS SINCE LTA 3 #PTW ongoing

Safety Meeting 21/6

Pump DataP JmD Data • last 24 hrs Slow Pumo Oat ~

# TYPE LNR SPM EFF Flow SPP SPM SPP DEPTH MW(") (%) (gpm (psi) (psi) {mRn (ppg)

1 National 6.50 0 97 0 0 30 325 2216 1.12 National 6.50 0 97 40 425 2216 1.1

50 600 2216 1.1

Copyright IDS Pry Ltd, Rbtof6 report Mar 16th 1998.1 Page Number: 2

Page 33: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

25/05/1998 09:22 0352722058 PREMIER OIL GEELONG PAGE 04/04

PremierOil AustralasiaReport Date: 24.06.98

CAlLY DRILLING REPORT # 26

White Ibis 1

Casina Personnel : on Site = 97eSG LOT PHASE CSGSHOe CSG SHOE00(") MO TVD (mBR1) J06TlTLE NAME COMPANY NAME #

13,318 II 14.16 863 863 Drlg Supervisor H. Knobl Premier 4N. Qrlg Supervisor K. Dubravac Northern 68

lYPE LNGTH eSG WT GRD THREAD Geologist K. Frankiewicz Dowell Cement 2

(m) ID (") Ibslft Res, EngIneer T. Fontaine Asiatic ROV 3Dowell Mud ,

Shoejt 12.5 12.4 68.0 LSO N.VAM Northern E)Cplorer P Julier& Cox1 x 6akerlok jt 11.2 12,4 68.0 Lao N.VAM $med"ig Safety 1F/Collar jt 12.3 12,4 66.0 LBO N.YAM Geoserviee 23 x Bakerlok Jt 35.5 12.4 68.0 L80 N.VAM Vetco 120jts 237.7 12.4 67.0 LaO BTC Schlumberg@r 940 jts 466.9 12.4 68.0 L80 N.YAM pcs 6Pup 3.1 12.4 68.0 Lao N,VAMWellheadjt 10.7 12.4 68.0 LBO N,VAM

t""'··~rvey MD TVO INCL AZ. CORR. V DOGLEG N/S ENIJ TOOL lYPE

Last Tool Type: Anderdrift(mR1) (m Rl) DEG (deg) AZ SECT (mf30m) (m) (m)

(deg) (m)

Magnetic Declination: 12.41 1,422 1.422 0.50 Anderdrift

Survey method : Min Curvature 1.479 1,479 0.50 Anderdrift1.594 1,594 0.00 Anderdrift1.680 1,680 0.50 Anderdrift:1,768 1.768 0.50 Anderdrift1,852 1,852 1.00 Anderdrift',937 1,937 0.00 Anderdrift1.944 1,944 0.50 Anderdrift

Copyright IDS Ply Ltd. Rbtof6 report Mar 16th 1998.1 Page Number: 3

Page 34: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

24/06/1998 09:42 0352722058 PREMIER OIL GEELONG PAGE 01,/04

Premier Oil AustralasiaGeelong Operations BasePhone:03527~2101

Fax: 0352722058

Fax

Premier OilAustralasia

To:

Fax:

Phone:

Re:

Victoria Minerals & Petroleum Ops, Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Bacon

Boral Energy Resources, Attn: A. Guthrie, Ross Naumann

CalEnergy. Attn: Jane Duncan

White Ibis 1 Daily Drilling Reports

From: Gordon Hunter

Date: June 24, 1998

Pages:

cc:

D Urgent

-Comments:

D For Review o Please Comment 0 Please Reply o Please Recycle

Please nnd attached the DDR for 23n.1 June 1998. The daily cost calculation included on this reportcontains 50% of the rig mobilisation from Singapore and Seychelles, 50% of the de-mobilisation of therig and also mob/demob of supply boats. This accounts for the large incremental increase on to-daysreport.

Regards

C·~·~·Gordon Hunter

Drilling Superintendent

Page 35: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

24/05/1998 09: 42 . 0352722058 PREMIER OIL GEELONG PAGE 02/04

PremierOil AustralasiaReport Date: 23.06.98

CAlLY DRILLING REPORT # 25

White Ibis 1

Well DataCOUNTRY Australia r.D. (m Rn: 2,220.0 CUR. HOLE SIZE (n): 12.25 DAIlY COST $ ; $2.875.571FIELD B3ss Basin PROGRESS (m): 3.0 CSG 00("): 13.38 CUM COST $ : $8,015.865DRILL CO. : Northern Offshore DAYS FROM SPUD: 22.21 SHOE TVD (m R.T): 863 AFECOST $: $7,321.212

RIG: Northern Explorer III DAYS +/~ CURVE: LEAK-OFF EMW(ppg) 14.16 AFE BAStS: PMMUD CO: Dowell

RoT ABOVE MSL (m) : 12.5 CURRENT OP @ 0600: Running 95/8" casing.

WATER DEPTH @MSL (m) ; 61.9 PLANNED OP.; Run &cement 9 5/8" casing.

RT TO SeABED (rn) ; 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops· This report only

Cire HiVis sweep. POOH. Attempted Schlumberger logs· unsuccessful. [ FORMATION !rOP(mBRniRID Schlumberger. RU for 9 5/8" csg.

ACTIVITY FOR PERIOD 00:00 HRS TO 24:00 HRS ON 23.06.98FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 00:30 .50 2,220 Cire 30bbl LoVis/LoWt·HiVis/HiWt sweep out of hole. Observed very heavysolids unloading @ shakers fl BU plus 20min • 1/2" clay cavings wI occasional 2-3" piece. 6" deep on scalper screen.

00:30 00:45 .25 2,220 Boosted Riser wI 850gpm until shaker screens clean.00:45 01:30 .75 2,220 Pumped 200bbls of very high vis unweighted KCI mud! and displaced to bottom

of hole (calculated to cover 2220-1900m, plus 40% excess).01:30 02:30 1.00 2,220 POOH from 2220-1846m (pulling out of HiVis pill on btm). Flow Checked well

static· okay.02:30 04:30 2.00 2,220 Cont POOH from 1846·863m. Hole conditions (as seen from tripping) very good

from TO to the 133/8" shoe, wI only normal drags seen except a very brief10klbs drag @ 930m.

04:30 04:45 .25 2,220 Flow checked well static at 13 3/8" shoe - okay.04:45 06:45 2.00 2,220 POOH from 863 to surface. UO bit #5RR2 & graded.06:45 09:00 2.25 2,220 RU Schlumberger for logging.09:00 10:30 1.50 2,220 RIH wI PEX .. Sonic - GR. Tools passed through 936m wlo problems. but stood

up @ 1048m. Made repeated attempts to pass through resistance wlo success.Observed +/. 500lbs a/pull picking up • "felt" sticky, possibly not ledging.

10:30 14:00 3.50 2,220 POOH wI Schlumberger tools. Modified bottom of the large rUbber Hole Finder,and using existing fin hole, attached 8m of 15mm chain to bottom of tool.Weather forecast poor weather through 25/6 .. presently 5m seas, 30kt winds.

14:00 15:15 1.25 2,220 RIH with chain Hole Finder; tool string again stood up @ 1048m, and would notpass even after repeated attempts were made. No indications of chain faIllng offledging into open hole

15:15 17:30 2.25 2,220 POOH wI Schlumberger tools. UOut tools & chain attachment. RIDSchlumberger,

17:30 19:00 1.50 2,220 Slip & cut drilling line. Serviced TDS.19:00 20:00 1.00 2.220 M/U Nom. seat protector running/retrieving tool, and RIH. Recover Nom. seat

protector to surface.20:00 24:00 4.00 2,220 RU to run 9 5/8" casing. PU TAM packer. PU stabbing board & mount in derrick.

Prepare 500MT Spiders, tongs, handling gear, etc.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 24.06.98FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 06:00 6.00 2,220 Run 9 5/8" VAM Ace L-80 casing, Ba~erloking 1st 6 jts, centralizing 1st 8 jts, asper program. Filled & checked shoe & FIC • okay. Cont RIH wI csg. filling each jtwI mud. Run in to 654m.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 23.06.98

Copyright lOS PtY Ltd, Rbt0f6 report Mar 16th 1998.1 Page Number: 1

Page 36: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

24/~5/1998 09:42 0352722058 PREMIER OIL GEELONG PAGE 03/04

PremierOil AustralasiaReport Date: 23.06.98

REMARK I OBSERVAliON

NERA inmarsat phone "down" for 24hrs - wouldn'tconnect on phone or fax (busy signals) or on data linerNo Carrier' message). Daily reports having to bere-typed by Geelong office, all faxes through radio room.Premier office advised.Geologist fax doesn't function since visit by technician,phone erratic; Premier Perth advised.

OAILY DRILLING REPORT # 25

White Ibis 1

SOLUTION I RECOMMENDATION

Recommend te.chnician(s) be contacted for causes offaults.

Mud Properties MUD COST FOR TODAY: $6,496 CUMULATIVe MUD COST TO DATE: $167,330

Type: VISCOSITY( sec I qt }: 57 API FLUID LOSS5

CI· {ppm) ; 43,000 SOLIDS (%vol) : 4.4

PHPA PV (cps): 16 (cm3f30min) K+ (ppm): 31500 H20 (%vol); 95.6API FILTE~ CAKE

FROM: FLYP (lb/100sq.ft): 25 (32nds inch 1 HARD/Ca (ppm) : 761 OIL (%vol); 0

TIME: 20:00 GEL 10s/10m/30m HTHP FLUID LOSS MBT (ppb eq) : 5.0 SAND: .1

W51GHT (ppg): 1.16 (lb/100sqft) ; 7 12 0 (em3130min) 0 PM: .8 PH: 8.8

TEMP (C): 0 FANN 3/6/100 7 10 0 HTHP FILT5R CAKE PF: .2 PHPA: 0.0(32nds inch) 0

Bit Data for Bit # SRR2

SIZE (") : 12.25MANUFACTURER: HU

TYPE: Max GT-PS09

SERIAL # : X78CH

DEPTH IN (m RT) : 2220

DEPTH OUT (m RT) ; 2220

IAOC# 4 3

AVE WOB (k.lbs);AVERPM:

FLOW (gpm):

PUMP PRESS. (psi):

HSI (hp/sqi) ;

5Wear EB~tEEi3EEEEf1E~

NOZZLES Drilled over the last 24 hrs Calculated over the bit run

o 3 X32 METERAGE (m) : CUM.METERAGE (m)

o X ON BOTTOM HRS : CUM. ON eOT. HRS :

o X IADC DRILL. HRS : CUM.lADC DRILL HRS:

o X TOTAL REVS: ° CUM.TOT. REVS: 0o X ROP (mlhr); Rap (m/hr):

BHA#6 Length (ft) :208.6 D.C. (1) ANN. VELOCITY (mpm): 0HRS ON JA~S: STRING VVT'(k-lbs): 253 TRQE MAX (ft·lbs): 11,000 D.C. (2) ANN VELOCITY (mpm): 0'NT BLW JAR(k.lbs): 34 PICK UP VVT(k-lbs) : 245 TRQE ON (ft·lbs); 5,000 H.W.D.P, ANN VELOCITY (mpm): 0

BHA WT(k·lbs) : 58 SLK OFF WT(k·lbs) : 240 TRQE OFF (ft-Ibs): 4,000 D.P. ANN vELOCITY (mpm) : 0

8HA Df:SCRIPTJON ; TOOL DESCRIPTION HRS SERIAL # COMMENT12 1/4"Sit w/o nozzles· Bit sub cIw float \f/v - 8"

MAXGT~PS09 31.0 X78CHNMDC c/IN Tolco Ring- 1 x 8" DC· 12 1/4" Stab- jars 152,8 A021 06x8"DC - jars - 3xS" DC· xlo • 9 x HWOP,

Anchor Tension A1 : 60.0 A2: 65.0 A3; 60.0 A4: 50.0 A5: 70.0

(kips) A6: 80.0 A7; 80.0 A8: 110.0 A9: A10 :

Workboats Location. Fuel Sartte Dfwtr Plwtr Cmt Sent Heli Weather & Rig data @ 24:00 hrs(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltr) VDL (kips: 542.0

p, Commander Geelon WIND SP. (kts) : 23.0 VISIB.(nm) ; 10 RIS.TENS: 68Brute Tide rig 211 2.233 453 WIND DIR (deg) :190 CEILING (m) : 2,500 HEAVE (m): 1.0

PRES.(mbars): 1010 WAVES(m): 2.2 ROLL (deg): 1.0AIR TEMP (C) ; S,O SWELL (m); 2.5 PITCH (deg); 1,0

ICOMMENTS: "Commander' @ Geelong: "Brute" at rig; 0 helicopter flight. 0 PAX on rig: 0 PAX. off rig (helicopter fit cancelled due toprtch/heave/roll).

Bulk Stocks Used lin Stock Used lin Stock Used lin Stock Used lIn Stock

DRILL WATER (bb!) :63 3.396 FUEL (bbl): 9 1,230 GEL (sx): 0 ·0 HELl-FUEL (kltr) : 0.0 7.6

POT WATER (bbl) : 69 1,176 BARIT5 (sx) : 0 5,181 CEMENT (sx) : 0 1.764

Drills, Permits & InspectionsDR1LL TYPE DATE INSPECTIONS DATE SAF5TY DETAILS

TRIP DRILL 14/6 BOP TEST 9/6 LTI 22/6FIRE 21/6 NEXT TEST DUE DATE 23/6 MTI 2/6PIT DRILL 14/6 RIG INSPECTION 1816 JSA ongoingINCIDENT 1916 DAYS SINCE LTA 2 #PlW ongojng

Safety Meeting 21/6

Copyrlght IDS Pty Ltd, RbtofB report Mat' 16th 1998.1 Page Numbor: 2

Page 37: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

24!~6/1998 09:42 0352722058 PREMIER OIL GEELONG PAGE 04/04

PremierOil AustralasiaReport Date: 23.06.98

DAILY DRILLING REPORT # 25

White Ibis 1

COMPANY NAME '#

Smedvig Safety 1Geoservice 2Vetco 1Sehlumberger 10pes 6

Premier 4Northern 68Dowell Cement 2AsiaticROV 3Dowell Mud 1

Casino Pump DataCSG LOT PHASe CSGSHOE CSGSHOe PUI110 Data -last 24 h~00('1 MD ND (maRT) # TYPE LNR SPM EFF Flow

13.318 " 14.16 863 863 n (%) (gpm

1 National 6.50 0 97 0TYPE LNGTH eSG WT GRD THREAD 2 National 6.50 0 97

(m) ID (") Ibslft

Shoe jt 12.5 12.4 68,0 L80 N.VAMPersonnel: on Site = 981 x Bakerlok jt 11.2 12.4 68.0 LSO NVAM

F/CoJlarjt 12.3 12.4 68.0 LSD NVAM3 x Bakerlok jt 35.5 12.4 68.0 LBO NVAM JOB TITLE NAME20jts 237.7 12.4 67.0 L80 eTC Drlg Supervisor H. Knobl40jts 466.9 12.4 68.0 LBO N.VAM N. Orlg Supervisor K. DubravaePup 3.1 12.4 68.0 LSO N,VAM Geologist K, FrankiewiczWellheadjt 10.1 12.4 68.0 LBO NVAM

Res. Engineer T. Fontaine

Northern Explorer P Julier& Cox

spp $PM(pSI)

o 304050

Slow Puma Oat,.spp DEPTH MW(psi) (m Rn (ppg)

325 2216 1.1425 2216 1.1600 2216 1.1

Survey MD TVD INCL fo2. CORR. 'V DOGLEG N/S Ef\N TOOL TYPE

Last Tool Type: Anderdrift (m RT) (mRT) DEG (deg) AZ. SECT (mI30m) (m) (m)(deg) (m)

Magnetic Declination: 12.41 1,422 1,422 0.50 Anderdrift

Survey method : Min Curvature 1,479 1,479 0.50 Anderdrift1,594 1,594 0.00 Anderdrift1,680 1.6S0 0.50 Anderdrjft1.768 1.76S 0.50 Anderdrlft1,852 1.852 1.00 Anderdrift1.937 1,937 0.00 Anderdrift1.944 ',944 0.50 Anderdrift

Copyright IDS FttY Ltd. RbtofB report Mar 16th 1998.1 Page Number: 3

Page 38: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

23/05/1998 10:13 0352722058 PREMIER OIL. GEELONG PAGE 01/

Premier Oil AustralasiaGeelong Operations BasePhone: 0352722101Fax: 0352722058

Premier OilAustralasia

To: Victoria Minerals Nadji From: Gordon Hunter

Mineral Resources Tasmania, Attn: Carol Bacon

80ral Energy Resources I Attn: A. Guthrie, Ross Naumann

CalEnergy. Attn: Jane Duncan

Fax:

Phone:

Re: White Ibis 1 Daily Drilling Reports

Date: June 23, 1998

Pages:

cc:

o Urgent . 0 For Review 0 Please Comment 0 Please Reply

-Comments:

o Please Recycle

Please be advised that all data links to and from the rig are down at present due to a technical problemwithin the satellite (not the rig hardware). Please find below a precis of today's Drilling Report

FROM TO ACTIVITY

05:30 07:45 RJU SCHLUMBERGER

07:45 09:30 RIH PEX/SONIC LOG

09:30 10:30 UNABLE TO PASS 927M. POH LAYOUT BOW$PRING.

10:30 12:30 RIH. ATTEMPT TO PASS 927M - NO SUCCESS.

12:30 15:30 RIH DRILLING ASSY. STOOD UP AT 1048M WITH 50K.

15:30 20:00 WASH AND REAM FROM 1048M TO 1380M. OBSERVE SOLIDS UNLOADINGAT SHAKERS - MAINLY CAVINGS.

20:00 21:15 RIH STANDS TO 2195M. STOOD UP WITH SOK

21:15 22:45 WASH AND REAM TO 2203M. EASY REAMING FROM 2203M TO TD.

Page 39: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

23/05/1998 10:13 0352722058 PREMIER OIL GEELONG PAGE 02/02

22:45 00:45 PUMP 3088LS LOVIS UNWEIGHTED PILL FOLLOWED BY 100BBl HIVISWEIGHTED 15PPG PILL. MASSIVE SOLIDS UNLOADING AT SHAKERS WITHRETURN OF HIVIS. 2·3" CAVINGS WITH SMALLER CAVINGS. 6" DEEP ATSHAKERS FOR 20 MINS. BOOST RISER UNTIL SHAKERS CLEAN.

00:45 01 :30 SPOT 20088LS HIVIS FROM TD TO CALCULATED 1900M WITH 40%EXCESS.

01 :30 06;00 POH. HOLE SLICK. NO OVERPULLS OBSERVED. POH TO SURFACE

Gordon Hunter

Drilling Superintendent

Page 40: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

22/05/1998 09:07 0352722058 PREMIER OIL GEELONG PAGE 01/04

Premier Oil AustralasiaGeelong Operations BasePhone: 0352722101Fax; 0352722058

Fax

Premier OilAustralasia

To;

Fax:

Phone:

Re:

Victoria Minerals & Petroleum Ops, Attn: Ahmed Nadjr

Mineral Resources Tasmania, Attn: Carol Sawn

Boral Energy Resources. Attn: A Guthrie, Ross Naumann

CalEnergy. Attn: Jane Duncan

Whrte Ibis I

From: Gordon Hunter

Date: June 22, 1998

Pages: 4 inc. this one-------------cc:

o Urgent

-Comments:

o For ReYiew o Please Comment 0 Please Reply o Please Recycle

Please find attached the Daily Drilling Summary Report for 21 st June 1998.

Regards

Gordon Hunter

Drilling Sup~rintendent

Page 41: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

22/05/1998 09:07 0352722058 PREMIER OIL GEELONG PAGE 02/04

PremierOil AustralasiaReport Date: 21.06.98

CAlLY DRILLING REPORT # 23

White Ibis 1

Well DataCOUNTRY Australia T.D. (m RT): 2,220.0 CUR. HOLE SIZE C'): 12.25 DAILY COST $ : $190,523FIELD Bass Basin PROGRESS (m): 3.0 CSGOD("): 13.38 CUMCOST$: $5,140.294DRILL CO. : Northern Offshore DAYS FROM SPUD: 20.21 SHOE ND (m RT): B63 AFE COST $ : $7,321,212RIG: Northern Explorer III DAYS +/- CURVE : LEAK·OFF EMW(ppg) 14.16 AFE BASIS: PMMUD CO: DowellRT ABOVE MSL (m) ; 12.5 CURRENT OP @ 0600: RU fer logging.

WATER DEPTH @MSL (m) : 61.9 PLANNED OP.; Logging.RT TO SE.ASE::D (m) ; 74.4

Summary of period 00:00 to 24:QO hrs: Formation Tops .. This report only

Wait for rig repairs. RIH & retrieve hang off tool. RIH to 941 m. Wash & I FORMATION ITOP(m8RT) ,

ream as necessary to btm. eire. POOH for logging.

ACTIVITY FOR PERIOD 00·00 HRS TO 24"00 HRS ON 210698.FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 08:30 8.50 2,220 Unable to temporarily repair high press hyd supply line to pipe racking system -need to replace complete 20+ ft section. Weather poor wi high winds, swell,pitch & ro!llimiting operations. Thrusters working from 22:S0hrs, 20/6.

08:30 09:15 .75 2,220 Prepare to retrieve hang off tool while finishing repairs to high pressure hydsupply line for racking system.

09:15 10:45 1.50 2,220 RIH w/ EZ back out sub & retrieved hang off tool. Racked back hang off andlanding string.

10:45 11 :15 .50 2,220 RIH wI stds to 941 m. Observed string start to take weight. MU TDS.11:15 15:45 4.50 21220 Reamed tight hole f/925-1250m, w/70·150rpm, 450-700gpm, & 1600-3150psi,

4.S·6k ft-Ibs torque. Hard reaming f/1060~1100m (+/. 6klbs WOB).Precautionary wash & ream (hole clean) fl 12J50-1360m.

15:45 16:30 .75 2,220 String began taking weight again @ 1360m. Washed/reamed wI parameters a/afrom 1360·1412m (tight 1388-1390).

16:30 18:00 1.50 2,220 RIH wi stds f/1412·2157m - hole clean.18:00 19:00 1.00 2,220 Washed/reamed f/2157.2220m, w/80·150rpm, 700gpm, 3560psi, and 4-10k ft-

Ibs torque.19:00 20:30 1.50 2,220 Circulated hole clean from btm wI 700gpm. 3400psi, and slow pipe rotation &

reciprocation. Heavy solids unloading evident at shale shakers.~0:30 20:45 .25 2,220 Boosted Riser through C & K lines with 850gpm, 700psi, until shakers clean.20:45 21:00 .25 2,220 Pumped heavy slug. Flow checked well static - okay.21:00 24:00 3.00 2,220 POOH fl 2220-1220m. Observed intermittent 50-80klbs O/pull while POOH fl

21 02-1900m (pass. aggravated by bit balling). MU TDS & quickly rotated bit @120-150rpm wi 350gpm (didn't pump away slug). Cont POOH wi normal drags.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 22.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 00;15 .25 2,220 Cant POOH f/1220-1152m. Experienced 70klbs Olpull from 1152-1129m, withswabbing evident Unable to pull through 1129m. MU TDS. Wind/sea conditionsworsening. Wind gusting to 45knt· lay down cranes.

00:15 02:00 1.75 2,220 Backreamed f/1152-863m, wI 100rpm, 450gpm, 500psi, & 4.5·5k ft-Ibs torq ue.Observed lower pump psi, normal drags, & correct vol of mud to hole above1129m - cleared balled bit. Occasional 6-10k torque observed whilebackreaming.

02:00 02:45 .75 2,220 Circulated BU from 13 3/8" shoe.02:45 03:00 .25 2,220 Pumped heavy slug. Flow checked well ststic • okay.03:00 05:30 2.50 2,220 POOH from 863m.05:30 06:00 .50 2.220 RU for Schlumberger logs.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 21.06.98

CopyrIght IDS ~ry Ltd, RbtofB report Mar 16th 1998.1 Page Number: 1

Page 42: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

22/06/1998 09:07 0352722058 PREMIER OIL GEELONG PAGE 03/04

PremierOil AustralasiaReport Date: 21.06.98

CAlLY DRILLING REPORT # 23

White Ibis 1

Mud Properties MUD COST FOR TODAY: $1,926 CUMULATIVE MUD COST TO DATE: $160,834

Type: VISCOSITY( sec I qt ): 51 API FLUID LOSS CI- (ppm): 43,000 SOLIDS (%vol) : 3.9

PHPA PV (cPs): 13 (cm3130min) 5 K+ (ppm): 31500 H20 (%vol): 96.1API FILTER CAKE

FROM: FLYP (Ib/100sq.ft): 24 (32nds inch 1 HARO/Ca (ppm): 401 OIL (%vol): 0

TIME: 21:00 GEL 1Os/1Om~Om HTHP FLUID LOSS MeT (ppb eq) ; 5.0 SAND: .1

W~IGHT (ppg): 1.11 (lb/100sqft) ; 6 9 0 (cm3l30min) 0 F'M: .9 PH: 9.4

TEMP (C); 130 FANN 3161100 6 9 0 HTHP FILTER CAKE PF: .2 PHPA: 0.0(32nds inch) 0

Bit Data for Bit # 5RR IADC# 4 3 5 Wear E9~~Bf:g~ G if 02i~SIZE ("): 12.25 NOZZL.ESMANUFACTURER; HU AVE WOB (k·lbs): 0

Drilled over the last 24 hrs Calculated over the bit run3 x14 METERAGE (m) : 0 CUM,METERAGE (m) 0TYPE: Max GT-PS09 AVE RPM: 85 X ON BOTTOM HRS : CUM. ON BOT. HRS :

SERIAL#: X78CH FLOW (gpm) : 680 X IADC DRILL. HRS : CUM.lADC DRILL HRS:D~PTH IN (m Rl) : 2220 PUMP PRESS. (psi): 3,620 X TOTAL REVS: 0 CUM.TOT. REVS: 0IDEPTH OUT (m r<T) : HSI (hp/sqi) : 1 X ROP (m/hr): ROP (m/hr):

BHA#6 Length (tt) :208.6 D.C. (1) ANN. VELOCITY (mpm); 142HRS ON JARS : STRING WT(k-lbs) : 253 TRQE MAX (1t.lbs): 11.000 D.C. (2) ANN VELOCITY (mpm): 0wr SLW JAR(k·lbs): 34 PICK UP WT(k-Ibs) : 245 TROE ON (ft-Ibs): 5,000 H.W.D.P. ANN Ve;LOCITY (mpm): 98BHA VIIT(k-lbs): 58 SLK OFF VVT(k-IbS) ; 240 TRQE OFF (ft-Ibs): 4,000 D.P. ANN Ve;LOCITY (mpm): 98

BHA DESCRIPTION: TOOL DESCRIPTION HRS SERIAL # COMMENT12 1J4"Bit - biT SUB clwfloat vlv - 8" NMDC cJw

MAXGT-PS09 31.0 X78CHTotco Rlng-1 x 8" DC - 12 1/4" Stab- 6x8"DC·Jars - 3x8" DC - xlo • 9 x HWDP.

jars 143.6 A0210

Anchor Tension A1 : 80.0 A2. : 50.0 A3: 50.0 A4; 40,0 AS: 60.0

(kips) A6: 70.0 A7: 80.0 A8: 90.0 A9; A10:

Workboats Location. Fuel Barite Dlwtr P/wtr Cmt Bent Heli Weather & Rig data @24:00 hrs(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltr) VDL (kips: 692.0

P. Commander Geelon WINO SP, (kts): 41.0 VISIB.(nm) : 8 RIS.TENS: 68BnJte Tide rig 215 2.233 503 WIND OIR (deg) : 180 CEILfNG (m) : 1,500 HEAVE (m); 3.0

PRES.(mbars): 1014 WAVES (m): 2.0 ROLL (deg); 3.0AIR TEMP eC) : 12.7 SWELL (m): 3.2 PiTCH (deg): 2.0

IlcOMMENTS : "Commander" to Geelong: "Brule" at rig; 0 helicopter flight - 0 PAX on rig; 0 PAX off rl9.' 1

Bulk Stocks Used lin Stock Used lin Stock Used lin Stock Used / In StockDRILL WATER (bbl) :0 3.580 FUEL (bbl); 14 1.250 GEL (sx): 0 ·0 HELl-FUEL (kltr) : 0.0 7.8

POT WATER (bb!) : 265 1.201 BARITE (sx): 0 5,181 CEMENT (sx) : 0 1,764

Drills, Permits & lnspection~

DRILL TYPE DATE INSPECTIONS DATE SAFErY DETAILS

TRIP DRILL 14/6 BOPT~ST 916 LTI 25/4FIRE 21/6 NEXT Te;ST DUE DATE 2316 MTI 2/6PIT DRILL 14/6 RIG INSPECTION 1816 JSA ongoingINCIDENT 19/6 DAYS SINCE LTA 171 #PTW ongoing

Safety Meeting 2116

Pump DataPuma Data -last 24 hrs Slow Pumo Data

# TYPE LNR SPM EFF Flow Spp SPM SPP De;F'TH MW(") (C/o) (gpm (psi) (psi) (mRn (ppg)

1 National 6.50 70 97 700 3400 30 325 2216 1.12 National 6.50 70 97 40 425 2216 1.1

50 600 2216 , .1

Copyright IDS Ply Ltd, RbtofB report Mar 16th 1998.1 Paga Numbar: 2

Page 43: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

22/05/1998 09:07 0352722058 PREMIER OIL GEELONG PAGE 04,/04

PremierOil AustralasiaReport Date: 21.06.98

CAlLY DRILLING REPORT # 23

White Ibis 1

Casing Personnel: on Site =99eSG LOT PHASE CSGSHOE CSGSHOEOD(") MO TVO (mBRT) JOB TITLE NAME COMPANY NAME #

13.3/8 .. 14.16 863 863 Drl9 Supervisor H. Knobl Premier 4N. Orl9 Supervisor K. Dubravac Northern 70

TYPE LNGTH CSG WT GRO THREAD Geologist K. Frankiewicz Dowell Cement 2

(m) IOC) Ibslft Res. engineer T. Fontaine Asiatic ROV 3Dowell Mud 1

Shoejt 12.5 12.4 68.0 Lao NVAM Northern Explorer P Juliet & Cox EMS 1, x Sakerlok jt 11.2 12.4 68.0 LaO NVAM Smedvig Safety 1F/Collar jt 12.3 12.4 68.0 Lao NVAM Geoseryice 33 x Sakerlok jt 35.5 . 12.4 68.0 LBO NVAM Vetco 120jts 237.7 12.4 67.0 Leo STC Schlumberger 1040 jts 466.9 12.4 68.0 Lao N.VAMPup 3,1 12.4 68.0 Leo N.VAM PCS 3

Wellheadjt 10.7 12.4 68.0 Lao N,VAM

Survey MO ND INCL ~ CORR. "V DOGLEG N/S Em TOOL TYPE

Last Tool Type: Anderdrift (m RT) (mRT) 05G (deg) ft2. SECT (m/30m) (m) (m)(deg) (m,

Magnetic Declination : 12.41 1,422 1,422 0.50 Anderdrift

Survey method : Min Curvature 1,479 1,479 0.50 Anderdrift1,594 1,594 0.00 Anderdrift1.680 1.680 0,50 Anderdrift1.768 1.768 0,50 Anderdrift1.852 1,852 1,00 Anderdrift1.937 1.937 0,00 Anderdrift1,944 1.944 0,50 Anderdrift

Copyright IDS Pty Ltd, RbtofB report Mar 16th 1998,1 Page Number: 3

Page 44: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

,.. '." •• - ••_-------.----••_'_.-.., .... _ ..... ~.... ~ ,_ .... --.<- ..... "

PrcmicrOil AustralasiaReport Date: 20.06.98

,------_._.•.,~_ .._....•__.,.._..•--.~.

PAGE 01/03OIL GEELONG

CAlLY DRILLING REPORT # 22•• 'l ••..,~_..........._,...·,.._. r.I.I ....... ,··,'._··__···,II. ---

White Ibis 1

035272205821/06/1998 11:30

SIlEO: 12.25 DAILY COST $ : SO13,36 CUM COSTS: SO

{!Tl 1oC1}: 86J ~ECO$T$: $,\j21 ,212

f!MW(ppg) 0.00 AFE BASIS: l=>&A

T.O. (m R1') ; 2,220.0PROGRESS (m}: 3.0OAYS FROM :SPUD: , :t ~,DAY~ -/ .. CURVE;

ClJRRENTOP @ 0600 ~.•. Rig R~airs.

PL,ANNEOOP, ; . Finlstl Wiper trip, Lqgging.

Austrar.~

Ba$8 Be~n

Northern Off:.;hon::Nnrthero EcplQYf>f 111

Dowell I-__..........__.-,-__-J;.. ~-----~-----------I

12.561.974,4

Well DataCOUNTRYFrELDDRILL-CO, :RIG:

MUD co:RT ABOVE MSL (m) :

WATER DEPiH @MSl (m):

Ri TO SEABED (m) :~======-~.. =.~~..======:::;::=======-======:::;..;;=.-=:.':::::===::::;.=.-=-:::::'-==.-:.=.:;.;:,_.::;...;::;....;:;;.. '.::.::.~:;;:.':::::::Summary of period 00:00 to 24:00 hrs:Attempt Scnlumberger logs - unsucces~ful. RIJ·.. Work tighll'l~le. Wipertrip. Work tight hole. Wait on repairs,

,75

.75

.50

.25

.25

.501.00

.752.001.00

2,75

1.50

,251,75

2,00.75

2.75

01:15021503:0005:0006:00 .

00:4501.1502:1503;0005:00

i 1:00 11 :45

06:45 09:30

06:00 06:45

09:30 11 :00

11:45 12:0012:00 13:45

'3:45 15:4515'.45 16:30

16:30 19:15

19:15 19.4519:45 20,1520:15 20:30

20:30 21 :0021'0021:1521:45 21 :30

,\CTIVITY FOR PERIOD 00:00 HRS TO 24:00 HRS ON 20.06.98.'.. " " l' _. . ', -, ,-"." ,.'.-----.--- '~, ._ _ ..--..".r-'ROM TO HRS DEPTH ACTIVI1Y DESCRIPTION1-----+-------'. _._- '--'_..- " ,' .00:00 00:15 ,25 2,220 Reconfigure PEX tool with hole finder.00:'5 00:45 .50 2,220 RIH with Schlumberger PEX tool to 936m (passed 916m wlO difficuly). Made

repeated attempts to work tool past 936m (stood up 2m higher than on previousrun). w/o success.

2.220 POOH wI PEX tool.2,220 RID Schlumberger from logging.2.220 PU re·run bit #5 (HTC Ma:ri GT-PS09, w/3.x 14 nozzles) and BHA.

,2,220 RIH to 863m, 13 3/0" csg shoe.. 2,220 Washed & reamed fl BG3-939m, w/80rpm. 700gpl'n, 2800psi, & 3k ft-Ibs torque·

no indications of excessive drag observe. String stood up with 30klbs @ 939m­apparent bridge Reamed bridge, Moderately heavy ~Ittings @ shakers.

2,220 Cont wash & ream fJ939·953m, Observed heavy unloading of hole over shakerscreens,

2,220 Attempted to RIH w/stds f/953-95Sm. but string stood up. MU TOS. &washed/reamed 955-1183m. wI 70rpm, 700gpm. & 2800psi, Downhole lossesincreased to 46bph @ 1050m - decreased flowrate to SOOgpm. losses to 10bph.

2,220 RIH wI stds fl 1183-2097 w/o resistance, Due to wind & vessel's roll (3 112m

Iseas fJ off stb beam. 3deg roil, 20-25knt Wind). TOS umbirie31 again caught inthe derrick & pulled fillings off.

2,220 eire hole @ 2097m, while repairing all umbilical fittings except air line (problemduplicating existing fittings).

2.220 Cont RIH from 2097 ·2149m, where strins stood up wI 60klbs,2,220 Washed -& reamed ff 2149-2220m, wI eOrpm. 5DOgpm, S 22:50psi. Hard reaming

experienced - increased rotary to 60.'40rpml 4.5-6k ft-!bs torque. Ob$erv~d 6mfill on btm.

2,220 Circulated hole clean @ 700gpm, while boosting Riser through C & K lines.2,220 Flow checked well while effecting repairs-losses +J-10bph, Re..connected TDS

air line in the umbilical package, which operates the IBOP & elevators,2,220 Pumped slug. POOH f/2220-1000m. Experienced tight areas of hole from

1350-1 aDOrn which required eOklbs O/pull to pull through..~O .2,220 Backreamed tight hole f/1QOO.944m, w/70rpm, SOOgpml & 2400psi..50 .2,220 POOH wI stds from 944-863rn (13 3/811 shoe). Flow checked well static-okay..25 2,220 Tied orf TDS hoses to prevent excessive movement in them due to the

worsening weather &. sea conditions.2,220 RIH from 863·955m - hole tight at 955m. MU TOS.2.220 Washed & reamed f/955,980m w/70rpm. SOOgpm, &2200psi.2,220 Cont to wash & ream 9:S5·980m while? anempting to place a patch on the

racking arm system's hydraulic line, beneath the rigfloor. Temporary repairsunsuccessful: line still losing +/- O.5gpm of hydrauHc fluid.

21:30 22:30 1.00 2.220 POOH fl9gS-765m (3 stds inside shoe, to be able to run hang off tool) in orderto effect repairs to racking arm system's hydraulic supply line (line needs to be

,._, .,.,_, __..,.._,1.. ~.!.!e~~~,~_~~!?re ~~~~~~.~~.~_~(~ any prpe•.::e.!~~~.i.?~~L . " _ _.'__ d.

CopyTrg""JDS ~ LIt!, ~btom r~port MPJr 1Sltl1998,'

Page 45: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

21/05/1998 11:30 0352722058 PREMIER OIL GEELONG PAGE 02/03

PremierOil AustralasiaReport Date: 20.06.98

QAl!-.-Y-Q~~~.LING R~~ORT:!-.... 22

White Ibis 1

~i~:~ii~' .~RiJp_E:i;o -p;:~~re~~~;;;~:I ~:':~p~~~:~::~~~~k::?fR~.::~~-~f a~pro;.....

~time of repairs at 6hrs.. Weather cant to worsen, pitch & roll espeCially due toseas hitting abeam; wor1< conditions on rigfloor very dIfficult.

22:45 23:00 ,25 2.220 PU hang off tool.23~OO 23.30 .50 2,220 RIH wi hang off tool & landing string. Land out hang off tool, and back out.23,30 24:00 .. .50 __2.220 POOH wI hang ~!!. !~~~~ding string. ,._.__.._ _ . .

ACTlVtlY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 21.06.98IfROM' TO' HRS DEPTH "" ----.. ACT1VIlY DESCRIPTION ... --•.'

00.00 06:00 6.00 2,220 u~allle to temporarily repair high press hyd supply line to pipe racking system·need to replace complele 20+ ft section. Weather poor wI high winds, swell.pitch & roll limiting operations, Thru~ters working from 22:50hrs, 2016.

'_, ,... ..__ • ."'.__.. __....._d',"'· •

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 20.06~98...-....-.---,~. --------------.._....._._._-, ........,-

Myd Prop(!rties MUD COST FOR TODAY: $3,434 CUMULATIVE MUD COST TO QA.TE: $15\,264

Type ~ VISCOSfTY( see Jqt }: 45 API ~LUID LOSS CI- (ppm): 43,000 SOl,IDS (D/t>vol) : ~.g

PHPA PV (cps): 12 (cm3!30mln) 5 K'" (ppm): 31500 H20 {%vol}; 96.1API FILTER CAKE

FROM: FLYP (ItJ/100sq.ft): 22 (32t\dll il"leh 1 HARO/Ca (ppm) : 161 OIL (%vcl); 0

T1M!!.: 14:00 GEL 103Jl0m130m HTHP FLUID LOSS MaT (PPO ~q) : 5.0 SAND: ,1

WEIGHT (ppg): 1,10 (fb/1 OO~qft) : 6 10 0 {{;m~f30mio) 0 PM: .6 PH; 9.0

TEMP (C): UO FANN !ltJ/100 6 S 0 PiTHP FILTER CAKE: FlF'. ,2 PHPA; 0,0(32n~inch) 0

Bit Data for Bit # 5

SIZE r> : 12.26MANUFACTURER: HU

TYPe: : Max GT PS09

SERIAI...: X7aCH

OEPTH IN (m ~T) : 2017

.. DePT~ OUT (m RT) ; 2220

Bit Data for Bit # 5RR

SIZE n ; 12.25MANUFACTURER; PillTYPE: Max GT PSOS

SERIAL. : X78CH

DEPTH IN (rn RT) ; 222.0

DEPTH OUT (Ill f(n :

lADe. ,. 3 5 Wear E±3 01 II o n I.. fErn! ~~ jtI32 II 8T Ii (;3

NOZZLES Orined over the la~t 24 hfs Calculated O"'~I' I:tl~ bit runAVE WOB {It;,lbS} : 24 3 x14 M£:.T(RAGC (m} : ~AvE RPM ~ 80

CUM.METERAGE (m) 203x ON eOTTOM HRS ; 5 CUM, ON BOT. HRS : 28.4

I"LOW (gpm) : 700 X lADe DRill. HRS ; ~ CUM.fADe O~ILL HRS; 31.0PUMP P~ESS, (P5J); 3.S00 x TOTAL. RE.VS : 2.400 CUM.TOT. REVS: 135,320HSI (hp/sqi) : ,

J( ROP (m/hr); 6.0 ROP (m/hr): 6,5

lADe., 4 3 5 Wear Ej~~HfI1~~P:3NOZZLES Dr'iRed ave!' 'lhc 1:Y.>t 24~ C<1rt!cll/i;lred o....er ttle bit run

AVE woe (k-Jbs) ~ 0 ~ .x 14M~TEAACE (tTl) ; 0 CUM.METEAAGE (m)

AvE RPM : 100

X ON BOTTOM HRS : CUM ON SoT. HRS:FLOW (gpm); 50C X lADe DRILL, !'iRS: CUM.lADC DRII.~ !iRS:PUMP PRESS. {psi}: 2,300 x TOTAL REVS : Q CUM,TOT. REVS; 0HSI (1'lP/sqi) : 1) ): ROP (mll'lr): ROF' (1T\)h,);

199o

137137

D.C. (i) ANN. VELOCITY (mpm):

11,000 I D.C. (2) ANN VELOCITY (mpm):S,OW H.W,D.P. ANN VELOCITY (I"pm):4.000 D.P. ANN VeLOCITY (mvm);

8HA '# 6 Length (tt) :208.6HRS ON JARS: I STRING WT(k~} : 253 1 TRQE MAX (f1-lbs):WT BLW JAR{k-lt)t;): 34 PICK UP WT(k-lbs}: 245 TROE. ON (Tt-/bf:;);BHA WT(k..lb~} : S6 SLK OFF WT(k·Ib5) : 240 TRQE OFF (ft-lbf;);

------r----,.------..---SHA DESCRIPTION: TOOL DESCRIPTION HRS S5RlA.L.,. COMMENT j12 1/4·Bit - biT SUB c/w flo;;.l% vN. 8" NMOC cJw ~._- - - - ,._.•Tateo Ringa 1 x S'I oe - 12 1/4" Stab- 6xS"OC _jars MAX GT·PSOlt 31.0 X78CH-~rOO.~.9xHWC~ ~j~~ ~_~_~12~7~~~M~2~'~O~_~_. .~_~--

Copyrignt lOS !='ty ltd. RbtofB report MlIr 16l1'l '9!ilB.1 Page Numt.r; ~

Page 46: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

21/05/1998 11:30 0352722058 PREMIER OIL GEELONG PAGE 03/03

PremierOil AustralasiaReport Date: 20.06.98

CAlLY DRILLING REPORT! 22

White Ibis 1, • ~ ..... _ ..... 0."\. ' •• "'1...._. - ...".·,..-'1 .. • ,... ·-., .. IIf ....... , •••", .....1.··_. , ., y •• -._. - ......,- .........-_._'.....-._-

Anchor Tension(kips)

A' , 45.0

AS: 85.0

A2 ; 50.0

A7: 60.0

A3: 50,0

AB: 60.0

A4: sooA9:

AS: 80,0

A10 :

Weather & Rig data @ 24;00 nn

rigrig

Lo(;atlon. Fuel Barite DIwtr PIwtr ernt Ber'lt Heli(kltr) (3X) (bbl) (t.Jbr) (gx) (5):) (~)

131 1.447 1,887220 2.23Z 528

P, CCimmander8r'ute Tide

WorkboatsVOL (kips: 880.0

WIND sr, (k't'l): -45.0 \lISIS (nm) ~ 10 F'<.IS.TliNS: f;iSWIND OIR (deg) :330 CEILING (m) : 2,200 HeAVE (m): 4.0PRES.(mbatS): 1009 WAVES (m): 2.8 ROLL (deg): 6,0AIR TtMP (el; 13.5 SWELL (m); 4.5 PITCH (deg}: 3.0

;~~~~:§§!~ ..:· :.·::~~·,m·~~~d~,!:~:~~X~~~:~~~~:~~~~~i.§.:~~.~~~~~~r:;li~~(~::~:~~.~~:~~~:;:9.~~~:.,~~:;~i:::::::'::::::::'::':':::~::::::::::::::,~:::::.:::::::'.:::.":::::::: :::: ".. ,,, ~:::::

Bulk Stocks US~d lin StOCkl Used lIn StocJc. Used J In Stock U:!oCd lIn StockDRILL WATeR (bbf) :0 . :1.,580 FuEL (bb!); 15 1.264 GEL (sx) : 0 -0 HELl-FfJEL (kltT) : 0.0 7.8

POT WATER {bbt}: 0 1,466 BARITE (S1t) ; 0 5,181 (;=MENT (~) : 0 1,764

Northern ~Ior t:f PI Julier & Cox

Pump Data

7~' n;Pili"PUT:~t~~l~~~'iiow·ipp·· S?M' .S$~~.P~~fH~.MW"n (%) (91)''' (psi) (psi) (m RT) (ppg)

r-- ......... ,. "... _., , ....._'

1 Nl!2tlonsl 6.50 50 91 500 2800 30 325 2216 1,1Z NatiDn~1 6.50 50 97 ''0 425 2'216 i.1

50 600 2216 1.1".- .,- ._".. - --Personnel: on Site =99......- _- ------.-.r-.. , ," _._-

COMPANY NAME .,~....Premier 4No~hern 70Dowell Cement 2Asiatir. ROV '3Dowell Mud 1EMS 1Smedvig Satety 1Gecservice :)V~tt:o 1SchllJmberger 10~CS 3....._---_--1...-.._---_--1.__.._...

-_. '-- ." ... ._-_.... , " ..._- ,

DATE SAFETY DETAILS.,. ...- ._..- '1'-'-"

9/6 LTI 25'42316 Mn 21618/6 JSA ongoing170 #PlW ongoing

Safety M~fling 21/6,11'-'.. l.·....·..

INSPEC TlONS

tsQP TESTNEXT TEST DuE DATERIG INSPECTIONDAYS SINCE: LTA

863 863

' ....._- _. _....-LOT PHASe: CSG SHOE CSG SHOE

MO TVO (mBRT)

Drills, Permits & Inspection~_.... , .... _.---------..---Cll~ILL TYPE DATE1---__... .. .---_+-- _

TRIP ORrLL 14/8FIRE. 21/6PIT DRILL 1416INCIDENT 19/6

..... '.'

i 3.3/8 h

ro'

c;~singCSGODn

~9B !!!J:-.~._.,~ ._. ,_", ...~t.!1,EDrlg SuperviiOr H. Koobi.N. Orl9 SupeNisof K.OllbravacGeologist K. FrllnKlewicz:Res. Engineer T, E=ont::dne:-------------------/11

!_ .....- ..TYPE LNGTH CSG \NT GFlC THREAD

(m) 10 (") IbsIft_..._... -" _......_--

Shoe jt 12.5 12.4 68.0 L80 N.VAM1 x 6akerlokjt 11.2 12.4 68.0 L80 N.VAMF/CQnar it 12.3 12,4 68.0 L80 N.VAM3 :r Bi'IIluttlok Jt 35.5 12,4 68.0 LBO N.\lAM20 jts 231.7 12.4 157.0 LBO eTC40jts 466.9 12.4 68.0 LBO N.VAMPup 3.' '2.1 66.0 L80 N.vAMI~~~jt 10.7 12.4- 68.0 LSO N.VA'".. _, ...

Survey r----" r---~ 1.·1 ... ., .MO TVO INCL p.z CORR. 'V DOGLEG NIS ENV TOOL TYpe

La~t Tool Type : Anderdrift (m RT) {rrtRn DEG (deg) p.z. SI!.CT (m!30m) (m) (m)(deg) (rn)

Magnetic Declination: 12.41 1---- - .. ' .- "'" ..... _.. ,- _..1.422 1.4 2'2 0.50 Mderdrifl

Survey method: Min Curvature 1,479 1.479 0.50 Anderdrlft1,594- 1,594 0.00 Ander~rlft.

1,680 1.660 O.SO A"cJc<drift',768 1,168 0.50 Anclerdrift',852 1,652 1.00 AnderdrTft1.$31 1,937 0,00 Aflderdrtft1,944 ',944 0.50 And.,dl'ift

Copyright IDS F>ty Ltd. RbtofB report Mar 16U'11998.1

--_._- ".....",.. "'~""_T7

Page 47: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

21/05/1998 12:19 0352722058 PREMIER OIL GEELONG PAGE 01/03

PremierOil AustralasiaReport Date: 20.06.98

CAlLY DRILLING REPORT # 22

White Ibis 1

Well DataCOUNTRY Australia T.D, (m RT): 2,220.0 CUR. HOLE SIZE ("): 12.25 DAilY COST $ : $323,069FIELD Bass Basin PROGRESS (m): 3,0 eSG 00 ("):. 13.38 CUM COSTS; $4,949,771DRILL CO.: Northern Offshore DAYS FROM SPUD: 19.21 SHOE TVO (m Rn: 863 AFECOST$: $7.321.212RIG: Northern Explorer III DAYS +/- CURVE; lEAK-OFF EMW(ppg) 14,16 AFE BASIS: P&AMUD CO: DowellRT ABOVe MSl (m) : 12.5 CURRENT OP @ 0600; Rig Repairs to hydraulic racking system.

WATE~ DEPTH @MSl (m) : 61.9 PLANNED OP.: Finish Wiper trip. Logging.

RT TO SEABED (m) : 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops. This report only

Attempt Schlumberger logs - unsuccessful. RIH. Work tight hole. Wiper I FORMATION II2P(mBRT)Itrip. Work tight hole. Wait on repairs.

ACTIVITY FOR PERIOD 00:00 HRS TO 24:00 HRS ON 20.06.98FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 00:15 .25 2,220 Reconfigure PEX tool with hole finder.00:15 00:45 .50 2,220 RJH with Schlumberger PEX tool to 936m (passed 916m w/o difficuly). Made

repeated attempts to work tool past 936m (stood up 2m higher than on previousrun), wlo success,

00:45 01:15 ,50 2,220 POOH wI PEX tool.01:15 02:15 1.00 2,220 RID Schlumberger from logging.02:15 03:00 .75 2.220 PU re-run bit #5 (HTC Max GT-PS09, wI 3 x 14 nozzles) and BHA.03:00 05:00 2.00 2,220 RIH to 863m, 13 31B" csg shoe.05:00 06:00 1.00 2,220 Washed & reamed fl 863-939m, w/80rpm, 700gpm, 2800psi, & 3k ft-Ibs torque -

no indications of excessive drag observe. String stood up with 30klbs @ 939m ~

apparent bridge. Reamed bridge. Moderately heavy cuttings @ shakers.06:00 06:45 .75 2,220 Cont wash & ream f/939-953m. Observed heavy unloading of hole over shaker

screens.06:45 09:30 2.75 2,220 Attempted to RIH wtstds f/953-955m, but string stood up. MU TDS, &

washed/reamed 955-1183m, wI 70rpm, 700gpm, & 2800psi. Downhole lossesincreased to 46bph @ 1050m - decreased fJowrate to 500gpm, losses to 10bph,

09:30 11:00 1.50 2,220 RfH wI stds f/1183-2097 w/o resistance. Due to wind &vessel's roll (3 112mseas fl off stb beam, 3deg roll, 20-25knt wind), TDS umbilical again caught in thederrick & pulled fittings off.

1:00 11:45 .75 2,220 eirc hole @ 2097m, while repairing all umbilical fittings except air line (problemduplicating existing fittings).

11:45 12:00 .25 2,220 Cont RIH from 2097-2149m, where string stood up w/60klbs.12:00 13:45 1.75 2,220 Washed & reamed f/2149-2220m, wI BOrpm, 500gpm, & 2250psi. Hard reaming

experienced - increased rotary to 60-140rpm, 4.5-6k ft~lbs torque, Observed 6mfiU on btm.

13:45 15:45 2.00 2,220 Circulated hole clean @ 700gpm, while boosting Riser through C & K lines.15:45 16:30 .75 2,220 Flow checked well while effecting repairs-losses +/- 10bph. Re·connected TDS

air line in the umbilical package, which operates the 180P & elevators.16:30 19:15 2.75 2,220 Pumped slug. POOH fl 2220-1 OOOm. Experienced tight areas of hole from 1350-

1000m which required aOklbs O/pull to pull through.19:15 19:45 .50 2,220 Backreamed tight hole f/1 000-944m, wI 70rpm, 500gpm, & 2400psi.19:45 20:15 .50 2,220 POOH wI stds from 944-863m (13 3/8" shoe). Flow checked well static-okay.20:15 20:30 .25 2,220 Tied off TDS hoses to prevent excessive movement in them due to the

worsening weather & sea conditions.20:30 21:00 .50 2,220 RIH from 863-955m - hole tight at 955m. MU TDS.21:00 21:15 .25 2,220 Washed & reamed fl 955-980m w/70rpm, SOOgpm, & 2200psi.21:15 21:30 .25 2.220 Cont to wash & ream 955-980m while attempting to place a patch on the racking

arm system's hydraulic line. beneath the rigfloor. Temporary repairsunsuccessful; line still losing +/- 0.5gpm of hydraulic fluid.

21:30 22:30 1.00 2,220 POOH f/955-765m (3 stds inside shoe, to be able to run hang off tool) in orderto effect repairs to racking arm system's hydraulic supply line (line needs to bereplaced before continuing wI any pipe operations).

Copyright IDS pty Ltd. RbtofB report Mar 16th 1998.1 Page Number: 1

Page 48: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

21/05/1998 12:19 0352722058 PREMIER OIL GEELONG PAGE 02/03

PremierOil AustralasiaReport Date: 20.06.98

DAILY DRILLING REPORT # 22

White Ibis 1

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

22:30 22:45 .25 2,220 Prepare equipment for repairs to pipe racking system. Re-estimate of approx.time of repairs at 6hrs. Weather cont to worsen, pitch & roU especially due toseas hitting abeam; work conditions on rigfloor very difficult.

22:45 23:00 .25 2,220 PU hang off tool.23:00 23:30 .50 2,220 RIH wI hang off tool &landing string. Land out hang off tool, and back out.23:30 24:00 .50 2,220 POOH wI hang off tool landing string.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 21.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 06:00 6.00 2,220 Unable to temporarily repair high press hyd supply line to pipe racking system -need to replace complete 20+ ft section. Weather poor wI high winds, swell, pitch& roll limiting operations. Thrusters working from 22:50hrs. 20/6.

\NNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 20.06.98

Mud Properties MUD COST FOR TODAY: $3,434 CUMULATIVE MUD COST TO DATE: $151,264

Type: VISCOSllY( sec I qt ): 45 API FLUID LOSS CI· (ppm): 43,000 SOLIDS (%vol) : 3.9PV (cps): 12 (em3130min) 5 K+ (ppm): 31500 H20 (%vol): 96.1PHPA API FILTER CAKE

FROM: FLYP (lb/100sq.ff): 22 (32nds inch 1 HARD/Ca (ppm) : 761 OIL (%vol): 0

TIME: 14:00 GEL 1Os/1 Om130m HTHP FLUID LOSS MBT (ppb eel) : 5.0 SAND: .1

WEIGHT (ppg): 1.10 (lb/100sqft) : 6 10 0 (cm3130min) 0 PM: .6 PH: 9,0

TEMP (C): 130 FANN 3/6/100 6 9 ° HTHP FILTER CAKE0 PF: .2 PHPA: 0.0(32nds ineh)

Bit Data for Bit # 5

SIZE (") : 12.25MANUFACTURER: .HUTYPE: Max GT-PS09

SERIAL # ; X78CH

DEPTH IN (m RT): 2017

DEPTH OUT (m RT) ; 2220

Bit Data for Bit # SRR

SIZE (") : 12.25

MANUFACTURER; HU

'TYPE: Max GT-PS09

SERIAL # : X7SCH

DEPTH IN (m RT) : 2220

DEPn; OUT (m RT) :

IADe# 4 3 5 Wear EBEEOOEfjEBEEEmEI31 2 BT G3 E I CT TO

NOZZLES Drilled over the last 24 hrs Calculated over the bit runAVe WOB (k·lbs) : 24 3 X14 METERAGE (m) : 3 CUM.METERAGE (m)AVE RPM: SO

203x ON BOTTOM HRS : .5 CUM. ON BOT. HRS : 28.4

FLOW (gpm) : 700 x IADC DRILL. HRS : .5 CUM.IADe DRILL H~S: 31.0PUMP PRE.SS. (psi}; 3,300 X TOTAL REVS: 2.400 CUM.TOT. REVS: 136.320HSI (hp/sqi) : 1 X ROP (m/hr): 6.0 ROP (m/hr): 6.5

lAOC# 4 3 5 Wear El~~E9E9~~EgNOZZLES Drilled over the last 24 hrs Calculated over the bit run

AVE wos (k-Ibs): 0 3 X14 METERAGE (m) : 0 CUM,METERAGE (m)AVE-RPM; 70 0

X ON BOTTOM HRS : CUM. ON 60T. HRS :FLOW (9pm) : 500 X IADG DRILL. HRS : CUM.lADC DRILL HRS:PUMP PRESS. (psi): 2,300 X TOTAL REVS: 0 CUMTOT. REVS: 0HSI (hplsqi) : 0 X ROP (m/hr): ROP (m/hr):

BHA#6 Length (ft) :208.6 D.C. (1) ANN. VELOCllY (mpm): 199HRSONJARS: ISTRING WT(k-lbs) : 2531 TRQE' MAX (It-Ibs): 11,000 I D.C. (2) ANN VELOCITY (mpm); 0wr BLW JAR(k-lbs}: 34 PICK UP WT(k-lbs) : 245 TROE ON (ft-lbs): 5,000 H.W.D.P. ANN VELOCITY (mpm): 137aHA \NT'(k·lbs) : 58 SLK OFF \NT(k-lbs} : 240 TRQE OFF (ft·lbs): 4,000 D.P, ANN VELOCITY (mpm) : 137

BHA OESCRIPTION ; TOOL DESCRIPTION HRS SERIAL # COMMENT12 1/4"Bit - biT SUS eJw float vtv· 8" NMDC eJw

MAXGT·PS09 31.0 X7SCHTotco Ring- 1 x 8" DC -121/4" Stab· 6x8"OC-jars 127.0 A0210jars - 3xS" DC • xlo - 9 x HWDP.

Copyright IDS Ply Ltd. RbtofB report Mar 16th 1998.1 Page Number: 2

Page 49: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

21/05/1998 12:19 0352722058 PREMIER OIL GEELONG PAGE 03/03

PremierOil AustralasiaReport Date: 20.06.98

CAlLY DRILLING REPORT # 22

White Ibis 1

Anchor Tension(kips)

A1 : 45.0

A6; 85.0

A2: 50.0

14.7: 60.0

A3: 60.0

AS: 60.0

A4: 80.0

AS:A5; 80.0

A10 ;

rigrig

Workboats

P. CommanderBrule Tide

Location. Fuel Barite Dtwtr P/Wtr Cmt Bent Heli(kltr) (sx) (bbl) (bb!) (sx) (sx) (kltr)131 1,447 1.887220 2,233 528

Weather & Rig data @ 24:00 hrs

WINO SP. (kts) : 45.0 VISIB.(nm): 10WIND DIR (deg) :330 CEILING (m) : 2,200PRES.(mbars): 1009 WAVES (m) : 2.8AIR TEMP (C): 13.5 SWELL (m): 4.5

VOL (kips: 580.0RIS.TENS: 58HEAVe (m): 4.0ROLL (deg): 6.0PITCH (deg); 3.0

ICOMMENTS: "Commander" at rig: "Brute" at rig; 0 helicopter flight· 0 PAX on rig; 0 PAX off rig.

Bulk Stocks Used lin Stock Used lin Stock Used lin Stock Used lin StockDRILL WATER (bbl) :0 3,560 FUEL (bbl): 15 1,264 GEL (sx) : 0 ·0 HELl-FUEL (kltr) : 0.0 7.8POTWATER(bbl): a 1.466 BARlTE(sx}:O 5,181 CEMENT(sx):o 1,764

Jrills, Permits & Inspection~

DRILL TYPE DATE

TRIP DRILL 14/6FIRE 21/6PIT DRILL 14/6INCIDENT 19/6

INSPECTIONS

BOP TESTNEXT TEST DUE DATERIG INSPECTIONDAYS SINCE LTA

DATE SAFETY DETAILS

9/6 LTI 25/423/6 MTI 2/618/6 JSA ongoing170 #PTW ongoing

Safety Meeting 21/6

COMPANY NAME #

Prem~ 4Northern 70Dowell Cement 2Asiatic ROV 3Dowell Mud ,EMS 1Smedvig Safety 1Geoservlc:.e 3Vetco 1Schlumberger 10PCS 3

Casinq Pump DataCSG LOT PHASE CSG SHOE CSG SHOE PumD Data· last 24 hrs00(") MD lVD(mBRT) # TYPE LNR SPM EFF Flow

13.3/8 ,. 14.16 863 8S3 (") (%) (gpm

1 National 6.50 50 97 500TYPE LNGTH CSG WT GRO THR~D 2 National 6.50 50 97

(m) ID (") Ibslft

Shoe jt 12.5 12.4 68.0 L80 NVAM1 x Bakerlok jt 11.2 12.4 68.0 L80 N.VAM Personnel : on Site = 99F/Collar jt 12.3 12.4 68.0 L80 NVAM3 x Bakerlok jt 35.5 12.4 68.0 L80 N.VAM JOB TITLE NAME20 Jts 237.7 12.4 67.0 LBO BTC Orlg Supe.....isor H. Knobl40jts 466.9 12.4 68.0 L80 N.VAM N. Drl9 SupeNlsor K. OubravacPup 3.1 12.4 68.0 LBO N.VAM Geologist K. FrankiewiczVellhead jt 10.7 . 12.4 66.0 LBO N.VAM

Res. Engineer T. Fontaine

Northern E"plorer P Julier& CO;K

Spp SPM(psi)

2600 SO4050

Slow Pumo DataSpp DEPTH MW(psi) (m RT) (ppg)

325 2216 1.1425 2216 1.1600 2216 1.1

Survey MO 1\10 INCL AZ. CORR. 'V DOGl.EG N/S EN.J TOOL TYPE

Last Tool Type: Anderdrift (m RT) (mRn DEG (deg) A2. SECT (mI30m) (m) (m)(deg) (m)

Magnetic Declination: 12.41 1.422 1,422 0.50 Anderclrlft

Survey method : Min Curvature 1.479 1,479 0.50 Anderdrift1,594 1,594 0.00 Anderdrift1.680 1,680 0.50 Anderdrift.1,768 1.768 0.50 Anderdrift1,852 1.852 1,00 Anderdlift1.937 1,937 0.00 Anderdrift1.944 ',944 0.50 Anderdrift

Copyright IDS Pty Ltd. RbtofB report Mar 15th 1998.1 Page Number: 3

Page 50: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

20/05/1998 10:50 0352722058 PREMIER OIL GEELONG PAGE 01/03

$184,606$4,626,702$7.321,212

P&A

12.25 DAllY COST $ :13.38 CUM COST $:

863 AFE COST $ :

14.16 AFE BASIS;

t~.,J~AILY DRILLING REPORT # 21

White Ibis 1

T.D. (mRn;PROGRESS (m):

DAYS FROM SPUD:

DAYS +/-CURVe:

CURRENT OP @ 0600: Wiper trip.

PLANNED OP.: Wipertrip. Logging.

AustraliaBass Basin

Northern OffshoreNorthern Explorer III

Dowell t-----------l--__------""'-----------12.561.974,4

Well DataCOUNTRYFJELDDRILLeD. :RIG:MUDCO:RT ABOVE MSL (m) :WATER DEPTH @MSL (m) ;RTTO SEABED (m):

PremierOil AustralasiaReport Date: 19.06.98

Summary of period 00:00 to 24:00 hrs:

22 std wiper trip, eire BU. POOH. RIH wi Schlumberger- won't pass938m. POOH wi Schlumberger.

Fonnation Tops - This report only

I FORMATION ITOP(mBR!2j

ACTIVITY FOR PERIOD 00:00 HRS TO 24:00 HRS ON 19.06.98FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 00:30 .50 2,220 Drilled Basement f/2217-2220m, wI 30-40klbs WOB, 80rpm, 700gpm, 3350psi,& 6-9k ft-lbs torque. ROPs 4-7m/hr. DownhOle losses at 5-8bph..

00:30 01:30 1.00 2,220 Circulated hole clean @ 700gpm, 3350psi, with slow string rotation andreciprocation.

01:30 01:45 .25 2,220 Flow checked well static - okay.01:45 05:45 4.00 2,220 Began 11std wiper trip f/2220-2073m. Attempted to pull w/o TDS-hole tight

(>30klbs O/pull) fl 2196m. B/ream wI 80rpm, 400-700gpm, & 1500-3300psi. TDSstalling @ 13k ft-lbs while b/reaming - necessary to work hole slOWly.

05:45 06:00 .25 2,220 Streamed to 2073m w/80rpm, 700gpm, & 3300psi. Torque 5·13k ft-Ibs, wIfrequent TDS stalling. String suddenly pulled free of O/pull - high torque areas at2073m; able to pull stands from 2073-2025m.

06:00 08:00 2.00 2,220 Cont to pull stds fl 2025-1606m, wi intermittent O/pull of 60+ klbs (generallyclean hole f/1650-1606m, wI normal 20-25klbs drag observed).

08:00 09:30 1.50 2,220 RIH f/1606-2207m. wi normal drags encountered.09:30 10:00 .50 2,220 Precautionary wash & ream f/2207-2220m.10:00 11:30 1.50 2,220 Circulated hole clean with 700gpm, 3200psi.11:30 12:00 .50 2,220 Dropped EMS.12:00 18:45 6.75 2,220 POOH w/5stds wet· hole good. Slug. Cont POOH wi normal 20-25klbs drags

(except 1125-1080m, where +/-50klbs O/pull was observed). Wiped all tightsections while POOH. Btm 2 x stabs 1/16" UG. Recover EMS « O.5deg, faxedto office).

18:45 21:30 2.75 2,220 RU Schlumberger. Attempt to RU CMR-PEX, but unable to configure relays forCMR section. RU PEX only (tool 15m length), clw hole finder.

21:30 22:30 1.00 2,220 RIH wI logging run #1 (PEX) to 918m • tool standing up, won't pass w/ repeatedattempts ( +/- 5m limestone striger at 918m). POOH wI Schlumberger.

22:30 23:00 .50 2,220 UO hole finder from PEX tool, & RU to re·run tool without it.23:00 23:45 .75 2.220 RIH wI PEX tool w/o hole finder. Worked tool past 918m, but tool stood up at

938m (100% claystone). Made repeated unsuccessful attempts to pass 938m,w/o success.

23:45 24:00 .25 2,220 POOH wI Schlumberger.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 20.06.98FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 00:15 .25 2,220 Reconfigure PEX tool with hole finder.00:15 00:45 .50 2,220 RIH with Schlumberger PEX tool to 936m (passed 916m w/o difficuly). Made

repeated attempts to work tool past 936m (stood up 2m higher than on previousrun), w/o success.

00:45 01:15 .50 2.220 POOH wI PEX tool.01:15 02:15 1.00 2,220 RID Schlumberger from logging.02:15 03:00 .75 2,220 PU re-run bit #5 (HTC Max GT-PS09, w/3 x 14 nozzles) and BHA,03;00 05:00 2.00 2,220 RIH to 863m, 133/8" csg shoe.05:00 06:00 1.00 2.220 Washed & reamed f/ 863-939m, w/80rpm, 700gpm, 2800psi, & 3k ft-Ibs torque -

no indications of excessive drag observe. String stood up with 30klbs @ 939m -apparent bridge. Reamed bridge. Moderately heavy cuttings @ shakers.

Copyright IDS Pty Ltd, RbtofB report Mar 16th 1998.1 Page Number: 1

Page 51: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

20/05/1998 10:50 0352722058 PREMIER OIL GEELONG PAGE 02/03

PremierOil AustralasiaReport Date: 19.06.98

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 19.06.98

DAILY DRILLING REPORT # 21

White Ibis 1

Mud Properties MUD COST FOR TODAY; $939 CUMULATIVE MUD COST TO DATE: $147,830

Type: VISCOSITY{ sec 1qt ): 41 API FLUID LOSS CI- (ppm): 43,000 SOLIDS (%vof) : 3.9

PHPA PV (cps); 11 (cm3f.30min) 5 K+ (ppm): 31500 H20 (%\101); 96.1API FILTER CAKE

FROM: FLYP (1b/100sq.ft): 25 (32nds Inch 1 HARD/Ca (ppm) : 802 OIL (%\101) : 0

TIME; 9:00 GEL 10s/10m130m HTHP FLUID LOSS MBT (ppb eq) : 5.0 SAND: .1

WEIGHT (ppg): 1.10 (lb/100sqft) : 6 9 0 (em3/30min) 0 PM: .6 PH: 8.9

TEMP (C): 132 FANN 316/100 6 9 0 HTHP FILTER CAKE PF: .2 PHPA: 0.0(32nds inch) 0

Bit Data for Bit # 5 IADC# 4 3 5 Wear 8jt!]OOI;gEI3fGlf02lEljS.ZEr} :

1 2 8T G3 E II I "CT I; TD12.25 NOZZLES Drilled over the last 24 hrsMANUFACTURER: HU AVE WOB (k·lbs): 24

Calculated over the bit run3 X14 METE:RAG!: (m) : 3 CUM.METERAGE em) 203TYPE: Max GT-PS09 AVE RPM: 80 X ON eOn-OM HRS : .5 CUM. ON BOT. HRS : 28.4

SERIAL # ; X78CH FLOW (gpm) ; 700 X lADe DRILL. HRS ; .5 CUM,fADC DRILL HRS: 31.0IDEPTH IN (m RT) : 2017 PUMP PRESS. (psi): 3,300 X CUM.TOT, REVS;DEPTH OUT (m RT) ;

TOTAL REVS : 2,400 136.3202220 HSI (hp/sqi) : 1 X ROP (mlhr): 6.0 ROP (mlhr): 6.5

BHA#6 Length (ft) :210.4 D.C. (1) ANN. VELOCITY (mpm): 199HRS ON JARS: STRING WT(k-lbs) : 253 TRQE MAX (ft-Ibs): 1',300 D.C. (2) ANN VELOCITY (mpm): 0WT BLW JAR(k·lbs): 36 PICK UP WT(k-lbs) : 245 TRQE ON (ft·lbs): 6,900 H.W.D.P. ANN VELOCITY (mpm): 137BHA WT(k-lbs) : 60 SLK OFF 'lJT(k-lbs) ; 240 TROE OFF (ft·lbs): 4.800 D.P. ANN VELOCITY (mpm): 137

BHA DESCRIPTION: TOOL DESCRIPTION HRS SERIAL # COMMENT12 1/4"Sit - 12 1/4" NB Stab cJw float vlv - 8"

MAXGT-PS09 31.0 X78CHNMDC eJw Totco Rlng-12 1/4" Stab ., x 8" DC·12 1/4" Stab- 6xS"De - jars - 3xS" DC· xlo· 9 x jars 127.0 A0210

HWDP.

Anchor Tension A1 : 45,0 A2: 50.0 A3: 70.0 A4: 60,0 A5: 75.0(kips) A6; 80.0 A7: 70.0 A8; 75,0 A9: A10 :

Workboats Location. Fuef Barite DhAr Plwtr Cmt Bent Heli Weather &Rig data @ 24:00 hrs(kltT) (sx) (bb!) (bbl) (sx) (sx) (kltr) VDL (kips: 578.0

P. Commander T!9 133 1,447 1,918 WIND SP. (kts) : 20.0 VISIB.(nm) ; 10 RIS.TENS: 681rute Tide rig 233 2,233 S54 WIND DIR (deg): 10 CEILING (m) : 3.000 HEAVE (m): 0.8

PRES.(mbars}: 1024 WAVES (m): .9 ROL.L (deg): 1,5AIR TEMP (C); 12,5 SWELL. (m); 1.7 PITCH (deg); 0.5

ICOMMENTS: "Commander" at rig; "Brute" at rig: 1 helicopter flight· 8 PAX on rig; 5 PAX off rig. I

Bulk Stocks Used lin Stoc.k Used lin Stock Used I In Stock Used I In stockDRILL WATER (bbl) :0 3,580 FUEL (bbl) ~ 11 1,279 GEL (sA) : 0 -0 HEll-FUEL. (kltr) ; 0.3 7.8POT WATER (bbl) : 0 1,421 BARITE (sx) : 0 5.181 CEMENT (sx) : 0 1.764

Drills, Permits & Inspection~

DRILL TYPE DATE INSPECTIONS DATE SAFETY DETAILS

TRIP DRILL 14/6 SOP TEST 9/6 LTI 25/4FIRE 14/6 NEXT TEST DUE DATE 2316 MTI 2/6PIT DRILL 14/6 RIG INSPECTION 18/6 JSA ongoingINCIDENT 19/6 DAYS SINCE LTA 169 #PTW ongoing

Safety Meeting 14/6

Pump DataPumD Data -last 24 hI'S Slow Pumg Data

# TYP!: LNR SPM EFF Flow Spp SPM SPP DEPTH MWn (%) (gpm (psi) (psi) (mRn (ppg)

1 National 6,50 70 97 700 3350 30 325 2216 1,12 Nat!onal 6,50 70 97 40 425 2216 1.1

50 600 2216 1.1

Copyright IDS Pty Ltd. RbtofB repOlt Mar 16th 1998.1 Page Number; 2

Page 52: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

20/05/1998 10:50 0352722058 PREMIER OIL GEELONG PAGE 03/03

PremierOil AustralasiaReport Date: 19.06..98

DAILY DRILLING REPORT # 21

White Ibis 1

CasinQ Personnel: on Site::;; 99CSG LOT PHASE CSG SHOe eSG SHOE00(") MD lVD(mBRl) JOSTITLE NAME COMPANY NAME. #

13.318 II 14.16 863 863 Drlg Supervisor H. Knobl Premier 4N. Orlg Supervisor K.. Dubravac Northern 70

TYF'E:: LNGTH CSG wr GRD THREAD Geologist K. Frankiewicz Dowell Cement 2

(m) 10 (") lbslft Res, Engineer T. Fontaine AsiaticROV 3Dowell Mud 1

Shoejt 12.5 12.4 68.0 LSO NVAM Northern ~xplorer F' Juller& Cox EMS 11 x Bakerlok jt 11.2 12.4 68.0 LaO NVAM Smedvig Safety 1F/Collar jt 12.3 12.4 68.0 LBO NVAM Geoservice 33 x Bakenok jt 35.5 12.4 68.0 LaO NVAM Vetco 120jts 237.7 12.4 67.0 L80 BTC Schlumberger 1040jts 466.9 12,4 68.0 L80 NVAMPup 3,1 12.4 68.0 LBO N.VAM pes 3

Wellheadjt 10,7 12.4 68.0 L80 N.VAM

Survey MD TVD INCL P2. CORR. 'V DOGLEG N/S EM! TOOL TYPE

Last Tool Type : Anderdrift (m R1) (mR1) DEG (deg) IV. SECT (m/30m) (m) (m)(deg) em)

Magnetic Declination : 12..41 1.422 1,422 0.50 Anderdrift

Survey method: Min Curvature 1,479 1,479 0,50 Anderdrift1,594 1.594 0.00 Anderdrift.1,680 1,680 0.50 Anderdrlft1,768 1.768 0.50 Anderdrjft1.852 1,852 1,00 Anderdrift1.937 1,937 0.00 Anderdrlft1.944- 1.944 0.50 Anderdrift.

Copyright IDS Ply Ltd, RbtofB report Mar' 6th 1998.1 Page Number: 3

Page 53: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

Premier Oil AustralasiaGeelong Operations BasePhone; 0352722101Fax: 0352722058

19V~6/1998 09:16I!

i!I

0352722058 PREMIER OIL GEELONG

Premier OilAustralasia

PAGE 01/04

FaxTo:

Fax:

Victoria Minerals &Petroleum Ops, Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Bacon

Boral Energy Resources, Attn: A Guthrie, Ross Naumann

CalEnergy. Attn: Jane Duncan

From; Gordon Hunter

Date: June 19, 1998

Phone:---'.._-'--._-----_.,---.' Pages: 4 inc, this one-----------

Re: Wnite Ibis I cc:

o Urgent

·Comments:

o For Review o Please Comment 0 Pleas, Reply o Please Recycle

Please find attached the Daily Drilling Summary Report for 18th June 1998.

Regards

Gordon Hunter

Drilling Superintendent

Page 54: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

19YaG/1998 09:15I

i0352722058 PREMIER OIL GEELONG PAGE 02/04

;

iI

fremierOil Australasia~eportDate: 18.06.98

DAILY DRILLING REPORT # 20

White Ibis 1

Well Data:COUNTRY Australia T.D. (m RD; 2,217.0 CUR. HOLE SIZE ("): 12.25 DAILY COST $ : $233.617I

:FIELD Bass Basin PROGRESS (m): 153.0 CSG 00 ("): 13.38 CUM COST $ : $4,442,096IpRILL CO. : Northern Offshore DAYS FROM SI'UD; 17.21 SHOE NO (m RD: 863 AFE COST $ : $7.321,212:RIG; Northern Explorer 1lI DAYS +/- CURVE: LEAK-OFF EMW(ppg) 14.16 AFE BASIS: PMiMUDCO: Dowell~T ABOVE MSL (m) : 12.5 CURRENT OP @ 0600: Wiper trip.

WATER DEPTH @MSL (m) ; 61.9 PLANNED OP, ; eire. EMS. POOH. Log

ftT TO SEABED (m) ; 74.4

$ummary of period 00:00 to 24:00 hrs: Formation Tops - This report onlyI

il ITOP(mBR1) IiDrilled 12 1/4" hole. FORMATION

·lSasement I 2,1731IiiACTIVITY FOR PERIOD 00'00 HRS TO 24:00 HRS ON 18 06 98.jFROM TO HRS DEPTH ACTIVITY DESCRIPTION

1,00:00 04:00 4.00 2,103 Drilled f/2064-2103m, w/25-30klbs WOB, 120-130rpm, 700gpm, 3250psi, & 6-I 8k ft-lbs torque. Background gas @ 0.1-0.2%. Raps 6-30m/hr. Cont to treat!I downhole losses (5-1 Obph) wi Barofiber & Kwickseal F.~4:00 06:00 2.00 2,124 Drilled f/2103-2124m, wI 25-35klbs WOB, BOrpm, 700gpm, 3250psi, &6-9k ft-I Ibs torque. ROPs 4-2Bm/hr. Downhole losses remaining fairly constant at <II 10bph.I

p6:00 12:30 6.50 2,173 Drilled f/2124-2173m, wI 25-35klbs WOB, 85rpm, 700gpm, 3300psi, & 6-8k ft-

I Ibs torque. ROPs 6-30m/hr. Downhole losses at < 10bph. Jumped ROV: LMRPI unchanged @ 2deg; BOP slope indicator @ 2.25deg (was 2deg).I

h3:00 24:00 11.00 2,217 At 2173, observed slowing in ROPs to 2.S-3.5m/hr - Basement confirmed byi geologist. Drilled f/2173-2217m, wi 30-42klbs WOB, 90rpm, 700gpm. 3300psi,

i & 6-8k ft-Ibs torque. Raps 3.5-5.5m/hr. Downhole losses at 5-8bph.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 19.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

PO:OO 00:30 .50 2,220 Drilled Basement f/2217-2220m, w/30-40klbs WOB, 80rpm, 700gpm, 3350psi,I &6-9k ft-Ibs torque. Raps 4-7m/hr. Downhole losses at 5-8bph..iPO:30 01:30 1.00 2,220 Circulated hole clean @ 700gpm, 3350psi, with slow string rotation and

P1:30reciprocation.

01:45 .25 2,220 Flow checked well static - okay.01:45 05:45 4.00 2,220 Began 11std wiper trip f/ 2220-2073m. Attempted to pull w/o TDS-hole tight! (>30klbs O/pulI) f/2196m. 8/ream w/80rpm, 400-700gpm, & 1500-3300psi. TDSii stalling @ 13k ft-Ibs while b/reaming - necessary to work hole sloWly.i

95:45 06;00 .25 21220 B/reamed to 2073m w/80rpm, 700gpm, & 3300psi. Torque 5-13k ft-Ibs, w/I frequent TDS stalling. String suddenly pulled free of a/pull - high torque areas atI

i 2073m; able to pull stands from 2073-2025m.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 18.06.98I

Mud Properties MUD COST FOR TODAY: $6,256 CUMULATiVe MUD COST TO DATE: $146.891

~ype : VISCOSITY( sec I qt }: 41 API FLUID LOSS C.· (ppm): 43,000 SOLIDS (%'101) ; 3.9

PHPA PV (cps) : 11 (cm3/30min) 5 K+ (ppm): 31500 H20 (%vol): 96.1Al'l FILTER CAKE

~ROM: FLYP (lbf100sq.ft): 21 (32nds ineh 1 HARD/Ca (ppm) : 762 OIL (%voJ): 0

~tME; 22:00 GEL 10s/10m130m HTHP FLUID LOSS MBT (ppb eq) . 5.0 SAND: .1

WEIGHT (ppg): 1.10 (lb/100sClft) : 6 10 0 (cm3/30min) 0 PM; .6 PH: 9.0

~EMP (C): 130 FANN 3/6/100 6 9 0 HTHP FILTER CAKE0

PF: .2 PHPA: 0.0(32nds inch)

I

ii

cJpyright IDS Ply Ltd, RbtofB report Mar 16th 1998.1

i

Page Number: 1

Page 55: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

0352722058

CAlLY DRILLING REPORT # 20

White Ibis 1

19r06J1998 09:15

I .

I

fremierOii Australasia~.portDate: 18406.98

OIL GEELONG PAGE 03/04

I

!Bit Data for Bit # 5 IADe# 4 3 5 Wear E8~fDlrlf:g~~r:gISIZE(") : 12.25 NOZZLES Drilled over the last 24 hrsMANUFACTURER: HU AVE WOB (k-Ibs) : 20 Calculated over the bit run

3 x14 METERAGE (m) : 153 CUM.METERAGE (m) 200:TYPE: Max GT·PS09 AVE RPM: 90 X ON BOTTOM HRS : CUM. ON 80T. HRS : 27.9ISERIAL#: FLOW (gpm): 700

22.6X78CH X IADC DRILL. HRS : 24.0 CUM.IADC DRILL HRS: 30.5

iDEPTH IN (m RT) : 2017 PUMP PRESS. (psi): 3,300 x TOTAL ~EVS: 122,040 CUM.TOT. REVS: 150,660DEPTH OUT (m RT) : HSI (hp/s~i) : 1 X ROP (m/hr); 6.4 ROP (m/hr): 6.6

:I.iBHA # 6 Length (ft) :210.4 O.C. (1) ANN. VELOCITY (mpm): 199,HRS ON JARS: ISTRING WT(k-lbs) : 2531 TRQE MAX (It-lb.): 11,300 D.C. (2) ANN VELOCI1l' (mpm): 0jVVT BLW JAR(k-lbs): 36 PICK UP 'NT(k-lbs) : 245 TRQE ON (ft·lbs): 6.900 H.W.D.P. ANN VELOCITY (mpm): 137!8HA \rVT(I<-lbs) ; 60 SLK OFF wr(k-Ibs) : 240 TRQe OFF (ft-Ibs): 4,800 D.P. ANN VELOCITY (mpm) : 137

~HA DESCRIPTION: TOOL DESCRIPTION MRS SERIAL # COMMENT112 1/4"Bit ~ 12 1/4'1 N6 Stab cJw float vlv. 81f

MAX GT-PS09 30.5 X78CH/NMDC cJw TOlCO Ring-12 1/4" Stab ·1 x 8" DC-jars 118.9 A021 0/12 1/4" Stab- 6xS1tDC • jars - 3xS" DC - xfo - 9 x

,iHWDP.

Anchor Tension A1 : 60.0 A2: 60.0 A3; 60.0 A4: 50.0 AS: 65.0(kips) A6: 75.0 A7: 70.0 A8: 75.0 A9: A10 :IWorkboats Location. Fuel Barite DMttr Plwtr Cmt Bent Heli Weather & Rig data @ 24:00 hrs

(kltr) (s,;) (bbl) (bbl) (sx) (sx) (kltr) VDL (kips; 543.0~. Commander rig 135 1.447 1.950 WIND $P. (kts) : 19.0 VIStB.{nm) : 10 RJS.TENS; 68

rute Tide Geelon WIND DIR (deg) :250 CElLiNG (m) : 3.000 HEAVE (m): 1.8

IPRES.(mbars): 1030 WAVES (m): 1.5 ROLL (deg): 2.5AIR TEMP (e): 13.0 SWELL (m): 3.3 PITCH (deg): 1.0

rCOMMENTS: "Commander" at rig; "Brute" at Geelong; 1 helicopter f1ignt - 7 PAX on rig: 5 PAX off rig. I

tU1k Stocks Used lIn Stock Used lin Stock Used ./ In Stock Used /In StockRILL WATER (bbl);O 3,5BO FUEL (bbl) : 10 ',290 GEL (sx): 0 -0 HELl-FUEL (kJtr) : 0.0 8.1~OTWATER (bb!): 214 1,390 BARITE (sx) : 0 5,181 CEMENT (sx) : 0 1,764I

'c rills, Permits & Inspections

r DRILL TYPE DATE INSPECTIONS DATE SAFETY DETAILS

·1 RIP DRILL 14/6 BOP TEST 9/6 LTI'liRE 14/6 NEXT TEST DUE DATE 23/6 MTI 2/6FPIT DRlLL 14/6 RIG INSPECTION 18/6 JSA ongoingI~CIDeNT 14/6 DAYS SINCE LTA 166 #PTW ongoing

Safety Meeting 14/6

Casino Pump DataI CSG LOT PHASE CSG SHOE CSGSHOE PumD Data· last 24 hrs Slow Pume Datai OD(") MD TVD (m8RT) # TYPE LNR SPM EE=F Flow SPP SPM SPP DEPTH MW3.3/8 " 14.16 863 863 (") (%) (gpm (psi) (pSi) (m RT) (ppg)

I1 National 6.50 70 97 700 3350 30 325 2216 1.1I TYPE LNGTH CSG wr GRD THREAD 2 Nationar 6.50 70 97 40 425 2216 1.1

! (m) ID ('1 Ibslft 50 600 2216 1.1

Shoe jt 12.5 12.4 68.0 LSO N.VAM1! x Bakerlok jt 11.2 12.4 68.0 L80 N.VAMR/Collar jt 12.3 12.4 68.0 LSO NVAM~ x 8aker!ok jt 35.5 12.4 68.0 L80 NVAM2,0 jls 237.7 12.4 67.0 LBO BTC

~jts 466.9 12.4 68.0 LSO N.VAMup 3.1 12.4 68.0 LBO NVAM

Wellheadjt 10.7 12.4 68.0 LSO N.vAM

f

I

Co~yrlght IDS Pty Ltd. RbtofB report Mar 16th 1998.1I

Page Number: 2

Page 56: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

PAGE 04/04

DAILY DRILLING REPORT # 20

White Ibis 1

PREMIER OIL GEELONG0352722058

Personnel: on Site =96

JOB TITLe NAME COMPANY NAME #

Drlg Supervisor H. Knobl Premier 3N. Drlg Supervisor K.Dubravac Northern 70Geologist K. Frankiewicz Oowell Cement 1

AsiaticROV 3Dowell Mud 1

Northern Explorer P Julier& Cox EMS 1Smedvig Safety 1Geoservice 4Vetco 1Alfa Laval 1Core hand 1Schlumberger 9

,

!Survey MD ND INCL AZ CO~~. 'V DOGLEG N/S eNV TOOL TYPE

~ast Tool Type: Anderdrift (mRn (m RT) DEG (deg) AZ seCT (mI30m) (m) (m)(deg) (m)

f,agnetic Declination: 12.41 1,422 1,422 0.50 Anderdrift

urvey method: Min Curvature 1,419 1,479 0.50 Anderdrift

I1,594 1,594 0.00 Anderdrift1,680 1,680 0.50 Anderdrift

I 1.768 1,768 0,50 AnderdriftI 1,852 1,852 1,00 AnderdriftII 1,937 1,937 0.00 Anderdrifti

I1,944 1,944 0.50 Anderdrift

19(0511998 09:15

I

I

fremierOil Australasiareport Date: 18.06.98

II

IIiII

II

C~yright IDS Ply I.ld. RbtofB ,epM Mar 16th 1998.1I

I

Page Number: 3

Page 57: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

18/05/1998 09:43 0352722058 PREMIER OIL GEELONG PAGE 01

Premier Oil AustralasiaGeelong Operations BasePhone; 0352722101Fax~0352722058

Fax

Premier OilAustralasia

To:

Fax:

Phone:

Re;

Victoria Minerals & Petroleum Ops. Attn: Ahmed Nadji

Mineral Resources Tasmania. Attn: Carol Bacon

Boral Energy Resources, Attn: A. Guthrie. Ross Naumann

CalEnergy. Attn: Jane Duncan

White IbiS I

From: Gordon Hunter

Date: June 18, 1998

Pages: 5 inc. this one

cc:

o Urgent

-Comments:

o For Review o Please Comment 0 Please Reply o Please Rec.:yde

Please find attached the Daily Drilling Summary Report for 17th June 1998.

Regards

Gordon Hunter

Drilling Superintendent

Page 58: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

18/05/1998 09:43 0352722058 PREMIER OIL GEELONG PAGE 02

PremierOil AustralasiaReport Date: 17.06.98

DAILY DRILLING REPORT # 19

White Ibis 1

Well DataCOUNTRY Australia T.D. (m RT): 2,064.0 CUR HOLE SIZE ("): 12.25 DAILY COST $ : $216.957FIELD Bass Basin PROGRESS (m): 56.0 CSGOD("): 13.38 CUM COST $ : $4,.208,479DRILL CO.: Northern Offshore DAYS FROM SPUD' 16,21 SHOE TVD (m RT); 863 AFE COST $ : $7,321,~12

RIG: Northern Explorer III DAYS 't'/- CURVE: LEAK·OFF EMW{ppg) 14.16 AFE BASIS: P&AMUD CO: DowellRT ABOVE MSL (m) ; 12.5 CURRENT OF'@ 0600; Dr/ll12 1/4" hole to TD.

WATER DEPTH @MSL (m) : 61.9 PLANNED OP. : Drill 12 1/4" hole to TO. Wiper Trip. EMS. POOH. Log.

RT TO SEABED (m) ; 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops - This report only

POOH wI core. LID core bbl. Repair pipe racking system & re-align I FORMATION ITOP(mBRT) Idiverter. MU BHA. RIH. Drill 12 1/4". Circ BU for samples. Drill 12 1/411

hole.

ACTIVITY FOR PERIOD 00:00 HRS TO 24'00 HRS ON 17.06.98.IFROM TO HRS DEPTH ACTIVITY DESCRIPTION

,,)0:00 00:30 ,50 2,017 Cont to POOH wI coring BHA00:30 01:30 1.00 2,017 Broke out core bbl- empty except 1 x 120mm UG piece of core jammed into 2nd

section. Broke out core head - observed ·it packed w/20-40mm thick "pancake"shaped disks of UG core, 0.6m total. Total core: a.72m, 8%,

01:30 01:45 .25 2,017 Graded core head: approx. 5% wear, 1/16" UG, w/3 x cutters slightly chipped.Core sample appears quite friable, apparently washed or abraded UG.

01:45 05:00 3.25 2.017 Removed standlift fl derrick for repair. New pins for standlift cylinderincompatible wi yoke. Remove pins. modify, bore & install clevis pins. Reinstall.Adjust diverter alignment, turning 10deg (no hold down 'V" in this style diverter).

05:00 05:30 .50 2,017 PU 12 1/4" BHA from derrick. LlO Xlovers, NB stab, Anderdrift.05:30 07:30 2.00 2,017 PU new NB Stab, & MU. MU new bit, HTe MAX GT-PS09 ctw 3 x 14 nozzles.

RIH wi DCts & jars.07:30 09:00 1.50 2,017 RIH wI remainder of BHA &5" DP to 133/8" csg shoe. Break circ & fill lines

(18bbls).09:00 11:30 2.50 2,017 RIH from 863-1974m, where string encountered 20klbs resistance, PU to

1958m. and MU TDS.11:30 13:00 1.50 2,017 Washed/reamed from 1958-2017m (TD), w/70rpm, 700gpm, 3150-3200psi

initially, slowly dropping to 2800psi, 3-5k ft-Ibs torque.13:00 13:30 ,50 2,019 Bed in bit fI2017-2019m, w/O-10klbs WOB, 60-70rpm, 700gpm, & 2700psi. Due

to sudden release of compensator, string dropped, spudding bit w/40klbs. PU offbtm to investigate lack of compensation (had been pumped up while RIH).

13:30 14:30 1.00 2,019 Trouble shoot drill string compensator, pumping up system. Both aircompressors running. Discovered air had been "stolen" from compensatorsystem to pressure up the previously bled Guide wire system (after air linerepairs).

14:30 15:15 .75 2,019 Investigated standpipe pressure loss, from 3100psi initially to 2800psi, droppingfurther to 2400psi while working on comp'ensator air pressure. Opened up pump#1-neg. P/test surface system - neg.

15:15 16:15 1.00 2,019 Put bit on bottom for 10min to confirm pressure drop - SPP dropped f/2400-2250psL POOH to look for DP washout. Discovered washout 0.74m below box inmiddle jt of stand # 8 off btm. Broke out jt and replaced wi new single.

16:15 16:45 ,50 2,019 RIH from 179S-2019m.16:45 21:45 5.00 2,061 Resumed drilling fl 2019-2061 m, wi 30klbs WOB, 90-120rpm, 700gpm, 3200psi

& 4-6k ft-Ibs torque. ROP's 6-12m/hr. Observed drilling break @ 2057-2061m, wIRap's increasing to >30m/hr. Began treating losses (20bph) w/ LCM.

21:45 22:00 .25 2,061 Flow checked well static .. okay.22:00 23:30 1.50 2,061 Circulate bottoms up from 2061m for geological sample. Max, gas 15'%.23:30 24:00 .50 2,064 Drilled f/2061-2064m, wI 25·30klbs WOB, 130-140rpm, 700gpm, 3250psi, & 6-

8k ft-lbs torque. Background gas levels at normal 0.1-0.2%. ROPs 6-8m/hr.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 18.06.98

Copyright IDS Pry ltd, RbtofS report Mar 16th 1998.1 Page Number: 1

Page 59: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

18/05/1998 09:43 0352722058 PREMIER OIL GEELONG PAGE 03

PremierOil AustralasiaReport Date: 17.06.98

CAlLY DRILLING REPORT # 19

White Ibis 1

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 04:00 4.00 2,103 Drilled f/ 2064·21 03m, wI 25-30klbs WOB, 120-130rpm, 700gpm, 3250psi. & 6-8k ft-Ibs torque. Background gas @ 0.1-0.2%. ROPs 6-30m/hr. Cont to treatdownhole losses (5-10bph) wI Barofiber & Kwickseal F.

04:00 06:00 2.00 2.124 Drilled f/2103-2124m, w/25-35klbs WOB, 80rpm, 700gpm, 3250psi, & 6-9k ft-Ibs torque. ROPs 4-28m/hr. Downhole losses remaining fairly constant at <10bph.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 17.06.98

REMARK I OBSERVATION

Repaired washed out air fine with pre-fabricated sectionwhile handling tools for new BHA and fe-aligning Diverter.New air line installation fabricated to maximize distancefrom Guide lines in order to avoid reoccurrence.

Vhile RIH after repairs to air line, the driller pumped up(he compensator system, as both the compensator andguide wire tensioning system work off the same repairedair line which had been bled off. When bedding in the bitand trying to adjust the compensator, however,insufficient air pressure to the compensator was availableto hold the string, allowing the bit to spud into the btm ofthe hole wi 40klbs.

Summary of DP washouts: Washout # 1 fl White Ibis, onrep.16, was reported as 2 ft below tool jt (0.61 m), not 2m,7 std below RT. Washout # 2, rep 19, was 0.74m belowthe tool jt (box) on the middle jt of std 8 off btm. On theYolla well, washout # 1, rep # 35, was 0.61 m below tool jt(box) on 16th std below RT; washout #21 rep # 35, wasO.61m above tool jt (pin) on the 22nd std below RT. Allare strikingly similar, Digital photos of the 1st 3 havealready been sent to Premier, Geelong (4th in mailbag).NB: the internal upset on this pipe is +/- a.6m from thetool jt.

SOLUTION I RECOMMENDATION

Diverter alignment: This is the old stlye diverter, withouta ''V'' shaped dog which locks into a corresponding "V'recess, preventing torque-ing out of alignment.Previously here, they used a cover plate and bolted thisdown, but experienced problems pulling the bolts due tothe torque forces against them.The air storage bottle bank had been bled off for repairs,but the compressors slowly provided enough air topressurize the string compensator while RIH.Unbeknownst to the driller, the guidewire tensioningsystem was pressured up before the system'saccumulator bottles were fully charged. This had theeffect of bleeding off the compensator air. Problemsolution: communicationlll and separate air supplies(compressors) for each system.

Jd Properties MUD COST FOR TODAY: $1.866 CUMULATIVE MUD COST TO DATE: $148,278

Type: VISCOSITY( sec I qt ): 42 API FLUID LOSS CI- (ppm): 42.000 SOLIDS (%'101); 3.5PV (cps): 11 (cm3/30min) 5 K+ (ppm): 31500 H20 (%vol): 96.5PHPA API FILTER CAKEYP (lb/100SCj.ft); 21 ($2nds inch 1 HARD/Ca (ppm) : 761 OIL (%vol): 0

FROM: FLTIME: 21:00 GEL 1Os/1 Om/30m HTHP FLUID LOSS M6T (ppb eq) : 5.0 SAND: .1

WEIGHT (ppg): 1.09 (lb/100sqft) : 6 9 0 (cm3/30min) 0 ~M: .7 PH: 8.9

TEMP (C): 129 FANN 3/6/1 00 6 9 0 HTH~ FILTeR CAKE0 PF: .2 PHPA: 0.0

(32nds inch)

Bit Data for Bit # 4 lADe # Wear I:, O~ J~E9E9f:gMM

SIZE(") : 12.25 NOZZLES Drilled over the laSl24 hI'S Calculated over the bit runMANUFACTURER: OT AVE: WOB (k-Ibs) ; 5 x METERAGE (m) : 9 CUM.METERAGE (m) 9TYF'E: CM365 AVE RPM : 45 X ON BOTTOM HRS : .7 CUM. ON BOT. HRS : .7SERIAL # : 775201 FLOW (gpm): 400 X JADe DRJLL. HRS: 1.0 CUM.JADC DRILL HRS: 1.0DEPTH IN (m RD : 2008 PUMP PRESS. (psi): 350 x TOTAL REVS: 1,890 CUM.TOT. REVS; 1,890DEPTH OUT (m RD : 2017 HSI (hp/sql) : a x ROP (m/hr); 9.0 ROP (m/hr): 9.0

Copyright IDS Pty Ltd, RbtofB report Mar 16th 1998.1 Page Number: 2

Page 60: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

18/05/1998 09:43 0352722058 PREMIER OIL GEELONG PAGE 04

PremierOil AustralasiaReport Date: 17.06.98

DAILY DRILLING REPORT # 19

White Ibis 1

Wear ~~Bit Data for Bit # 5

SIZE (n) : 12.25

MANUFACTURER: HU

TYPE: Max GT-PS09

SERIAL # : X78CH

DEPTH IN (m RT) : 2017

DEPTH OUT (m RD :

lADe. 4 3

AVE WOB (k·lbs):

AVE RPM:

FLOW (gpm):

PUMP PRESS. (psi):

HSI (hp/sql) ;

5

17

106

1003.100

1

NOZZLES3 X14

XXxx

Drilled over the last 24 hrs

METERAGE(m): 47

ON BOTTOM HRS : 5.3

IADC DRILl. HRS : 6.5TOTAL REVS: 33.708ROP (m/h:-): 7.2

Calculated over the bit run

CUM,METERAGE (m) 41CUM. ON BOT. HRS : 5.3CUM.lADC DRILL HRS: 6.5CUM.TOT. REVS: 33,708ROP (m/hr): 7.2

BHA#5 Length (tt) :214.5 D.C. (1) ANN. VEl.OCITY (mpm): 0HRS ON JARS: STRING WT(k-Ibs) : 227

ITRQE MAX (ft-Ibs); 14,000 I D.C. (2) ANN VELOCITY (mpm): 0

wr BLW JAR{k-lbs): 30 I PICK UP WT(k-lbs) : 220 TROE ON (ft·Jbs): 5,300 H.W.D.P. ANN VELOCITY {mpm}: 0BHA \NT(k-Ib6) ; 59 SlK OFF WT(k-lbs) : 225 TRQE OFF (ft-Ibs): 2,300 D.P. ANN VELOCITY (mpm) : 0

BHA DESCRIPTION: TOOL DESCRIPTION HRS SERIAL # COMMENT121/4" Corehead+8 3/8" core bbl+9 1/2" bumper

CM365 corehead 1.0 775201sub+S" bumper sub+6x8" DC+jar+3x8"jars 86.5 A0210-"C+x!over+-9xHWDP

BHA#6 Length (ft) :210.4 D.C. (1) ANN. VELOCITY (mpm): 0HRSONJARS: STRING WT(k-lbs) : 244 TROE MAX (ft·lbs): 9,300 O.C. (2) ANN VELOCITY (mpm): 0wr BLW JAR(k-lbs): 36 PICK UP Wf(k-Ibs} : 244 TRQE ON (ft-Ibs); 6.000 H.W.D.P. ANN VELOCITY (mpm): 0aHA Wf(k-Ibs) : 60 SLK OFF WT(k·lbs) : 242 TRQE OFF (ft-lbs): 4,100 D.P. ANN VELOCITY (mpm) ; 0

BHA DESCRIPTION; TOOL DESCRIPTION HRS SERIAL # COMMENT12 1/4"Slt - 12 1/4" NB Stab clw float v/v - 8"

MAX GT-PS09 6.5 X78CHNMDC cIw Totco Ring- 12 1/4" Stab -1 x 8" DC -jars 96.3 A021012 1/4" Stab- 6x8"DC - jars - 3x8" DC • xfo • 9 x

HWDP.

Anchor Tension A1 : 60.0 A2. ; 60.0 A3: 60.0 A4: 60,0 A5: 70.0(kips) A6: 75.0 A7: 70.0 A8: 80 ..0 AS; A10 :

Workboats Location. Fuel Barite Olwtr Plwtr Cmt Bent Heli Weather & Rig data @ 24:00 hrs(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltr) VDL (kips: 595.0

P. Commander rig 142 1.447 1,961 WIND SP. (kts) : 20,0 VISIB,(nm) ; 9 RIS.TENS: 68Brute Tide Geelon WIND DIR (deg) :260 CEILING (m) ; 2,500 HEAVE (m); 1.8

PRES.(mbars): 1028 WAVES (m): 1.4 ROLL (deg) : 1,5AIR TEMP (C) ; 13.0 SWELL (m); 2.8 PITCH (deg): 1,0

I ,OMMENTS: "Commander" at rig; "Brute" sailing to Geetong, ETA C1ua,yslde @10:00hrs; 1 helicopter flight - 8 PAX on rig; 7 PAX off rig. I

Bulk Stocks Used lin Stock Used lin Stock Used / In Stock Used lin Stock

DRILL WATER (bbl) :0 3,580 FUEL (bbl): 15 1.300 GEL (sx) : 0 -0 HEll-FUEL (kltr) : 0.3 8.1

POT WATER (bbl): 0 1,604 BARITE (sx): 0 5.181 CEMENT (sx) : 0 1.764

Drills, Permits & Inspectlon~

DRILL 1YPE DATE

TRIP DRILl. 14/6FIRE 14/6PIT DRIL.L 1416INCIDENT 1416

INSPECTIONS

BOP TESTNEXT TEST DUE DATERIG INSPECTIONOAYS SINCE LTA

DATE SAFETY DETAILS

9/6 LTI 25/423/6 MTI 2/618/6 JSA ongoing166 #PnN ongoing

Safety Meeting 14/6

Pump Data

Copyright IDS Ply Ltd, RbtofB report Mar 16th 1998.1

PumD Data· last 24 hrs# TYPE LNR SPM EFF Flow

(") (%) (gpm

1 National 6,50 70 91 7002 National 6.50 70 97

spp(psi)

3230

Slow PumD Data

SPM SPP DEPTH MW(psi) (m RT) (ppg)

30 325 2041 1,140 425 2041 1.150 575 2041 1.1

Page Number: 3

Page 61: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

18/06/1998 09:43 0352722058 PREMIER OIL GEELONG PAGE 05

PremierOil AustralasiaReport Date: 17.06.98

CAlLY DRILLING REPORT # 19

White Ibis 1

Casing Personnel: on Site =94CSG LOT PHASE CSG SHOE CSG SHOE00(") MD TVD (mBRT) JOB TITLE NAME COMPANY NAME #

13,3/8 II 14.16 863 863Oris Supervisor H. Knobl Premier 3N, Orlg Supervisor K, Dubravac Northern 70

TYPE LNGTH CSG vvr GRD THREADGeologist K. Frankiewicz Dowell Cement 1

(m) IDC') Ibs/ft AsiaticROV 3Dowell Mud 1

Shoe jt 12.5 12.4 68,0 L80 NVAM Northern Explorer P RUddleston &Cox EMS 11x Bakerlok jt 11.2 12.4 68.0 L80 N,VAM Smedvig Safety 1F/Collar Jt 12.3 12,4 68.0 L80 NVAM Geoservlce 43 x Bakerlok jt 35.5 12.4 68.0 LSD N,VAM Alfa Laval 120Jts 237,7 12.4 67.0 LSO BTC Core hand 140 jts 465,9 12.4 68.0 LBO N.VAM

Schlumberger 8Pup 3,1 12.4 68.0 LBO NVAMWellheadjt 10.7 12.4 68.0 LBO N.VAM

t~·.rvey MD TVO INCL AZ. CORR, 'V DOGLEG N/S EIW TOOL TYPE

Last Tool Type: Anderdrift(m RT) (m RT) DEG (deg) AZ SECT (m/30m) (m) (m)

(deg) (m)

Magnetic Declination: 12.41 1,422 1.422 0.50 Anderdrift

Survey method : Min Curvature ',479 1,479 0.50 Anderdrjft1,594 1,594 0.00 Anderdrift1,680 1,680 0.50 Anderdrift',768 1,768 0.50 Anderdrift1.852 1,852 1.00 Anderdrift1,937 1.937 0.00 Anderdrift1,944 ',944 0.50 Al1derdrift

Copyright IDS F'ty Ltd, RbtofB report Mar 16th 1998.1 Pags Number: 4

Page 62: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

18/06/1998 09:20 0352722058 PREMIER OIL GEElONG PAGE 01/05

Premier Oil AustralasiaGeelong Operations BasePhone: 0352722101Fax=0352722058

Fax

Premier OilAustralasia

To:

Fax:

Phone:

Re.

Victoria Minerals & Petroleum Ops, Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Bacon

Boral Energy Resources I Attn: A. Guthrie, Ross Naumann

CalEnergy. Attn: Jane Duncan

White Ibis I

From: Gordon Hunter

Date: June 18,1998

Pages: 5 inc. this one

cc:

o Urgent o For Review o Please Comment 0 Please Reply o Please Recycle

Please find attached the Daily Drilling Summary Report for 17th June 1998.

Regards

Gordon Hunter

Drilling Superintendent

Page 63: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

18/05/1998 09:20 0352722058 PREMIER OIL GEELONG PAGE 02/05

PremierOil AustralasiaReport Date: 17.06.98

CAlLY DRILLING REPORT # 19

White Ibis 1

Well DataCOUNTRY Australia T.D. (m Rl): 2.064.0 CUR. HOLE SIZE ("): 12.25 DAILY COST $ : $216.957FIELD Bass Basin PROGRESS (m); 56.0 CSGOD ("): 13.38 CUM COSTS: $4,208.479DRILL CO.; Northern Offshore DAYS FROM SPUD: 16,21 SHOE NO (m RT): 863 AFE COST $ : $7,321.212RIG: Northern Explorer III OAYS +/- CURVE: LEAK-OFF EMW(ppg) 14.16 AFE BASIS: P&AMUD CO: DowellRT ABOVe MSL (m) : 12.5 CURRENT OP @ 0600; Drill 12 1/4" hole to TO.

WATER DEPTH @MSL (m): 61.9 PLANNED OP.: Drill 12 1/4" hole to TO. Wiper Trip. EMS. POOH. Log.

RT TO SEABED (m) : 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops - This report only

POOH wI core. LID core bbl. Repair pipe racking system &re-align I FORMATION ITOP(mBRnl

diverter. MU BHA. RIH. Drill 12 1/4". Circ BU for samples. Drill 12 1/4"hole.

ACTIVITY FOR PERIOD 00'00 HRS TO 24'00 HRS ON 17 06 98. ,

-'ROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 00:30 .50 2,017 Cont to POOH wI coring BHA.00:30 01:30 1.00 2,017 Broke out core bbl - empty except 1 x 120mm UG piece of core jammed into 2nd

section. Broke out core head - observed it packed wI 2040mm thick "pancake"shaped disks of UG core, 0.6m total. Total core: O.72m, 8%.

01:30 01:45 .25 2,017 Graded core head: approx. 5% wear, 1/16" UG, w/3 x cutters slightly chipped.Core sample appears quite friable, apparently washed or abraded UG.

01:45 05:00 3.25 2,017 Removed standlift fl derrick for repair. New pins for standlift cylinderincompatible wI yoke. Remove pins, modify, bore & install clevis pins. Reinstall.Adjust diverter alignment, turning 10deg (no hold down "V" in this style diverter).

05:00 05:30 .50 2,017 PU 12 1/4" BHA from derrick. UO xJovers, NB stab, Anderdrift.05:30 07:30 2.00 2,017 PU new NB Stab, & MU. MU new bit, HTC MAX GT-PS09 cIw 3 x 14 nozzles.

RIH wI DC's & jars.07:30 09:00 1.50 2,017 RIH wI remainder of BHA & 5" DP to 13 3/8" csg shoe. Break circ & fill lines

(18bbls).09:00 11 :30 2.50 2,017 RIH from 863-1974m, where string encountered 20klbs resistance. PU to

1958m, and MU TDS.11:30 13:00 1.50 2,017 Washed/reamed from 1958·2017m (TO), w/70rpm, 700gpm, 3150-3200psi

initially, slowly dropping to 2800psi. 3-5k ft-Ibs torque.13:00 13:30 .50 2,019 Bed in bit f/2017-2019m, w/0-10klbs WOB, 60-70rpm, 700gpm, &2700psi. Due

to sudden release of compensator, string dropped, spudding bit w/40klbs. PU offbtm to investigate lack of compensation (had been pumped up while RIH).

13:30 14:30 1.00 2,019 Trouble shoot drill string compensator, pumping up system. Both aircompressors running. Discovered air had been "stolen" from compensatorsystem to pressure up the preViously bled Guide wire system (after air linerepairs).

14:30 15:15 .75 2,019 Investigated standpipe pressure loss, from 3100psi initially to 2800psi, droppingfurther to 2400psi while working on compensator air pressure. Opened up pump#1-neg. P/test surface system - neg.

15:15 16:15 1.00 2,019 Put bit on bottom for 10min to confirm pressure drop· SPP dropped f/2400-2250psi. POOH to look for DP washout. Discovered washout 0.74m below box inmiddle jt of stand # 8 off btm. Broke out jt and replaced w/ new single.

16:15 16:45 .50 2,019 RIH from 1795-2019m.16:45 21:45 5.00 2.061 Resumed drilling f/2019-2061m, w/30klbs WOB, 90-120rpm, 700gpm, 3200psi

& 4-6k ft-Ibs torque. ROP's 6-12m/hr. Observed drilling break @ 2057-2061m, w/ROP's increasing to >30m/hr. Began treating losses (20bph) w/ LCM.

21:45 22:00 .25 2,061 Flow checked well static· okay.22:00 23:30 1.50 2,061 Circulate bottoms up from 2061m for geological sample. Max. gas 15%.23:30 24:00 .50 2,064 Drilled f/2061.2064m, wI 25-30klbs WOB, 130-140rpm, 700gpm, 3250psi, & 6-

Bk ft-Ibs torque. Background gas levels at normal 0.1-0.2%. ROPs 6-8m/hr.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 18.06.98

Copyrlght IDS F'ty Ltd, RbtofB report Mar 16th 1998.1 Pago Number: 1

Page 64: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

18/05/1998 09:20 0352722058 PREMIER OIL GEELONG PAGE 03/05

PremierOil AustralasiaReport Date: 17.06.98

DAILY DRILLING REPORT # 19

White Ibis 1

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 04:00 4.00 2,103 Drilled f/2064-2103m, wI 25-30klbs WOB, 120-130rpm, 700gpm, 3250psi, &6-8k ft-Ibs torque. Background gas @ 0.1-0.2%. ROPs 6-30m/hr. Cont to treatdownhole losses (5-10bph) wi Barofiber & Kwickseal F.

04:00 06:00 2.00 2,124 Drilled f/2103-2124m, wI 25-35klbs WOB, 80rpm, 700gpm, 3250psi, & 6-9k ft-Ibs torque. ROPs 4-28m/hr. Downhole losses remaining fairly constant at <10bph.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 17.06.98

REMARK I OBSERVATION

Repaired washed out air line with pre-fabricated sectionwhile handling tools for new BHA and re-aligning Diverter.New air line installation fabricated to maximize distancefrom Guide lines in order to avoid reoccurrence.

While RIH after repairs to air line, the driller pumped upthe compensator system, as both the compensator andguide wire tensioning system work off the same repairedair line which had been bled off. When bedding in the bitand trying to adjust the compensator, however,insufficient air pressure to the compensator was availableto hold the string, allowing the bit to spud into the btm ofthe hole wI 40klbs.

Summary of OP washouts: Washout # 1 fl White Ibis, onrep.16, was reported as 2 ft below tool jt (0.61 m), not 2m,7 std below RT, Washout # 2, rep 19, was 0.74m belowthe tool jt (box) on the middle jt of std 8 off btm. On theYolla well, washout # 1, rep # 35, was 0.61 m below tool jt(box) on 16th std below RT; washout #2, rep # 35, was0.61 m above tool jt (pin) on the 22nd std below RT. Allare strikingly similar. Digital photos of the 1st 3 havealready been sent to Premier, Geelong (4th in mailbag).NB: the internal upset on this pipe is +1- O.6m from thetool jt.

SOLUTION I RECOMMENDATION

Diverter alignment: This is the old stlye diverter, withouta "V' shaped dog which locks into a corresponding "V"recess, preventing torque-ing out of alignment.Previously here, they used a cover plate and bolted thisdown, but experienced problems pulling the bolts due tothe torque forc~s against them.The air storage bottle bank had been bled off for repairs,but the compressors slowly provided enough air topressurize the string compensator while RIH.Unbeknownst to the driller, the guidewire tensioningsystem was pressured up before the system'saccumulator bottles were fully charged. This had theeffect of bleeding off the compensator air. Problemsolution: communication!!! and separate air supplies(compressors) for each system.

Mud Properties MUD COST FOR TODAY: $1,866 CUMULATIVE MUD COST TO DATE: $148,278

Type: VISCOSITY( sec 1qt ): 42 API FLUID LOSS CI- (ppm): 42,000 SOLIDS (%vol): 3.5PV (cps); 11 (cm3/30mln) 5 K... (ppm): 31500 H20 (%vol); 96.5PHPA API FILTER CAKE HARD/Ca (ppm) ;

FROM: FLYP (lb/100sq.ft): 21 (32nds inch 1 761 OIL (%vol) : 0

TIME: 21:00 GEL 1Os/1 Oml30m HTHP FLUID LOSS MeT (ppb eq) : 5.0 SAND: .1

weiGHT (ppg): 1.09 (lb/1OOsqft) : 6 9 0 (cm3/30min) 0 PM: .7 PH: 8.9

TEMP (C): 129 FANN 3/6/100 6 9 0 HTHP FILTER CAKE0 PF: ,2 PHPA: 0.0

(32nds inch)

Bit Data for Bit # 4

sIze ("):MANUFACTURER:

TYPE:

SeRIAU' :DEPTH IN (m R1) :

DEPTH OUT (m R1):

12.25OT

CM365

775201

2008

2017

lADC#

AVEWOB (k·lbs):AVE RPM:

FLOW (gpm):PUMP PRESS, (psi);

HSI (hpfsqi) ;

545

400350

o

Wear

NOZZLES

XXX

X

X

Drilled ever the last 24 hrs Calculated over the bit run

METERAGE (m) : 9 CUM,METERAGE (m) 9ON BOTTOM HRS : .7 CUM. ON BOT. HRS : .7lADe DRILL. HRS : 1.0 CUM.IADC DRILL HRS: 1.0TOTAL REVS: 1,890 CUM.TOT. REVS: 1,890ROP (m/hr): 9.0 ROP (mlhr): 9.0

Copyright IDS pty Ltd. Rbtote report Mar 16th 1998.1 Page Number: 2

Page 65: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

17/05/1998 09:07 0352722058 PREMIER OIL GEELONG PAGE 01/04

'7Premier Oil AustralasiaGeelong Operations BasePhone: 0352722101Fax: 0352722058

Fax

Premier OilAustralasia

To:

Fax:

Victoria Minerals & Petroleum Ops, Attn: Ahmed Nadji

Mineral Resources Tasmania. Attn: Carol Baron

Boral Energy Resources. Attn: A Guthrie, Ross Naumann

CalEnergy. Attn: Jane Duncan

From: Gordon Hunter

Date: June 17,1998

Phone:

Re: V\h1ite Ibis I

Pages: 4 inc. this one---- -----cc:

o Urgent

-Comments:

D For Review 0 Please Comment D Please Reply o Please Recycle

Please find attached the Daily Drilling Summary Report for 16th June 1998.

Regards

Gordon Hunter

Drilling Superintendent

",;

;',> o'

1'" "~, l .. 1

L_~.,._.

._.",.... j

i

..L._._.' ~._ ,_.__.J

Page 66: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

17/06/1998 09:07 0352722058 PREMIER OIL GEELONG PAGE 02/04

PremierOil AustralasiaReport Date: 16.06.98

DAILY DRILLING REPORT # 18

White Ibis 1

Well DataCOUNTRY Australia T.D. (m RT): 2,008.0 CUR. HOLE SIZE (oo): 12.25 DAILY COST $ : $186,798FIELD Bass Basin PROGRESS (m); 0.0 CSG 00 ("): 13.38 CUM COSTS : $3,991.522DRILL CO.: Northem Offshore DAYS FROM SPUD: 15.21 SHOE TVD (m RT): 863 AFECOSTS: $7,321,212RIG: Northern Explorer III DAYS +/. CURVE: LEAK-OFF EMW(PPQ) 14,16 AFE BASIS: P&AMUD CO: DowellRT ABOVE MSL (m) : 12.5 CURRENT OP @ 0600; MU 8HA.WATER DEPTH@MSL(rn): 61.9 PLANNED OP.: MU BHA. RIH. Drill 12 1/4" hole to TD.RT TO SEABED (m) : 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops - This report only

Wash &ream to btm. Circ BU. Drop ball. Cut core, POOH. I FORMATION ITOP(mBR1JACTIVITY FOR PERIOD 00·00 HRS TO 24·00 HRS ON 160698. .FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 04:30 4.50 2,008 Continue to wash & ream tight hole from 960-1214m, with 50rpm, 400gpm, &350psi. Unable to run stands without 10-20 klbs drag. Immediate 100psiincrease when attempting to wash wlo rotation. Downhole losses +/- 25bph.

04:30 05:00 .50 2,006 Retaining nut on TDS torque wrench activating ram backed off. Circ whileeffecting repairs.

05:00 12:00 7.00 2,008 Continue to washlream tight hole f/1214-1876m, w/50rpm, 400gpm. & 400-500psi. Unable to run stands w/o 10-20 klbs drag, but improving slowly below +/-1250m. Weather slowly abating, but still >4m seas, >30knt wind.

12:00 14:00 2.00 2,008 Cant to wash/ream (packed coring BHA, w/4 stab in 18m) f/1876-2008m, w/parameters a/a. Notably tight areas on trip in @ 1022, 1624, 1628, 1674. 1700-1767m, Thrusters & propellers still utilized to maintain position in swells.

14:00 15:30 1.50 2,008 Circulate btms up from 2008m w/500gpm, 810psi. Max gas recorded - 0.5%;max C02 while washing/reaming - 10%; max H2S recorded (from sensor inmUd)· 5-13ppm; max H2S in air - Oppm..

15:30 16:00 .50 2,008 Dropped ball. Took SCRs.16:00 16:45 .75 2,008 Cut core f/2008-2017m, w/10-15klbs WOB, 90rpm, 250-300gpm. 700psi, at

50+ m/hr. Core jammed off at 2017m, Attempted to re-start - no success.16:45 17:00 .25 2.008 Flow checked well static - okay.17:00 24:00 7.00 2.008 POOH: clean off bottom, but 40-50klbs O/pull from 1990-1822m. Intermittent

drag, but hole generally very good. Flow checked well static @ shoe, and withtop of BHA at BOPs,

.CTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 17.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 00:30 .50 2.008 Cant to POOH wI coring BHA.00:30 01:30 1.00 2,008 Broke out core bbl - empty except 1 x 120mm UG piece of core jammed into 2nd

section. Broke out core head - observed it packed wi 20-40mm thick "pancake"shaped disks of UG core, 0.6m total. Total core: 0,72m, 8%,

01:30 01:45 .25 2.008 Graded core head: approx. 5% wear. 1/16" UG. wI 3 x cutters slightly chipped.Core sample appears quite friable, apparently washed or abraded UG.

01:45 05:30 3.75 2,008 Removed standlift from derrick for repair. New pins for standlift cylinderincompatible with yoke. Remove pins, modify, bore & install clevis pins. Reinstall.Adjust diverter alignment. turning 10deg (no hold down "\I" in this style).

05:30 06:00 .50 2,008 MU 12 1/4" rotary-drilJing BHA.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 16.06.98

Mud Properties MUD COST FOR TODAY: SO CUMULATIVE MUD COST TO DATE: $146,413

Type; VISCOSITY( see / qt ): 52 API FLUID LOSS CI· (ppm): 42,000 SOLIDS (%vol) : 4.8PV (cps); 15 (cm3130min) 5 K'" (ppm): 31500 H20 ("IovOI): 95.2PHPA API FILTER CAKE

FROM; Pit YP (Ib/100sq.ft): 33 (32ndsinch 1 HARO/Ca (ppm) : 681 OIL (%vol) : 0

TIME: 9:00 GEL 1Os/1 Om130m HTHP FLUID LOSS MBT (ppb eq) : 6.0 SAND: .2

WEIGHT (ppg); 1.09 (lb/1 OOsQft) : 7 11 0 (cm3130min) 0 PM: .4 PH: 8.5

TEMP (C) : 107 FANN 3/6/100 7 10 0 HTHP FILTER CAKE PF: ,1 PHPA: 0.0(32nds Inch) 0

Copyright IDS Ply Ltd. RbtofB report Mar 16th 1998.1 Page Number: 1

Page 67: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

17/05/1998 09:07 0352722058 PREMIER OIL GEELONG PAGE 03/04

PremierOil AustralasiaReport Date: 16.06.98

DAILY DRILLING REPORT # 18

White Ibis 1

Bit Data for Bit # 4 lADe # Wear r=g~~~~2j~E9SIZE(") : 12.25 NOZZLES Orllled over the last 24 hrs Calculated over the bit runMANUFACTURER: OT AV~WOB (k-Ibs) : 5 X MET~RAGE (m) : 9 CUM.METERAGE (m) 9TYPE: CM365 AVE RPM : 45 X ON BOnOM HRS ; .7 CUM. ON BOT. HRS : .7SERIAL#: 775201 FLOW (gpm); 400 X IADC DRILL. HRS : 1.0 CUM.IADC DRILL HRS: 1.0OEPTI-IIN (m RT) ; 2008 PUMP PRESS. (psi): 350 X TOTAL REVS : 1.890 CUM.TOT. REVS: 1,890DEPTH OUT (m RT) : 2017 HSI (hp/sqi) : 0 X ROP (mlhr): 9.0 ROP (m/hr): 9.0

BHA#S Length Cft) :214.5 D.C. (1) ANN. VELOCITY (mpm): 0

HRSONJARS: STRING WT(k-lb:o) ; 227 TRQE MAX (ft-Ibs): 14,000 D.C. (2) ANN VELOCITY (mpm): 0WT BLW JAR(k-lbs): 30 PICK UP WT(k-lbS) : 220 TRCE ON (ft·lbs): 5.300 H.W.D.P. ANN VEL.OCITY (mpm): 0

BHA WT(k-lbs) : 59 SLK OFF WT(k-lbs) : 225 TRQE OFF (ft-Ibs): 2,300 D.P. ANN VELOCITY (mpm) ; 0

BHA DESCRIPTION: TOOL. DESCRIPTION HRS SERIAL # COMM5NT121/4" Corehead+8 3/8" core bbl+9 112" bumper

CM365 corehead 1.0 775201sub+8" bumper sub+6x8" DC+jar+3x8"

jars 86.5 A0210DC+x!over+9xHWDP

I

Anchor Tension A1 : 60.0 A2.: A3: 60.0 A4: 40.0 A5; 50.0

(kips) A6: 80.0 A7: 75.0 AS: 75.0 A9: A10 :

Workboats Location. Fuel Barite Dlwtr P/wtr Cmt Bent Heli Weather & Rig data @ 24:00 hI'S(kltr) (sx) (bbl) (bbl) (s",) (s",) (kltr) VDL (kips: 550.0

P. Commander r!g 144 1.447 2.013 WIND SP. (lets) : 11.0 VISIB.(nm) : 10 RIS.TENS: 22Brute Tide fig 150 2,107 465 WIND DIR (deg) :200 CEILING (m) : 3.000 HeAVE (m); 2.6

PRES.(mbars): 1027 WAVES (m): 1.5 ROLL (deg): 3.5AIR TEMP (C): 10.5 SWELL (m): 3.8 PITCH (deg); 2.0

COMMENTS: "Brute Tide" & "Commander" at rig; 1 helicopter flight - 7 PAX on rig: 7 PAX off rig. Tension meter on #2 reading low - need tocheck wi mechanic.

Bulk Stocks Used lin Stock Used lIn Slock Used lin Stock Used I In StockDRILL WATER (bbl):O 3.580 FUeL (bbl): 15 1,315 GeL. (sx); 0 -0 HEll-FUEL (kltr) : 0.0 8.3POT WATER (bbl): 0 1,415 BARITE (sx) : 0 5.181 ceMENT (:ox) : 0 1.764

Drills, Permits & Inspection!!I DRILL TYPE DATE INSPECTIONS DATE SAF~TY D~TAILS

TRIP DRILL 14/6 BOP TEST 9/6 LTI 25/4FIRE 1416 NEXT TEST DUE DATE 23/6 MTI 2J6PIT DRILL 14/6 RIG INSPECTION 1714 JSA ongoingINCIDENT 14/6 DAYS SINCE L.TA 165 #P1W ongoing

Safety Meeting 14/6

Casino Pump DataCSG LOT PHASE CSG Srioe CSGSHOE p umDDa ta -last 24 hrs Slow PumD DataOOn MD TvD(mBRT) # TYPE LNR SPM EFF Flow SPP SPM spp DEPTH MW

13.3/8 " 14.16 863 863 (") (%) (gpm (psi) (psi) (mRT) (ppg)

1 National 6.50 60 97 300 700 30 225 2008 1.1TYPE LNGTH CSG \NT GRD THREAD 2 National 6.50 97 40 325 2008 1.1

(m) ID (") Ibslft 50 375 2008 1.1

ShOejt 12.5 12.4 138.0 L80 N.VAM 60 450 2008 1.1

1 x Bakerlok jt 11.2 12.4 68.0 L.SO N.VAMF/CoUar jt 12.3 12,4 6B.0 L.BO N.VAM3 x Bakerlok jt 35.5 12.4 68.0 L80 N.VAM20jts 237.1 12.4 67.0 LBO BTC40)ts 466.9 12.4 68.0 LSO N.VAMPup 3.1 12.4 68.0 LSO N,VAMWellheadlt 10.7 12.4 68.0 L80 N.VAM

Copyright IDS pty Ltd. RblofB report Mar 16th 199B.1 Page Number: 2

Page 68: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

17/06/1998 09:07 0352722058 PREMIER OIL GEELONG PAGE 04/04

PremierOil AustralasiaReport Date: 16.06.98

DAILY DRILLING REPORT # 18

White Ibis 1

Personnel: on Site =93

JOB TITLE NAME COMPANY NAME #

Drl9 SupelVisor H. Knobl Premier 3N, orl9 Supervisor K.oubravac Northem 72Geologist K. Frankiewicz Dowell Cement 1

AsiaticROV 3Dowell Mud 1

Northern Explorer P Ruddleston & Cox EMS 1Smedvig Safely 1Geoservice 4Alfa Laval 1Core hand 1Schlumberger 5

Survey MO TVD INCL AZ. CORR. .V' DOGLEG N/S EIW TOOL TYPE

Last Tool Type: Anderdrift (m RT) (mRl) DEG (deg) ~ SECT (m/30m) em) (m)(deg) (m)

"'agnetic Declination : 12.41 1,422 1,422 0.50 Andertfrlft.Jurvey method : Min Curvature 1,479 1,479 0.50 Anderdrift

1.594 1,594 0.00 Anderdrift1.680 1,680 0.50 Anderdrif!1.768 1,768 0.50 Anderdrift1.852 1,852 1.00 Anderdrift1.937 1.937 0.00 Anderdrift1.944 1.944 0.50 Anderdrifl

Copyright IDS Pty Ltd, RblofB report Mar 16th 1998.1 Page Number: 3

Page 69: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

15/05/1998 09:28 0352722058 PREMIER OIL GEELONG

Premier Oil AustralasiaGeelong Operations BasePhone: 0352722101FalC:0352722058

Fax:

Premier OilAustralasia

To:

Fax:

Phone:

Re:

Victoria Minerals &Petroleum Ops, Attn: Ahmed Nadji

Minerai Resources Tasmania, Attn: Carol Bacon

Boral Energy Resources, Attn: A. Guthrie, Ross Naumann

CalEnergy. Attn: Jane Duncan

White Ibis I

From: Gordon Hunter

Date: June 16, 1998

Pages: 5 inc. this one

cc:

D Urgent

-Comments:

o For Review 0 Please Comment 0 Please Reply o Please Reqoc:le

Please find attached the Daily Drilling Summary Report for 15th June 1998.

Regards

Gordon Hunter

Drilling Superintendent

1I

...........J

Page 70: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

15/051-1998 09:28 0352722058 PREMIER OIL GEELONG PAGE 02/05

PremierOil AustralasiaReport Date: 15.06.98

DAILY DRILLING REPORT # 17

White Ibis 1

Well DataCOUNTRY Australia T.C, (m RT): 2,008,0 CUR. HOLE SIZE ("): 12.25 CAlLY COST $ : $233,186FIELD 6ass Basin PROGRESS (m): 151,0 CSGOD('1: 13.38 CUMCOST$: $3.804.724DRILL CO. : Northern Offshore DAYS FROM SPUD: 14.21 SHOE TVD (m RT): 863 AFE COST $ : $7.321,212RIG: Northern Explorer III DAYS +/- CURVE: LEAK-OFF EMW(ppg) 14.16 AFE BASIS: P&AMUD CO: DowellRT A60Ve MSL. (m) : 12.5 CURRENT OP @ 0600: RIH for core #1.

WATER DEPTH @MSL (m) : 61.9 PLANNED OP.: RIH. Cire BU, Cut core, POOH. RIH wi bit.RT TO SEABED (m) : 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops· This report only

POOH. LlO BHA & motor. PU core bbl. RIH. Wash/ream tight hole while I FORMATION ITOP(m6RT) IRIH.

ACTIVITY FOR PERIOD 00·00 HRS TO 24·00 HRS ON 150698. . .FROM TO HRS DEPTH ACTIVITY DESCRIPTION

lOO:OO 00:15 .25 2,008 Circ for geological samples and to ensure gas at normal levels.00:15 00:30 .25 2,008 POOH 1std from 2008-1980m. Flow checked the well static - okay.00:30 03:15 2.75 2,008 POOH from 1980-1269m, with 10-20klbs drags observed. Weather deteriorating;

gale warnings received from site-specific forecasters.03:15 03:30 .25 2,OOS Flow checked well static 15min (no flow) to confirm that hole was taking correct

amount of flUid - trip tank motor behaving erratically.03:30 05:00 1.50 2,008 Cant POOH from 1269-866m, with 20·30klbs drags generally observed. 50-

60klbs O/pull registered between 1159-1150m, & 1143-1134m, but holegenerally good, and taking correct amount of fluid. Wind/sea rising.

05:00 08:00 3.00 2,008 Flow checked well static at 13 3/S" shoe - okay. Cont POOH from S66-267m.08:00 10:00 2.00 2,008 Filled hole to top - mud level dropped 40bbl. Rack BHA in derrick. Break out bit

and graded (one nozzle plugged with clay): 1-2-PN·C-X-1/16-CT/BT-CP.Gauged stabs: middle stab 3/16" UG.D

10:00 11:00 1.00 2,008 Flush motor. Measure motor bearing wear - 2mm (started w/1 mm). L/O motor.Lost 90bbls mud 1hr while trying to keep hole full. Weather very marginal.

11:00 11:30 .50 2,008 Stopped attempting to fill hole. Observed fluid level in Riser drop 4-5m, andstabilize. Work BHA.

11:30 14:00 2.50 2,008 PU 3 x 6m sections of core barrel. new corehead CM365. MU core bbl ass'y. MU2 x 8" Bumper subs onto top of core barrel..

14:00 17:30 3.50 2,008 Finish MU coring 6HA. Move stands in derrick as necessary to complete 8HA.RIH wi slick S" BHA and 5" DP to 682m, breaking circ at top of HWDP.

17:30 18:30 1.00 2,008 PU hang-off tool & RIH. Land hang-off tool in wellhead (as a precaution duringthe slip &cut of the drill line, since weather conditions marginal anddeteriorating). Retrieved H.O. landing string.

18:30 21:00 2.50 2,008 Slip and cut drill line. Serviced TDS (both operations slower than normal due towind, heave, ship's movement in poor weather, etc. Cranes continue to be shutdown due to high Winds).

21:00 22:30 1.50 2,008 RIH. Latch into hang-off tool. Retrieve hang-off tool, and rack back.22:30 23:15 ,75 2,008 RtH w/ core barrel to 133/8" shoe @ 863m. Seas (5-7m), wind, pitch & roll

continue to hamper speed of operations.23:15 23:30 .25 2,008 Break circulation at 13 3/8" shoe. Weather continues marginal. Max wave ht

>6m, winds 35-40 knots, with gusts:> 45 knots.23:30 23:45 .25 2,008 RIH from 8S3-928m - string stood up and wouldn't pass w/30+ klbs drag.23:45 24:00 .25 2,008 MU TDS. Wash & ream tight hole from 928-960m, wi 50rpm, 400gpm, and

380psi.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 16.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 04:30 4.50 2,008 Continue to wash & ream tight hole from 960-1214m. with 50rpm. 400gpm, &350psi. Unable to run stands without 10-20 klbs drag. Immediate 100psiincrease when attempting to wash wlo rotation. Downhole losses +1- 25bph.

04:30 05:00 .50 2,008 Retaining nut on TDS torque wrench activating ram backed off. Circ whileeffecting repairs.

CopyrighllDS F'ty Ltd, RbtolB report Mar 16th 1998.1 Page Number: 1

Page 71: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

16/06~1998 09:28 0352722058 PREMIER OIL GEELONG PAGE 03/05

PremierOil AustralasiaReport Date: 15.06.98

CAllY DRILLING REPORT # 17

White Ibis 1

FROM TO HRS DEPTH ACTIVI1Y DESCRIPTION

05:00 06:00 1.00 2,008 Continue to wash &ream tight hole from 1214-1303m, with 50rpm, 400gpm, &350psi. Unable to run stands wlo 10-20 klbs drag, but improving slowly below +/-1250m. Weather slowly abating, but still >4m seas, >30knt wind.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 15.06.98

REMARK I OBSERVATION SOLUTION I RECOMMENDATION

The high pressure air line, feeding the Riser tensioners .-. '",..~ ., . '

and Guide wires, was observed to have been worn by , .. ' .. .. . .."

...,constant tensioner contact (from the loose end of thetensioner) and consequent abrasion, creating a slight airleak. Compressors currently able to cope with the leak,but in order to effect repairs, the system needs to be bledof air pressure.

Mud Properties MUD COST FOR TODAY; $0 CUMULATIVE MUO COST TO DATE: $138.769

rype: VISCOSITY( sec I qt ); 56 API FLUID LOSS CI· (ppm); 42,000 SOLIOS (%vol) : 3.5PV (eps): 15 (em3130min) 5 K+ (ppm): 31500 H20 (%vol):PHPA API FILTER CAKE

96.S

FROM; PitYP (lb/100sq.ft): 33 (32nds inch 1 HARD/Ca (ppm) : 721 OIL (%voJ) : 0

TIME: 22:00 GEL 10s/10m130m HTHP FLUID LOSS MBT (ppb eq) : 0.0 SANO: .2

WEIGHT (ppg): 1.09 (lbl1 OOsqft) : 7 11 0 (cm3130min) 0 PM: .5 PH: 9.0

TEMP (C) : 0 FANN 3/61100 7 10 0 HTHP FILTER CAKE0 PF: .1 PHPA: 0.0(32nds inch)

Bit Data for Bit # 3 IADC# M 3 2 3 Wear EBI 01 II D IEEEE~~EE1 II 2 II PN I C X 1/16 CT·B CPSIZE ("): 12.25 NOZZLES Drilled over the last 24 hrs Calculated over the bit runMANUFACTURER: HU AVE: WOB (k-Ibs) : 2 x16TYPE: eD536HD AVE RPM;

METERAGE (m) : CUM.METERAGE (m) 11432X15 ON BOTTOM HRS : CUM. ON BOT. HRS ; 41.S

SERIAL#: 1902432 FLOW (gpm) : 2X12 IADC DRILL. HRS : CUM.IAOC DRILL HR$: 57.5DEPTH IN (m Rn ; S66 PUMP PRESS. (psi): X TOTAL REVS : 0 CUM.TOT, REVS: 0DEPTH OUT (m Rn : 2008 HSI (hp/sql) : 0 X ROP (mlhr): ROP (m/hr): 19.9

Bit Data for Bit # 4 IADC. Wear E9~r:g: L:: B :f:g~~SIZE C"): 12.25 NOZZLES Orilled over the last 24 hrsMANUFACTURER; CH AVe woe (k-Ibs): 5

Calculated over the bit runX METERAGE (m) : CUM.METERAGE (m)TYPE: CM365 AVE RPM ; 45 X ON BOTTOM HRS : CUM. ON BOT. HRS :

SERIAL#: 775201 FLOW (gpm): 400 X IADC DRILL. HRS : CUM.IADC DRILL. HRS;DEPTH IN (m Rn : 2008 PUMP PRESS. (psi): 350 X TOTALREVS: 0 CUM,TOT. REVS; 0OEPTH OUT (m Rn : HSI (hp/sqi) ; 0 X ROP (mlhr); ROP (m/hr):

BHA#4 Length (ft) :204.3 D.C. (1) ANN. VELOCITY (mpm): 285HRS ON JARS; STRING WT(k·lbs) : 240 TRQE MAX (ft·lbs): 16.000 I D.C, (2) ANN VELOCITY (mpm): 0WT BLW JAR(k-lbs): 36 PICK UP lNT(k-lbs) : 232 TReE ON (ft·lbs); 7,220 H.W.D.P. ANN VELOCITY (mpm): 196BHA WT(k-lbs) : 62 SLK OFF WT(k·lbs) : 250 TRQE OFF (ft·lbs): 3.900 D.P. ANN VELOCITY (mpm) : 196

BHA DESCRIPTION: TOOL DESCRIPTION HRS SERIAL # COMMENT12 1/4"Bit· Bit sub· Motor - ~oyer - sub - 12 3/16"

121/4" PDC bit 57.5 1902432 PDCNB Stab eJw float vtv • S"Anderdrift cJw TotcoRing- 8" NMDC • 123116" Stab - 6xS"OC - jars- Anderdrift tool 105.8 ADB814 New flask 316198

3xS" DC· ~o· 1xHWDp· dart sub - 8 x HWDP. Ja~ 72.5 A021 0 New on 121/4" ass')'A962XP 314MOlor 72.5 2125 Anadrill motor

Copyright IDS Ply Ltd, RbtofB report Mar 16th 1998.1 Page Number: 2

Page 72: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

15/05/1998 09:28 0352722058 PREMIER OIL GEELONG PAGE 04/05

PremierOil AustralasiaReport Date: 15.06.98

DAILY DRILLING REPORT # 17

White Ibis 1

BHA#S Length (ft) :214.5 D.C. (1) ANN. VELOCITY (mpm): 0HRSON JARS: STRING WT(k-lb$) : TRQE MAX (ft-Ibs): 11,000 D.C. (2) ANN VELOCITY (mpm): 0WT BLW JAR(k-lbs): 30 ~ICK U~ 'Ni(k-Ibs) : TRQE ON (ft-lbs): 4,000 HW.D.P. ANN VELOCITY (mpm): 0BHA WT(k-lb$) : 59 SLK OFF lNT(k-lbs) : TROE OFF (ft-Ibs): 2.500 D.P. ANN VELOCITY (mpm): 0

BHA DESCRIPTION: TOOL OESCRIPTION HRS SERfAL# COMMENT121/4" Corehead+8 3/8" core bbl+8 3/8" bumper

CM365 corehead 775201sub+8" bumper sub+6x8" DC+jar+3xB" jars 73.5 A0210OC+x!over+9xHWDP

Anchor Tension A1: 75.0 A2: 60.0 A3: 60.0 A4: 80.0 AS: 80.0

(kips) A6: 70.0 A7: 80.0 AB: 75.0 A9: A10 :

Workboats L.ocation. Fuel Barite Dlwlr Plwlr Cmt Bent Heli Weather & Rig data @ 24:00 hrs(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltr) VOL (kips: 759.0

P. Commander r!9 152 1,447 2,044 WIND SP, (kts) : 35.0 VISIB.(nm) : 8 RIS,TENS: 26Brute Tide rig 157 2,107 465 WIND OIR (deg) :250 CEIL.ING (m) : 1.200 HEAVE(m) ; 2.0

PRES.(mb81"$); 1013 WAVES (m): 3.0 ROL.L.(deg) : 5.0

IICOMMENTS :

AIR TEMP (C): 14.0 SWEL.L (m): 5.4 PITCH (deg); 3.5

"Brute Tide" & "Commander" at rig; 0 helicopter flight - 0 PAX on rig; 0 PAX off rig. JBulk Stocks Used /In Stock Used lin Stod< Used lin Stocle: Used I In StockDRILL WATER (bbl):O 3,580 FUEL (bbl) : 15 1,330 GEL (sx): 0 -0 HEL.I-FUEL (kltr) ; 0.0 8.3POT WATER (bbl) : 0 1,289 BARITE (sx) : 0 5,181 CEMENT (sx) : 0 1,764

Drills, Permits & Inspection~

DRILL TYPE DATE INSPECTIONS DATE SAFETY DETAILS

TRIP DRILL 14/6 BOP TEST 9/6 LTI 25/4FIRE 14/6 NEXT TEST DUE DATE 23/6 MTI 2/6PIT DRILL 14/6 RIG INSPECTION 17/4 JSA ongoingINCIDENT 14/6 DAYS SINCE LTA 165 #PTW ongoing

Safety Meeting 14/6

Casing Pump DataCSG LOT PHAse CSGSHOE CSGSHOE PumD Data -last 24 hrs Slow PumD Data00(") MO TVO (maRT) # TYPE LNR SPM EFF Flow Spp S~M spp DEPTH MW

13.318 .. 14.16 863 863 (") (%) (gpm (psi) (psi) (m RT) (Ppg)

, National 6.50 80 97 400 350 30 275 1720 1.1TYPE LNGTH CSG wr GRD THREAD 2 National 6.50 97 40 370 1720 1.1

(m) IDn Ibslft 50 425 1720 1.1

Shoejt 12.5 12,4 68.0 L.80 NVAM1 x Bakerlok jt 11.2 12.4 68.0 LBO NVAM Personnel: on Site = 93F/Collar jt 12.3 12.4 68.0 LBO NVAM3 x Bakerlok jt 35.5 12.4 68.0 LSO NVAM JOB TITLE NAME COM~ANYNAME #20jts 237.7 12.4 67.0 Lao BTC Drlg Supervisor H. Knobl Premier 340jls 466.9 12.4 68.0 LBO NVAM N. Drlg Supervisor K. Dubravac Northern 71Pup 3.1 12.4 68.0 LBO NVAM Geologist K. Frankiewicz Dowell Cement 1Wellheadjt 10.7 12.4 68.0 L80 NVAM

AsiaticROV 3Dowell Mud 1

Northern explorer P Ruddleston & Cox EMS 1Smedvig Safety 1Geoservice 4Directional Driller 1Alfa Laval 1Core hand 1Schlumberger 5

Copyright IDS Ply Ltd. RblOfB repon Mar 16th 1995.1 Page Number: 3

Page 73: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

16/06f1998 09:28 0352722058 PREMIER OIL GEELONG PAGE 05/05

PremierOil AustralasiaReport Date: 15.06.98

DAILY DRILLING REPORT # 17

White Ibis 1

Survey MD lVD INCL A2. co~~. ''1' DOGLeG N/S ENol TOOL TYpe

Last Tool Type: Anderdrift (mRl) (mRl) DEG (deg) A2. SECT (m'30m) (m) (m)(deg) (m)

Magnetic Declination: 12.41 ',422 1,422 0,50 Anderdrift

Survey method : Min Curvature ',479 '.479 0,50 Anderdrift',594 1,594 0.00 Anderdrift1,680 1,680 0.50 Anderdrilt1,768 1,768 0.50 Anderdrift1,852 ',852 '.00 Anderdrift',937 ',937 0.00 Anderdrift',944 ',944- 0.50 Anderdrift

Copyright IDS PlY LId, ~btofB report Mar 16lh 1998,1 Page Number: 4

Page 74: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

15/05/1998 09:51 0352722058 PREMIER OIL GEELONG PAGE 01/04J!;\J

Premier Oil AustralasiaGeelong Operations BasePhone: 0352722101Fax; 0352722058

Fax

Premier OilAustralasia

To:

FalC:

Phone:

Re:

Victoria Minerals &Petroleum Ops, Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Bacon

BoraI Energy Resources, Attn: A. Guthrie, Ross Naumann

CalEnergy. Attn: Jane Duncan

White Ibis 1 Daily Drilling Reports

From: Gordon Hunter

Date: June 15, 1998

Pages:

cc:

o Urgent

-Comments:

o For Review D Please Comment 0 Please Reply o Please Recycle

Please find attached the Daily Drilling report for 14th June 1998, Premier Oil have instigated tight holeprocedures. Please restrict the circulation of this report and the Geological report. You will be advisedof the tight hole procedures in due course.

Regards

C·Q~Gordon Hunter

Drilling Superintendent

.,j ,

i IL_._..._...._J..

Page 75: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

15/05/1998 09:51 0352722058 PREMIER OIL GEELONG PAGE 02/04

PremierOil AustralasiaReport Date: 14.06.98

DAILY DRILLING REPORT # 16

White Ibis 1

Well DataCOUNTRY Australia T.O. em RT): 2.008,0 CUR. HOLE SIZE ("): 12.25 DAILY COST $ : $240,307FIEL.D Bass Basin PROGRESS (m): 151,0 CSGOD ("): 13,38 CUM COSTS : $3.571.538DRILL eo. : Northern Offshore DAYS ~ROM SPUD: 13.21 SHOE TVD (m RT): 863 AFE COSTS: $7,321,212RIG: Northern Explorer JlI DAYS +/. CURve: LEAK-OFF EMW(ppg) 14.16 AFE BASIS: P&AMUD CO: DowellRT ABOVE MSL (m) ; 12.5 CURRENT OP @0600: POOH for core.WATER DEPTH @MSL(m) : 61.9 PLANNED OP.: POOH. PU core bbl. WOW. RIH. Cut core. POOH. RIH wI bit.

RT TO SEABED (m) ; 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops - This report only

Drill 12 1/4" hole. Circ BU. POOH for washout. Repair TDS umbilical. FORMATION TOP(mBRT)POOH for washout (found & replaced). RIH. Drill. Circ 8U for samples. Demon's Bluff 1,430Drill. Cire BU for samples. EVCM 1.577

ACTIVITY FOR PERIOD 00'00 HRS TO 24'00 HRS ON 14 OS 98. , .J l:ROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 04:00 4.00 1,903 Drill 12 1/4" hole f/1857·1903m, w/5·15klbs WOB, 80 surf rpm, 260 bit rpm,900gpm, 2850psi, & 4-15k ft-Ibs torque. ROPs 6-70+m/hr. Downhole losses cont@ 40-20bph. Add 12 sx Barafiber & 12 sx Kwikseal F (small/no motor/nozzledamage).

04:00 06:00 2.00 1,921 Drilled 12 1/4" hole from 1903-1921 m, w/parameters ala. Noticeable slowing - to6-7m/hr - below 1900m, probably formation related. Downhole losses less afterearlier LCM treatments, +/-20bph.

06:00 08:15 2.25 1,944 Drill 12 1/4" hole f/1921-1944m. w/10-20klbs WOB, 70 surf rpm, 250 bit rpm,900gpm, 3200psi, & 5-17k ft-Ibs torque. ROPs 6-60+m/hr. Observed gradualpressure drop from 3200·2600psi - surface systems okay.

08;15 09:00 .75 1.944- eire au to clean annulus prior to POOH, looking for possible washout. ausample: 20% SST, 60% siltstn, 20% c1stn.

09:00 09:30 .50 1,944 Attempted to take Anderdrift survey; unsuccessful. Not pulsing. possibly becauseof washout. POOH 3std wet from 1944m, looking for washout.

09:30 14:00 4.50 1.944 Broke TDS umbilical, due to high winds. w/ gusts> 40 knots (toolpusher on thebrake). Replaced TDS umbilical bundle while circulating at 250gpm, 200psi.

14:00 15:00 1.00 1,944 Cant POOH, looking for washout. Discovered washout in middle jt of std #7 off-bottom, 2' below tool joint (exactly the same area as the 2 washouts on Yolla 2).Replaced single of 5" DP. MU TDS & broke circ - standpipe pressures okay.

15:00 15:45 .75 1,944 Confirmed off-bottom standpipe pressures okay_ RIH to btm. No excessive dragsor other hole problems during short trip. and only minor downhole losses whilecirc during the TDS umbilical repairs.

15:45 20:15 4.50 1,989 Drill 12 1/4" hole f/1944-1989m, w/6-24klbs WOB, 70 surf rpm, 250 bit rpm,900gpm, 3100psi, & 5-17k ft·lbs torque. ROPs 4~0+m/hr. Downhole losses +/-40bph (increasing to 70bph f/1970-1975m). Temporary psi drop observed f/mud treatment.

20:15 21:15 1.00 1,989 Observed 4m drilling break at 1985-1989m. Circulated au for geologicalsamples; 10.3% gas registered at BU. Negative indications of coring point.

21:15 23:15 2.00 2,008 Drill 12 1/4" hole f/1989·2008m, w/8-25klbs WOB, 70 surf rpm, 250 bit rpm,900gpm, 3200psi, & 5-17k ft-Ibs torque. ROPs 4-40m/hr. Downhole losses +/-40bph; treat w/ Barafiber. Observed 4m drilling break, to 39m/hr, fl 2004-2008m.

23:15 24:00 .75 2,008 Observed 4m drilling break at 2004-2008m. Circulated BU for geologicalsamples; 45% gas registered at BU. 8U samples indicated +/- 70%, good sand,with e...idence of flourescence in the samples.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 15.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 00:15 .25 2,008 Cire for geological samples and to ensure gas at normal levels.00:15 00:30 .25 2,008 POOH 1std from 2008-1980m. Flow checked the well static - okay.00:30 03:15 2.75 2,008 POOH from 1980-1269m, with 10-20klbs drags observed. Weather deteriorating:

gale warnings received from site-specific forecasters.03:15 03:30 .25 2,008 Flow checked well static 15min (no flow) to confirm that hole was taking correct

amount of fluid - trip tank motor behaving erratically.

Copyright IDS ~ty Ltd, RbtofB report Mar 16th 1998.1 Page Number: 1

Page 76: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

15/06/1998 09:51 0352722058 PREMIER OIL GEELONG PAGE 03/04

PremierOil AustralasiaReport Date: 14.06.98

DAILY DRILLING REPORT # 16

White Ibis 1

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

03:30 05:00 1.50 2.008 Cont POOH from 1269-866m, with 20-30klbs drags generally observed. 50-60klbs O/pull registered between 1159-1150m, & 1143-1134m, but holegenerally good, and taking correct amount of fluid. Wind/sea rising.

05:00 06:00 1.00 2,008 Flow checked well static at 13 3/S" shoe· okay. Cont POOH from 866-720m,

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 14.06.98

REMARK I OBSERVATION

All 3 wash outs during the 2 wells have occurred inapproximately the same area of the jt, while the jt was inthe same part of the upper string. where the jts aresupporting the max. weight. This supports the hypothesisthat corrosion is not the mechanism causing these washouts, but perhaps the jts have not received the correctpost·heat treatment after the fusion of the pipe & the tooljoint. As a result, this area of the jt is now hard & brittle,Ind is not flexing to the same degree as the remainder of

I the joint.

SOLUTION I RECOMMENDATION

Laboratory of the washed joints is recommended toconfirm the mechanism involved.

Mud Properties MUD COST FOR TODAY: 530.079 CUMULATIVE MUD COST TO DATE: $146,413

Type: VISCOSITY( see I qt ): S2 API Fl.UID LOSS CI- (ppm): 41,000 SOl.IDS (%vol) : 3.5PV (cps): 1S (cm3130min) 5 K+ (ppm): 31500 H20 ("Iovol): 96.5PHPA API FILTER CAKE

FROM: PitYP (lb/100sq,ft): 33 (32ndsinch 1 HARD/Ca (ppm) : 762 OIL (%vol) : a

TIME: 21:00 GEL 10sl10m130m HTHP FLUID LOSS M6T (ppb eq) : 6.0 SAND: ,2

WEIGHT (ppg): 1.09(lb/100sqft) : 7 10 0 (em3130min) 0 PM: .6 PH: 9.0

TEMP (C): 135 FANN 3/6/100 7 10 0 HTHP FILTER CAKE0 PF: .1 PHPA: 0.0

(32nds Inch)

Bit Data for Bit # 3 IADC# M 3 2 3 Wear ~~~E9~~~E9SIZE ("): 12.25 NOZZLES Drilled over the last 24 hrs Calculated over the bil runMANUFACTURER: HU AVE WOB (k-Ibs): 8 2 x16 METERAGE (m) : 152 CUM.METEAAGE (m) 1143TYPE; BD536HD AVe RPM; 254 2 x15 ON BOn-OM HRS : 12.0 CUM. ON BOT. HRS : 41.8SERIAL#: 1902432 FLOW (gpm): 1,000 2X12 IADC DRILL. HRS : 14.3 CUM.lADC DRILL HRS: 57.5DEPTH IN (m RT) ; 866 PUMP PRESS. (psi); 3,200 X TOTAL REVS : 182,880 CUM.TOT. ReVS: 637,642DEPTH OUT (m RT) : 2008 HSI (hpfsqi) : 1 X ROP (mfhr): 10.7 ROP (mfhr); 19.9

BHA # 4 Length (ft) :204.3 D.C. (1) ANN. VELOCITY (mpm): 285

HRS ON JARS: STRING WT(k·lbs) : 240 ITROE MAX (ft-Ibs): 16.000 I O.C. (2) ANN VELOCITY (mpm): 0wr BLW JAR(k-lbs): 36 PICK UP WT(k-lbs) : 232 TROe ON (ft-Ibs); 7,220 HW.D.P. ANN VEL.OCITY (mpm): 1966HA WT(k-lbs) : 62 SLK OFF WT(k·lbs) : 250 TRQE OFF (ft-Ibs): 3.900 D.P. ANN VELOCITY (mpm) : 196

BHA DESCRIPTION: TOOL oeSCRIPTION HRS SERIAL # COMMENT12 1/4"Bit - Bit sub - Motor - :voyer - sub - 123/16" 121/4" POC b't 57.5 1902432 PDCNB Stab cJw float vlv • 8"Anderdrift cJwTotco Anderdrift tool I 105.S ADBS14 New flask 3/6/98Rlng- 8" NMDC -12 3/16" Stab· 6xS"DC - jars - Jars 72.5 A0210 New on 12 1/4" ass'y3x8" DC - xlo - 1xHWDP - dart sub - S x HWDP. A962XP 3/4Motor 72.5 2125 AnadrHl motor

Anchor Tension(kips)

A1 ; 60.0

A6: 75.0

A2; 75.0

A7: 70.0

A3: 75.0

AS; 80.0

A4: 75.0

A9:

A5; 70.0A10 :

Location, Fuel Sarite Dtwtr Pfwtr Cmt 8ent Heli Weather & Rig data @ 24:00 hrs(kltr) (SX) (bbl) (bbl) (sx) (sx) (kltr)

Workboats

P. CommanderBrute Tide

Geelonrig 163 2,107 491

WIND SP. (klS) : 35.0 VISIB.(nm): 10WINO OIR (deg) :270 CEILING (m) : 1,400PRES.(mbars); 1011 WAVES (m) : 2.2AIR TEMP (C): 14.0 SWELL (m): 4.5

VOL (kips: 759.0RIS.TENS: 22HEAVE (m): 2.2ROLL (deg): 2.5PITCH (deg): 1.5

ICOMMENTS: "Brute Tide" at rig. "Commander" sailing to Geelong; 0 helicopter flight - 0 PAX on rig; 0 PAX off rig.

Copyright IDS Pty Ltd. RbtofB report Mar 16th 1998.1 Page Number: 2

Page 77: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

15/06/1998 09:51 0352722058 PREMIER OIL GEELONG PAGE 04/04

PremierOil AustralasiaReport Date: 14.06.98

DAILY DRILLING REPORT # 16

White Ibis 1

Bulk Stocks Used lin Stock Used lin Stock Used lin Stock Used lin StockDRill WATER (bbl):O 3.580 FUEL (bbl): 15 1.345 GEL (sx): 0 -0 HELl-FUEL (kltr) : 0.0 8.3POT WATER (bbl); 0 1,201 BARITE (sx) : 0 5.181 CEMENT (sx) : 0 1,764

Drills, Permits & InspectionsDRIll TYPE OATE INSPECTIONS DATE SAFE1Y DETAILS

TRIPORILL 10/6 BOP TEST 9/6 I.TI 25/4FIRE 715 NEXT TEST DUE DATE 2316 MTI 216PITORlll 14/6 RIG INSPECTION 17/4 JSA ongoingINCIOENT S/6 DAYS SINCE lTA 164 #r>TW ongoing

Safety Meeting 14/6

Casino Pump DataCSG LOT FlHASE CSGSHOE CSGSHOE Pump Data • last 24 h~ Slow Pumo Data00(") MD TVD(mBRT) #- TYPE lNR SPM EFF Flow SPP SPM SPP DEPTH MW

13.3/8 .. 14.16 863 863 (") (%) (gpm (psi) (psi) (mRT) (ppg)

1 National 5.50 100 97 1000 3200 30 275 1720 1.1TYPE lNGTH CSG wr GRD THREAD 2 National 6.50 100 97 40 370 1720 1.1

(m) IDn Ibslft 50 425 1720 1.1Shoejt 12.5 12.4 68.0 lBO N.VAM1 x Bakerlok jt 11.2 12.4 68.0 lSO N.VAM Personnel: on Site = 93F/Collarjt 12.3 12.4 68.0 lao N.VAM3 x 8akerlok jt 35.5 12.4 68.0 lBO N.VAM JOB TITLE NAME COMPANY NAME #20jts 237.7 12.4 67.0 lSO BTC Drtg Supervisor H. Knobl Flremler 340jls 466.9 12,4 66.0 l60 N.VAM N. Drlg Supervisor K. Dubravac Northern 71Pup 3.1 12,4 68.0 1.60 N.VAM Geologist K. Frankiewicz Dowell Cement 1Wellhead jt 10.7 12,4 68.0 LBO N.VAM

AsiaticROV :3Dowell Mud 1

Northern Explorer Fl F<uddleston & Cox EMS 1Smedvlg Safety 1Geoservice 4Directional Driller 1Alfa Laval 1Core hand 1Schlumberger 5

Survey MO NO INCL AZ CORR. 'V DOGLEG N/S EIW TOOL TYPE

Last Tool Type: Anderdrift (mRT) (m RT) OEG (deg) AZ SECT (mI30m) (m) (m)(deg) (m)

Magnetic Declination: 12.41 1,422 1.422 0.50 Anderdrift

Survey method ; Min Curvature 1,479 1,479 0.50 Anderdrift1.594 1,594 0.00 Anderdrifi1.680 1,680 0.50 Anderdrifi1.768 1.768 0.50 Anderdrift1.852 1,852 1.00 Anderdrift1,937 1,937 0.00 Anderclrift1.944 1,944 0.50 Anderclrift

CopyrlghtlDS Ply Ltd. RbtofB report M"r 16th 199B.1 Page Number; 3

Page 78: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

14/05/1998 10:42 0352722058 PREMIER OIL GEELONG PAGE 01/03

, _..-._~- J----~'ROt::\=lFCO "

.PremierOil Australasia ~"NO~If<C1]J~11It.J.... \.] DAILY DRILLING REPO~T # . 15

Report Date: 13.06.98 l:.:-.------- - White Ibis 1

Well DataCOUNTRY Australia T.D. (m RT): 1,857.0 CUR. HOLE size 0: 12.25 DAILY COST $ : $211.093FIELD Bass Basin PROGRESS (m); 477.0 CSG 00 ("): 13.38 CUMCOsT$: $3,331,231DRILL CO. : Northern Offshore DAYS FROM SPUD: 12.21 SHOE "TVD (m RT): 863 AFECOSTS: $7.321.212RIG: Northern Explorer III DAYS +1- CURVE: LEAK-OFF EMW(PP9) 14.16 AFE BASIS: P&AMUD CO: DowellRT ABOVE MSL (m) : 12.5 CURRENT OP@ 0600; Drill 12 1/4" hole.WATER DEPTH @MSL (m) : 61.9 PLANNED OP. : Drill 12 1/4" hole. Clrc. POOH. PU core bbl. RIH. Cut core. POOH. RIH wI

RT TO SEABED (m) : 74.4 bit.

Summary of period 00:00 to 24:00 hrs: Formation Tops· This report only

Drill 121/4" hole. TDS service & repair rpm gauge. Drill 12 1/4" hole. I FORMATION ITOP(mBRT) IString in LCM. Drill 12 1/4" hole.

ACTIVITY FOR PERIOD 00·00 HRS TO 24:00 HRS ON 13.06.98.IFROM TO HRS DEPTH ACTIVITY DESCRIPTION

,)0:00 06:00 6.00 1,551 Drill 12 1/4" hole f/1380-1551m, w/10-20klbs WOB, 70 surf rpm, 270 bit rpm,1000gpm, 2900psi, & 4-15k ft-Ibs torque. Raps 18-100+m/hr. Occasional psispikes to 3100psi after 1500m . Some shaker losses due to heave.

06:00 12:00 6.00 1.685 Drill 12 1/4" hole f/1551-1685m, w/5-15klbs WOB, 70 surf rpm, 270 bit rpm,1000gpm, 3000psi, & 5-15k ft-Ibs torque. ROPs 10-100+m/hr. Occasional TDSstalling evident as before (sandstone stringers). Anderdrift surveys on stands

12:00 14:00 2.00 1,720 Drill 12 1/4" hole ff 1685·1720m, wf5·15klbs WOB. 70 surf rpm, 270 bit rpm,1000gpm, 3000psi, & 5-15k ft-Ibs torque. ROPs 10-100+m/hr. Occasional TDSstalling evident as before (sandstone stringers). Anderdrift surveys every 3 stds.

14:00 14:30 .50 1,720 Service TDS. Take SCR's.14:30 15:00 .50 1,720 Repair rpm gauge on driller's console, and sensor to TDS torque readings (TDS

stalling at below 10k ft-Ibs, with limit switch set at 16k ft-Ibs).15:00 19:00 4.00 1,780 Drill 12 1/4" hole f/1720-1780m, w/5-15klbs WOB, 70 surf rpm, 270 bit rpm,

1000gpm, 3000psi, & 5-15k ft-Ibs torque. Raps 6-100+m/hr. Reduced TDSstalling (sandstone stringers) since repairs. Vary pumps/rpm to optimize Rap.

19:00 21:00 2.00 1,810 Drill 12 1/4" hole f/1780-1810m, parameters a/a, varying pumps/rpm to optimizeROP. Torque generaIly higher, 5-15k ft-Ibs. Observed downhole losses frombelow 1770-1780m (SST below 1730m), initially @40bph, increasing to 80bphmax.

21:00 22:30 1.50 1,833 Drill 12 1/4" hole f/1810·1833m, parameters ala. Cont downhole losses initally@ 40+bph. Began adding 12 x 25kg sx LCM (Barafiber), 1 sxl5min· lossesreduced to 5bph initially, then to 40+bph after 30min. ROPs 5-20m/hr.

22:30 24:00 1.50 1,857 Drill 121/4" hole f/1833·1857m, parameters a/a. Cant downhole losses @40+bpn. Add another 12 x 25kg sx LCM (Barafiber), loss rate unchanged-apparently incurring new losses into each new sand stringer drilled.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 14.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 04:00 4.00 1,903 Drill 12 1/4" hole f/1857-1903m, w/5·15klbs WOB, 80 surf rpm, 260 bit rpm,900gpm, 2850psi, & 4·15k ft·lbs torque. ROPs 6-70+m/hr. Downhole losses cant@40-20bph. Add 12 sx Barafiber & 12 sx Kwikseal F (small/no motor/nozzledamage).

04:00 06:00 2.00 1,921 Drilled 12 1/4" hole from 1903·1921m, w/parameters ala. Noticeable slowing - to6-7m/hr· below 1900m, probably formation related. Downhole losses less afterearlier LCM treatments, +1-20bph.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 13.06.98

Copyright IDS Ply Ltd. RbtofB report Mar 16th 1998.1 Page Number: 1

Page 79: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

14/05/1998 10:42 0352722058 PREMIER OIL GEELONG PAGE 02/03

PremierOil AustralasiaReport Date: 13.06.98

DAILY DRILLING REPORT # 15

White Ibis 1

Mud Properties MUD COST FOR TODAY: $2U39 CUMULATIVE MUD COST TO DATE: $116.334

Type: VISCOSITY( sec I lit ): 47 API FL.UID LOSS CI· (ppm); 41,000 SOLIDS (%vol) : 2

PHPA PV (cps): 13 (cm3/30min) 6 K... (ppm): 31500 H20 (%vol): 98.0API FILTER CAKE

FROM: Pit YP (lb/100sq.ft): 2S (32nds Inch 1 HARD/Ca (ppm) : 721 OIL. (%VOJ) : 0

TIME: 21:00 GEL 10sl10m130m HTHP FLUID LOSS MBT (ppb eq) : 5.0 SAND: .2

WEIGHT (PP9): 1.08 (lb/100slift) : 5 7 0 (cm3J30mln) 0 PM: .6 PH: 9.0

TEMP (C): 132 FANN 3/6/100 6 9 0 HTHP FILTER CAKE PF; .1 PHPA: 0.0(32nds inch) 0

Bit Data for Bit # 3 IADCft. M 3 2 3 Wear ~~~E9~~~~SIZE ("): 12.25 NOZZLES Drilled over the last 24 hrs Calculated over the bit runMANUFACTURER: HU AVE WOB (k-Ibs): 8 2 X16TYPE: BD536HD AVE RPM: 262

METERAGE (m) : 477 CUM,METERAGE (m) 9912X15 ON BOTTOM HRS : 16.9 CUM. ON BOT. HRS : 29.8

SERIAL#: 1902432 FL.OW(9pm) ; 1,000 2X12 IADC DRILL. HRS : 23.0 CUM.lADC DRILL. HRS: 43.3DEPTH IN (m RT) : 866 PUMP PRESS. (psi): 3.000 X TOTAL. REVS : 265.668 CUM.TOT. REVS: 469.085I")EPTH OUT (m RT) : HSI (hp/sqi) : 1 X ROP (mlhr): 20.7 ROP (m/hr): 22.9,

285o

196196

D.C. (1) ANN. VELOCIn' (mpm):15,000 D.C. (2) ANN VELOCITY (mpm):6,600 HW.D.P. ANN VELOCIn' (mpm):1,500 D.P. ANN VELOCIn' (mpm) :

TRQE MAX (ft-Ibs);TRQE ON (ft-Ibs):TRQE OFF (ft-Ibs):

230227228

BHA # 4 Length (ft) :204.3HRS ON JARS; STRING WT(k-lbs} :WT BLW JAR(k-lbs): 36 PICK UP WT(k·lbs) :BHA WT(k-lbs) : 52 SLK OFF WT(k-lbs) ;

BHA DESCRIPTION : r--........T~O~O-L-D-E~SC~R-I-PT-l0~N--r-H-R~S~--S~ER~I-AL-#-~---C--:O"':'"M':"'M-=e=-N-T----,I12 1/4"8it - Bit sub - Motor - xlover - sub - 12 3/16" r1-2-1-/4-"-P-DC-b-lt------t-4-3.-3+-1-9-02-4-3-2--t-P-D-C---------11NB Slab cIW float vlv - 8"Anderdrift cIw TolcoRing- 8" NMDC _123/16" Stab _6x8"DC _jars. Anderdrlft tool 88.5 ADB814 New flask 3/61983xS" OC - 'tIo _1xHWDP _dart sub _8 x HWDP. Jars 55.3 A0210 New on 12 1/4" ass'y

A952XP 3/4Motor 55.3 2125 Anadrill molor

Anchor Tension(kips)

A1 : 6.070.0

A6: 80.0

Kl.: 60.0

A7: 75.0

A3; 70.0AS: 85.0

A4; 70.0

A9:

AS: 75.0A10 :

Workboats Locallon. Fuel Barite DAYlr PAYlr Cmt Bent Heli Weather & Rig data @ 24:00 hrs(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltr) VDl. (kips: 705.0

P. Commander Geelon WIND SF!. (kIS) : 20,0 VISIB.(nm) ; 10 RIS.TENS: 22Bl\lte Tide rig 167 2,107 516 WINO DIR (deg) :320 CEILING (m) :2,500 HEAVE(m) : 1.2

PRES.(mbars): 1003 WAVES (m): 1.3 ROLL (deg): 1.5AIR TEMP (C): 13,5 SWELL (m): 2.5 PITCH (deg); 1,0

I(COMMENTS; • "Brute Tide" at rIg, "Commander" sailing to Geelong (dep rig @ 19:30hrs); 1 helicopter flight • BPAX on rig; 4 PAX off rig, I

Bulk Stocks Used lin Stock Used lin Stock Used lin Stock Used /In StockDRILL WATER (bbl) :653 3.580 FUEL (bbl): 15 1,360 GEL (sx): 0 -0 HEL.I-FUEL (kltr); 0.3 a.3POTWATER(bbl): 31 1.126 BARITE(sx):O 5,181 CEMENT(sx):o 1,764

Drills, Pennits & Inspection~

DRILL. TYpe DATE

TRIP DRILL 10/6FIRE 7/6PIT DRILL 14/6INCIDENT 816

INSPECTIONS

BOP TESTNEXT TEST DUE DATERIG INSPECTIONDAYS SINce LTA

DATE SAFETY DETAILS

9/6 LTI 25/423/6 MTI 21617/4 JSA ongoing163 t#PTW ongoing

Safety Meeting 14/6

Pump Datap,L1mDD~ t.a - la t 24 hI'S Slow PumD Data

# n'PE LNR SPM EFF Flow SPP SPM SPP DEPTH MW(n) (%) (gpm (psi) (psi) (m RT) (ppg)

1 National 6.50 100 97 1000 3000 30 275 1720 1.12 National 6,50 100 97 40 370 1720 1.1

50 425 1720 1.1

Copyright IDS pty Ltd. RbtofB report Mar 16th 1998.1 Page Number: 2

Page 80: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

14/06/1998 10:42 0352722058 PREMIER OIL GEELONG PAGE 03/03

PremierOil AustralasiaReport Date: 13.06.98

DAILY DRILLING REPORT # 15

White Ibis 1

Casino Personnel : on Site =93CSG LOT PHAse CSGSHOE CSGSHOE Joe TITLE NAME COMPANY NAME #00(") MO T\lD(mBRT)

13.3/8 H 863 863Orlg Supervisor H. Knobl Premier 3N. Orlg SupeN'isor K. Dubravac Northern 71

TYPE: LNGTH CSG WT GRD THREAD Geologist K. Frankiewicz Dowell Cement 1

(m) ID (") Ibs/ft Asiatic ROV 3Dowell Mud 1

Shoejt 12.5 12.4 68.0 L80 N.VAM Northern Explorer P Ruddleslon & Cox EMS 11 x Bakerlok jt 11.2 12.4 68.0 LSO N.VAM Smedvig Safety 1F/Collar jt 12.3 12.4 68.0 LaO N.VAM GeoseN'ice 43 x Bakerlok jt 35.5 12.4 68.0 L.ao N.VAM Directional Driller 120jts 237.7 12.4 67.0 L80 eTC Alfa Laval 140jts 466.9 12.4 68.0 LBO N.VAM

Core hand 1Pup 3.1 12.4 68.0 L80 N.VAMSchlumberger 5Wellheadjt 10.7 12.4 68,0 LeO N.VAM

Jrvey MD TVD INCL AZ CORR. 'V DOGLEG N/S erN TOOL. TYPE

Last Tool Type: Anderdrift(mRT) (mRT) DEG (deg) AZ SECT (m/30m) (m) (m)

(deg) (m)

Magnetic Declination : 12.41 1,251 1.251 0.50 Anderdrlfl

Survey method : Min Curvature 1.308 1.308 0.50 Anderdrift1.362 1.362 0.50 Anderdrift1.422 1.422 0.50 Anderdrifl1,479 1.479 0.50 Anderdrift1.594 1.594 0.00 Anderdrift1.680 1.680 0.50 Anderdrifl1,768 1,768 0,50 Anderdrift

Copyright IDS Pty Ltd, RbtofB report Mar 16th 1998.1 Page Number: 3

Page 81: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

13/05/1998 13:25 0352722058 PREMIER OIL GEELONG PAGE 01/03

l3PremierOil Australa~CORDS~.··~.,r~~~'~l CAlLY DRILLING REPORT # 14

Report Date: 12.06.98 IFile NO:\~r.\n~.~~jSL~I \.LiN~ White Ibis 1

Well DataCOUNTRY Australia T.D. (rnRT): 1,380.0 CUR. HOLE SIZE ("): 12.25 DAILY COST $ : $207,61JFIELD Bass Basin PROGRESS (m): 32.0 CSGOD("): 13.38 CUMCOST$: $3.120.138DRILL CO. : Northern Offshore DAYS FROM SPUD; 11.21 SHOe 1VO (m RT): 863 AFECOSTS: $7.321.212

RIG: Northern Explorer III DAYS +/- CURVE: LEAK-OFF EMW(ppg) 0.00 AFE BASIS: P&A

MUD CO: DowellRT ABOVE MSL (m) ; 12.5 CURRENT OP @ 0600: Drilling 12 1/4" hole

WATER DEPTH @MS!. (m) ; 61.9 PLANNED OP.: Drill 12 1/4" hole. POH for core.

RT TO SEABED (m) : 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops· This report only

WOW. Retrieve hang·off tool. RIH. Drill 12 1/4" hole. I FORMATION ITOP(mBRT) IACTIVITY FOR PERIOD 00'00 HRS TO 24'00 HRS ON 120698. . . .FROM TO HRS DEPTH ACTIVllY DESCRIPTION

00:00 05:30 5.50 1,348 WOW while observing weather conditions, awaiting forecast gale force storm toarrive. Prepared to retrieve hang·off tool @ 03:45hrs • weather seeminglyabating - but wind, pitch, heave, roll, wave ht, etc. - all began increasing again.

05:30 17:00 11.50 1,348 WOW while observing weather conditions, awaiting sea to abate sufficiently toresume operations. Seas rached max. height of 7.2m as recorded by WaveRider. Began using thrusters @ 05:30hrs to help maintain position.

17:00 17:30 .50 1,348 Displaced Riser from S/water to KCI mUd. Prepare to retrieve hang-off tool.17:30 19:00 1.50 1,348 RIH with hang·off retrieval tool, retrieve hang·off tool.19:00 21:45 2.75 1,348 RIH. Encountered bridgelledge @ 1037m. PU TOS and worked tight spot with

200rpm, 800gpm until clean. Continue to RIH from 1040 - 1265m.21:45 22:15 .50 1,348 MU TOS and precautionary washlream from 1265-1348m, with Oklbs WOB, 50

surface rpm, 210 bit rpm, 800gpm, 22S0psi, and 3-4k ft-Ibs torque. Hole clean,no excessive drag or torque observed.

22:15 24:00 1.75 1,380 Drill 12 1/4" hole from 1348·1380m, w/1 0·20klbs WOB, 70 surface rpm, 270 bitrpm, 1000gpm, 2750psi, and 4-15k ft·lbs torque.ROPs 16-70m/hr. Occasionalhigh torque wi temporary TOS stalling.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 13.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 06:00 6.00 1,551 Drill 12 1/4" hole f/1380-1551m, w/10-20klbs WOB, 70 surf rpm, 270 bit rpm,1000gpm, 2750psi, &4-15k ft-Ibs torque. ROPs 18-100+m/hr. Occasional psispikes to 3100psi after 1500m . Some shaker losses due to heave.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 12.06.98

REMARK 1OBSERVATION SOLUTION I RECOMMENDATION

Weather Conditions (Higher "spike" values have beenrecorded between all time periods):Time Wind Wind Dir Pitch Heave Roll Max Ht Bar02:0030/35 350 2.0 2.62 3.0 3.71 100404:0030/35 350 3.0 4.00 4.0 4.44 1002.506:0040/45 340 3 4.0 4.0 5.35 999.508:0043/48 330 4 5.0 4.0 4.90 998.210:0040/46 320 5 7.0 4.2 4.2 99812:0035/40 300 5 4.5 8.0 6.20 998.214:0040/45 270 3 3.9 4.0 5.52 99916:0040/45 280 1.5 2.0 3.0 6.27 100018:0030/35 270 2 2.5 3.0 4.02 1002

CQPyright IDS Ply Ltd, RbtofB report Mar 16th 1998.1 Page Number: 1

Page 82: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

13/06/1998 13:26 0352722058 PREMIER OIL GEELONG PAGE 02/03

PremierOil AustralasiaReport Date: 12.06.98

DAILY DRILLING REPORT # 14

White Ibis 1

Mud Properties MUD COST FOR TODAY: 51,380 CUMULATIVE MUD COST TO DATE: $81.852

Type: VISCOSITY( sec / qt ): 55 API FLUID LOSS CI· (ppm): 45.000 SOLIDS (%yol) : 1.6PV (cps); 11 (cm3l30min) 6 K+ (ppm): 28000 H20 (%vol): 98.4PHPA API FIL.TER CAKE

FROM; Pit YP (lb/100sq.ft): 24 (32nds inch 1 Ho4.RD/Ca (ppm) ; 481 OIL. (%vol): 0

TIME: 21:00 GEL. 10s/10mr.30m HTHP FLUID LOSS MBT (ppb eq) : 0,0 SAND:

WEIGHT (ppg): 1.06 (lb/100sqft) : 5 6 0 (cm3/30min) 0 PM: ,9 PH: 9.0

TEMP (C): 0 FANN 3/6/100 5 9 0 HTHP FILTER CAKE PF: .2 PHPA: 0.0(32nds inch) 0

Bit Data for Bit # 3 IADC# M 3 2 3 Wear E91 01 II D:f:g~~~~" IISfZE("): 12.25 NOZZLES Drilled over the last 24 hrs Caleulated over tile bit runMANUFACTURER: HU AVE WOB (k-Ibs) : 8 2 X16 METERAGE (m) : 32 CUM.METE:RAGE (m) 514TYPE: : BD536HD AVE RPM: 255 2x15 ON BOTTOM HRS ; 1.2 CUM, ON BOT. HRS : 12.9

SERIAL'# : 1902432 FLOW (gpm) : 1.000 2X12 IADC DRILL. HRS : 1.8 CUM.IADC DRILL HRS; 20.3DEPTH IN (m RT) : S66 PUMP PRESS. (psi): 2,800 X TOTAL REVS : 18,360 CUM.TOT. ReVS; 197.982DEPTH OUT (m RT) : HSI (hp/sqi) : 1 X ROP (m/llr): 18.3 ROP (m/hr): 25.4

285o

196196

PDCNew flask 316/98New on 12 114" ass'yAnadrill motor

D.C. (1) ANN. VELOCITY (mpm):13,000 D.C. (2) ANN VELOCITY (mpm):5,400 H.W.D.P. ANN VELOCITY (mpm):1,500 D,P, ANN VELOCITY (mpm):

dHA # 4 Length (tt) :204.3HRS ON JARS: STRING WT(k-lbS} : 204 TRQE MAX (ft-Jbs):"NT BLW JAR(k-lbs): 36 PICK UP WT(k-lbs) : 200 TROe ON (ft-Ibs):BHA WT(k-lbs) : 62 SLK OFF WT(k-lbs): 198 TROE OFF (ft·lbs):

BHA DESCRIPTION : .-----T-O-O-L-O-E-SC-R-I-PT-IO-N-~r-H-R-S.....,.-S-ER-I-AL-#-.,....----C-O-M-M-E-N-T----'

~i~i~~i~~oSa~~;"M.O~~~~~~~~rft-~TO~~3/16" 121/4" ~DC bit 12.9 1902432Ring- 8" NMDC • 12 3/16" Stab. 6xS"DC. jars _ Anderdrift taol 65.0 ADBS14

Ja~ 31.8 04.02103xS" DC ·xla ·1xHWDP· dart sub - 8 x HWDP. A962XP 3/4Motor 31.8 2125Io.... ----l.__-'----'--__----l._--'-- -J

Anchor Tension(kips)

A1 : 70.0

A6; 75.0

A2: 60.0A7: 75.0

A3: 75.0A8: 85.0

A4: 75.0

A9:

AS: 70.0

A10 :

risrig

Workboats

P. CommanderBrute Tide

Location. Fuel Barite Dlwtr Plwtr Cmt Bent Heli(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltr)175 1,227 1.101173 2.107 541

Weather & Rig data @ 24:00 hrsVDL (kips: 582.0

WIND SP. (kts): 36,0 VISIB.(nm): 10 RIS,TENS: 22WIND OIR (des) :260 CEIL.ING (m); 1.500 HEAVE (m): 1.3PRES.(mbars): 1007 WAVES (m) ; 2.5 ROLL (des); 2,0AIR TEMP (C): 12.0 SWEL.L. (m); 3.7 PITCH (des): 1,S

I ~OMMENTS: "Commander" & "BrUle Tide" at rig: 0 helicopter flight -0 PAX on rig; 0 PAX off rig (flt cancelled due to weather). I

Bulk Stocks Used lin Stock Used lin Stock Used lin Stock Used lin StockORIL.L WATER (bbl) :138 4,233 FUEL (bbl): 15 1.375 GEL (sx) : 0 -0 HEll-FUEL (kltr) : 0.0 6.6POTWATER(bbl): 0 1.157 SARITE(sx):220 5.181 CEMENT(sx);O 1.764

Drills, Permits & Inspection!DRILL TYPE DATE

TRIP DRILL 10/6FIRE 7/6PIT DRILL. 11/6INCIOENT 816

INSPECTIONS

BOP TESTNEXT TEST DUE DATERIG INSPECTIONDAYS SINCE L.TA

DATE SAFETY DETAILS

9/6 LTI 25/423/6 MTI 21617/4 JSA ongoing162 #PTW ongoing

Safety Meeting 7/6

Pump DataPumD Data -lasl24 hrs Slow Pume Data

'# TYPE LNR SPM EF=F= Flow(") (%) (gpm

Spp SPM(psi)

SPP DEPTH MW(psi) (m Rl) (ppg)

1 National 6.50 90 97 10002 National 6.50 90 97

2500 30405060

300 1264 1.1360 1264 1.1430 1264 1.1480 1264 1.1

CopyrighllDS Ply Ltd. RblOfB repol'! Mar 16th 1996.1 Page Number: 2

Page 83: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

13/05/1998 13:25 0352722058 PREMIER OIL GEELONG PAGE 03/03

PremierOil AustralasiaReport Date: 12.06.98

DAILY DRILLING REPORT # 14

White Ibis 1

Casino Personnel : on Site =89CSG LOT PHASE CSG SHOE CSGSHOEDD{") MD lVD{mBRT) JOB TITLE NAME COMPANY NAME #

13.3/8 .. 863 863 Orlg Supervisor H. Knobl Premier 3N. Orl9 Supervisor K. Dubravac Northern 72

TYPE L.NGTH CSG wr GRO THREAD Geologist K. Frankiewicz Dowell Cement 1

(m) 10 (") Ibstfl AsiatieROV 4Dowell Mud 1

Shoejt 12.5 12.4 68.0 L80 N.VAM Northern Explorer P RuddJeston & Cox.1xBakerlok jt 11.2 12,4 68.0 L80 N.VAM Smedvig Safety 1F/Collar jt 12.3 12.4 68.0 LBO N.VAM Geoservice 43 x. Bakerlok jt 35.5 12,4 68.0 L80 N.VAM Directional Driller 120jts 237.7 12.4 67.0 LSO BTC Alfa Laval ,40jts 466.9 12.4 68.0 LBO NVAM

Core hands 1Pup 3.1 12.4 68.0 LBO NVAMWellheadjt 10.7 12.4 68.0 LSO NVAM

I ~!Jrvey MD TVO INCL ~ CORR, 'V OOGLEG N/S ENV TOOL TYPE

..ast Tool Type: Anderdrift(m RT) (m RT) OEG (deg) AZ. SECT (mI30m) (m) (m)

(deg) (m)

Magnetic Declination : 12.41 1,107 1,107 0.00 Anderdrifl

Survey method ; Min Curvature 1,136 1,136 0.00 Anderdrifl1,164 1,164 0.00 Anderdrifl1.193 1,193 0,00 Anderdrifl1,222 1,222 0.00 Anderdrift1,251 1,251 0.50 Anderdrift1,308 1,308 0.50 Anderdrift1,362 1,362 0.50 Anderdrift

Copyright IDS Ply Ltd, RbtofB report Mar 16th 1998,1 Page Number: 3

Page 84: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

12/05/1998 09:05 0352722058 PREMIER OIL GEELONG PAGE 01/04

10<Premier O~ AustralasiaGeelong Operations BasePhone; 0352722101Fax:035272205S

Fax

Premier OilAustralasia

To: Victoria Minerals & Petroleum Ops. Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Bacon

Boral Energy Resources. Attn: A Guthrie, Ross Naumann

CalEnergy. Attn: Jane Duncan

From: Gordon Hunter

Fax:

Phone:

Date: June 12, 1998------------_._--Pagn: 4 inc. this one

Re; VVhite Ibis I cc:------------_....__.._- --- ._--_._--o Urgent

-Comments:

o For Review 0 Pleaae Comment D Please Reply o Please Recycle

Please find attached the Daily Drilling Summary Report for 111h June 1998.

Regards

Gordon Hunter

Drilling Superintendent

.tI

Page 85: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

12/06/1998 09:05 0352722058 PREMIER OIL GEELONG PAGE 02/04

PremierOil AustralasiaReport Date: 11.06.98

DAILY DRILLING REPORT # 13

White Ibis 1

Well DataCOUNTRY Australia T.O. (m RT): 1,348.0 CUR. HOLE SIZE ("): 12.25 DAILY COST $ : $218,654FIELD Bass Basin PROGReSS (m): 383.0 CSG OD ("): 13.38 CUMCOST$: $2,912.525DRILL CO. : Northern Offshore OAYS FROM SPUD: 10.21 SHOE iYO (m Rn: 863 AFE COST $ : $7.321.212RIG: Northern Explorer 111 DAYS +/- CURVE: LEAK-oFF EMW(ppg) 0.00 AFE BASIS: P&AMUD CO: DowellRT ABOVE MSL (m) : 12,5 CURRENT OP @0600: Hung off. WOW,

WATER DEPTH @MSL (rn) : 61.9 PLANNED OP.: RIH. OrllJ 12 1/4" hole.

RT TO SEABED (m) ; 74.4

Summary of period 00;00 to 24:00 hI'S: Formation Tops - This report only

Drill 12 1/4" hole. Wiper trip to shoe. PU & set hang-off tool. WOW. I FORMATION ITOP(mBRT)IACTIVITY FOR PERIOD 00'00 HRS TO 24'00 HRS ON 110698. .FROM TO HRS DEPTH ACTIVITY DESCRIPTION

IljO:OO 06:00 6.00 1,149 Drilled 12 1/4" hole from 965-1149m, w/5-13klbs WOB, 70 surf rpm, 270 bitrpm, 1000gpm, 2550psi &3-12ft-lbs torque. ROPs 30-120m/hr.

06:00 15:30 9.50 1,348 Drilled 12 1/4" hole from 1149-1348m, w/5-15klbs WOB, 70 surf rpm, 270 bitrpm, 1000gpm, 2900psi & 3-12ft-Ibs torque. ROPs 20-60m/hr. Occasionalmotorlstring stalling from compensator/stabs. Formation firmer, ROPs slower.

15:30 16:30 1.00 1,348 eirc hole clean at 1348m. Pumped 20bbl slug @ 11ppg.16:30 18:00 1.50 1,348 Made 21std wiper trip from 1348-751m (inside 13 3/S" shoe), to check hole

condition & in anticipation of deteriorating weather conditions. Observed severalintervals of max. 60klbs a/pull, but pulled through w/o MU TDS.

18:00 19:00 1.00 1,348 RigfTDS service.19:00 20;00 1.00 1,348 After consultation wI town in face of very poor forecasted weather conditions, PU

the hang-off tool, RIH 3std to 825m, and land off the hang-off tool in the WHo20:00 21:00 1.00 1,348 Retrieved landing string. Installed Riser spider.21:00 24:00 3.00 1,348 WOW observing weather conditions, awaiting forecast gale force storm. Anchor

tensions on 3-$ (facing weather) spike to 160kips, max seas to 3.5m, winds 25-32kts. Extrapolating fl current conditions, max weather could be 9hr delayed.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 12.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 06:00 6.00 1,348 WOW while observing weather conditions, awaiting forecast gale force storm toarrive. Prepared to retrieve hang-off tool @ 03:45hrs - weather seemingly

I abating - but wind, pitch, heave, roll, wave ht. etc. - all began increasing again.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 11.06.98

REMARK / OBSERVATION SOLUTION 1RECOMMENDATION

Weather Conditions (Higher "spike" values have beenrecorded between all time periods):Time Wind Wind Dir Pitch Heave Roll Max Ht Bar20:0030/35 010 2.2 2.93 2.6 3.45 100822:0020/25 010 2.2 2.93 2.6 3.8 100624:0025/35 350 4 4.7 6.8 4.35 100502:0020125 350 2 2.6 3.0 4.97 100404:0030/35 350 3 3.9 4.0 4.4 100205:0030/40 350 3 3.9 5.0 5.32 100006:0040/45 340 3 3.2 4/0 5.32 999.5

Mud Properties MUO COST FOR. TODAY: $9,401 CUMULATIVE MUD COST TO DATE: $60,472

Type: VISCOSITY( sec 1qt ): 50 API FLUID LOSS Cl- (ppm) : 45,000 SOLIDS (%vol) : 1.6

PHPA PV (cps): 11 (cm3130mln) 6 K. (ppm); 26000 H20 (%vol): 98.4API FILTER CAKE

FROM: PitYP (lb/100sq.ft): 24 (32ndsinch 1 HARD/Ca (ppm) : 481 OIL (%vol) ; 0

TIME: 18:00 GEL 10s/10m/30m HTHP FLUID LOSS MBT (ppb eq) : 0.0 SAND:

WEIGHT (ppg): 1.07 (lb/100Sqft) : 5 6 0 (cm3130min) 0 PM: .9 PH: 9.0

TEMP (C): 105 FANN 3/61100 5 9 0 HTHP FILTER CAKE PF: .2 PHPA; 0.0(32nds inch) 0

Copyright IDS Ply Ltd. Rbtof6 report Mar 16th 1996.1 Page Number: 1

Page 86: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

12/06/1998 09:05 0352722058 PREMIER OIL GEELONG PAGE 03/04

PremierOil AustralasiaReport Date: 11.06.98

DAILY DRILLING REPORT # 13

White Ibis 1

Bit Data for Bit # 3

SIZE ("):

MANUFACTURER:

IYPE:

SERIAL#:DEPTH IN (m RT) :

OEPTH OUT (m RT) :

12.25HU

B0536HO

1902432

866

IADC# M 3 2

AVE WOB (k·lbs) :AVe RPM:FLOW (gpm) :PUMP PRess. (psi);HSI (hp/sqi) :

3

10256

1,0002,900

1

Wear E:jl 01 11 D 1E9~2j~r:g

NOZ2LES Drilled over the last 24 hrs Calculated over the bit run

2 X16 METERAGE (m): 363 CUM.METERAGE (rn) 4622 X15 ON BOTTOM HRS: 9.6 CUM. ON BOT. HRS: 11.72 X12 IADC DRILL. HRS: 15.5 CUM.JADC DRILL HRS: 18.5

X TOTAL REVS: 148,070 CUM.TOT. REVS: 180,326X ROP (m/hr): 24.7 ROP (m/hr): 26.1

285o

196196

O.C, (1) ANN. VELOCliY (mpm):13,000 D.C. (2) ANN VELOCIIY (mpm):4,695 H'w.D.P. ANN VELOCliY (mpm):1.600 0.1=>. ANN VELOCliY (mpm) :

TRQE MAX (ft-Ibs):TRQE ON (ft·lbs):TRQE OFF (ft-Ibs):

199195193

BHA # 4 Length (ft) :204.3HRS ON JARS: STRING wr(k·lbs) :WT BLW JAR(k-lbS): 36 PICK UP WT(k-lbs) :BHA WT(k-lbs) : 62 SLK OFF wr(k-Ibs) :

BHA DESCRIPTION : .----T-O-O-L-D-E-S-C-R-IP-T-IO-N---r-H-R-S--r-S-ER-I-A-L-#---r----C-O-M-M-e-N-T-----, I

12 1/4"Blt - Bit sub - Molor • xlover • sub· 12 3/16" 1-1-2-1-/4..;"..;P-D-C-b-il-----i-1-S.-5+1""":9-0-24-3-2--t-=P=-0-=C-----------l1NB Slab cJw f10al vlv - S"AndElrdrift cJw Totco Add 1ft I 62.5 ADB814 New flas'" 316/98~ing. 8" NMDC - 123/16" Stab _6xS"DC _jars. n er r 100 "

Jars 29.3 A0210 New on 121/4" ass'y13XS" DC • xlo • 1xHWOP - dart sub - 8 x HWDP. A962XP 3/4Motor 29.3 2125 Anadrill motor

Anchor Tension(kips)

A1 : 70.0

A6: 95.0

A2: 70.0

A7: 60.0A3; 120.0AS: 70.0

A4; 90,0

A9:

,0.5: 100.0A10:

Workboats Location. Fuel Barile OMr PMf Cmt B8nt Heli Weather & Rig data @ 24:00 hrs(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltr) VDL (kips: 461.0

P. Commander rig 183 1,227 1.132 WINO SP, (kts) : 30.0 VISIB.(nm) : 10 RIS.TENS:Brute Tide rig 179 2,107 566 WINO DIR (deg) :350 CEILING (m) : 2.400 HEAVE (m): 3.5

PRES.(mbars): 1005 WAVES (m): 2.4 ROLL (deg); 5.0AIR TEMP (C): 14.0 SWELL (m): 360.0 PITCH (deg): 3.0

ICOMMENTS: "Commander" & "BnJte Tide" at rig; 1 helicopter f1lght-9 PAX on rig: 9 PAX off rig. I

Bulk Stocks Used lin Stock Used lIn Stock Used lin Stock Used 1In StockDRILL WATER (bbl) :686 4.371 FUEL (bbl): 12 1.390 GEL (sx) : 0 -0 HEll-FUEL (kltr); 0.2 8.6POT WATER (bbl): 44 1,157 BARITE (SlC): 0 5,401 CEMeNT (SlC) : 0 1,764

f)rills, Permits & Inspection£DRILL IYPE DATE

TRIP DRILL 10/6FIRE 716PIT DRILL 10/6INCIDENT 816

INSPECTIONS

BOP TESTNEXT TEST DUE DATERIG INSPECTIONDAYS SINCE LTA

DATE SAFElY DETAILS

9/6 LTI 25/423/6 MTI 2/617/4 JSA on90ln9161 #PTW ongoing

Safety Meeting 7/6

CasinoCSG00(")

13,3/8 "

LOT PHASE CSG SHOE CSG SHOEMD TVO(mBRn

863 863

Pump DataPumD Data· last 24 hrs

# TYPE LNR SPM EFF Flow(") (%) (gpm

spp SPM(psi)

Slow Pumn DataSPP DEPTH MW(psi) (m RT) (ppg)

iYPE LNGTH eSG WT GRD THREAD(m) 100 Ibslft

Shoejt 12.5 12,4 68.0 L80 N.VAM1 x Bakerlok jt 11.2 12.4 66.0 LSO N.VAMF/Collarjt 12.3 12.4 6S.0 Lao N.VAM3 x Bakerlok jt 35.5 12.4 68.0 LSO N.VAM20jts 237.7 12.4 67.0 LSO BTC40jts 466.9 12.4 68.0 L80 N,VAMPup 3.1 12.4 68.0 L80 N,VAMWellhead]t 10.7 12.4 68.0 L80 N,VAM

1 National 6.50 90 97 10002 Nallonal 6.50 90 97

2500 30405060

300 1264 1.1360 1264 1,1430 1264 1.1480 1264 1.1

Copyright lOS Ply Ltd, RbtofB report Mar 16th 1998.1 Page Number: 2

Page 87: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

12/06/1998 09:05 0352722058 PREMIER OIL GEELONG PAGE 04/04

.PremierOil AustralasiaReport Date: 11.06.98

DAILY DRILLING REPORT # 13

White Ibis 1

Personnel : on Site =89

JOB TITLE NAME COMPANY NAME #

Drlg Supervisor H. Knobl Premier 3N. Orl9 Supervisor K. Dubravac Northern 72Geologist K. Frankiewicz Dowell Cement ,

AsiaticROV 4Dowell Mud ,

Northern Explorer P Ruddleston &COlCSmedvig Safety 1Geoservice 4Directional Driller 1Alfa Laval ,Core hands ,

Survey MD lVD INCL A2. CORR. 'V DOGLEG N/S erN TOOL TYPE

Last Tool Type: Anderdrift (mRn (mRn OEG (deg) AZ SECT (m/30m) (m) (m)(deg) (m)

'agnatic Declination: 12.41 1,078 1.078 0.00 Anderdrift

Survey method: Min Curvature 1.107 1,107 0.00 Anderdrift1,136 1,136 0.00 Anderdrift1,164 1,164 0.00 Anderdrift1.193 1,193 0,00 Anderdrift1.222 1.222 0,00 Anderdrift1.251 1.251 0.50 Anderdrift1,308 1.308 0.50 Anderdrift

Copyright IDS Ply Ltd, RbtofB report Mar 16th 1998.1 Page Number: 3

Page 88: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

11/05/1998 09:52 0352722058 PREMIER OIL GEELONG PAGE 01/04

Premier Oil AustralasiaGeelong Operations BasePhone: 0352722101Fax; 0352722058

Fa)(

Premier OilAustralasia

I 1

To:

Fax:

Phone:

Re:

Victoria Minerals &Petroleum Ops, Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Bacon

Boral Energy Resources I Attn: A Guthrie, Ross Naumann

CafEnergy. Attn: Jane Duncan

White Ibis I

From: Gordan Hunter

Date: June 11 , 1998

Pages: 4 inc. this one

cc:

o Urgent

-Comment»:

o For Review 0 Please Comment 0 Please Reply o Please Recycle

Please find attached the Daily Drilling Summary Report for 10th June 1998.

Regards

({?Zy-----Gordon Hunter

Drilling Superintendent

y..

Page 89: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

11/05/1998 09:52 0352722058 PREMIER OIL GEELONG PAGE 02/04

,PremierOil AustralasiaReport Date: 10.06.98

DAILY DRILLING REPORT # 12

White Ibis 1

Well DataCOUNTRY Australia T.D, (mRn: 965.0 CUR. HOLE SIZE (n): 12.25 CAlLY COST $ : 5202,299FIELD Bass Basin PROGRESS (m): 99.0 CSGOO('1: 13.38 CUM COSTS: $2,693,871DRILL CO. : Northern Offshore DAYS FROM SF!UD: 9,21 SHOE WD (m RT): 863 AFECOSTS: $7,321.212RIG: Northern Explorer III ClAYS +/. CURVE; LEAK·OFF EMW(ppg) 0,00 AFE BASIS: P&AMUD CO: DowellRT ABOVE MSL (m) : 12.5 CURRENT OP @ 0600: Clrilling 12 1/4" hole at 1149m

WATER DEPTH @MSL (m) ; 61.9 PLANNED OF!.: Drill 12 1/4" hole.

RT TO SEABED (m) : 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops - This report only

Pump repairs. Drill shoe track. Drill 3m new 12 1/4"hole. Circ clean. RU & I FORMATION ITOP(mBRT)Iperform FIT. Drill 12 1/4"hole.

ACTIVITY FOR PERIOD 00:00 HRS TO 24-00 HRS ON 10.06.98.FROM TO HRS DEPTH ACTIVITY DESCRIPTION

'0:00 07:00 7.00 866 Continue repairs on mudpump #1 - replace centre discharge module, washedout at base of v/v seat.

07:00 07:30 .50 866 RIH from 777m & tagged hard cement at 834m, while continuing to replacecentre discharge module on pump #1.

07:30 07:45 .25 866 Pumped 50bbls hi-vis pill &commenced displacing to 1.159 KCL mud at595gpm. (Pump #1 repairs continuing)

07:45 08:00 .25 866 Drilled 4m of hard cmt above plugs While displacing to mud, from 834-838m withpump #2. 595gpm, 50 surface rpm, 170 bit rpm, 0-5K WOB, torque 2-7K ft-Ibs.(#1 pump repairs continuing). Anderdrift Tool functioning OK.

08:00 13:00 5.00 866 Drill plugs f/838m to top of FIC @ 839m w/pump #2, 595gpm, 50 surf. rpm, 170bit rpm. 5-36K varying WOB to compensate for hydraulic effect - top plug drilledfast but bottom plug difficult due to spinning, necessitating spudding on plug.

13:00 14:30 1.50 866 Drilled F/Collar from 839-840m with #2 pump, 10-30K WOB, 595gpm, 50-100surface rpm, 170-220 bit rpm. 3-5K ft-Ibs torque.

14:30 16:00 1.50 866 Drilled hard emt in shoetrack from 840m to top of shoe at 862.5m with 5-15KWOB, 900gpm (#1 pump back on line at 14:45hrs). 70 surface rpm, 250 bit rpm,3-9K ft-lbs torque.

16:00 16:15 .25 866 Drilled 13 3/B"shoe from 862.5-S63m with 10-15K WOB, 905gpm, 70 surfacerpm, 251 bit rpm, 3-9K ft-Ibs torque.

16:15 16:30 .25 869 Cleaned out 17 1/2"rathole &drilled 3m of new 12 1/4"hole (5mins) from 866-869m, with 0-3K WOB, 900gpm, 70 surface rpm, 250 bit rpm, 3-9K ft-Ibs torque.

16:30 19:00 2.50 869 Pumped 100bbls of hi-vis mud & eire clean until balanced mud wt at shakers,while working & rotating pipe from 869m & through the 13 3/8"shoe. Lined upDowell unit to jet Riser and clean cuttings load.

19:00 19:45 .75 869 Pull back 1 x single to 863m shoe.. MU emt hose &Chiksans, &established eire.Pumped down C & K lines wI mud. PlTested Choke manifold &surface lines to3000psi for 10min-okay. Closed UPR.

19:45 20:30 .75 869 Line up Dowell down Cline &DP. Perform FIT: pump 1.6bbls 1.07sg mud &recorded 842psi (14.6ppg EMW). Monitor psi: pressure dropped from 842 to800psi in 5min, then steadied @773psi, 14.16ppg EMW. Pumped 1.6bbls,recovered 1.6bbls.

20:30 21:15 .75 869 Recorded SCR's on both pumps at 30,40, &50 spm. Recorded pressure dropson K & C lines with both pumps at 30,40, & 50 spm.

21:15 22:30 1.25 912 Drilled 12 1/4" hole from 869-912m, w/5-13klbs WOB. 70 surface rpm, 250 bitrpm. 900gpm, 2100psi and 3-5ft-lbs torque. Instantaneous ROPs 90-110m/hr.Reaming each stand before connections, as precaution, and to clean hole.

22:30 23:00 .50 926 Drilled 12 1/4" hole from 912-926m, w/5-13klbs WOB, 70 surface rpm, 270 bitrpm, 1000gpm, 2500psi and 3-5ft-lbs torque. Instantaneous ROPs 90-11 Om/hr.Reaming each stand before connections as a precaution and to clean hole.

23:00 24:00 1.00 965 Drilled 121/4" hole from 926-965m, w/5-13klbs WOB, 70 surface rpm, 250 bitrpm, 900gpm (reduced pumprate due to shaker losses), 2100psi & 3-6ft-lbstorque. Instant ROPs 90-110m/hr. Ream each stand as a precaution & to cleanhole.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 00.00.0000Copyright IDS pty Ltd. RblOfB report Mar 16th 1998.1 Page Number: 1

Page 90: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

11/05/1998 09:52 0352722058 PREMIER OIL GEELONG PAGE 03/04

DAILY DRILLING REPORT # 12

White Ibis 1

PremierOil AustralasiaReport Date: 10.06.98

IFROMI TO I HRS IDEPTH I ACTIVITY DESCRIPTION

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 10.06.98

Mud Properties MUD COST FOR TODAY: $7.251 CUMULATIVE MUD COST TO DATE:: $71,071

Type: VISCOSITY( sec I qt ): 49 API FLUID LOSS CI- (ppm): 48,000 SOLIDS (%vol) : 1.5PV (cps): 11 (cm3130mln) 10 K+ (ppm): 31000 H20 (%vol) : 98.5PHPA API FILTER CAKE

FROM: PitYP (lb/100sq.ft): 21 (32nds inch 1 HARD/Ca (ppm) : 200 OIL (%vol) : 0

TIME: 23:58 GEL 10s/10m130m HTHP FLUID LOSS MBT (ppb eq) : 0,0 SAND:

WEIGHT (ppg): 1.07 (lb/100sqft) ; 4 5 0 (em3130min) 0 PM: 0.0 PH: 9.0

TEMP (C): 0 FANN 3/6(100 4 6 0 HTHP FILTER CAKE PF; .2 PHPA: 0.0(32nds inch) 0

Bit Data for Bit # 3 IADC" M 3 2 3 Wear I:: 01 :~E9f:g~~~

SIZE ("); 12.25 NOZZLES Drilled over the last 24 hrs Caleulated over the bit runMANUFACTURER: HU AVe WOB (k-Ibs) : 9 2 x16 99TYPE: BD536HD AVE RPM : 250 2X15

ME!:TERAGE (m) : CUM.METERAGE (m) 99ON BOTTOM HRS : 2.1 CUM. ON BOT. HRS : 2.1

SERIAL # : 1902432 FLOW (gpm): 1.000 2X12 IADC DRILL. HRS ; 3.0 CUM.IADC DRILL HRS: 3.0DEPTH IN (m RT) : 866 PUMP PRESS. (psi); 2.500 x TOTAL REVS: 31,500 CUM.TOT. REVS: 31,500DEPTH OUT (m Rn : HSI (hp/sqi) ; 1 X ROP (mlhr): 33.0 ROP (m/hr): 33.0

285o

196196

PDCNew flask 3/6/9BNew on 12 1/4" ass'yAnadJiIl motor

D.C. (1) ANN. VELOCITY (mpm):12.000 D.C. (2) ANN VE:LOCITY (mpm):4,110 H,W.D.P. ANN VELOCITY (mpm):2,450 D.P, ANN VELOCITY (mpm) :

BHA # 4 Length (ft) :204.3HRS ON JARS; STRING WT(k-Ibs) : 168 TRQE MAX (ft-Ibs):'NT BLW JAR(k·lbs): 36 PICK UP WT(k-lbs) : 164 TRQE: ON (ft-Ibs):BHA WT(k.lbs) : 62 SLK OFF WT(k-lbs) : 168 TRQE OFF (ft·lbs):

BHA DESCRIPTION : ..---r-O-O-L-D-ES-C-R-IP-T-IO-N---,'H-R-S...,...-SE-R-IA-L-#-r----C-O-M-M-E-N-T----' I

12 1/4"Bit - Bit sub - Motor· xlover· sub - 123/16" 121/4" PDC b't 3.0 1002432NB Stab eIw float vlv - B"Anderdrift cIw TelCO . I ..Ring- S" NMDC -12 3/16" Stab. 6xS"DC -J'ars _ Anderdr,ft tool 47.0 ADB814

Jars 13.8 A02103x8" OC - xlo - 1xHWDp· dart sub· 8 x HWDP. A962XP 3/4Motor 13.8 2125..... ......__01...- --'- -'

Anchor Tension(kips)

A1 : 60.0

A6; 110,0

A2: 50.0

A7: 75.0

AS; 80.0

A8: 90.0

A4: 70.0

A9:

AS: 90.0A10 ;

rigGeelon

Workboats

P. CommanderBrute Tide

Location. Fuel Barite Olwtr PNitr Cmt Bent Hell(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltr)186 1,227 1,164

Weather & Rig data @ 24:00 hrsVOL (kips: 326.0

WIND SP. (kts): 24.0 VISIB.(nm): 10 RIS,TE:NS:WIND DIR (deg): 50 CEIl.ING (m) : 3,000 HEAVE (m) ; 0.4PRES.(mbars): 1020 WAVES (m) : 1.2 ROLL (deg); 0.6AIR TEMP (C): 13.0 SWELL (m): 60.0 PITCH (deg): 0.4

!COMMENTS: "Commander" at rig: "Brute Tide" at Geelong: 0 heicopter flight -0 PAX on rig: 0 PAX off rig. Rec fuel &DIW from"Commander".

Bulk Stocks Used /In Stock Used /In Stock Used /In StOCk Used /In StockDRILL WATER (bbl):O 5.057 FUEL (bbl): 10 1,402 GEL (sx) : 0 -0 HELl-FUEL (kltr) : 0.0 8,9

POT WATER (bbl): 0 1,201 BARITE (sx) : 0 5,401 CEMENT (sx): 0 1.764

Drills, Permits & Inspections:DRILL TYPE DATE

TRIP DRIl.L 10/6FIRE 7/6PIT DRILL 10/6INCIDENT 8/6

INSPECTIONS

BOP TESTNEXT TEST DUE DATERIG INSPECTIONDAYS SINCE LTA

DATE SAFETY DETAILS

9/6 LTI 25/423/6 MTI 21617/4 JSA ongoing161 "PTW ongoing

Safety Meeting 7(6

Copyright IDS Pty Ltd. RbtofB report Mar 16th 1998.1 Page Number: 2

Page 91: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

11/06/1998 09:52 0352722058 PREMIER OIL GEELONG PAGE 04/04

,PremierOil AustralasiaReport Date: 10.06.98

DAILY DRILLING REPORT # 12

White Ibis 1

Casing Pump DataCSG LOT PHASE CSGSHOE CSGSHOe PumD Data· la ~t 24 hrs Slow PumD Data00('1 MD TVO(mBRT) # TYPE LNR SPM EFF Flow SPP SPM SPP DePTH MW

13.3/8 .. aS3 863 (") (%) (gpm (psi) (psi) (mRT) (ppg)

1 National 90 1000 2500 30 200 8636.50 97 1.1TYPE LNGTH CSG wr GRO THREAD 2 National 6.50 90 97 40 225 863 1.1

(m) 10 (") Ibslft 50 300 863 1.1

Shoejt 12.5 12.4 613.0 LBO N.VAM1 x Bakerlokjt 11.2 12.4 68.0 L80 N.VAM Personnel: on Site =89F/CollsrJt 12.3 12.4 613.0 LBO N.VAM3 x Bal<erlok jt 35.5 12.4 68.0 LSO N.vAM JOB T1TL.E NAME COMPANY NAME #20jts 237.7 12.4 67.0 L80 BTC Orlg Supervisor H, Knobl Premier 340 jt!> 466.9 12.4 68.0 LBO N.VAM N. Drlg Supervisor K.Dubravac Northern 70Pup 3.1 12.4 66.0 LSO N.VAM Geologist K, Frankiewicz Dowell Cement 1Wellheadjt 10.7 12.4 68.0 LBO N.VAM

AsiaticROV 4Dowell Mud 1

Northern Explorer P Rucldleston & Cox Velco 1Smedvig Safety 1Geoservice 4Directional Driller 1Alfa Laval 1Core hands 2

Survey MO TVD INCL AZ CORR. 'V' DOGLEG N/S EJW TOOL TYPE

Last Tool Type: Anderdrift(m RT) (m Rl) OEG (deg) ,.z SECT (m/30m) (m) (m)

(deg) (m)

Magnetic Declination: 12.41 766 766 0.00 Anderdrifl

Survey method : Min Curvature 795 795 0.00 Anderdrift823 823 0.00 Anderdrift852 852 0.00 Anderdrifl863 B63 0.00 Anderdrifl690 S90 0.00 Anderdrift908 90S 0.00 Anderdrift936 936 0.00 Anderdrift

Copyright IDS pty Ltd. F<btofB report Mar 16th 1998.1 Page Number: 3

Page 92: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

10/06/1998 09:40 0352722058 PREMIER OIL GEELONG PAGE 01/04

l~Premier Oil AuslI'alasiaGeelong Operations BasePhone; 0352722101Fax; 0352722058

Fax

Premier OilAustralasia

To: Vldoria Minerals &Petroleum Ops, Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Baron

From: Gordon Hunter

---_ ..,--Fax:

Phone:

Re: White Ibis Daily Drilling Reports

Date: June 10, 1998~-------_._--

Pages: 4 inc. this one

cc:

o Urgent

..Commenbi:

o For Review 0 Please Comment 0 Please Reply o Please Rec;ycle

Please find attached the Daily Drilling report for 9th June 1998.

Regards

Gordon Hunter

Drilling Superintendent

Pn

t '.,' .I CA flJ,!~p ..... ,)

!!

"

Page 93: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

10/05/1998 09:40 0352722058 PREMIER OIL GEELONG PAGE 02/04

PremierOil AustralasiaReport Date: 09.06.98

DAILY DRILLING REPORT # 11

White Ibis 1

Well DataCOUNTRY Australia T.D, (m RI): 866.0 CUR. HOLE SIZE ("): 17.50 DAILY COST $ ; $260.963FIELD Bass Basin PROGRESS (m): 150.0 CSGOD("): 13.38 CUM COST $ : $2,491.572

DRILL CO. : Northern Offshore DAYS FROM SPUD: 8.21 SHOE lYD (m Rn; 863 AFECOST$: $7.321.212

RIG: Northern Explorer III DAYS +/- CURVE: LEAK·OFF EMW(ppg) 0.00 AFE BASIS; P&A

MUD CO: Dowell

RT ABOVE MSL (m) : 12.5 CURRENT OP @ 0600: Mud pump repairs. Centre discharge module washed. CIO module.

WATER DEPTH @MSL (m) ; 61.9 PLANNED OP.: Drill cmt. Displace to mud. FIT. Drill 12 1/4" hole.

RT TO SEABED (m) ; 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops - This report only

Nipple up K+C lines/goosenecks. Align BOP over guideposts, Pump down I FORMATION ITOP(mBRI) IK+C lines & wash fill from WH/PGB. Land/latch BOP. Stroke Slip Jt. InstallDiverter. Test csg & shear rams. Test BOP. MU 12 1/4"BHA. RIH. TagTOC. Repair pump.

~CTIVITY FOR PERIOD 00'00 HRS TO 24'00 HRS ON 09 06 98. . . .t=ROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 01:00 1.00 866 Finished connecting KiJlline. Connected Choke line / gooseneck.01:00 01:15 .25 866 Lowered stack to 1/2m over guide posts. Moved rig very slightly to port I aft to

complete alignment of stack over gUide posts.01:15 01:30 .25 866 Completed alignment of stack wI guide post. Lowered stack onto guide posts, &

checked all 4 x posts with ROV • okay. Lowered stack, but funnels stood up onfill wi H4 +/- 4' above WH due to fill (4') haVing been washed across the PGBagain.

01:30 02:00 .50 866 Lined up C & K lines to s/water, shear rams open, and pumped to max. of650gpm, 500psi. attempting to wash sand/silt from between stack and PGB.Unable to maintain pumprate as slwater being pumped out top of Riser.

02:00 02:30 .50 866 Closed shear rams and pumped s/water @ 740gpm, 600psi, attempting to washout fill between stack and PGB, Washed out approx. 1ft of sand/silt.

02:30 03:00 .50 866 Continued to pump s/water. wi shear rams closed. at 740gpm, 600psi. Slightincrease in space gained between the H4 profile and the sand covering the PGB.

03:00 03:45 .75 866 Raised stack 12" to permit jetting to extend to stack's guide post funnels whichare also buried in sand silt. Jetted w/ shear rams closed with aOOgpm, 600psi.

03:45 04:15 .50 866 Waited until visibility cleared - slight improvement observed after washing. Keptshear rams closed and re-started pumping. at 1000gpm. 950psi

04:15 05:00 .75 866 Stopped pumping to monitor progress. When visibility cleared observed top ofWH in middle of a concave depression extending to outside edges of the H4profile, with guide funnels resting on btm. Re-started pumping @ 1000gpm.

05:00 05:30 .50 866 Stop washing btm. Observe top of PGB. 30" csg, & WHo Land BOP's on WHoOpen shear rams & re·establish eire w/150gpm. Observe indicator flag in unlockposition. Latch in wI 1500psi - indicator shift to lock. Pull 50k O/pull-latched inokay.

05:30 08:30 3.00 866 Air down to 90K. Un-pin Slip Jt inner barrel, stroked out Slip Jt & I/out landing jtof Riser. PU & MU Diverter. Land out Diverter. Function tested Diverter insertpkr.

08:30 09:00 .50 866 Flushed lines &established eire from Dowell down C line. Pressure tested 133/8"csg & across BOP connector against shear rams to 1OOOpsi for 30mins - 1.ebbls pumped, 1.5bbls returned. (At same time MU &RIH BOP test plug).

09:00 09:30 .50 866 Opened shear rams & landed BOP test plug. RU to test BOP & K+C lines. (ROVreported that BOP connector was now buried in sand/seabed debris. Seabedcurrent 1.5-2knts moving cuttings/sand mound adjacent to PGB).

09:30 12:30 3.00 866 Pressure tested BOP & K+C lines:- Upper & lower annulars 250/3500psi,5/10mins. UPR, MPR, LPR, K+C lines & failsafe v/v's 250/5000psi, 5/10mins.

12:30 13:00 .50 866 POOH w/ test plug.13:00 13:30 .50 866 MU Wear bushing run/retrieve tool. Run & set wear bushing. POOH wI setting

tool.14:00 20:30 6.50 866 MU 121/4" BHA: Break out stabilizer sleeve from A962 motor & MU to A962XP

motor. Test motor bearings. Test motor - okay. Install Diverter bag. PU new jar.Test Anderdrift - okay.

Copyright IDS Pry Ltd, RbtofB report Mar 16th 1996,' Page Number: 1

Page 94: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

10/05/1998 09:40 0352722058 PREMIER OIL GEELONG PAGE 03/04

PremierOil AustralasiaReport Date: 09.06.98

DAILY DRILLING REPORT # 11

White Ibis 1

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

20:30 22:45 2.25 866 RIH from BHA (204.25m) to 780m wi 5" DP.22:45 23:30 .75 866 Precautionary wash from 780 - 834m with 500gpm, 100 bit rpm, & 50 surface

rpm. Tag TOC @ 834m with 5klbs WOB.23:30 24:00 .50 866 Pump #1 down - center discharge module washed out at base of vlv, POOH

3std to 777m while awaiting pump repairs.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 10 06.98.FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 06:00 6.00 866 Continue repairs on mudpump #1 a replace pump module.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24;00 HRS ON 09.06.98

REMARK I OBSERVATION SOLUTION I RECOMMENDATION

Deployed Wave Rider between anchors #3 & #4 a signalgood.

.Iud Properties MUD COST FOR TODAY: $11.397 CUMULATiVe MUD COST TO DATE: $63.620

Type: VISCOSITY( see I Cll ): 57 API FLUID LOSS CI- (ppm): 4S.000 SOLIDS (%vol) : 1,5PV (cps): 12 (em3130min) 15 K+ (ppm): 31000 H20 (%vol): 98.5PHPA API FILTER CAKE

FROM: Flit YFl (lbJ100sCl.ft>: 23 (32nds inch 1 HARDJCa (ppm) : 140 OIL (%vol) : 0

TIME: 22:00 GEL 10sl10m130m HTHP FLUID LOSS MBT (ppb eq) : 0.0 SAND:

WEIGHT (ppg): 1.07(lbJ100sqfl.) : 4 5 0 (cm3130mln) 0 PM: 0.0 PH: 9.5

TEMP (C): 0 FANN 3/6/100 4 6 0 HTHP FILTER CAKE0 PF: .4 PHPA: 0.0

(32nds inch)

Bit Data for Bit # 3 IADC# M 3 2 3 Wear Ej~f:gE9~~~E9SIZE (") ; 12.25 NOZZLES Orilled over the last 24 hrs Calculated over the bit runMANUFACTURER: HU AVE WOB (k-Ibs): 2 x16 METERAGE em) ;TYPE; BD53SHD AVE RPM : 2X15

CUM.METERAGE (m)ON BOTTOM HRS : CUM. ON BOT. HRS ;

SERIAL#: 1902432 FLOW (9pm) : 2X12 IADC DRILL. HRS : CUM.IADC DRILL HRS:DEPTH IN (m Rn : S66 PUMP PRESS. (psi): X TOTAL REVS : 0 CUM.TOT. REVS: 0DEPTH OUT (m RT) : HSI (hp/sClI) : 0 x ROP (mlhr): ROP (mlhr):

IBHA # 4 Length (tt) :204.3 D.C. (1) ANN, VELOCITY (mpm): 0

IolRS ON JARS: ISTRING WT(k-lbs) : 168 ITROE MAX (ft·lbs): D.C. (2) ANN VELOCITY (mpm): 0NT BLW JAR(k-lbs): 36 PICK UP wr(k·lbs) : 164 TROE ON (ft-Ibs): HW.D.F'. ANN VELOCITY (mpm): 0BHA wr(k-Ibs) ; 62 SLK OFF WT(k-lbs) : 168 TRQE OFF (ft-Ibs): D.P. ANN VELOCITY (mpm) : 0

BiolA DESCRIPTION; TOOL DeSCRIPTION HRS seRIAL # COMMENT12 1/4"Bil - Bit sub - Motor - ~over - sub - 123/16" 121/4" PDC bit 0.0 1902432 PDCNB Stab r;Jw float v/v - 8"Anderdrift r;Jw TalCORing- S" NMDC - 12 3/16" Stab - 6xS"DC - jars -

Anderdrift 1001 33.3 AD8814 New flask 316/98Jars 0.0 A0210 New on 12 1/4" ass'y

3x8" DC - xlo· 1xHWDP· dart sub· 8 x HWOP. A962XP 3/4Motor 0.0 2125 Anadrill molor

Anchor Tension A1 : 60.0 1>2. : 60.0 A3; 75.0 A4: 75.0 AS: 80,0

(kips) A6: 100.0 A7: 75.0 AS: 95.0 A9: A10 ;

Workboats Location. Fuel Barite DflNtr PflNtr Cmt Bent Heli Weather & Rig data @ 24:00 hrs(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltr) VOL (kips: 643,0

P. Commander rig 4a9 1,698 1,195 WIND SF'. (kts) : 20.0 VISIB.(nm) ; 10 RIS.TENS:Brule Tide Geelon WIND DIR (deg): 50 CEILING (m) : 3.000 HEAVE (m): 0.5

PRES.(mbars): 1023 WAVES (m): 1.0 ROLL (deg) : 0.6AIR TEMP (C): 13.0 SWELL (m): 60.0 PITCH (deg); 0.4

ICOMMENTS: "Commander" at rig; "Brule TIde" at Geelong: 1 heieopter flight -7 PAX on rig; 6 PAX off rig. I

Bulk Stocks Used lin Stock Used lin Stock Used lin Stock Used / In Stock

DRILL WATER (bbl):O 4.5S6 FUEL (bbl): S 1.112 GEL (sx): 0 -0 HEL.I·FUEL (kltr) :0.0 8.9POT WATER (bbl): 0 1,120 BARITE (sx) : 0 5.401 CEMENT (sx) : 0 1.764

COPyri9ht IDS PlY Ltd, RbtofB repol'! Mar 16th 1998.1 Page Number; Z

Page 95: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

10/05/1998 09:40 0352722058 PREMIER OIL GEELONG PAGE 04/04

PremierOil AustralasiaReport Date: 09.06.98

DAILY DRILLING REPORT # 11

White Ibis 1

Drills, Permits & Inspection!DRILL TYPE DATE INSPECTIONS DATE SAFETY DETAILS

TRIPDRIL.L 13/5 eOPTEST 30/5 LTI 25/4FIRE 716 NEXT TeST DUE DATE 14/6 MTI 2/6PITDRIL.L 13/5 RIG INSPECTION 17/4 JSA ongoingINCIDENT 816 DAYS SINCe LTA 159 'PTW ongoing

Safely Meeling 7/6

Casina Pump DataCSG LOT PHASE CSGSHOE CSGSHOE Pumg Data· last 24 hrs Slow PumD DataODn MD lVD(mBRl) #I TYPE LNR SPM EFF Flow SPP SPM SPP DEPTH MW

13.3/8 .. 863 863 (") (%) (gpm (psi) (psi) (m RT) (Ppg)

1 National 6.50 97"TYPE LNGTH CSG WT GRD THREAD 2 National 6.50 97

(m) ID (U) Ibs/ft

Shoe jt 12.5 12,4 68.0 L80 N.VAM Personnel : on Site - 891 x Bakerlok jt 11.2 12,4 68.0 LSO N.VAMF/Cellar jt 12.3 12.4 68.0 L.80 N.VAM JOBTITL.E NAME COMPANY NAME #

x Bakerlek jt 35.5 12.4 68.0 LSO N,VAM Drl9 Supel\'lsor C. Stirrett Premier 3lO jts 237.7 12.4 67.0 L80 BTC N. Orlg Supel\'lsor K. Oubravae Northern 7040)t5 466.9 12.4 68.0 L80 N.VAM

Geologist K. Frankiewicz Dowell Cement 1Pup 3.1 12.4 68.0 L80 N.VAMAslaticROV 4Wellheadjt 10.7 12.4 68.0 LBO N,VAMDowell Mud 1

Northern Explorer I' Ruddleston & Cox Vetco 1Smedvig Safety 1Geoservice 4Directional Driller ,Alfa Laval 1Core hands 2

Survey MO TVO INCL AZ. CORR. '1.1 DOGLEG N/S EJW TOOL TYPE

Last Tool Type: Anderdrift (m RT) (m "n OEG (deg) AZ SECT (mI30m) (m) (m)(deg) (m)

Magnetic Declination: 12.41 681 681 0.00 Anderdrift

Survey method : Min Curvature 710 710 0.00 Anderdrift739 739 0.00 Anderdrift766 766 0.00 Anderdrift795 795 0.00 Anderdrift823 823 0.00 Anderdrift852 852 0.00 Anderdrift863 863 0.00 Anderdrift

Copyright IDS pty L.td, RbtofS report Mar 16th 1998.1 Page Number: 3

Page 96: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

09/06/1998 11:36 0352722058 PREMIER OIL GEELONG PAGE 01/04

9Premier Oil AustralasiaGeelong Operations BaseFhone;0352722101Fax:03527220S8

Fax

Premier OilAustralasia

To:

Fax:

Victoria Minerals & Petroleum Ops, Attn: Ahmed Nadji

Mineral Resources Tasmania. Attn: Carol Bacon

From: Gordon Hunter

Date: June 9, 1998

Phone: Pages: 4 inc. this one-----------_._---------Re: White Ibis Daily Drilling Reports CC:

o Urgent

·Commenb:

o For Review o Please Comment 0 Please Reply o Please Recycle

Please find attached the Daily Drilling report for 8th June 1998.

Regards

Gordon Hunter

Drilling Superintendent

Page 97: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

09/05/1998 11:35 0352722058 PREMIER OIL GEELONG PAGE 02/04

PremierOil AustralasiaReport Date: 08.06.98

DAILY DRILLING REPORT # 10

White Ibis 1

Well DataCOUNTRY Australia T.O. (m RT); 866.0 CUR.. HOLE SIZE ("): 17.50 DAILY COST $ : $189,886F=IELD Bass Basin PROGRESS (m): 150.0 CSGOD("); 13.38 CUM COST $ : $2,230.609DRILL CO.: Northern Offshore DAYS FROM SPUD: 7,21 SHOE lVD (m RT): 863 AFE COST S : $7.321,212RIG: Northern Explorer 111 DAYS +1- CURVE: LEAK·OF=F EMW(ppg) 0.00 AFE BASIS: P&AMUD CO: DowellRT ABOVE. MSL (m) ; 12.5 CUR.RENT OP @ 0600: BOP's down and latched. casing pressure tested. LJOut Riser landing jt.

WATER DEPTH @MSL (m) : 61.9 PLANNED OP.: Run divel'ler. Test BOP's. R.un wear bushing. MU 12 1/4" BHA. R.IH. Drill

RT TO SEABED (m) : 14.4 cmt. FIT. Drill 12 1/4" hole.

Summary of period 00;00 to 24:00 hrs: Formation Tops - This report only

Ran BOP & riser. Repaired traveling block brace arm. Jetted PGB & I FORMATION ITOP(mBR1)Iwellhead. Ran Riser. Examined wellhead. MU MRT's.

ACTIVITY FOR PERIOD 00'00 HRS TO 24:00 HRS ON 08.06 98.IFROM TO HRS DEPTH ACTIVllY DESCRIPTION

';0:00 06:00 6.00 866 Cont running BOPs: finished installing guide lines 1-4; Installed work platform;PU ball jt &50' Riser jt, & MU; ran ball jt & riser section; landed & MU clamp(6900ft-lbs); began fitting kill line flex hoop.

06:00 12:00 6.00 866 Cont installing & nippling up K+C line flex loops. MU 1st riser jt. InstalledbUl1seyes &beacons. Ran BOP below splash zone. Tested K+C lines500/6000psi. Cont running BOP on riser. Tested K+C lines 500/6000psi, PU Slipjt.

12:00 13:30 1.50 866 MU Slip Jt. Run BOP down to 10m above WHo Moved rig back over location.(ROV reported that WH was not exposed but was now totally buried under s/beddebris contrary to post-cement observation (storm rolled cuttings bed over WH).

13:30 14:30 1.00 866 Removed damaged carriage stiffener brace from travelling block (damaged/bentwhen blocks were raised to remove the csg stabbing board after the csg job &blocks hit the lower fast line sheeve, causing travelling blocks to sit at an angle).

14:30 16:00 1.50 866 RU to run bit & DP to jet WH clean - installed "C"plate, false RT & slips on top ofSlip Jt. MU 17 1/2"bit onto DP. Ran bit down through riser & BOP to 1.5-2mabove WH (clearly observed with ROV).

16:00 16:45 .75 866 Jetted WH with s/water at 1200gpm while slowly rotating string/bit 1.5-2m aboveWH • ROV visibility immediately lost.

16:45 18:30 1.75 866 Pulled bit back to rigfloor &allowed visibility to clear in order to see jetting effecton WH • ROV observed 0.5m+ of WH now exposed but visibility still poor atbase ofWH.

18:30 19:30 1.00 866 PU landing jt of Riser, &MU to slip jt.19:30 20:15 .75 866 Swam ROV to examine WH, Observed blemish/shadow on surface of VX seal

area of wellhead; nature of anomoly unknown. Repositioned ROV for closerinspection, & waited for visibilty to clear sufficiently· no apparent damageevident.

20:15 21:00 .75 866 Prepared to lower BOP's. but ROV's umbilical wrapped around guide posts,visibility zero wi slbed disturbance. ROV Gyro failed, & unit lost orientation. Ableto visually orientate ROVand unwrap umbilical when visibility partially cleared.

21:00 22:00 1.00 866 Swam ROV to bottom of BOP's. Lowered BOP's to 2m above PGB whilemaintaining visual observation I orientation with the ROV (Gyro not functioning),

22:00 24:00 2.00 866 Connect MRT's on slip jt; test to 100klbs· okay. Connect Kililine/gooseneck.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 09.06.98

FROM TO HRS DEPTH ACTIVllY DESCRIPTION

00:00 01:00 1.00 866 Finished connecting Kill line. Connected Choke line I gooseneck.01:00 01:15 .25 866 Lowered stack to 112m over guide posts. Moved rig very slightly to port I aft to

complete alignment of stack over guide posts.01:15 01:30 .25 866 Completed alignment of stack wI guide post. Lowered stack onto guide posts, &

checked all 4 x posts with ROV - okay. Lowered l:itack, but funnels stood up onfill wI H4 +1- 4' above WH due to fill (4') having been washed across the PGBagain.

Copyright IDS Pty Ltd. RbtofB repOl"l Mar 16th 1998.1 Page Number: 1

Page 98: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

09/05/1998 11:35 0352722058 PREMIER OIL GEELONG PAGE 03/04

PremierOil AustralasiaReport Date: 08.06.98

DAILY DRILLING REPORT # 10

White Ibis 1

FROM TO HRS DEPTH ACTIVllY DESCRIPTION

01:30 02:00 .50 866 Lined up C & K lines to slwater, shear rams open, and pumped to max. of650gpm, 500psi, attempting to wash sand/silt from between stack and PGB.Unable to maintain pumprate as s/water being pumped out top of Riser.

02:00 02:30 .50 866 Closed shear rams and pumped slwater@ 740gpm, 600psi, attempting to washout fill between stack and PGB. Washed out approx. 1ft of sand/silt.

02:30 03:00 .50 866 Continued to pump s/water. w/ shear rams closed, at 740gpm, 600psi. Slightincrease in space gained between the H4 profile and the sand covering the PGB.

03:00 03:45 .75 866 Raised stack 12" to permit jetting to extend to stack's gUide post funnels whichare also buried in sand silt. Jetted w/ shear rams closed with 800gpm, 600psi.

03:45 04:15 .50 866 Waited until visibility cleared - slight improvement observed after washing. Keptshear rams closed and re-started pumping, at 1000gpm. 950psi

04:15 05:00 .75 866 Stopped pumping to monitor progress. When visibility cleared observed top ofWH in middle of a concave depression extending to outside edges of the H4profile, with guide funnels resting on btm. Re·started pumping @ 1000gpm.

05:00 05:30 .50 866 Stop washing btm. Observe top of PG8, 30" csg, & WHo Land BOP's on WHoOpen shear rams & re-establish circ w/150gpm. Observe indicator flag in unlock

105:30

position. Latch in w/1500psi - indicator shift to lock. Pull50k a/pull-latched inokay.

06:00 .50 866 Uout landing jt of Riser.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 08.06.98

REMARK/ OBSERVATION SOLUTION / RECOMMENDATION

Recovered Wave Rider from Yolla 2 location (stillsending signals). Will launch at White Ibis as soon ashang weight fabricated (today?).Lloyd's helicopters performed nighttime landing exerciseson the helipad from 17:30 - 20:30hrs.

Mud Properties MUD COST FOR TODAY: $12.377 CUMULATIVE MUD COST TO DATE: $52.424

Type: VISCOSITY( see I qt ): 72 API FLUID LOSS Cl- (ppm): 51,000 SOLIDS (%Yol) : .6PV (cps): 14 (cm3130min) 13 K+ (ppm): 31000 H20 (%vol) : 99.2PHPA API FILTER CAKE

F~OM: PitYP (lb/100sq,ft): 27 (32nds inch 1 HARD/Ca (ppm) : 120 OIL (%vol) : 0

TIM~: 17:00 GEL 10sl10m130m HTHP FLUID LOSS MBT (ppb eq) : 0.0 SAND:

WEIGHT (ppg): 1.07 (lb/100sqft) : 6 7 0 (cm3/30min) 0 PM: .5 PH: 9.5

TEMP (C): 0 FANN 3/61100 6 8 0 HTHP FILTER CAKE PF: .5 PHPA: 0.0(32nds inch) 0

Anchor Tension A1 ; 75.0 A2: 60.0 A3; 60.0 A4: 80.0 AS: 75,0

(kips) A6: 95.0 A7: 80.0 AS: 80.0 A9: A10 :

Workboats Location, Fuel Barite Dlwtr Plwtr Cmt Bent Heli Weather & Rig data @ 24:00 hrs(kltr) (Sl() (bb!) (bbl) (sx) (sx) (kltr) VOL (kips: 615.0

P. Commander rig 493 1,698 1.227 WIND SP. (kts): 8.0 VISIB.(nm) ; 10 RIS.TENS:Brute Tide rig 205 491 WIND DIR (deg): 72 CEILING (m) : 3,000 HEAVE(m) : 1.5

PRES.(mbars): 1025 WAVESCm): .8 ROLL (deg): 2.0AIR TEMP (C): 11.0 SWEll (m): 240.0 PITCH (deg); o,e

(COMMENTS; "Commander" and "Brute Tide" at rig: 1 heicopler fllghl for night exercises. 0 PAX on rig: 0 PAX off rig. I

Bulk Stocks Used lin Stock Used lin Stock Used /In Stock Used lin StockORlll WATER (bbl):O 4,586 FUEL (bbl): 11 1,120 GEL (sx): 0 -0 HELI·FUEL (kllr) ;0.4 8.9

POT WATER (bbl); 151 1.157 BARITE (sx) : 0 5,401 CEMENT (sx) : 0 1,764

Drills, Permits & Inspection~

DRILL TYPE DATE INSPECTIONS DATE SAFE1Y OETAllS

TRIP DRILL 13/5 80PTEST 30/5 LTI 25/4FIRE 716 NEXT TEST DUE DATE 14/6 MTI 2J6PIT DRILL 13/5 RIG INSPECTION 17/4 JSA ongoingINCIDENT 1/6 DAVS SINCE l TA 42 jPTW ongoing

Safety Meeting 7/6

Copyright IDS Pty Ltd. RbtofB report Mar 16th 1998.1 Page Number: 2

Page 99: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

09/05/1998 11:35 0352722058 PREMIER OIL GEELONG PAGE 04/04

PremierOil AustralasiaReport Date: 08.06.98

CAlLY DRILLING REPORT # 10

White Ibis 1

Casina Pump DataCSG LOT FlHASE CSGSHOE CSGSHOE PumD Data - last 24 hrs Slow Pumn Data00(") MO TVD(mBRT) # TYPE LNR SPM EFF Flow SPFl SPM spp DEPTH MW

13.3/8 .. a63 863 (lO) (%) (gpm (psi) (psi) (mRT) (ppg)

1 National 97CSG

6.50"TYPE LNGTH WT GRO THREAD 2 National 6.50 97

(m) tOn IbsJft

Shoejt 12.5 12.4 68.0 Lao N.VAM Personnel : on Site =881 x Bakerlok jt 11.2 12.4 68.0 LSO N.VAMF/Coller jt 12.3 12.4 68.0 LSO N.VAM JOB TITLE NAME COMPANY NAME #3 x 8akerlok jt 35.5 12.4 68.0 LSO N.VAM Drlg Supervisor C. Stirrett Premier 320jt3 237.7 12.4 67.0 LBO BTC N. Orlg Supervisor K. OUbravac Northern 7140jls 466.9 12.4 68.0 LaO N.VAM Geologist K. FrankiewiC2 Dowell Cement 1Pup 3.1 12.4 68.0 LSO N.VAM AsialicROV 4Wellheadjt 10.7 12.4 68.0 LSO N,VAM

Dowell Mud 1Northern Explorer P Ruddleslon & Cox Vetco 1

Smedvig Safety 1Geoservice 4Directional Driller 1Alfa Laval 1

Survey MO TVO INCL 102. CORR, 'V DOGL.EG N/S EJW TOOL "TYPE

Last Tool Type: Anderdrift (m RT) (m RT) OEG (cleg) /4Z. SECT (mI30m) (m) (m)(deg) (m)

Magnetic Declination: 12.41 681 681 0.00 Anderdrift

Survey method : Min Curvature 710 710 0.00 Anderdrifl739 739 0,00 Anderclrift766 766 0.00 Anderdrifl795 795 0.00 Anderdrift823 823 0.00 Anderdrifta52 852 0.00 Anderdrift863 863 0.00 Anderdrifl

Copyright lOS Ply Ltd. RbtofB report Mar 16th 1998.1 Page Number: :3

Page 100: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

PAGE 01/03yPREMIER OIL GEELONG0352722058

rR-EC-C)RDS' -0- --- -._- -."lPremierOil Australasi1th lti N~~~:!I~:.:~o~..I.m~iN'"CAlLY DRILLING REPORT # 9

Report Date: 07.06.98 White Ibis 1

08/05/1998 09:22

Wen DataCOUNTRY Australia T.D.(mR"D: 866,0 CUR. HOLE SIZE (00): 17.50 DAILY COST $: $208,119FIELD Bass Basin PROGRESS (m): 150.0 CSGOD("): 13.38 CUM COST $ : $2,040,723DRILL CO. : Nol1hern Offshore DAYS FROM SPUD; 6.21 SHOE TVD (m R"D: 863 AFE COST $ : $7.321,212RIG: Northern Explorer III DAYS +/- CURVE; LEAK-OFF EMW(Ppg) 0.00 AFEBASIS: P&AMUD CO: DowellRT ABOVE MSL (m) : 12.5 CURRENT OP @ 0600: Run BOP'sWATER DEPTH @MSL (m) : 61.9 PLANNED OP.: Run & test BOP's. MU 12 1/400 BHA.RT TO SEABED (m) : 74.4

Summary of period 00:00 to 24:00 hrs: Formation Tops - This report only

MU DP sgl clw cmt head to landing string -Ianded/latched WH • 50K test I FORMATION IrOP(mBR"DIo/pull- circ csg/ann - test lines· cmt csg - displace cmt (no plug bump)-check zero backflow - release CART - pull/layout CART - I/out BHA -

ACTIVITY FOR PERIOD 00·00 HRS TO 24·00 HRS ON 070698. .IFROM TO HRS DEPTH ACTIVITY OESCRI PTION

00:00 00:15 .25 866 PU cement head made·up on single of 5" HWOP for proper space-out. MUcementing hose to cement head. Shut down crane due to 45knt winds. Pitch &roll noticeably increasing - difficult working conditions on rigf/oor.

00:15 00:45 .50 866 Monitor WH jt w/ ROV, but sea conditions deteriorating, w/ heave @ 2+ meters.Pull back to install addition single as precaution prior to latching Wellhead into30".

00:45 01:45 1.00 866 Broke out jt clw cement head. While attempting to MU to single in mouse hole,cmt head turned through bails (3deg+ pitch & roll making operating conditionsvery difficult). Necessary to break out cmt hose &cmt head from DP single.

01:45 03:00 1.25 866 Max heave 3.5m, pitch & roll @ 5, and 6.5 deg respectively, wind 40-45knt,hampering operations. MU single w/ cement head, hose. Run in and latchWellhead into 30" Conductor. Pull 50klbs O/pull to test latch - okay.

03:00 04:15 1.25 866 13 3/S"shoe at 863m. Circulate 13 3/8" casing at 10bpm wI seawater to cleancasing and annulus.

04:15 04:30 .25 866 Pumped 5bbl slwater from Dowell &pressure tested cmt lines for 10min at3500psi.

04:30 04:45 .25 866 Released ball for bottom plug from cement head.04:45 06:00 1.25 866 Mixed &pumped 5S6bbls of 12ppg Class "G" lead cement in SW containing

0047, @ 8bpm. Weights steady throughout @ 11.9 - 12.1ppg, w/o blockages orshipping problems. Weather continues to deteriorate.

06:00 06:15 .25 866 Mixed & pumped 134bbls of 15.8ppg Class "G" tail slurry in drillwater containing0075. Wts & cement shipping good throughout. apart from last 5bbls when cmtsupplies slowed down possibly due to silo being nearly empty.

06:15 06:30 .25 866 Released dart from emt head. Chased dart with s/water f/Oowell at 6bpm - obs'd400 psi increase then decrease after 5bbls pumped (HWOP calc vol =2.3bbls) -not conclusive if top plug sheared (should shear with 1950psi).

06:30 07:00 .50 866 Displaced cmt & top plug with s/water@ 20bpm w/rig pumps. Pumped 2794stks(371bbls @ 93% eft.) - no bump obs'd. (Observed pressure stepping up in250psi - 350psi increments while displacing). Final diff.pressure =450psi.

07:00 07;30 .50 866 Bled down differential pressure to zero - no backfJow. Broke off cmt hose &released 18 3/4"CART from WH with 4 1/2RH turns ( 3m heaves hinderingoperations using rig tongs to turn landing string).

07:30 10:00 2.50 866 Rldown & Ilout cmt head. Commenced pulling CART back to rigfloor, strappingpipe for accurate depth RT-top 18 3/4"WH, measured as 73m tide corrected.(Revised depth for RT·PGB =73.9m). Llout CART & subsea plug launch assy.

10:00 10:30 .50 866 Changed out long bails used for running esg. (Top racking arm fingerdamaged/bent while attemtping to rack HWDP with severe picht/roll of rig duringpulling CART).

10:30 12:00 1.50 866 Straightened out top racking arm finger. Fitted new washpipe packing assy.(Commenced changing pump liners to 61/2", checking suction filters, checkingvlv's & pistons for 12 1/4"phase).

12:00 14:00 2.00 866 Llout 17 1/2" stabs from BHA in derrick.14:00 17:00 3.00 866 Removed all casing running & handling equip from rigfloor (weather conditions

~Inwlv imnrovinn ~hlA to II!i:lll r:~nA intArmittAntlv) PrAn~rjno to run RnpCopynght IDS Pty Ltd. RblofB report Mar 16th 1998.1 Page Number: 1

Page 101: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

08/05/1998 09:22 0352722058 PREMIER OIL GEELONG PAGE 02/03

PremierOil AustralasiaReport Date: 07.06.98

DAILY DRILLING REPORT # 9

White Ibis 1

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

17:00 17:30 .50 866 Serviced TDS & blocks. Cont preparing to run BOP· weather & sea stategradually improving.

17:30 20:30 3.00 866 Prepare tools & handling equipment to run BOPs.20:30 21:30 1.00 866 Moved rig fwd 30' prior to running BOPs, while organizing Riser sections and

moonpool area.21:30 24:00 2.50 866 PU BOPs, split cart, etc. Installed Guidelines into stack gUide frame.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 08.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 06:00 6.00 866 Work on BOPs: finished installing gUide lines 1-4; Installed work platform: PUball jt & 50' Riser jt, &MU; ran ball jt & riser section; landed & MU clamp {6900ft-Ibs}: began fitting kill line flex hoop.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 07.06.98

REMARK I OBSERVATION SOLUTION I RECOMMENDATION

Daily consumables:1 x VX Ring Gasket (cad. plated) for stack

Mud Properties MUD COST FOR TODAY: SO CUMULATIVE MUD COST TO DATE: $40,047

Type: VISCOSI"N( sec I qt ): 120 API FLUID L.OSS CI· (ppm): 0 SOLIDS (%vol) ;PV (cps): 23 (em3/30min) 0 K+ (ppm); 0 H20 (%vol);Gel 0.0

API FIL.TER CAKEFROM: Pit

YP (lb/100sq.ft); 67 (32nds inch 0 HARD/Ca (ppm) : 0 OIL (%val): 0

TIME: 6:00 GEL. 1Ost1 Om130m HTHP FLUID L.OSS MBT (ppb eq) : 0.0 SAND:

WEIGHT (ppg); 1.14 (lb/100sqft) : 45 52 0 (em3/30min) 0 PM: 0,0 PH; 0,0

TEMP (C); 0 FANN 3/61100 45 47 0 HTHP FILTER CAKE PF; 0.0 PHPA: 0.0(32nds inch) 0

Anchor Tension A1 : 50.0 A2.: 40.0 AS: 80.0 A4: 10.0 A5; 30.0(kips) A6; 70.0 A7; 80.0 A8: 40.0 A9: A10 :

Workboats Location. Fuel Barite Dlwtr PlWtr Cmt Bent Heli Weather & Rig data @ 24:00 hrs(kltr) (5X) (bbl) (bbl) (sx) (sx) (kltr) VDL (kips: 1.049.0

P. Commander rig 499 1.698 1,258 WIND SP. (ktS): 14.0 VISIB.(nm) : 10 RIS.TENS:Brute Tide rig 210 2.378 516 WIND DIR (deg) :160 CEIL.ING (m) : 2.000 HEAVE(m) : 1.5

PRES.(mbars): 1023 WAVES (m): 1.2 ROLL (deg): 2.0AIR TEMP (C): 11.4 SWEL.L. (m): 200.0 PITCH (deg): 1.0

!COMMENTS; "Commander" and "Brute Tide" at rig; 1 PAX on rig; 4 PAX off rig. IBulk Stocks Used lin Sloel< Used lin Stock Used lin Slock Used lin SlockDRILL WATER (bbl) :0 2,485 FUEL. (bbl): 10 1,131 GEL (sx) : 0 -0 HELI·FUEL. (kltr) : 0.2 9.2POi WATER (bbl) : 126 1.308 BARITE (5X) ; 0 5.401 CEMENT (sx) : 1.871 1,764

Drills, Permits & Inspection!DRILL. TYPE DATE INSPECTIONS DATE SAFETY DETAIL.S

TRIP DRILL 13/5 BOP TEST 30/5 L.TI 25/4FIRE 716 NEXT TEST DUE DATE 14/6 MTI 216PIT DRILL 13/5 RIG INSPECTION 17/4 JSA ongoingINCIDENT 1/6 DAYS SINCe LTA 41 #PlW ongoing

Safety Meeting 7/6

Pump DatapumD Data· last 24 hI'S Slow PumD Data

# TYPE LNR SPM EFF Flow SPP SPM spp DEPTH MW(") (%) (gpm (psi) (psi) (mRn (P))9)

1 National 6.50 972 National 6.50 97

Copyright IDS Ply Ltd. RbtofB report Mar 16th 1998.1 Page Number: 2

Page 102: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

08/09/1998 09:22 0352722058 PREMIER OIL GEELONG PAGE 03/03

PremierOil AustralasiaReport Date: 07.06.98

DAILY DRILLING REPORT # 9

White Ibis 1

Casina Personnel : on Site =88CSG LOT PHASE CSGSHOE CSGSHOE

JOB TITLE NAME COMPANY NAME tI-00(") MD TVD(mBRn

13.3/S" 863 863Orlg Supervisor C.Stirrett Premier 3N. Drlg Supervisor K.Dubravac Northern 71

TVPE LNGTH CSG WT GRO THREAD Geologist K. Frankiewicz Dowell Cement 1

(m) 10(") Ibs/ft AsiaticROV 4Dowell Mud 1

Shoejl 12.5 12.4 68.0 L80 N.VAM Northern Explorer P Ruddleston & Cox Vetco 11 x Bakerlok jt 11.2 12.4 68.0 L80 N.VAM Smedvig Safety 1F/Collarjt 12.3 12.4 68.0 LSO N.VAM Geoservice 43 x Bakerlok jt 35.5 12.4 68.0 LSO N,VAM Directional Driller 120jts 237.7 12.4 67.0 LSO BTC Alfa Laval 140jts 466,9 12.4 68,0 LSO N.VAMPup 3.1 12.4 68.0 LSO N,VAMWellheadjt 10.7 12.4 68.0 L80 N.VAM

.survey MO TVD INCL p.z CORR. ·v DOGLEG N/S EJW TOOL 'TYPE

Last Tool Type: Anderdrift (mR"D (mR"D DEG (deg) ~ SECT (mI30m) (m) (m)(deg) (m)

Magnetic Declination : 12.41 681 681 0,00 Anderdrift

Survey method: Min Curvature 710 710 0.00 Anderdrift739 739 0.00 Anderdrifl766 766 0.00 Anderdrift795 795 0.00 Anderdrift823 823 0.00 Anderdrift852 852 0.00 Anderdrift863 863 0.00 Anderdrift

Copyright IDS Ply Ltd, RbtofB report Mar 16th 1998.1 Page Number: 3

Page 103: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

07/05/1998 11:37 0352722058 PREMIER OIL GEELONG PAGE 01 "7

PremierOil Australasia rREC'O'RDs~'"'~'''~~'~'~----~l DAILY DRILLING REPORT # 7

I· '. . '" 1t 1i SV i' 'Y~ • •Report Date: 05.06.98 t:~~_.~~~-.:L~:·~··.J····~ \;\ ~ '. White Ibis 1

Well DataCOUNTRY Australia T.D. (m RT); 1366.0 CUR. HOLE SIZE ("): 17.50 DAILY COST $ : $238.370FIELD Bass Basin PROGRESS (m): 150.0 CSGOD("): 30.00 CUM COST $ : $1,526,341DRILL CO. : Northern Offshore DAYS FROM SPUD: 4.21 SHOE NO (m RT): 131 AFE COST $: $7,321.212

RIG: Northern Explorer 1II DAYS +/- CURve: LEAK·OFF EMW(ppg) 0.00 AFE BASIS: P&AMUD CO: Dowell

RT ABOVE MSL (m) : 12.5 CURRENT OP @ 0600: RU to run 13 3/8" casing.

WATER DEPTH@MSL(m): 60.8 PLANNED OP.; Run 13 3/B" csg. Cire. Cement csg, Displace cml. DIsengage CART &

RT TO SEABED (m) : 13.3 POOH. RU to run BOP·s.

Summary of period 00:00 to 24:00 hrs: Formation Tops - This report only

Drilled 17 1/2"hole - circ clean - displace to hi-vis gel- drop EMS - POOH- I FORMATION ITOP(mBRT) Iwork tight hole - backream - POOH to shoe· fish EMS - RIH - ream tighthole to bottom - circ clean - displace to hi-vis gel - POOH

ACTIVITY FOR PERIOD 00·00 HRS TO 24·00 HRS ON 05 06 98.~OM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 08:00 8.00 866 Drill 17 1/2"hole from 716-866m, w/2-14k WOB, 120rpm, 11 OOgpm, 2750psi, 4-8k ft·lbs torq. Av ROP 15-30m/hr. slowing below 750m. Anderdrift surveys every2 stds, &35bbl HiVis sweep each single. B/ream each stand as precaution.

08:00 10:30 2.50 866 Pumped 100bbls hi-vis pill &circ crean with s/water at 1200gpm while workingstring from 866-853m &rotating at 50rpm. Displaced hole with 960bbls of 1.1459gel mud.

10:30 10:45 .25 866 Dropped EMS barrel. Take first survey on bottom.10:45 11:00 .25 866 POOH with normal 3-5K drags from 866m. started pUlling tight with 30-40K

o/pu lis at 743m.11:00 11:45 .75 866 Cont attempting to POOH. Worked & wiped pipe from 743m with 30·40K

constant drags. Unable to pass 886m - holding SOK a/pUll, jars fired. Workedpipe & made repeated attempts to pUll & wipe past 886m - no success. 80K solida/pull.

11:45 12:30 .75 866 Washed/reamed with s/water from 686· 743m without resistance, 120rpm, 2-4Kft-Ibs torque, 1200gpm, no indications of packing off.

12:30 13:00 .50 866 Backreamed with slwater at 120rpm, 1200gpm from 743 - 660m withoutresistance apart from 10K ft·lbs torque at 873m reamed/wiped clean.

13:00 14:30 1.50 866 POOH from 660m to 30"shoe without pumping or reaming - 0~5K normal drags.14:30 15:00 .50 866 RIH with o/shot on slickline & retrieved EMS barrel while resting the hole.,5:00 16:30 1.50 866 RIH with normal 0-5K resistance from 30"shoe· started taking 35-40K

resistance at 824m.16:30 17:30 1.00 866 Washed & reamed with s/Water at 1200gpm, 110rpm, from 824m to bottom at

866m with 0-7K WOB intermittent resistance (attempted to RIH from 858-866mto estimate fill on bottom - no success, stood up with 30K WOB).

17:30 18:30 1.00 866 eire clean with s/water at 1200gpm while working & rotating pipe at 50rpm, andbuilding new 1.14sg hi-vis gel for 2nd displacement.

18:30 19:30 1.00 866 Pumped 230bbls guar gum pill & eire clean with 1200gpm while working &rotating pipe.

19:30 20:30 1,00 866 Displaced hole with 936bbls of 1.14sg hi-vis gel.20:30 24:00 3.50 866 POOH from 866 - 114m, with 50-60k O/Pull encountered at 854m. Observed 2-

4klbs drags for remainder of trip out (strapped pipe while POOH),

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 06.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 00:30 .50 866 Continue to POOH from 114 - 72m (O.7m inside 30" Housing). Positioned ROVto observe BHA at PGB.

00:30 00:45 .25 866 Attempt to observe PGB wI ROV, but visiblity very poor. Finally able to partiallyobserve top of PGB w/ bit inside 30", PGB generally clear of cuttings. Cuttingsmound estimated to bottom of PGB {from ROV set-down}.

00:45 01:00 .25 866 Jetted inside 30" Conductor I PGB for 10min with 1400gpm to clear cuttings.Unable to observe effects of jetting due to poor visibility.

Copyright IDS Ply Ltd. RbtofB report Mar 16th 199B.1 Page Number: 1

Page 104: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

07/06/1998 11:37 0352722058 PREMIER OIL GEELONG PAGE 02

PremierOil AustralasiaReport Date: 05.06.98

CAlLY DRILLING REPORT # 7

White Ibis 1

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

01:00 02:30 1.50 866 Cont POOH with BHA from 70m to surface. Moved ROV back to PGB andclearly observed PGB / 30" Conductor area· clear of cuttings after the jettingoperations.

02:30 03:00 .50 866 Rack back BHA. Gauge Stabs: top String stab 1/16" UG. btm String stab & NBstab IG. Graded bit #2, Reed Y11: IG, slight rounding on teeth. but all conebearings effectively destroyed, wi noticeable cone movements on all spindles.

03:00 05:15 2.25 866 PU cmt head & MU to jt HWDP & lI0 ass'y. PU & MU 18 3/4" CART cIw DPsingle below to 18 3/4" WHo Rack ass'y back in derrick and secure with chainsas precaution for heavier weather.

05:15 06:00 .75 866 RU to run 133/8" csg. RU & secured stabbing board. Changed over to longbails. RU power tongs. MU csg tongs to correct configuration for 13 3/8" csg.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 05.06.98

I REMARK / OBSERVATION SOLUTION I RECOMMENDATION

Iq,8corded EMS surveys from 852.2· 125.6m: all surveys~tween 0 - O.5deg. Survey report faxed to office.

Mud Properties MUD COST FOR TODAY: $15.716 CUMULATIVE MUD COST TO DATE: $40,047

Type: VISCOSITY( sec I qt ); 120 API FLUID LOSS CI- (ppm): 0 SOLIDS (%vol) :(cm3130min) 0

GuarGum PV (cps): 23 K+(ppm) ; 0 H20 (%vol): 0.0API FIL.TER CAKE

FROM; PitYP (lb/100sq.ft): 67 (32ndsinch 0 HARD/Ca (ppm) ; 0 OIL (%vOI) ; a

TIME; 6;00 GEL 1Os/1 Om/30m HTHP FLUID LOSS MBT (ppb eq) : 0.0 SAND:

WEIGHT (ppg): 1.14 (lb/100sqfl) : 45 52 0 (cm3/30min) 0 PM: 0.0 PH: 0.0

TEMP (e); 0 FANN 3/6/100 45 47 a HTHP FILTER CAKE PF: 0.0 PHPA: 0.0(32nds inch) 0

Bit Data for Bit '# 2 lADe. 1 1 1 Wear I II 01 II D II L II B

'EE~~1 II 1 II NO II 1 2 3 II 8 II I NO TDSIZE ("): 17.50 NOZZLES Drilled over the last 24 hrs Calculated over the bit runMANUFACTURER: RE AVE WOB (k-Ibs) : 8 3 x,a METERAGE (m) : 150 CUM.METERAGE (m) 733TYPE: Y11 AVE RPM: 120 1 x,e

ON BOTTOM HRS : 5.3 CUM. ON BOT. HRS : 20.8SERIAL. # ; 670452 FLOW (gpm) : 1,120 X IADC DRILL. HRS ; 8.0 CUM.IADC DRILL HRS: 32,6DEPTH IN (m RT) : 133 PUMP PRESS. (psi): 2,750 X TOTAL REVS : 38,160 CUM.TOT. REVS; 149.760DEPTH OUT (m RT) : 866 HSI (hp/sqi) : 0 X ROP (m/hr): 18.8 ROP (mlhr): 22.5

3HA#3 Length (ft) :198.4 D,C. (1) ANN. VEL.OCITY (mpm): 113HRS ON JARS : STRING WT(k-lbs) ; 165 TRQE MAX (ft·lbs):

1: I D.C. (2) ANN VELOCITY (mpm): 0WT BLW JAR(k·lbs): 38 PICK UP WT(k·lbs) : 165 TRQE ON (ft.-Ibs): H.W.D.P. ANN VELOCITY (mpm): 98BHA VIIT(k-lbs) : 57 SLK OFF WT(k-lbs) : 170 TRQE OFF (ft·lbs): D.P. ANN VELOCITY (mpm) : 98

BHA DESCRIPTION: TOOL DESCRIPTION HRS SERIAL # COMMENT17 1/2""Bil - NB Stab cIw float vN • 8"Anderdrin·

171/2" bit 32.5 Y11C Center jetS" Pony NMDC - 17 1/2" Stab cJw Totco Ring - 8"Anderdrlfl 1001 33.3 ADB814 New flask 3/6/98

NMDC - 17 1/2" Stab - 6xS"DC - Jars - 3xS" DC- Jars 142.0 2S51 Used on Yolla 2, w/99.2hrsxlo· 1xHWDP - dart sub - ax HWDP.

Anchor Tension A1 : 60.0 A2.: 55.0 A3; 75.0 A4; 70.0 AS: 90.0

(kips) AS: 100.0 A7: 75.0 A8: 80.0 A9: A10 ;

Workboats Location. Fuel Barite Dlwtr Plwtr Cmt Bent Hell Weather & Rig data @ 24:00 hI'S(kltr) (SlC) (bbl) (bbl) (SlC) (sx) (klfr) VDL (kips: 647.0

P. Commander riSJ 503 1,698 1.321 WIND SP. (kts) ; 28.0 VISI6.(nm) ; 10 RIS.TENS:Brute Tide Geelon WINO DIR (deg); 30 CEILING (m) : 1,800 HEAVE (m): 1.0

PRES.(mbars): 1013 WAVES(m) : 1.5 ROLL (deg) : 1.8AIR TEMP (C): 14.8 SWELL (m); 40.0 PITCH (deg) : 1.0

lCOMMENTS: "Com~ander"af rlj; "Brute Tide" sailing from Geelon~. 7 PAX on rig; 3 PAX off rig. I

Bulk Stocks Used lin Stock Used lin Stock Used lin Stock Used lin StockDRILL WATER (bbl) :553 2.667 FUEL (bbl): S 1,155 GEL (sx) : 50' -0 HELl-FUeL (kltr) : 0.0 9.4POT WATER (bbl): 0 1,673 BARITE (sx) ; 265 5.401 CEMENT (sx) : 0 3.635

Copyrighl IDS Pty Ltd, RbtofB report Mar 16th 1998.1 Page Number: 2

Page 105: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

07J06/1998 11:37 0352722058 PREMIER OIL GEELONG PAGE 03

PremierOil AustralasiaReport Date: 05.06.98

DAILY DRILLING REPORT # 7

White Ibis 1

Drills. Permits & InspectionlDRILL TYPE DATE INSPECTIONS DATE SAFETY DETAILS

TRIP DRILL 13/5 BOP TEST 30/5 LTI 25/4FIRE 31/5 NEXT TEST DUE DATE 1416 MTI 2/6PIT DRILL 13/5 RIG INSPECTION 17/4 JSA ongoingINCIDENT 116 DAYS SINCE LTA 39 #PTW ongoing

Safety Meeting 31/5

Casino Pump DataC5G LOT PHASE CSGSHOe CSGSHOE .Ia!lt 24 I1r!Z Slow Ilumn OatOD{") MD WD (mBRT) # TYPE LNR SPM EFF Flow SPP SPM SPP DEPTH MW

30" 131 131 (") (%) (gpm (psi) (psi) (m RT) (ppg)

1 National 7.00 94 97 1120 2750TYPE LNGTH CSG WT GRD THREAD 2 National 7.00 93 97

(m) ID{") Ibslft

Shoejt 12.4 28.0 310.0 X-52 5T2 Personnel : on Site =91Intermediate jt 11.7 28.0 310.0 X-52 5T2'termediate jt 11.1 28.0 310.0 X-52 5T2 JOB TITLE NAME COMPANY NAME #

II .Iermedilne jt 11.7 28.0 310.0 X-52 5T2 Drlg Supervisor C, Stirrett Premier :3Housingjt 11.8 28.0 310.0 X-52 ST2 N. Drlg Supervisor K. Dubravac Northern 71

Geologist K. Frankiewicz Dowell Cement 2AsiaticROV 4Dowell Mud ,

Northern Explorer P Ruddleston & Cox Vetco ,Smedvig Safety 1Geoservice 4pes 2Anadrill 1Alfa Laval 1

Survey MD TVD INCL AZ. CORR. 'V' DOGLEG N/S ENV TOOL TYPE

Last Tool Type : Anderdrift (m AT) (mRT) DEG (deg) AZ. SECT (m/30m) (m) (m)(deg) (m)

Magnetic Declination: 12.41 681 681 0.00 Anderdrlft

Survey method: Min Curvature 110 710 0.00 Anderdrlft739 739 0.00 Anderdrift166 766 0.00 Anderdrift795 795 0.00 Anderdrifl823 823 0.00 Anderdrift852 852 0.00 Anderdrift863 863 0.00 Anderdrift

I

CopyrighllDS pty Ltd. RbtofB report Mar 16th 1998.1 Page Number: 3

Page 106: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

0&/0&/1998 11:24 0352722058 PREMIER OIL GEELONG PAGE 01/03 ~

r=~'~'--._"" '~" .. ~~-~ .. _--

P . 0·1 A I· IRECORDS ~-~Jremler I llstra aSia ;Fii' . DAILY DRILLING REPO~T # . 7Report Date: 05.06.98 L -,_~~o~~~_~~[~F~l?.q:~!\ N ~ White Ibis 1

Well DataCOUNTRY Australia T.O. (m RT): 866.0 CUR. HOL.E SIZE ("): 17.50 DAILY COST $ : $238,370FIELD Bass Basin ~ROGRESS (m): 1S0.0 CSG00 (") ; 30.00 CUM COST $ : $1.526,341DRILL CO. ; Northern Offshore DAYS FROM SPUD: 4.21 SHOE TVD (m RT): 131 AFECOST$: $7,321,212RIG: Northern Explorer III DAYS +/. CuRVE: LEAK·OFF EMW(ppg) 0.00 AFE BASIS: P&A

MUD CO: DowellRT ASOVE MSL (m) : 12.5 CURRENT OP @ 0600; RU to I'\In 133/8" casing.

WATER DEPTH @MSL (rn) : eo.s PLANNED OP, : Run 133/8" ag. Cire. Cement csg. Displace ernt. Disengage CART &

RT TO SEABED (m) : 73.3 POOH. RU to run BOP's.

Summary of period 00:00 to 24:00 hrs: Formation Tops - This report only

Drilled 17 1/2lfhole - eire clean - displace to hi-vis gel- drop EMS ~ POOH· I FORMATION ITOP(mBRT) Iwork tight hole - backream • POOH to shoe· fish EMS - RIH - ream tighthole to bottom - circ clean - displace to hi-vis gel - POOH

ACTIVITY FOR PERIOD 00'00 HRS TO 24'00 HRS ON 05 06 98. . . .':ROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 08:00 8.00 866 Dril117 1/2"hole from 716·866m, w/2-14k WOB, 120rpm, 1100gpm, 2750psi, 4-8k ft-Ibs torq. Av ROP 15-30m/hr, slowing below 750m. Anderdrift surveys every2 stds, & 35bbl HiVis sweep each single. B/ream each stand as precaution.

08:00 10:30 2.50 866 Pumped 100bbls hi.vis pill & circ clean with slwater at 1200gpm while workingstring from 866·853m & rotating at 50rpm. Displaced hole with 960bbls of 1.145ggel mud.

10:30 10:45 .25 866 Dropped EMS barrel. Take first survey on bottom.10:45 11:00 .25 866 POOH with normal 3·5K drags from 866m, started pulling tight with 30-40K

o/pulls at 743m.11:00 11:45 .75 866 Cont attempting to POOH. Worked & wiped pipe from 743m with 30-40K

constant drags. Unable to pass 686m • holding 80K o/pull, jars fired. Workedpipe & made repeated attempts to pUll & wipe past 686m - no success, 8DK solido/pull.

11:45 12:30 .75 866 Washed/reamed with s/water from 686· 743m without resistance, 120rpm, 2-4Kft-Ibs torque. 1200gpm, no indications of packing off.

12:30 13:00 .50 866 Backreamed with s/water at 120rpm, 1200gpm from 743 - 660m withoutresistance apart from 10K ft-Ibs torque at 673m reamedlwiped clean.

13:00 14:30 1.50 866 POOH from 660m to 30"shoe without pumping or reaming· O·5K normal drags.14:30 15:00 .50 866 RIH with o/shot on slickline & retrieved EMS barrel while resting the hole.15:00 16:30 1.50 866 RIH with normal 0-5K resistance from 30"shoe - started taking 35~OK

resistance at 824m.16:30 17:30 1.00 866 Washed & reamed with s/water at 1200gpm, 11 Orpm, from 824m to bottom at

866m with 0-7K WOB intermittent resistance (attempted to RIH from 858·866mto estimate fill on bottom - no success, stood up with 30K WOB).

17:30 18:30 1.00 866 Circ clean with slwater at 1200gpm while working & rotating pipe at 50rpm, andbuilding new 1.14sg hi-vis gel for 2nd displacement.

18:30 19:30 1.00 866 Pumped 230bbls guar gum pill & cire clean with 1200gpm while working &rotating pipe.

19:30 20:30 1.00 866 Displaced hole with 936bbls of 1.14sg hi-vis gel.20:30 24:00 3.50 866 POOH from 866 - 114m, with 50-60k O/Pull encountered at 854m. Observed 2·

4klbs drags for remainder of trip out (strapped pipe while POOH).

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 06.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 00:30 .50 866 Continue to POOH from 114· 72m (0.7m inside 30" Housing). Positioned ROVto observe BHA at PGB.

00:30 00;45 .25 866 Attempt to observe PGB w/ ROV, but visiblity very poor. Finally able to partiallyobserve top of PGB wI bit inside 30". PGB generally clear of cuttings. Cuttingsmound estimated to bottom of PGB (from ROV set.down).

00:45 01:00 .25 B66 Jetted inside 30" Conductor I PGB for 10min with 1400gpm to clear cuttings.Unable to observe effects of jetting due to poor Visibility.

CopyrighllDS pty Ltd. RbtofB repol't Mar 16th 1998.1 Page Number: 1

Page 107: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

05/05/1998 11:24 0352722058 PREMIER OIL GEELONG PAGE 02/03

PremierOil AustralasiaReport Date: 05.06.98

DAILY DRILLING REPORT # 7

White Ibis 1

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

01:00 02:30 1.50 866 Cont POOH with BHA from 70m to surface. Moved ROV back to PGB andclearly observed PGB I 30" Conductor area - clear of cuttings after the jettingoperations.

02:30 03:00 .50 866 Rack back BHA. Gauge Stabs: top String stab 1/16" UG, btm String stab & NBstab IG. Graded bit #2, Reed Y11; IG, slight rounding on teeth, but all conebearings effectively destroyed. wi noticeable cone movements on all spindles.

03:00 05:15 2.25 866 PU cmt head & MU to jt HWDP & LlO ass'y. PU &MU 18 3/4" CART clw DPsingle below to 18 3/4" WHo Rack ass'y back in derrick and secure with chainsas precaution for heavier weather.

05:15 06:00 .75 866 RU to run 133/8" csg. RU &secured stabbing board. Changed over to longbails. RU power tongs. MU O5g tongs to correct configuration for 13 3/8" csg.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 05.06.98

I REMARK I OBSERVATION

I "'lecorded EMS surveys from 852.2 -125.6m: all surveys~tween 0 - O.5deg. Survey report faxed to office.

SOLUTION I RECOMMENDATION

Mud Properties MUD COST FOR TODAY: $15,716 CUMULATIVE MUD COST TO DATE: $40,047

Type: VISCOSITY( sec I qt ): 120 API FLUID LOSS CI· (ppm): 0 SOLIDS (%'101) :PV (cps): 23 (cm3l30min) 0 K+ (ppm): 0 H20 (%'101): 0.0GuarGum API FILTER CAKE

FROM: Pit YP (lb/100sq.fl): 67 (32nds Inch 0 HARD/Ca (ppm) : a OIL (%vol) : 0

TIME; 6:00 GEL 1Os/1 Om130m HTHP FLUID LOSS MBT (1'1'0 eq) : 0.0 SAND:

WEIGHT (1'1'9): 1.14 (lb/1OOsqfl) ; 45 52 0 (cm3130min) 0 PM: 0.0 PH: 0.0

TEMP (C): 0 FANN 3/61100 45 47 a HTHP FILTER CAKE0 PF: 0.0 PHPA: 0.0(32nds inch)

Bit Data for Bit # 2

SIZE ("):MANUFACTURER:

TYPE;

SERIAL#:DEPTH IN (m RT) :

DEPTH OUT (m RT) ;

17.50RE

Y11

670452

133

S66

IADC# 1 1

AVE WOB (k·lbs):AVE RPM:FLOW (gpm) :PUMP PRESS. (psi):

HSI (hp/sqi) :

S120

1.1202,750

o

Wear EB~~@i1EErn~EENOZZLES Drilled over Ihe last 24 hrs Calculated over the bit run

3 X1S MeTERAGe (m): 150 CUM.METERAGE (m) 7331 X16 ON BOnOM HRS : 5.3 CUM. ON BOT. HRS ; 20.S

X IADC DRILL. HRS : 6.0 CUM.lADC DRILL HRS: 32.6X TOTAL REVS: 38,160 CUM.TOT. REVS: 149,760X ROP (mlhr): 18.8 ROP (m/hr): 22.5

113o

9898

3HA # 3 Length (ft) :198.4 D.C. (1) ANN. VELOCITY (mpm);

HRS ON JARS: ISTRING WT(k-lbs) : 165 TRQE MAX (ft-lbs): 10 D.C. (2) ANN VELOCITY (mpm):wr BLW JAR(k-lbs): 38 PICK UP wr(k-Ibs) : 165 TRQE ON (ft-Ibs): 5 HW.D.P. ANN VELOCITY (mpm):BHA WT(k.lbs) : 57 SLK OFF WT(k-lbs) : 170 TRQE OFF (It-Ibs): 4 D.P. ANN VELOCITY (mpm) ;

BHA DESCRIPTION : r---T-O-O-L-D-ES-C-R-I-PT-IO-N-.......r-H-R-S"""T'-SE-R-IA-L-#-~---C-O-M-M-e-N-T----' I

17112'·'Sit - NB Slab eIw float vlv - S"Anderdrift - 17 112" bit 32,5 Y11C Center jel8" Pony NMDC - 17 1/2" Stab eJw Totco Ring - S" Anderdrift tool 33,3 ADBS14 New nask 3/6196NMDC - 17 1/2" Stab· 6xS"DC - jars - 3xS" DC - Jars 142.0 2851 Used on Yolla 2, w/9Sl.2hrs.go • 1xHWDP • dart sub· 8 x HWDP.

Anchor Tension(kips)

A1 : 60.0

AS: 100.0

A:l.: 55.0

A7: 75.0

A3: 75.0A8; 80.0

A4: 70,0

A9:

A5: 90.0A10:

Workboats

P. CommanderBrute Tide

Location. Fuel Barite Dlwtr Plwtr Cml Bent Heli(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltr)

rig 503 1.698 1.321Geelon

Weather & Rig data @ 24:00 hrsVOL (kips: 647.0

WIND SP. (kts): 28.0 VISIB.(nm): 10 RIS.TENS:WIND OIR (deg): 30 CEILING (m): 1.800 HEAVE (m); 1.0PRES.(mbars): 1013 WAVES (m): 1.5 ROLL (deg): 1.8AIR TEMP (C): 14.8 SWELL (m): 40.0 PITCH (deg): 1.0

ICOMMENTS : "Commander" at rig; "Brute Tide" sailing from Geelong. 7 PAX on rig: 3 PAX off rig.

Bulk Stocks Used lIn Stock Used lin Stock Used lin Stock Used / In Stoel<DRILL WATER (bbl) :553 2.667 FUEL (bbl): 5 1,155 GEL (sx): 501 -0 HEll-FUEL (kltT) :0.0 9.4POT WATER (bbl): 0 1.673 BARITE (sx) ; 265 5.401 CEMENT (sx) : 0 3.635

Copyright IDS Ply Ltd. RbtofB report Mar 16th 1998.1 Page Number: 2

Page 108: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

05/05/1998 11:24 0352722058 PREMIER OIL GEELONG PAGE 03/03

PremierOil AustralasiaReport Date: 05.06.98

DAILY DRILLING REPORT # 7

White Ibis 1

Drills, Pennits & Inspection!ORlt.L TYPE DATE INSPECTIONS DATE SAFETY CETAILS

TRIP DRILL 13/5 BOP TEST 30/5 LTI 25/4,FIRE 31/5 NEXT TEST CUE DATE 1416 MTI 2/6PIT CRILL 13/5 RIG INSPECTION 17/4 JSA ongoingINCIDENT 1/6 DAYS SINCE LTA 39 #PlW ongoing

Safety Meeting 31/5

Casina Pump DataCSG LOT PHASE CSGSHOE CSGSHOE p mD Data - last 24 hI'S SlowF'umo Oat00(") MO TVC(mBRn # TYPE LNR 5PM EFF Flow SPP SPM SPP DEPTH MW

30" 131 131 (") (%) (9pm (psi) (psi) (mRn (ppg)

CSG wr 1 National 7.00 94 97 1120 2750TYPE LNGTH GRC THREAD 2 National 7.00 93 97

(m) 10(") IbsJft-

Personnel : on Site =91Shoejt 12.4 28.0 310,0 X-52 ST2Intermediate jt 11.7 28.0 310.0 X·52 5T2!ntermediate jt 11.7 28.0 310.0 X·52 ST2 JOB TITLE NAME COMPANY NAME #

termediate jt 11.7 28.0 310.0 X-52 ST2 Drlg Supe""isor C, Stirrett Premier 3I' riousing it 11.8 28.0 310.0 X-52 ST2 N. Oris Supervisor K. Dubravac Northern 71Geologist K. Frankiewicz Dowell Cement 2

AsiaticROV 4Dowell Mud 1

Northern Explorer P Ruddleston & Cox Vetco ,Smedvlg Safety 1Geoservice 4PCS 2Anadrill 1Alfa Laval 1

Survey MD TVO INCL A2. CORR. ''11 DOGLEG N/S EJtN TOOL TYPE

Last Tool Type: Anderdrift (mRn (mRn OEG (des) A2. SECT (rn/30m) (m) (m)(deg) (m)

Magnetic Declination: 12.41 681 681 0.00 Anderclrift

Survey method: Min Curvature 710 710 0.00 Anclerclrlft739 739 0.00 Anderdrift766 766 0.00 Anderdrift795 795 0.00 Anderdrift823 823 0.00 Anderdrift852 852 0.00 Anderdrift863 863 0.00 Anderdrift

Copyright ICS Pty Ltd. RbtofB report Mar 16th 1998.1 Page Number: 3

Page 109: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

05(06/1998 09:48 0352722058 PREMIER OIL GEELONG PAGE 01/03 ~

Premier Oil AustralasiaGeelong Operations BasePhone: 0352722101Fax: 0352722058

Fax

Premier OilAustralasia

To:

Fax:

Phone:

Re=

Vidalia Minerals &Petroleum Ops, Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Bacon

Vv'hite Ibis Daily Drilling Reports

From: Gordon Hunter

Date: June 5, 1998

Pages: 3 inc. this one

cc:

o Ul'!lent

-Comments:

o For Review D Please Comment 0 Please Reply o Please Rec;ycle

Please find attached the Daily Drilling report for 4th June 1998.

Regards

Gordon Hunter

Drilling Superintendent

1

.,.~j

Page 110: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

05/05/1998 09:48 0352722058 PREMIER OIL GEELONG PAGE 02/03

PremierOil AustralasiaReport Date: 04.06.98

DAILY DRILLING REPORT # 6

White Ibis 1

~Well Data..

COUNTRY Australia T.O. (m RT): 716.0 CUR. HOLE SIZE (n): 17.50 DAILY COST $ : ~ 1'18,680

FIELD Bass Basin PROGRESS (m): 530.0 eSG OD ("): 30.00 CUM COST$: 51.'2.~7,C\11IORILLCO.: Northern Offshore DAYS FROM SPUD: 3.21 SHOE TVD (m R"T): 131 AFECOST5: 57,321,212

RIG: . ' Northern Explorer III DAYS +1- CURVE: LEAK-OFF EMW{ppg) 0.00 AFE BASIS: P&A

MUD CO: DowellIRT ABOVE MSt. (m) : 12.5 CURReNT OP @ 0600; Drilling 17 112" hole.

• WATER DEPTH @MSl. em) : 60.8 PLANNED 01'.: DMII17 112" Plole. Dslplace hole to HiVis. POOH. RU & run 133/8" csg.

RT TO SEABED (m) : 73.3 Cementcsg.

ISummary of period 00:00 to 24:00 hrs: Formation Tops - This report only

Drilled 17 1/2"hole. I FORMATION ITOP(mBRT) IACTIVIrt' FOR PERIOD 00'00 HRS TO 24·00 HRS ON 04 06 98. . .FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 21:00 21.00 681 Drilled 17 1/2"hole from 186-681m, with 0-10k max WOB, 110-120rpm,1200gpm, 2800psi, 3·8k ft-Ibs torq. Av ROP 35-4Sm/hr. Below 282m, tooksurveys every 2 stds. Pumped 35bbl HiVis sweep each single. B/ream eachstand as precaution.

21:00 21:30 .50 681 Rig service - lOS, etc.21:30 24:00 2.50 716 Drilled 17 1/2"hole from 681-716m, with 2-14k max WOB. 120rpm, 1200gpm,

2800psi, 4-8k ft-lbs torq. Av ROP 30-35m/hr, w/ Anderdrift surveys every 2 stds.Pumped 35bbl HiVis sweep each single. Blream each stand as precaution.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 05.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 06:00 6.00 860 Drill 171/2"hole from 716-828m, w/2-14k waB, 120rpm, 1100gpm, 2750psi, 4-8k ft-Ibs torq. A'I/ ROP 15-30m/hr, srowing below 750m. Anderdrift surveys every2 stds, & 35bbf HiVis sweep each single. S/ream each stand as precaution.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 04.06.98

IMud Properties MUD COST FOR TODAY: $7,245 CUMULATIVE MUD COST TO DATE: $24.331

Type: VISCOSITY( see 1Cit ): 150 API FLUID LOSS CI-{ppm) : 0 SOLIDS (%vol) :

IGuarGum PV (cPS); 21 (cm3130min) 0 K+ (ppm): 0 H20 (%vol): 0.0

YP (lb/100sq.ft): 82Al'l FILTER CAKE HARD/Ca (ppm) : 0 OIL (%vol) : 0

FROM: Pit (32nds inch 0

-r"~E : 23:00 GEL 1Os/1 Om130m HTHP FLUID LOSS MBT (ppb eq) : 0.0 SAND:

I ,GHT (ppg): 1.03(lb/100sqft) : 30 30 0 (cm3130min) 0 PM: 0.0 PH; 0.0

TeMP (C) : 0 FANN 3/6/100 30 38 0 HTHP FILTER CAKE FlF: 0.0 PHPA: 0.0(32nds inch) 0

IBit Data for Bit # 2 JAOC# 1 1 1 Wear E9~f:gE9E9~~E9SIZE ("): 17.50 NOZZl.ES Drilled over the last 24 hrs Calculated over the bit runMANUFACTURER: RE AVE WOB (k-Ibs): 5 3 x18 METERAGE (m) : 530 CUM.METERAGE em) 583TYPE: Y11 AVERPM: 115 1 X16 ON BOTTOM HRS : 12.5 CUM. ON eOT. HRS : 15.5ISERIAL#: 670452 FLOW (gpm); 1.100 X IADC DRILL. HRS : 20.8 CUM.IADC DRilL HRS: 24.6DEPTH IN (m RT) : 133 PUMP PRESS. (psi): 2,750 X TOTALREVS: 86,250 CUM.TOT. REVS: 106.950DEF'TH OUT (m RT) : HSI (hp/sqi) : 0 X ROP (mlhr): 25.5 ROF' (mlhr): 23.7

lBHA#3 Length (ft) :198.4 D.C. (1) ANN. VELOCITY (mpm): 111IHRS ON JARS: STRING WT(k-lbs) : 160 TRQE MAX (ft·lbs); 8 D.C. (2) ANN VELOCITY (mpm): 0Iwr 8LW JAR(k·lbs): 38 PICK UP WT(k-lbs) : 160 TRQE ON (fl-Ibs): 4 HW.D.P. ANN VELOCITY (mpm): 96BHA wr(k·lbs) : 57 SLK OFF WT(k·lbs) ; 165 TRQE OFF (ft·lbs): 3 D.P. ANN VELOCITY (mpm) : 96

aHA DESCRIPTION: TOOL DESCRIPTION HRS seRIAL # COMMENT17 1/2"'Blt - NB Slab eJw float vlv • 8"Anderdrift - 17112" bit 24.5 Y11C Center jet18" Pony NMDC· 17 112" Stab eJw ToteD Ring· 8"NMDC • 17 112" Stab· 6x8"DC • jars· 3x8" DC • Anderdrift tool 25.3 ADB814 New flask 3/6/98

Jars 122.8 2851 Used on Yolla 2. w/99.2hrsrio· 1xHWOP • dart sub· 8 x HWDP.

~opyrightlDSPly Ltd. RbtofB report Mar 16th 1998.1 Page Number: 1

Page 111: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

05~06/1998 09:48 0352722058 PREMIER OIL GEELONG PAGE 03/03

>PremierOiI AustralasiaReport Date: 04.06.98

CAlLY DRILLING REPORT # 6

White Ibis 1

Anchor Tension A1: 65.0 Kl.: 55.0 A3: 70.0 M:7S.0 AS: 80.0

(kips) A6: 90.0 A7: 75.0 AS: 80.0 A9: A10:

Workboats .- Location. Fuel Barite O/Wtr Phttr Cmt Bent Heli Weather & Rig data @ 24:00 hrs(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltr) VOL. (kips: 282.0

P. Commander at rig 50? 1,698 1,352 WIND SP. (Ids) : 17.0 VISIB.{nm) : 10 RIS.TENS:Brule Tide Geelon WIND DIR (deg): 40 CEILING (m) : 2.000 HEAVE(m) : 1.5

PRES.(mba~): 1019 WAVES (m): 1.3 ROLL (deg): 1.5AIR TEMP (C): 14.5 SWELL (m): 30.0 PITCH (deg) : 1.0

ICOMMENTS: "Commander" at rig: "Brute Tide" sailing to Geelong (left @ 17:1Sh~). 9 PAX on rig; 8 PAX off rig. I

Bulk Stocks Used /In Stock Used lin Stock Used lin Stock Used lin Sloek

DRILL WATER (bbl) :630 3.220 FUEL (bbl): 15 1,160 GEL (sx): 140 501 HELl-FUEL (kltr) : 0.0 9.4

POT WATER (bbl) : 0 1,648 BARITE (sx) : 66 5,666 CEMENT (sx) : 0 3.635

Drills. Permits & Inspection!')RILL TYPE DATE INSPECTIONS DATE SAFeTY DETAILS

,~IPDRILL 13/5 BOP TEST 30/5 LTI 25/4FIRE 31/5 NEXT TEST DUE DATE 14/6 MTI 2/6PIT DRILL 13/5 RIG INSPECTION 17/4 JSA ongoingINCIDENT 1/6 DAYS SINCe LTA 38 #F'TW ongoing

Safety Meeting 31/5

CasinQ Pump DataCSG LOT PHASE CSGSHOE CSGSHOE Pump Data· last 24 hI'S Slow PumD OatOOn MD TVD(mBRT) # TYPE LNR SPM EFF Flow SPP SPM SPP DEPTH MW

30" 131 131 (U) (%) (gpm (psi) (psi) (mRi) (ppg)

TYPE LNGTH CSG wr THREAD1 National 7.00 94 97 1100 2750

GRD 2 National 7,00 93 97(m) 10 (") Ibsfft

Shoejt 12.4 28.0 310.0 X·52 ST2 Personnel: on Site =87IIntermediate jt 11.7 28.0 310.0 X-52 ST2Intermediate jt 11.7 28.0 310.0 X-52 ST2 JOB TITLE NAME COMPANY NAME #Intermediate jt 11.7 28.0 310.0 X-52 ST2 Orlg SupelVlsor C. Stirrett Premier 2i Housingjt 11.8 28.0 310.0 X-52 ST2 N. Orlg SupelVisor K. Dubravae Northern 70

Dowell Cement 2AsiatieROV 4Dowell Mud 1

Northern Explorer P Ruddleston & Cox Vetco 1Smedvig Safety 1Geoservice 2PCS 2Anadrill 1Quest ,

!Survey MD TVO INCL 1\1. CORR. ·v DOGLEG N/S EJIN TOOL TYPEI

:Last Tool Type: Anderdrift (m RT) (mRi) OEG (deg) AZ. SECT (m/30m) (m) (m)

IMagnetic Declination: 12.41(deg) (m)

394 394 1.00 Anderdrift

Survey method : Min Curvature 451 451 0.00 Anderdrift565 565 1.00 Anderdrift

I623 623 0.00 Anderclrift652 652 0.00 Anderdrift681 681 0.00 Anderdrift

i 710 ?10 0.00 Anderdrift739 739 0.00 Anderdrift

I

:Opyright IDS Pty Ltd, RbtofB report Mar 16th 1998.1 page Number: 2

Page 112: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

04/06/1998 09:41 0352722058 PREMIER OIL GEELONG PAGE 01/05

4>Premier Oil AustralasiaGeelong Operations BasePhone: 0352722101Fall': 0352722058

I=ax

--

Premier OilAustralasia

To: Vidoria Minerals & Petroleum Ops. Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Bacon

From: Gordon Hunter

Fax: Date: June 3, 1998----Phone:--,,-------_.._--- Pages: 5 inc. this one

CC:Re: White Ibis Daily Drilling Reports---.:-----------------------------

o ~rgent

·~m.nts:

o For Review 0 Ple.5e Comment 0 Please Reply o Please Recycle

Please find attached the Daily Drilling report for 3rd June 1998.

Regards

Gordon Hunter

Drilling Superintendent

Page 113: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

04/05/1998 09:41 0352722058 PREMIER OIL GEELONG PAGE 02/05

PremierOil AustralasiaReport Date: 03.06.98

DAILY DRILLING REPORT # 5

White Ibis 1

Well DataCOUNTRY Australia T.D.(m Rn: 186.0 CUR. HOL.E SIZE ("): 17.50 DAILY COST $ : $199.577FIELD Bass Basin PROGRESS (m); 54.0 CSGOD(") : 30.00 CUMCOST$; $1,089.091DRILL CO. : Northern Offshore DAYS FROM SPUD: 2.21 SHOE TVD (m Rn: 131 AFE COSTS: $7.321.212RIG: Northern explorer III DAYS +/- CURVE: LEAK-OFF EMW(PP9) 0.00 AFE BASIS: P&AMUD CO: DowellRT ABOVE MSL (m) : 12.5 CURRENT OP@0600: Drilling 17 112" hole.

WATER DEPTH@MSL(m): 60.8 PLANNED OP. : Drill 17 112" hole.

RT TO SeABED (m) : 73.3

Summary of period 00;00 to 24:00 hrs: Formation Tops - This report only

Cemented 30" Conductor. MU new BHAw/26" bit. RIH. Drill cmt. Drill 1m I FORMATION ~OP(mBRnlnew hole. POOH. PU new 171/2" bit. RIH. Drill 171/2" hole.

ACTIVITY FOR PERIOD 00·00 HRS TO 24"00 HRS ON 03 06 98" . .IFROM TO HRS DEPTH ACTIVITY DESCRIPTION

0:00 01:00 1.00 132 Finished testing cement lines. Opened LoTorq v/v to Dowell unit. Pumped 70bblsslwater with Dowell at 6.6bpm, 250psi. Filled displacement tanks w/ CaCI2mixwater. Lined up on cement silos to ship cement.

01:00 02:30 1.50 132 Attempted to ship cement to surge tank from silos, but only low volume ofcement passing to surge tank - both compressors & rig air being utilized. Broke& cleaned lines to aHow cement shipping to surge tank. No blockage found.

02:30 03:00 .50 132 Mixed and pumped total of 104bbls 15.8ppg Class G cement, with 1.5% BWOCCaCI2 mixwater. Shut down cement mixing/pumping when further blockageoccurred, restricting flow of cement to surge tank.

03:00 03:30 .50 132 Broke out lines from silos to surge tank in attempt to clear emt blockage.Discovered vent line from surge tank blocked wI hard emt. preventing filling ofsurge tank. Cleared line.

03:30 04:00 .50 132 Recommenced mixing and pumping cmt - total of 282bbls 15.8ppg Class Gcement, with 1.5% SWOC CaCI2 mixwater. Cement returns to slbed observedby ROV after +/- 245bbls pumped.

04:00 04:15 .25 132 Displaced cement with 50bbls seawater from cement unit (theoretically leave3bbls cement inside 30" conductor).

04:15 04:30 .25 132 Bled off pressure @ Dowell unit - float okay. Broke off cementing hose andchecked for back flow - negative, zero back flow.

04:30 04:45 .25 132 Backed off 30" CART from 30" housing, with 21/4 RH turns (observed withROV). Observed srope indicator @ 1/2deg Port.

04:45 06:00 1.25 132 UO kelly cock, Lo-Torq v/v, and side entry sub. POOH wI running string Breakout & Vout 30"CART.

06:00 07:00 1.00 132 PU 26"/36" BHA from derrick. Uout 36" HO, xJo, bit sub, 26" bit &AnderdriftTool.

07:00 09:30 2.50 132 MU 17 1/2"SHA - 17 112"Stabs, NMDC's, w/same CR·1 26"bit (#1RR2) fordrilling 30" shoe. Installed new survey flask in Anderdrift. MU TDS, pumpedthrough & function test Anderdrift OK. Install softline guides to bit at moonpool.

09:30 11:30 2.00 132 Ran 26"bit & BHA down to PGB. ROV observed 26"bit enter 30"Housing withoutproblems.

11:30 12:00 .50 132 Continued RIH w/out resistance to 110m. Recorded string wts. Washed downwith 11 OOgpm s/water & tagged hard cement with 10K WOB inside the 30"conductor @ 125m, 2m higher than planned/calculated TOC.

12:00 14:45 2.75 132 Drilled hard cement & 30"shoe with slwater from 125m with 3-7K WOB, 70rpm,1100gpm. 1500psi, torque 3-5K ft-Ibs. No movement on PGB observed. Brokethrough shoe @ 131m. Cleaned out 36" & 26" rathole down to 132m.

14:45 15:00 .25 133 Drilled 1m of new 26"hole with s/waterfrom 132-133m With 0-2K WOB, 70rpm,1100gpm, 1500psi, ROP 30mlhr. ROV reported bullseye reading 0 deg.

15:00 15:30 .50 133 Worked & rotated 26" bit through 30"shoe from 133-128m without resistancewhile pumping & sweeping 100bbls hi-vis pill & eire clean with s/water at1100gpm.

15:30 15:45 .25 133 Tested Anderdrift tool (new flask) and took survey at 128m - 1.5deg.15:45 17:00 1.25 133 POOH from 133m for bit change.

Copyright IDS Ply Ltd. RbtofB report Mar 16th 1998.1 Page Number: 1

Page 114: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

04/05/1998 09:41 0352722058 PREMIER OIL GEELONG PAGE 03/05

PremierOil AustralasiaReport Date: 03.06.98

DAILY DRILLING REPORT # 5

White Ibis 1

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

17:00 18:00 1.00 133 UD 26" HTC CR-1 bit and graded. PU new Reed Y11C (center jet) bit, with 3 x18's, 1 x 16 nozzles. Installed softline guides @ moonpool. Changed out newjars for re-runs from previous well.

18:00 19:00 1.00 133 Ran 171/2" BHA to PGB.19:00 19:15 .25 133 Positioned ROVat PGB. Stabbed 17112" Assembly into 30" Conductorw/o

difficulties.19:15 20:15 1.00 133 Cont to RIH from slbed to 30" csg shoe. Washed through shoe/rathole wlo

difficulties. Tag btm of 26" hole@ 133m.20:15 20:30 .25 140 Drilled 171/2" hole from 133 • 140m, with Oklbs WOB, 80 rpm, 1200 gpm, 2400

psi, &1-4k ft·lbs torque. Average ROPs: 35-40m/hr.20:30 21:30 1.00 140 Rig pump #1 down for repairs (pony rod clamp). Circulate with slow rotation and

reciprocation while effecting repairs. Greased and tightened leaking wash pipeon TDS.

21:30 24:00 2.50 186 Drilled 17 1/2" hole from 140-186m, with 0-5klbs WOB, 80-105 rpm, 1200 gpm,2550·2650 psi, &2-5k ft·lbs torque, wI Anderdrift surveys. Average ROPs 35-40m/hr. Pumped 35bbl HiVis each single &b/reamed each stand

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 04.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 06:00 6.00 311 Dri1l171/2" hole 186-311m, w/0-5kWOB, 80-105 rpm, 1200gpm, 2650 psi, 2-5k ft-Ibs torque. Av ROP 35-40m/hr. Below 282m, took Anderdrift surveys every2 stds (no build observed). Pump 35bbl HiVis sweep each single. B/ream eachstand.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 03.06.98

REMARK I OBSERVATION SOLUTION 1 RECOMMENDATION

BHA # 3 printed twice on daily report, but no apparentfunction to delete extra entry.Magnetic declination required for EMS survey.Deluge system repairs around helipad/helifuel tank areaongoing. estimated to be finished today.Bulk shipping lines from cement tanks to Dowell surgetank being broken apart and cleaned. Chemical surgetanks (2) both had weight indicators re·calibrated.Investigations into fwd crane's intermittent fault

1 continuing. Crane's SCR installers contacted.

Mud Properties MUD COST FOR TODAY: $5,917 CUMULATIVE MUD COST TO DATE: $17,086

Type: VISCOSITY( sec 1qt ): 120 API FLUID LOSS CI- (ppm): 19,000 SOLIDS (%vol) :PV (cps): 19 (cm3l30min) 0 K+ (ppm): 0 H20 (%vol): 0.0GuarGum API FILTER CAKE

FROM: PitYP (lb/100sq.ft): 68 (32nds inch 0 HARO/Ca (ppm) : 20 OIL (%vol) : 0

TIME: 15:30 GEL 10s/10m/30m HTHP FLUID LOSS MaT (ppb eq) : 0.0 SAND:

WEIGHT (ppg): 1.03 (lb/100sqft) ; 25 26 0 (cm3l30min) 0 PM: 0.0 PH; 7.0

TEMP (C): 0 FANN 3/6/100 24 30 0 HTHP FILTER CAKE PF: 0.0 PHPA; 0.0(32nds inch) 0

Bit Data for Bit # 1RR2 IADC# 1 1 1 Wear I II 01 II D 'EEEBrnfl3~1 II 1 II NO I A 2 I NO BHASIZE (") ; 26.00 NOZZLES Drilled over the last 24 hIS Calculated over the bit runMANUFACTURER: HU AVE WOB (k-Ibs): 4 3 X22 METERAGE (m) : 1 CUM.METERAGE (m) 1TYPE: CR-1 AVER-PM: 70 1 x20 ON BOTTOM HRS : .8 CUM. ON BOT. HRS : .8SERIAL#: B09CH FL.OW (gpm): 1.100 x IADC DRILL. HRS ; .8 CUM.IADC DRILL HRS: .8DEPTH IN (m RT) : 132 PUMP PRESS. (psi): 1.150 X TOTAL REVS ; 3,150 CUM.TOT. REVS: 3.150DEPTH OUT (m RT) : 133 HSI (hp/sqi) : 0 X ROP (m/hr): 1.3 Rap (mlhr): 1,3

Copyright IDS Pty Ltd. RbtofB report Mar 16tl'l 1998.1 Page Number: 2

Page 115: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

04/05/1998 09:41 0352722058 PREMIER OIL GEELONG PAGE 04/05

PremierOil AustralasiaReport Date: 03.06.98

CAlLY DRILLING REPORT # 5

White Ibis 1

Bit Data for Bit # 2 IADC# 1 1 1 Wear ~~E9E9f:g23: 02 :: R :SIZE (U): 17.50 NOZZLES Drilled over the last 24 hrs Calculated over the bit runMANUFACTURER: RE AVE WOB (k-Ibs): 3 3 X18TYPE: Y11 AVERPM; 90

METERAGe (m) : 53 CUM.METERAGE (m) 531 x16 ON BOTTOM HRS : 3.0 CUM. ON BOT. HRS : 3.0

SeRIAL#: B70452 FLOW (gpm) : 1.200 X IADC DRilL. HRS : 3.8 CUM.lADC DRILL HRS: 3.8DePTH IN (m RT) : 133 PUMP PRESS. (psi): 2,600 x TOTAL REVS : 16,200 CUM.TOT. REVS: 16,200CepTH OUT (m RT) : HSI (hp/SCli) : 0 X ROp (mlhr): 14.1 ROp (m/hr): 14.1

BHA#1 Length (ft) :132.0 D.C. (1) ANN. VELOCITY (mpm): 121HRS ON JARS : ISTRING WT'(k-lbs) : 42 TRQE MAX (ft-Ibs): 10,000 I D.C. (2) ANN VELOCITY (mpm): 0WT BLW JAR(k-lbs): PICK UP WT'(k·lbs) : 37 TRQE ON (ft·lbs): 4.000 HW.D.P. ANN VELOCITY (mpm): 105BHA WT(k-lbs) : 42 SLK OFF WT(k·lbS) : 24 TReE OFF (ft·lbS): 2.000 D.P. ANN VELOCITY (mpm) : 105

BHA DESCRIPTION: TOOL DESCRIPTION HRS SERIAL # COMMENT26"Bit - 36" H.O, - Bit sub eM float v/v· xlover·

26" bit 9.8 B09CH RR from Yolla 2 w/3.8hrs~"Anderdrift- 9x8"DC - 'tJover - 9 xHWDP.

36" hole opener 9.8 1014 Used from Yolla 2 WI 3.Shrs8" Anderdrift Tool 142,6 ADB814 Used from Yolla 2 wI 136.6hrs

BHA#2 Length (tt) :133.0 D.C. (1) ANN. VELOCITY (mpm): 44HRS ON JARS : STRING WT(k·lbs) : 42 TRQE MAX (ft·lbs): 10,000 D.C, (2) ANN VELOCITY (mpm): 0WT BLW JAR(k·lbs): 36 PICK UP WT(k·lbs) ; 38 TReE ON (ft·lbs): 4,000 HW.D.P. ANN VELOCllY (mpm): 41BHA WT(k·lbs) : 42 SLK OFF WT(k-lbs) : 42 TRQE OFF (ft-Ibs): 2,000 D.P. ANN VELOCITY (mpm) : 41

BHA DESCRIPTION: TOOL DESCRIPTION HRS SERIAL # COMMENT26"Bit· NB Stab eJw float vlv • S"Anderdrift • 8"

26" Bit 10.0 B09CH RR from Yolla 2 w/3.8hrsPony NMDC - 17 1/2" Stab eM Totco Ring. s"8" Anderdrift Tool 0.3 ADB814 New flask 3/6/98NMDC ·17 112" Stab - 6xB"DC· jars· 3xS" DC·8"jar 0.8 210 New jarxlo .1xHWDF' - dart sub - 8 x HWDP.

BHA#3 Length (ftl :198.4 D.C. (1) ANN. VELOCITY (mpm); 121HRS ON JARS : STRING WT(k·lbs) : 57 TRQE MAX (ft·lbs): 5 D.C. (2) ANN VELOCITY (mpm): 0\NT BLW JAR(k·lbs): 36 PICK UP WT(k·lbs) : 52 TReE ON (ft-Ibs): 3 HW.D.P. ANN VELOCITY (mpm): 105BHA WT(k-lbs) : 57 SLK OFF WT'(k-lbs) : 57 TRQE OFF (ft-Ibs): 2 C.P. ANN VELOCITY (mpm) : 105

6HA DESCRIPTION: TOOL DESCRIPTION HRS SERIAL # COMMENT17 1/2""Bit - NB Stab eM float vtv • 8"Anderclrift -

171/2" bit 3.8 '(11C Center jet8" Pony NMDC - 17 1/2" Stab cIw Tetco Ring - 8"Anderclrlft tool 4.5 ADB814 New flask 3/6198NMDC -17 1/2" Stab· 6xS"DC - jars - 3x8" DC - Jars 102.0 2S51 Used on Yolla 2, wi 99.2hrs'1/0· 1xHWD~ - dart sub· 8 x HWDP,

BHA#3 Length (ft) :198.4 D.C. (1) ANN. VELOCITY (mpm): 121HRSONJARS: STRING WT'(k-lbs) : 57 TRQE MAX (ft-lbs):

~ ID.C. (2) ANN VELOCITY (mpm): 0

wr BLW JAR(k-lbs): 36 PICK UP Wi(k-Ibs) : 52 TRQE ON (ft·lbs): HW.D.p. ANN VELOCITY (mpm): 105BHA \NT(k-lbs) : 57 SLK OFF WT(k·lbs) : 57 TReE OFF (ft.lbs): 0.1'. ANN VELOCITY (mpm) : 105

BHA DESCRIPTION: TOOL DESCRIPTION HRS SERIAL # COMMENT17 112''''6It - NB Stab cIw float vlv - 8"Anderdrift-

171/2" bit 3.8 Y11C Center jet8" F'ony NMOC -17112" Stab c:lwTotco Ring - 8"Andertlrift tool 4.5 AOBS14 New flask 3/6198NMDC - 17 112" Stab· 6x8"CC • jars - 3x8" DC -Jars 102,0 2851 Used on Yolla 2, w/99.2hrsxlo· 1xHWDP - dart sub· 8 x HWDF',

Anchor Tension A1 : 65.0 A2: 50.0 A3: 75.0 A4: 75.0 AS: 75.0

(kips) AS: 95.0 A7: 75.0 AS: 80.0 A9; A10 :

Workboats Location. Fuel Barile Olwtr plwtr Cmt Bent Heli Weather & Rig data @ 24:00 hI'S(kltr) (sx) (bbl) (bb!) (sx) (sx) (kltr) VDL (kips: 676.0

~. Commander Geelon WIND SP, (kts): 15.0 VISIB.(nm) : 8 RIS.TENS:Brute Tide rig 193 2,352 402 WINO OIR (deg): 25 CEILING (m) :2,000 HEAVe; (m): 1.5

PRES,(mbars): 1021 WAVES (m): 1.3 ROLL (deg): 2.0AIR TEMP (C); 14.5 SWELL (m): .3 PITCH (089) : 1.0

[COMMENTS: "Brute Tide" at rig, "Commander" at Geelong. 7 PAX on rig; 1 PAX off rig. [

Copyright IDS Ply Ltd, RbtofB report Mar 16th 1998,1 Page Number: 3

Page 116: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

04/05/1998 09:41 0352722058 PREMIER OIL GEELONG PAGE 05/05

PremierOil AustralasiaReport Date: 03.06.98

DAILY DRILLING REPORT # 5

White Ibis 1

Anchor Tension A1 : A2. ; A3: A4: AS:

(kips) A6: A7: A8: A9: A10:

Workboats Location. Fuel Barite Dlwtr Plwtr Cmt Bent Heli Weather & Rig data @ 24:00 hrs(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltr) VDL (kips:

WIND SP. (kts) ; VISIB.(nm) : RIS.TENS:WIND DIR (deg) : CEILING (m) : HEAVE (m):PRES.(mba~): WAVES (m): ROLL. (deg) ;AIR TEMP (C) : SWELL (m): PITCH (deg) ;

FOMMENTS; IBulk Stocks Used lin Stock Used lin Stock Used lin Stock Used lin StockDRILL WATER (bbl) :817 1,208 FUEL (bbl) : 10 1,175 GEL (sx): 121 641 HELI·FUEL. (kltr) ; 0.0 9.4POT WATER (bbl): 0 1,541 BARITE (sx) : 287 5.732 CEMENT (sx) : 1,293 3.635

""ills, Permits & Inspection.:DRILL TYPE DATE INS~ECTIONS DATE SAFETY DETAILS

TRIP DRILL 13/5 BOP TEST 30/5 LTI 25/4FIRE 31/5 NEXT TEST DUE DATE 14/6 MTI 2/6PIT DRILL 13/5 RIG INSPECTION 17/4 JSA ongoingINCIDENT 1/6 DAYS SINCE LTA 37 #~TW ongoing

Safety Meeting 31/5

Casinq Pump DataCSG LOT ~HASE CsGsHOE CsGSHOE PumD Data. Iilst 24 hrs Slow Pump Data00(") MD TVO(mBRT) # TY~E LNR SPM EFF Flow SPP S~M S~~ DEPTH MW

30" 131 131 (") (%) (gpm (psi) (psi) (m RT) (ppg)

LNGTH CSG WT1 National 7.00 103 97 1200 2660

lYPE GRD THREAD 2 National 7.00 103 97(m) 10 (") lbslft

Shoejt 12.4 28.0 310.0 X·52 ST2 Pe~onnel : on Site =86Intermediate jt 11.7 28.0 310.0 X·52 ST2Intermediate jt 11.7 28.0 310.0 X·52 ST2 JOB TITLE NAME COM~ANYNAME #Intermediate jt 11.7 28,0 ~10.0 X-52 sT2 Orlg Supervisor C. Stirrett Premier 2Housing jt 11.8 2a.o 310,0 X-52 ST2 N. Drlg Supervisor K. Dubravac Northern 69

Dowell Cement 2Asiatic ROV 4Dowell Mud 1

Northern Explorer P Ruddleslon & Cox Vetco 1Smedvig Safety 1Geoservice 2PCS 2Anadrill 1Quest 1

Survey MD lYD INCL AZ. CORR, '\! DOGLEG N/S Em TOOL TYPE

Last Tool Type: Anderdrift (m RT) (m RT) DEG (deg) ;.z SECT (m/30m) (m) (m)(deg) (m)

Magnetic Declination: 0.00 125 125 2.00 Totco

Survey method : Min Curvature 128 126 1.50 Anderdrifl182 182 1.00 Anderdrifl193 193 1.00 Anderdrifi198 198 1.50 Anderdrifl221 221 1.50 Anderdrift250 250 0.50 Anderdrtft279 279 1.00 Anderdrift

Copyright IDS Pty Ltd, RbtofB report Mar 16th 1998.1 Page Number; 4

Page 117: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

03/06/1998 09:31 0352722058 PREMIER OIL GEELONG PAGE 01/04 &Premier 011 AuslralasiaGeelong Operations BasePhone: 0352722101Fax:03527220S8

Fax

Premier OilAustralasia

To:

Fax:

Phone:

Re:

Victoria Minerals & Petroleum Ops, Attn: Ahmed Nadji

Mineral Resources Tasmania, Attn: Carol Bacon

White Ibis Daily Drilling Reports

Frvm: Gordon Hunter

Date: June 3, 1998

Pages: 4 inc. this one

D Urgent

-Comments:

o For Review 0 Please Comment 0 Please Reply o Please Recycle

Please find attached the Daily Drilling report for 2nd June 1998.

Regards

Gordon Hunter

Drilling Superintendent

Page 118: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

03/05/1998 09:31 0352722058 PREMIER OIL GEELONG PAGE 02/04

PremierOil AustralasiaReport Date: 02.06.98

DAILY DRILLING REPORT # 4

White Ibis 1

Well DataCOUNTRY Australia T.O. (m Rl): 132.0 CUR. HOL.E SIZE ("): 36.00 DAIL.Y COST $ : $318,074FIEL.D Bass Basin PROGRESS (m): 17.0 CSG 00 ("); 30.00 CUM COST $ : $889,514DRILL CO. ; Northern Offshore DAYS FROM SPUD: 2.00 SHOE lVD (m Rl): 131 AFE COST $ : $7.321.212RIG: Northern Explorer III DAYS +(- CURVE: LEAK·OFF EMW(ppg) 0.00 AFE BASIS: P&A

MUDCO: DowellRT ABOVE MSL (m) ; 12.5 CURRENT OP @ 0600; POOH wI running string & CART.

WATER OEPTH @MSL(m): 0.0 PLANNED OP.: MU 17 112" BHA. wI 26" bit. RJH and drill 30" csg shoe. POOH. RIH wI 17

RT TO SEABED (m) : 12.5 112" assy. Drill,

Summary of period 00:00 to 24:00 hrs: Formation Tops· This report only

Drilled to 132m. Displaced hole to HiVis. POOH to s/bed. W.O. ROV. RIH. I FORMATION ITOP(mBRT)IDisplace hole to HiVis. POOH. RU to run 30". Run & land 30" csg. Circ.PlTest cmt lines. Cement 30" casing.

ACTIVITY FOR PERIOD 00'00 HRS TO 24'00 HRS ON 02 06 98, . .I FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 00:30 .50 115 Made Totco survey at 107m· misrun, with one point at 0.5deg and the secondshowing 2.5deg.

00:30 01:30 1.00 132 Drilled 26"/36" hole from 115 • 132m, w/3-5klbs WOB, 90rpm, 1200gpm,1250psi, & 3-4k ft-Ibs torque, pumping 50bbl HiVis sweeps every single.

01:30 02:00 .50 132 Circulated hole clean with seawater. Pumped 100bbl HiVis sweep & circ holeclean.

02:00 02:30 .50 132 Made Totco survey at 124m - misrun, with one point at 1.75deg and the secondat 4.5deg. Re-checked instrument wI "doghouse" survey - both puncturescalibrated okay. Suspect string movement in washed-out hole.

02:30 03:00 .50 132 Displaced hole to +/. 300bbls (open hole + 20% excess) HiVis mud.03:00 03:15 .25 132 POOH from 132· 79m (5m below seabed).03:15 08:45 5.50 132 Wait 5m below seabed for hole to stabilize while awaiting ROV repairs. MU

cementing side entry sub, LoTorq vlv, & kelly cock to single of DP, and rackback. ROV completed/confirmed surface checks - ROV operational.

08:45 09:15 .50 132 RIH from 5m below s/bed w/out resistance - tagged 1m fill @131m. (ROV inwater). Washed fill from 131·132m, observed Anderdrift survey tool startedworking/pulsing - took survey @ 124m, 2.5deg.

09:15 09:45 .50 132 Pulled back & took Anderdrift surveys @113m, O.Odeg & 103m, 1.0deg. (ROV inposition @ s/bed.

09:45 10:00 .25 132 RIH to 132m without resistance. Attempt to take repeat Anderdrift survey-unable to obtain pulse after several attempts.

10:00 11:30 1.50 132 Displaced hole with +/·300bbls hi-vis gel mud (difficulty at first establishingsuction). Dropped Totco survey barrel.

11:30 12:45 1.25 132 POOH (recovered Totco survey ~ 125m, 2deg & 3deg). Rack back BHA including26" bit & 36" H/O.

12:45 13:00 .25 132 Held Safety Meeting prior to running 30" Conductor.13:00 13:15 .25 132 Moved PGB on cart over in maonpool & under RT.13:15 14:00 .75 132 RU slings on PGB. PU PGB from maonpool cart & installed guideposts &

guidewires.14:00 14:15 .25 132 RU to run 30"conductor.14:15 17:00 2.75 132 Commenced running 30"Conductor :. PU ST2 shoe jt, filled with s/water &

observed float draining. PU & MU 3 x $T2 Intermediate jts & ST2 30"Housing jt,filling with s/water with welder cutting off padeyes.

17:00 18:45 1.75 132 Installed "C"plate on 30"housing & ran 1 std DP stinger into conductor. MU30"CART clw single of DP stinger below, to the DP std stinger & the 30"Housing.Welder cut off padeyes on housing jt.

18:45 19:00 .25 132 Lowered 30"Cond & latched housing into PGB at moonpool.(Cond. wt =71 Kexcluding blocks). PU PGB & seperated moonpool cart. Lowered PG8 &Housing below slievel. Pumped s/water & filled condo Closed CART bleed·offvIvo

19:00 19:30 .50 132 Lowered 30"Cond until shoe level w/ s/bed (ROV observed/confirmed - vis.verypoor). Corrected measured RT-slbed depth to 73.3m tide corrected, frompreviously reported depth (tagged blind) of 74.2m. Broke out TDS from string.

Copyright IDS Ply Ltd. RblOfB report Mar 16th 1998.1 Page Number: 1

Page 119: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

03/05/1998 09:31 0352722058 PREMIER OIL GEELONG PAGE 03/04

PremierOiI AustralasiaReport Date: 02.06.98

DAILY DRILLING REPORT # 4

White Ibis 1

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

19:30 20:00 .50 132 RIH from s/bed to 116m (16m off bottom); string stood up on fill.20:00 20:45 .75 132 MU TDS, & washed from 116 - 130m. wi 450gpm, 200psi, & 0 • 20klbs

resistance. Waited for visibility to clear & ROV to monitor landing of casing.20:45 21:30 .75 132 MU single wi side entry sub to top of landing string, while allowing visibility to

clear (ROV vis continues to be very poor).21:30 21:45 .25 132 Lower 30" to setting depth-shoe @130.6m. compensating 10klbs resistance.

Confirm wi ROV PGB 2m above s/bed{& est. 3.5m stickup above 36" hole/craterbase). Observed bullseye: O.S - 0.75deg; some casing/bullseye movementvisible.

21:45 22:30 .75 132 MU LoTorq v/v &cementing hose to side entry SUb. R/U to circulate casing andannulus clean with s/water.

22:30 23:30 1.00 132 Circulate 30" casing & annulus clean with seawater at 450gpm, 250psi. ROVunable to monitor for clean returns due to poor visibility.

23:30 24:00 .50 132 Pressure test cement lines to 3000psi.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 03.06.98

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 01:00 1.00 132 Finished testing cement lines. Opened LoTorq vlv to Dowell unit. Pumped 70bblss/water with Dowell at 6.6bpm, 250psi. Filled displacement tanks wi CaCI2mixwater. Lined up on cement silos to ship cement.

01:00 02:30 1.50 132 Attempted to ship cement to surge tank from silos, but only low volume ofcement passing to surge tank - both compressors & rig air being utilized. Broke& cleaned lines to allow cement shipping to surge tank. No blockage found.

02:30 03:00 .50 132 Mixed and pumped total of 104bbls 15.8ppg Class G cement, with 1.5% BWOCCaCI2 mixwater. Shut down cement mixing/pumping when further blockageoccurred. restricting flow of cement to surge tank.

03:00 03:30 .50 132 Broke out lines from silos to surge tank in attempt to clear cmt blockage.Discovered vent line from surge tank blocked wI hard cmt. preventing filling ofsurge tank. Cleared line.

03:30 04:00 .50 132 Recommenced mixing and pumping cmt • total of 282bbls 15.8ppg Class Gcement. with 1.5% 8WOC CaCI2 mixwater. Cement returns to s/bed observedby ROV after +1- 245bbls pumped.

04:00 04:15 .25 132 Displaced cement with 50bbls seawater from cement unit (theoretically leave3bbls cement inside 30" conductor).

04:15 04:30 .25 132 Bled off pressure @ Dowell unit - float okay. Broke off cementing hose andchecked for back flow - negative. zero back flow.

04:30 04:45 .25 132 Backed off 30" CART from 30" housing, with 2114 RH turns (observed withROV). Observed slope indicator @ 1/2deg Port.

04:45 06:00 1.25 132 UO kelly cock, Lo-Torq vlv, and side entry sub. POOH wi running string andCART.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 02.06.98

REMARK I OBSERVATION SOLUTION I RECOMMENDATION

80MT discrepancy noted between volume of drillwater Supply boats should ensure that their tanks are soundedtransferred to Explorer from "Commander". Actual usage more accurately before and after transfers.for day was 170MT not 250MT. Remaining 80MT shOUldstill be onboard the "Commander",

Mud Properties MUD COST FOR TODAY: $9,406 CUMULATIVE MUD COST TO DATE: $18,813

Type: VISCOSITY( see I Qt ): 150 API FLUID LOSS C/· (ppm) ; 1,400 SOLIDS (%voJ) :PV (cps): 38 (cm3J30min) 0 K+ (ppm): 0 H20 (%vol): 0.0Gel API FILTER CAKE

FROM: Pit YP (lb/100sq.ft): 94 (32nds inch 0 HARD/Cs (ppm) : 20 OIL (%vol); 0

TIME: 151:00 GEL 1Os!1 Om130m HTHP FLUID LOSS MBT (ppb eq) : 0,0 SAND:

WEIGHT (ppg): 1.05 (IbnOOsqft) ; 57 65 0 (cm3130min) 0 PM; 0.0 PH: 10.0

FANN 3161100 57 60 0 HTHP FILTER CAKE PF; .9 PHPA: 0.0TEMP (e): 0 (32nds inch) 0

Copyright IDS pty Ltd. RbtofB report Mar 16th 15198.1 Page Number: 2

Page 120: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

03/05/1998 09:31 0352722058 PREMIER OIL GEELONG PAGE 04/04

PremierOil AustralasiaReport Date: 02.06.98

DAILY DRILLING REPORT # 4

White Ibis 1

Bit Data for Bit # 1RR lADe f# , 1 1 WearI II 01 '~E8EEffi~~, II , I NO A , I NO TO

SIZE ("): 26.00 NOZZLES Drilled over the last 24 hI'S Calculated over the bit nmMANUFACTURER: HU AVE WOB (k-Ibs) : 4 3X22lYPE: CR-' AVE RPM : 80

METERAGE (m) : 58 CUM.METERAGE (m) 99'1 X20 ON BOTTOM HRS : 3.3 CUM. ON BOT. HRS ; 5.6

SERIAL#: BOSCH FI.OW (gpm): 1,200 X IADC DRILL. HRS : 5,0 CUM.IADC DRILL HRS: 9.5DEPTH IN (m Rn ; 74 PUMP PRESS. (psi): '.250 x TOTAL REVS : 15,840 CUM.TOT. REVS: 26.640DEPTH OUT (m RT) ; 132 HSI (hp/sqi) : 0 X ROP (m/hr): 11.6 ROP (mlhr): 10.4

BHA#1 Length (ft) ;132.0 D.C. (1) ANN. VELOCllY (mpm): 24HRS ON JARS ; STRING WT(k-lbs) : 110 TRQE MAX (ft·lbs): 10,000 D.C. (2) ANN VELOCITY (mpm): 0wr BL.W JAR(k-lbs): PICK UP WT(k-lbs) : 105 TRQE ON (ft-Ibs): 4,000 H'w.D.P. ANN VELOCllY (mpm); 23BHA WT(k-lbs) : 110 SLK OFF W1"(k-lbs} : 110 TRQE OFF (ft-Ibs): 2.000 D.P. ANN VELOCITY (mpm) : 23

BHA OESCRIPTION : TOOL DESCRIPTION HRS SERIAL # COMMENT26"Bit· 36"H/O· Bit Sub cIw float 'Vlv - xJo·

26" Bit 9.8 B09CH RR from Yolla 2 w/3.8hrs8"Anderdrift· Totco Ring - 9x8"OC - xJo - HWDP.36" Hole Opener 9.8 1014 Used on Voila 2 with 3.Shrs

I8" Anderdrift Tool 142.6 ADB814 Used on Voila 2 with 136.6hrs

Anchor Tension A1 : 75.0 A2; 55.0 A3: 65.0 A4: 80.0 A5: 85.0

(kips) A6: 100.0 A7: 80.0 A8: 80.0 A9: A10 :

Workboats Location. Fuel Barite Olwtr Plwtr Cmt Bent Heli Weather & Rig data @ 24:00 hrs(kltr) (sx) (bbl) (bbl) (sx) (sx) (kltr) VDL (kips: 466.0

P. Commander Geelon WINO SF'. (Ids) : 17.0 VISIB.(nm) : 10 RIS.TENS:Brute Tide rig 209 2.352 453 WINO OIR (deg); 60 CEILING (m) : 3,000 HEAVE (m); 1,5

PRES.(mbars); 1023 WAVES (m): 1.7 ROLL (deg) : 2,0AIR TEMP (C): 12.0 SWELL (m): 250.0 PITCH (d8g): '.5

ICOMMENTS: "Brute Tide" at rig, "Commander" at G8810ng. 2 PAX on rig; 9 PAX off rig. I

Bulk Stocks Used lin Stock Used lin Stock Used lin Stock Used lin StockDRILL WATER (bbl) : 1,069 2.025 FUEL (bbl): 10 1.185 GEL (sx): 48 762 HEll-FUEL (kltr) ; 0.0 9.4

POT WATER (bbl) : 0 1,421 BARITE (sx) : 154 6.019 CEMENT (sx) : 0 4.928

Drills, Permits & Inspection~

DRILL TYPE DATE INSPECTIONS DATE SAFETY DETAILS

TRIP DRILL 13/5 BOP TEST 30/5 LTI 25/4FIRE 31/5 NEXT TEST DUE DATE 14/6 MTI 12/5PIT DRILL 13/5 RIG INSPECTION 17/4 JSA ongoingINC10E:NT 1/6 DAYS SINCE LTA 35 #PTW ongoing

Safety Meeting 31/5

Casina Pump DataeSG LOT PHASE CSGSHOE CSGSHOE PumD Data· last 24 hI'S Slow PumD Data00(") MD TVD (m8RT) # TYPE LNR SPM EFF Flow SPP SPM SPP DEPTH MW

30 .. 131 131 (") (%) (gpm (psi) (psi) em RT) (ppg)

12501 National 7.00 103 97 1200TYPE LNGTH CSG WT GRO THREAD 2 National 7.00 103 97

(m) 10 (") IbsJft

Shoal! 12.4 28.0 310.0 X-52 ST2 Personnel: on Site = 80Intermediate Jt 11.7 28.0 310.0 X·52 ST2Intermadlate jt 11.7 28.0 310.0 X·52 ST2 JOB TITLE NAME COMPANY NAME #Intermediate jt 11.7 28.0 310.0 X-52 ST2 Drlg Supetvisor C. Stirrett Premier 3Housingjt 11.8 28.0 310,0 X·52 ST2 N. Drlg Supervisor K.Oubravac Northem 69

Dowell Schlum Cement 2AsiaticROV 4Dowell Schlum Mud 1

Northern Explorer P Ruddleston & Cox Velco 1

Copyright IDS Ply Ltd. RbtofB report Mar 16th 1998.1 Page Number: 3

Page 121: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

02/0~/1998 09:20 0352722058 PREMIER OIL GEELONG PAGE 01/04 Q.Premier Oil AuSlralasiaGeelong Operations BasePhone: 0352722101Fax: 0352722058

Premier OilAustralasia

FaxTo: Vidoria Minerals & Petroleum Ops, Attn: Ahmed Nadji From: Gordon Hunter

Mineral Resources Tasmania, Attn: Carol Bacon

Fax: Date: June 2, 1998

Phone: Pages: 4 inc. this one

cc:Wlite Ibis Daily Drilling ReportsKe:----::....:..:..::.:=-=.=...::.::~::.:.::.::~:2.=.:.::_- __:._.- _

D Urgent o For Review 0 Plea58 Comment D Please Reply o Please R~le

·Comments:

Please find attached the Daily Drilling report for 1st June 1998.

Regards

Gordon Hunter

Drilling Superintendent

..

j

Lo_.~ -

Page 122: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

02/05/1998 09:20 0352722058 PREMIER OIL GEELONG PAGE 02/04

PremierOil AustralasiaReport Date: 01.06.98

CAlLY DRILLING REPORT # 3

White Ibis 1

Well DataCOUNTRY Australia T,O. (m RT): 115.0 CUR. HOl.E SIZE ("): 36.00 DAILY COST $ : $188.863FIELD Bass Basin PROGRESS (m): 115.0 CSG OD (M): 0.00 CUM COST $: $571.440DRILL eo. : Northern Offshore DAYS FROM SPUD: 1.00 SHOE; lYD (m RT); 0 AFE COST $ : $7.321.212RIG: Northern Explorer III DAYS +/. CUR.VE: LEAK-OFF EMW(ppg) 0.00 AFE BASIS: P&AMUOCO; Dowell

RT ABOVE MSL (m) : 12.5 CURRENT OP @ 0600: Rest Hole, wail on R.OV repairs.

WATER DEPTH @MSl. (m) ; 0.0 PLANNED OP.: Run & cement 30" Conductor.

RT TO SEABEO (m) : 12.5

Summary of period 00:00 to 24:00 hrs: Formation Tops· This report only

Ran anchors - tension test anchors - spud well. I FORMATION ITOP(mBR~1Torquay

ACTIVITY FOR PERIOD 00·00 HRS TO 24-00 HRS ON 01 06 98. . .FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 12:30 12.50 o Continue running anchors wi "Commander" & "Brute Tide". # 3 on bottom @0136hrs. #4 @0503hrs,#1 @0539hrs, #5 @ 1126hrs, #8 @ 1230hrs. (MU30"CART & stood back in derrick. Pumped through & tested Anderdrift Tool).

12:30 16:30 4.00 o Commenced test tensioning anchors· all anchors tensioned and holding at200kips except #8 slipping. (Ran 26" bit/36" hole opener BHA to +1- 5m aboveseabed). "Commander" alongside for backload, gel, water.

16:30 18:30 2.00 o Move/positon rig over wellsite as per proposed coordinates (prepare to jumpROV). Completed test tension #8 anchor to 200kips. Slack-off anchors toworking tensions, adjusted rig heading to 270deg & fine tuned final rig postion.

18:30 18:45 .25 o Made final adjustments on anchor tensions. (ROV Supvr. reported fault on ROVfound during final surface checks· intermittent failure of vehicle telemetry controlpod [surface command & response]. ROV Supvr. troubleshooting).

18:45 19:00 .25 o ROV Supvr. trOUbleshooting control/command problem with ROV. (Contbackloading "Commander" & laying out 30" Conductor).

19:00 19:30 .50 74 Tagged s/bed blind wlout ROV observation @ 74.2mBRT corrected for MeanTide. Attempted several times to take Anderdrift survey· no success, no pulseobtained, suspected due to pipe/sea movement.

19:30 20:00 .50 87 Spudded well. Drilled 26"/36"hole from slbed at 74.2m to 87m with 0-5K WOB,70rpm, 500gpm with s/water, 340psi. torque 2-10K ft-Ibs. Attempt to takeAnderdrift survey - no success, only 1 pulse obtained, tool not functioningcorrectly.

20:00 20:30 .50 90 Drilled 26"/36"hole from 87 - 90m with 3-4K WOB, 70-100rpm, 600-1000gpm, 2-3K ft-Ibs torque. Pumped 120bbl hi-vis sweep. Attempt Anderdrift survey severaltimes - no success, unable to obtain pulse from tool.

20:30 21:30 1.00 90 Cire &work pipe While RU to drop & fish Totco survey barrel due to Anderdrifttool not functioning. (Still troubleshc}oting problem with ROV - traced to circuitboard).

21:30 21:45 .25 97 Drilled 26"/36" hole from 90· 97m, with O·10klbs WOB. 70rpm, 800gpm. & 2-4kft·lbs torque. Attempted several Anderdrift surveys, w/o success. Pumped100bbls HiVis sweep due to indications of pipe sticking.

21:45 22:00 .25 97 Circ hole clean wi s/water. Pump 50bbls HiVis sweep, & circ clean. Racalconfirmed final position (faxed to Premier): 39deg 57' 49.607" S, 145deg 15' 17.234" E, heading 272.6deg (T). Vector from intended to actual1.15m @ 278.7deg(T).

22:00 22;45 .75 97 Broke top single from TDS and dropped survey instrument. MU single to TDS &worked pipe while awaiting survey timer. Survey @ 87m misrun, only one surveypoint apparent on disk, @ 1.25deg inclination.

22:45 23:45 1.00 115 Drilled 26"/36" hole from 97 - 115m, w/ 3-4klbs WOB. 90rpm. 1200gpm,1250psi. & 3-4k ft-Ibs torque, pumping 50bbl HiVis sweeps every single.

23:45 24:00 .25 115 Circulated hole clean with seawater. Pumped 50bbl HiVis sweep to cleanannulus before taking Totco survey.

ACTIVITY FOR PERIOD 00:00 HRS TO 06:00 HRS ON 02.06.98

Copyright IDS Pty Ltd. RbtofB report Mar 16th 1998.1 Page Number: 1

Page 123: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

02/05/1998 09:20 0352722058 PREMIER OIL GEELONG PAGE 03/04

PremierOil AustralasiaReport Date: 01.06.98

DAILY DRILLING REPORT # 3

White Ibis 1

FROM TO HRS DEPTH ACTIVITY DESCRIPTION

00:00 00:30 .50 115 Made Totco survey at 107m - misrun, with one point at O.5deg and the secondshowing 2.5deg.

00:30 01:30 1.00 132 Drilled 26"/36" hole from 115· 132m, w/3-5klbs WOB, 90rpm. 1200gpm,1250psi. & 3-4k ft-Ibs torque, pumping 50bbl HiVis sweeps every single.

01:30 02:00 .50 132 Circulated hole clean with seawater. Pumped 100bbl HiVis sweep & circ holeclean.

02:00 02:30 .50 132 Made Totco survey at 124m - misrlJn, with one point at 1.75deg and the secondat 4.5deg. Re-checked instrument wi "doghouse" survey· both puncturescalibrated okay. Suspect string movement in washed-out hole.

02:30 03:00 .50 132 Displaced hole to +1- 300bbls (open hole + 20% excess) HiVis mud.03:00 03:15 .25 132 POOH from 132 -79m (5m below seabed).03:15 06:00 2.75 132 Wait 5m below seabed for hole to stabilize while awaiting ROV repairs. MU

cementing side entry SUb, LoTorq vlv, & kelly cock to single of DP, and rackback.

ANNOTATIONS FOR PERIOD 00:00 HRS TO 24:00 HRS ON 01.06.98

REMARK 1OBSERVATION

Unable to jump ROV due to lack of response to surfacecommands. ROV unit had been tested daily -all okay- butintermittent fault developed as it was prepared to jumpimmediately prior to spUdding. Troubleshooting revealedthat the problem may lie in the control wires in thetelemetry system between the unit's computer and that inthe control cabin.The Anderdrift tool was checked and pulses recordedwhile MU the BHA, before spudding. Upon drilling the 1stsingle into the seabed, a survey was attempted and onlyone pulse (Sdeg) was recorded. When the survey wasrepeated, no pulses were observed. Subsequentattempts at surveys .were also unsuccessful, as no pulseswere observed.

SOLUTION 1RECOMMENDATION

After discussion with town, it was decided to spud "blind"as weather conditions were good and the BHA in themoonpool was hanging vertically. ROV repairs would beeffected before the interval was drilled and the BHAready to be pulled above the seabed.

The internal flask may have been damaged or pluggedwith debris while spudding. The backup tool will need tomade up into the string in order to break out the sub anddress the tool with a new flask.

Mud Properties MUC COST FOR TODAY: 59,406 CUMULATIVE MUC COST TO DATE: $9,406

Type: VISCOSITY( sec I qt ): 150 API FLUID LOSS CI-(ppm) : 1,400 SOLIDS (%vol) :pv (cps): 38 (cm3130min) 0 K+ (ppm): 0 H20 (%vol): 0.0Gel API FILTER CAKE

. FROM: Pit YP (lb/100sq.ft): 94 (32nds inch 0 HARD/Ca (ppm) : 20 OIL (%vol): 0

TIME: 19:00 GEL 10sl10ml30m HTHP FLUID LOSS MBT (ppb eq) : 0.0 SAND:

WEIGHT (PP9): 1.05 (lb/100sqft) : 57 65 0 (cm3130min) 0 PM: 0,0 PH: 10.0

TeMP (C): 0 FANN 316/100 57 60 0 HTHP FILTER CAKE PF: .9 PHPA: 0.0(32nds Inch) 0

Bit Data for Bit # 1RR

SIZE {'" : 26.00MANUFACTURER: HU

TYpe; CR·1

SERIAL # : B09CHDEPTH IN (m RT) : 74

DEPTH OUT (m RT) :

IADC# 1 1

AVE WOB (k-Ibs) :AVERPM;

FLOW (9pm):PUMP PRESS. (psi):HSI (hp/sqi) ;

480

1.2001,250

o

Wear

NOZZLES3X221 x20

xX

x

I /I 01 II D " L ID::]C[JI 02 II R III " II Ic::::Jt=:J I II I

Drilled over the last 24 hrs CalclJlated over the bit runMETERAGE (m) : 41 CUM.METERAGE (m) 41ON BOnOM HRS : 2.3 CUM. ON BOT. HRS : 2.3lADe DRILL. HRS : 4.5 CUM.lAOC DRILL HRS: 4.5TOTAL REVS: 10.800 CUM.TOT. REVS: 10.800ROP (m/hr): 9.1 ROP (m/hr): 9.1

BHA # 1 Length (ttl :132.0HRS ON JARS: ISTRING WT(k-lbS) :"NT BLW JAR(k·lbs); PICK UP WT(k·lbs) :BHA WT(k-lbs) : '10 SLK OFF WT(k-lbs) :

110 ITRQE MAX (ft·lbs):105 TROE ON (fl·lbsJ;110 TROE OFF (fl·lbs):

D.C. (1) ANN. VELOCITY (mpm): 2410,000 I D.C. (2) ANN VELOCITY (mpm): 04,000 H.W.D.P. ANN VELOCITY (mpm): 232.000 D.P. ANN VELOCITY (mpm) : 23

BHA DESCRIPTION:2S"Bit - 36"H/O • Bit SUb eJw float vN • xlo •8"Anderdrift • Toteo Ring· 9x8"DC • xlo - HWDP.

Copyright IDS Ply Ltd. RblOfB report Mar 16th 1998.1

TOOL DESCRIPTION

26" Bit36" Hole Opener8" Anderdrift Tool

HRS SERIAL 'If. COMMENT

8.3 B09CH RR bit used on Yolla 2 with 3.8h~

8.3 1014 Used on Yolla 2 with 3.8hrs141.1 ADB814 Used on Yolla 2 with 13S.6hrs

Page Number: 2

Page 124: Premier Oil Base PremierOil Australasia · 2018-05-10 · 998 11:54 0352722058 PREMIER OIL GEELONG PAGE 01/03 Premier Oil Australasia Geelong Operations Base Phone: 035Z722101 fax:

01/06/1998 09:10 0352722058 PREMIER OIL GEELONG PAGE 03/03

PremierOil AustralasiaReport Date: 31.05.98

DAILY DRILLING REPORT # 2

White Ibis 1

Bulk Stocks Used I In Stock Used III' Stock Used lin Stock Used I In StockDRILL WATER (bbl):O 2,095 FUeL. (bbl) : 8 1.200 GEL (5X): 0 475 HELI·FUEL (kltr) : 0.0 9.6POT WATER (bbl): 87 1,076 BARITE (5X): 0 6.173 CEMENT (5:r) : 0 4.928

Drills, Pennits & Inspection~

DRILL TYPE DATE INSPECTIONS DATE SAFETY DETAILS

TRIP DRILL 13/5 80PTEST 30/5 LTI 2514FIRE 31/5 NEXT TeST DUE DATE 1416 MTI 1215PIT DRILL 13/5 RIG INSPECTION 17/4 JSA ongOIngINCIDENT 30/5 DAYS SINCE LTA 34 #PTW ongoing

Safe!:)' Meeting 31/5

Casina Pump DataCSG I LOT IPHASEICSG SHOE ICSG SHoe I PumD Data • last 24 hl"$ Slow PumD Data00(") MD iVO (mBRT) # TYPE LNR SPM EFF Flow SPP SPM SPP DEPTH MW

n (%) (9pm (psi) (psi) (mRn (ppg)

1 National 7.00 97I r TYF'E ILNGTH ICS~Iwr:IGRD ITHREAD 2 National 7.00 97( m ) 10 (") Ibslfl

Personnel: on Site =87

JOB TITLE NAME COMPANY NAME #Drlg Supervisor C. Stirrett Premier 4N. Drlg Supervisor K. Dubravac Nonhern 71

Dowell Sehlum Cement 2AsiatieROV 5Dowell Schlum Mud 1

Northern Explorer P Ruddleston & Cox Vetco 1Rig Positioning 3

Survey MD TVO INCL A2 CORR. 'V' DOGLEG N/S EIW TOOL TYPE

Last Tool Type: (m Rl) (m Rl) OEG (deg) A2.. SECT (mI30m) (m) (rn)(deg) (m)

Magnetic Declination: 0.00Survey method : Min Curvature