E St (Mill St to 4 th St) - Pavement Restoration Appendix C 20904 / May 2020 APPENDIX C FOR NORTH SYSTEM TRANSMISSION E STREET PAVEMENT RESTORATION SUB PROJECT NO. 20904 BID NO. 2020 13 FOR SPRINGFIELD UTILITY BOARD Preliminary Traffic Control Plans

Transcript of Preliminary Traffic Control Plans€¦ · eng s. wages. drawing number. revision. temporary traffic...

Page 1: Preliminary Traffic Control Plans€¦ · eng s. wages. drawing number. revision. temporary traffic control plan. pioneer parkway east & e street. utility work ahead right lane closed

E St (Mill St to 4th St) - Pavement Restoration Appendix C

20904 / May 2020

APPENDIX C

FOR

NORTH SYSTEM TRANSMISSION – E STREET

PAVEMENT RESTORATION

SUB PROJECT NO. 20904

BID NO. 2020 – 13

FOR

SPRINGFIELD UTILITY BOARD

Preliminary Traffic Control Plans

Page 2: Preliminary Traffic Control Plans€¦ · eng s. wages. drawing number. revision. temporary traffic control plan. pioneer parkway east & e street. utility work ahead right lane closed

UTILITY

WORK

AHEAD

RIGHT

LANE

CLOSED

AHEAD

BE

PREPARED

TO

STOP

WORK

AREA

UTILITY

WORK

AHEAD

UTILITY

WORK

AHEAD

PIO

NEER PARKW

AY W

EST

PIO

NEER PARKW

AY EAST

D STREET

E STREET

F STREET

C STREET

M

I

L

L

S

T

R

E

E

T

4th STREET

5th STREET

FLAGGER ONLY TO BE USED

INTERMITTENTLY FOR

CONSTRUCTION VEHICLES

STREET

CLOSED

TO THRU

TRAFFIC

B STREET

A STREET

UTILITY

WORK

AHEAD

BE

PREPARED

TO

STOP

WORK

AREA

UTILITY

WORK

AHEAD

UTILITY

WORK

AHEAD

PIO

NEER PARKW

AY W

EST

PIO

NEER PARKW

AY EAST

D STREET

E STREET

F STREET

C STREET

M

I

L

L

S

T

R

E

E

T

4th STREET

5th STREET

FLAGGER ONLY TO BE USED

INTERMITTENTLY FOR

CONSTRUCTION VEHICLES

STREET

CLOSED

TO THRU

TRAFFIC

B STREET

A STREET

LEFT

LANE

CLOSED

AHEAD

AutoCAD SHX Text
DATE 2/27/2020
AutoCAD SHX Text
SCALE NONE
AutoCAD SHX Text
DIST MAP #12C
AutoCAD SHX Text
WATER ENGINEERING DIVISION
AutoCAD SHX Text
SPRINGFIELD UTILITY BOARD
AutoCAD SHX Text
SPRINGFIELD , OREGON
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWN EJN
AutoCAD SHX Text
ENG S. WAGES
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
TEMPORARY TRAFFIC CONTROL PLAN
AutoCAD SHX Text
PIONEER PARKWAY EAST & E STREET
Page 3: Preliminary Traffic Control Plans€¦ · eng s. wages. drawing number. revision. temporary traffic control plan. pioneer parkway east & e street. utility work ahead right lane closed

UTILITY

WORK

AHEAD

RIGHT

LANE

CLOSED

AHEAD

BE

PREPARED

TO

STOP

WORK

AREA

UTILITY

WORK

AHEAD

UTILITY

WORK

AHEAD

PIO

NEER PARKW

AY W

EST

PIO

NEER PARKW

AY EAST

D STREET

E STREET

F STREET

C STREET

M

I

L

L

S

T

R

E

E

T

4th STREET

5th STREET

UTILITY

WORK

AHEAD

BE

PREPARED

TO

STOP

WORK

AREA

UTILITY

WORK

AHEAD

UTILITY

WORK

AHEAD

PIO

NEER PARKW

AY W

EST

PIO

NEER PARKW

AY EAST

D STREET

E STREET

F STREET

C STREET

M

I

L

L

S

T

R

E

E

T

4th STREET

5th STREET

LEFT

LANE

CLOSED

AHEAD

FLAGGER ONLY TO BE USED

INTERMITTENTLY FOR

CONSTRUCTION VEHICLES

FLAGGER ONLY TO BE USED

INTERMITTENTLY FOR

CONSTRUCTION VEHICLES

AutoCAD SHX Text
DATE 2/27/2020
AutoCAD SHX Text
SCALE NONE
AutoCAD SHX Text
DIST MAP #12C
AutoCAD SHX Text
WATER ENGINEERING DIVISION
AutoCAD SHX Text
SPRINGFIELD UTILITY BOARD
AutoCAD SHX Text
SPRINGFIELD , OREGON
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWN EJN
AutoCAD SHX Text
ENG S. WAGES
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
TEMPORARY TRAFFIC CONTROL PLAN
AutoCAD SHX Text
PIONEER PARKWAY WEST & E STREET
Page 4: Preliminary Traffic Control Plans€¦ · eng s. wages. drawing number. revision. temporary traffic control plan. pioneer parkway east & e street. utility work ahead right lane closed

UTILITY

WORK

AHEAD

UTILITY

WORK

AHEAD

UTILITY

WORK

AHEAD

UTILITY

WORK

AHEAD

UTILITY

WORK

AHEAD

WITH ODOT PERMIT

THIS PORTION COVERED

UTILITY

WORK

AHEAD

UTILITY

WORK

AHEAD

UTILITY

WORK

AHEAD

UTILITY

WORK

AHEAD

STREET

CLOSED

TO THRU

TRAFFIC

STREET

CLOSED

TO THRU

TRAFFIC

PIO

NEER PARKW

AY W

EST

PIO

NEER PARKW

AY EAST

M

I

L

L

S

T

R

E

E

T

1ST STREET

4TH

STREET

5TH

STREET

D STREET

C STREET

E STREET

NO

PARKING

AT ANY

TIME

NO

PARKING

AT ANY

TIME

UTILITY

WORK

AHEAD

AutoCAD SHX Text
DATE 5/13/20
AutoCAD SHX Text
SCALE NONE
AutoCAD SHX Text
DIST MAP #12C
AutoCAD SHX Text
WATER ENGINEERING DIVISION
AutoCAD SHX Text
SPRINGFIELD UTILITY BOARD
AutoCAD SHX Text
SPRINGFIELD , OREGON
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWN EJN
AutoCAD SHX Text
ENG
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
TEMPORARY TRAFFIC CONTROL PLAN
AutoCAD SHX Text
E STREET MILL TO 4TH ST
Page 5: Preliminary Traffic Control Plans€¦ · eng s. wages. drawing number. revision. temporary traffic control plan. pioneer parkway east & e street. utility work ahead right lane closed

City of Springfield

Traffic Control Plan

Site Address:

Applicant:

Date:

Contractor:

Phone:

Phone:Owner:

Phone:

Period of use or time of construction:

Start Date/Time: Finish Date/Time:

Equipment:

Traffic Impacts:

Traffic Signal Turn off/on:

Criteria for City of Springfield Traffic Control Plan Submittals

A vicinity map: That includes the north arrow, road names, intersection/driveway access points, curb lines, the work zone, and any special features such as buildings, access points, sight obstructions, that could affect the TCP.

Location: Where will the TCP be active? This can be a line drawing of the work zone(s) and/or a map that clearly indicates where traffic control devices will be placed, including spacing and cone tapers.

Attachments of the appropriate traffic control diagram(s) as shown in the current MUTCD and/or the ODOT Oregon Temporary Traffic Control Handbook that reflect the work zone may be included as a standard reference.

ODOT's Traffic Control Handbook website: www.oregon.gov/ODOT/HWY/TRAFFIC-ROADWAY/docs/pdf/OTTCH_06.pdf?ga=t

See attached example Traffic Control Plan on listed website

Location of Work

Plan Submittal requirements: Submit your Traffic Control Plan (TCP) with the following information on 8.5"x11" or 11"x17" paper. Fill out and submit this form with your TCP.

The TCP shall be a legible hand drawing, or a computer aided design with the following information:

Reset Form

E STREET FROM MILL ST TO 4TH STREET

SPRINGFIELD UTILITY BOARD

May 18, 2020

5,417,262,396

SAME

TBD / 7:30am TBD / 5:00 pm

DUMP TRUCKS, EXCAVATOR, SERVICE TRUCKS, BACK HOES,...

Per OTTCH diagrams attached

N/A