LEGEND 100' 0' 100' 200' 50' UTILITY INFORMATION SUBJECT TO CHANGE. INCLUDING UTILITY EASEMENTS, ARE PRELIMINARY AND ARE UTILITY EASEMENTS. THE DESIGNS SHOWN ON THESE MAPS, LIMITED TO LOCATION OF MAJOR EXISTING AND POTENTIAL DISPLAYS. THE UTILITY INFORMATION SHOWN ON THESE MAPS IS UTILITIES ARE NOT SHOWN ON THESE MAPS OR ON OTHER TO PROVIDE GREATER VISUAL CLARITY, EXISTING AND PROPOSED IMPACTS AND DRIVEWAY TIES BE DETERMINED DURING FINAL DESIGN USING FINAL SURVEYS. USING FINAL GROUND SURVEYS. DRIVEWAY LOCATIONS WILL ALSO DESIGNERS WILL ATTEMPT TO MINIMIZE IMPACTS WHERE FEASIBLE PRELIMINARY GROUND SURVEYS. DURING THE FINAL DESIGN STAGE, HEARING MAP ARE BASED OFF OF PRELIMINARY DESIGNS AND LIMITS OF CONSTRUCTION AND THEIR IMPACTS SHOWN ON THIS LEGEND 100' 0' 100' 200' 50' EXISTING RIGHT OF WAY BUILDINGS CEMETERY LAKES, RIVERS, STREAMS, AND PONDS PROPOSED RIGHT OF WAY PROPOSED ROADWAY EXISTING ROADWAY TO BE RESURFACED EXISTING ROADWAY TO BE REMOVED PROPOSED FUTURE ROADWAY 0000 0000 PRESENT ADT FUTURE ADT PROPERTY LINES PROPOSED STRUCTURES, ISLAND, SIDEWALK, RAISED MEDIAN, CURB AND GUTTER EXISTING UTILITY EASEMENT AND UTILITY) PROPOSED EASEMENTS (DRAINAGE, CONSTRUCTION, EXISTING ROADWAY TRAFFIC SIGNAL EXISTING TRAFFIC SIGNAL PROPOSED EXISTING RIGHT OF WAY BUILDINGS CEMETERY LAKES, RIVERS, STREAMS, AND PONDS PROPOSED RIGHT OF WAY PROPOSED ROADWAY EXISTING ROADWAY TO BE RESURFACED EXISTING ROADWAY TO BE REMOVED PROPOSED FUTURE ROADWAY 0000 0000 PRESENT ADT FUTURE ADT PROPERTY LINES PROPOSED STRUCTURES, ISLAND, SIDEWALK, RAISED MEDIAN, CURB AND GUTTER EXISTING UTILITY EASEMENT AND UTILITY) PROPOSED EASEMENTS (DRAINAGE, CONSTRUCTION, EXISTING ROADWAY TRAFFIC SIGNAL EXISTING TRAFFIC SIGNAL PROPOSED DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION NOTES: CONNECTIONS ALLOWED. CROSS-STREETS ARE GRADE-SEPERATED. NO PRIVATE DRIVEWAY A FACILITY PROVIDED ONLY VIA RAMPS AT INTERCHANGES. ALL FULL CONTROL OF ACCESS IS DEFINED AS A CONNECTION TO UTILITY INFORMATION SUBJECT TO CHANGE. INCLUDING UTILITY EASEMENTS, ARE PRELIMINARY AND ARE UTILITY EASEMENTS. THE DESIGNS SHOWN ON THESE MAPS, LIMITED TO LOCATION OF MAJOR EXISTING AND POTENTIAL DISPLAYS. THE UTILITY INFORMATION SHOWN ON THESE MAPS IS UTILITIES ARE NOT SHOWN ON THESE MAPS OR ON OTHER TO PROVIDE GREATER VISUAL CLARITY, EXISTING AND PROPOSED IMPACTS AND DRIVEWAY TIES BE DETERMINED DURING FINAL DESIGN USING FINAL SURVEYS. USING FINAL GROUND SURVEYS. DRIVEWAY LOCATIONS WILL ALSO DESIGNERS WILL ATTEMPT TO MINIMIZE IMPACTS WHERE FEASIBLE PRELIMINARY GROUND SURVEYS. DURING THE FINAL DESIGN STAGE, HEARING MAP ARE BASED OFF OF PRELIMINARY DESIGNS AND LIMITS OF CONSTRUCTION AND THEIR IMPACTS SHOWN ON THIS NOTES: CONNECTIONS ALLOWED. CROSS-STREETS ARE GRADE-SEPERATED. NO PRIVATE DRIVEWAY A FACILITY PROVIDED ONLY VIA RAMPS AT INTERCHANGES. ALL FULL CONTROL OF ACCESS IS DEFINED AS A CONNECTION TO 10 + 00 10 + 00 M A T C H T O S HEET 2 10 + 0 0 PUBLIC MEETING MAP P U B L I C M EE T I NG M A P P U B L I C M E E T I NG M A P TIP NO. 46384.1.1 (U-5857) HOKE COUNTY HO K E C O U N T Y HO K E C OUN T Y APRIL 2019 A P R I L 2019 A P R I L 2019 T I P NO . 46384 . 1 . 1 ( U - 5857 ) T I P N O . 46384 . 1 . 1 ( U - 5 8 57 ) DESIGN DATA SCALE DESIGN DATA SCALE T O ( E A S T F I EL D D R. / W E S T F I EL D D R . ) F RO M S R 1 0 03 ( C A M D E N RD . ) RO C K F I S H RD . W I D E N I N G TO (EASTFIELD DR. / WESTFIELD DR.) FROM SR 1003 (CAMDEN RD.) ROCKFISH RD. WIDENING T O ( E A S T F I EL D D R . / W E S T F I EL D D R . ) F R O M S R 10 03 ( C A M D E N R D . ) R O C K F I S H R D . W I D E N I NG 6% = Max. Superelev. = 50 mph Design Speed Arterial = Functional Class. 6% = Max. Superelev. = 50 mph Design Speed Arterial = Functional Class. AERIAL DATA FLIGHT DATE: JANUARY 2017 FLIGHT #: M8091 AERIAL DATA FLIGHT DATE: JANUARY 2017 FLIGHT #: M8091 F F F F F F F F F F F F F F F F F F F F F F F F F F F F F C C C C C C C C C F C C C C F F F F F C F F F C C C F F F F F F F C C F F C F C F C F C C F F ET UX CHARLES MORALES, JOHN S. CHARLESWORTH, ET UX , LLC METES & BOUND CO, INC. PARNELL OIL STRANGER, ET UX ROBERT N. AYCOCK JEFFERY PODLUSKY KRISTA YORK B. AMANDA M C AULE Y NA T HANI EL MCNEILL LEE DARRIN YOURELL DAVID SHOUSE RALPH ASBRA E. DUANE SHOEMAKER BRITTNEY JONES EARL PARTRICK MILLER A. KARMA BURKS R. ERNEST HOUS I NG O F S E C UT A R Y YA R B O R O UGH W I L L I A M THOMAS PATRICIA KITTLE SUE A. NE I GHB O R S M I C HA EL CRUDUP MARIO HAYNES MONICA HO US T O N R I C K Y ELIAS MATIAS IRAN BR E NNE M AN J O S HUA R . C OV I NGT ON TE R E S A A . MARLOWE WILLIAM T. HAIRSTON DOMINIQUE M. RICHARDSON TERRY J. JONES LASHANDICE BOWDEN N. GEOVANNA BRYMER MARY N. NELSON DANIEL R. FRUEHLING MICHAEL W. CARTRETTE TEANA YOUNG JAYNE WRIGHT F. THOMAS WRIGHT F. THOMAS BROOKS BLAKE W HI TT I NGT ON V . HO W A R D BOLTON DAVID A. BOLTON DAVID A. JAMES A. GUY A. GUY JAMES ET UX JACKSON, J. WELTON YOUNG AMBER D. NEWKIRK THOMAS N. JOHNSON JACONNIE N. W. BADER RICHARD JORDAN ERIC R. K. DOWNS BRANDON RODRIGUEZ SIMON E. CATALA GOTAY HECTOR L. YAMBAO FRANCIS REYES BRYAN HARWOOD MICHAEL A. HARBOUR,JR. WINSTON K. HOELL HENRY W. WILLIS JAMES C. BUNDY RONALD A. I. DAVIS BARBARA BURGOS ORTIZ GERARDO CAROL F. DURHAM KATHY MARIE FOWLER FOWLER KATHY MARIE RACHEL S. CLARK MILLER MARGERY WOOD DAVID WILLIAM BRUNNET JAMES JACOB VENTERS TODD RANDY LANE MALLERNEE MERRETTE S. GIBSON ALFRED J. KOZIK PLAYER COX SHIRLEY MERRETTE S. GIBSON FOX JR. ROBERT L. BUNDY LINDA G. KELCHNER JESSE SCOTT LINDA G.KELCHNER WILLIAMS KLYE ALFRED WILLIAMS KLYE ALFRED WRIGHT JR. DANIEL V. FOUNTAIN ERNEST J. FOUNTAIN ERNEST J. R I V E R A - O T E R O R O S E NDO BAREFOOT DEENIE J. J. G. HUGHES, INC. TANNER HENRIETTA GIBSON BOMMELE ROBERT P I S t a 15 + 70 . 40 D L= 617 . 72 ' T = 309 . 26 ' R = 4 , 990 . 00 ' P I S t a 12 + 15 . 57 D L= 335 . 52 ' T = 168 . 86 ' R = 1 , 200 . 00 ' -L- CURVE DATA P I S t a 63 + 32 . 08 D L= 637 . 04 ' T = 324 . 75 ' R = 1 , 330 . 00 ' -Y1- CURVE DATA -L- POT STA. 10+40.00 -L- PC Sta. 12+61.14 -L- PT Sta. 18+78.86 -Y1- POT Sta. 10+00.00 -Y1- PC Sta. 10+46.70 -Y1- PT Sta. 13+82.23 -Y1- POT Sta. 21+84.10 -L- PC Sta. 60+07.33 -L- PT Sta. 66+44.36 10 15 20 25 30 35 40 45 50 55 60 65 7 0 75 15 20 R O C K F I S H R D . C A M DE N R D. M Y R A R D. K E R NS T O W N R D. OV E R T ON R D. ET HEL AND DR . B ELLEB OYD D R . S T ON E W A LL S T . C HURC H R D. P I TT M AN GR OV E C OP P E R CR EE K D R . R O C K F I S H R D . J A C K S ON L N . N. C O PP E R C R EE K DR . - L - - Y 1 - TRAFFIC VOLUME DATA 2040 2019 CHURCH RD. PITTMAN GROVE RD. ROCKFISH RD. ROCKFISH 6,900 3,400 23,000 13,600 24,300 14,600 2,800 1,200 4,100 2,400 TRAFFIC VOLUME DATA 2040 2019 CAMDEN RD. RD. ROCKFISH RD. ROCKFISH 22,500 7,300 16,100 8,500 23,000 13,600 7,800 1,100 14,700 6,200 TRAFFIC VOLUME DATA 2040 2019 RD. ROCKFISH RD. ROCKFISH 16,300 7,600 16,100 8,500 MYRA RD. 400 220 200 110 600 330 TRAFFIC VOLUME DATA 2040 2019 RD. ROCKFISH RD. ROCKFISH 17,000 9,200 16,300 9,000 RD. KERNSTOWN 1,100 560 900 170 200 110 T O DAV I SBR I DG ER D . BEGIN PROJECT U-5857 GULL Y BR ANC H TRAFFIC VOLUME DATA 2040 2019 RD. ROCKFISH RD. ROCKFISH 17,000 9,100 CREEK DR. COPPER 300 120 17,100 9,200 200 110 100 100 - L - N A T U R A L GA S C P & L T R ANS M I SS I ON L I NE SHEET 1 OF 2 S H EET 1O F 2 S H E ET 1 O F 2

Transcript of PRELIMINARY PLANS INCOMPLETE PLANS · m c au le y na t han iel mcneill lee darrin yourell david...

Page 1: PRELIMINARY PLANS INCOMPLETE PLANS · m c au le y na t han iel mcneill lee darrin yourell david shouse ralph asbra e. duane shoemaker brittney jones earl partrick miller a. karma

LEGEND

100' 0' 100' 200'

50'

UTILITY INFORMATION

SUBJECT TO CHANGE. INCLUDING UTILITY EASEMENTS, ARE PRELIMINARY AND AREUTILITY EASEMENTS. THE DESIGNS SHOWN ON THESE MAPS,LIMITED TO LOCATION OF MAJOR EXISTING AND POTENTIALDISPLAYS. THE UTILITY INFORMATION SHOWN ON THESE MAPS ISUTILITIES ARE NOT SHOWN ON THESE MAPS OR ON OTHERTO PROVIDE GREATER VISUAL CLARITY, EXISTING AND PROPOSED

IMPACTS AND DRIVEWAY TIES

BE DETERMINED DURING FINAL DESIGN USING FINAL SURVEYS. USING FINAL GROUND SURVEYS. DRIVEWAY LOCATIONS WILL ALSODESIGNERS WILL ATTEMPT TO MINIMIZE IMPACTS WHERE FEASIBLEPRELIMINARY GROUND SURVEYS. DURING THE FINAL DESIGN STAGE,HEARING MAP ARE BASED OFF OF PRELIMINARY DESIGNS ANDLIMITS OF CONSTRUCTION AND THEIR IMPACTS SHOWN ON THIS

LEGEND

100' 0' 100' 200'

50'

EXISTING RIGHT OF WAY

BUILDINGS

CEMETERY

LAKES, RIVERS, STREAMS, AND PONDS

PROPOSED RIGHT OF WAY

PROPOSED ROADWAY

EXISTING ROADWAY TO BE RESURFACED

EXISTING ROADWAY TO BE REMOVED

PROPOSED FUTURE ROADWAY

0000

0000 PRESENT ADT

FUTURE ADT

PROPERTY LINES

PROPOSED STRUCTURES, ISLAND, SIDEWALK,

RAISED MEDIAN, CURB AND GUTTER

EXISTING UTILITY EASEMENT

AND UTILITY)PROPOSED EASEMENTS (DRAINAGE, CONSTRUCTION,

EXISTING ROADWAY

TRAFFIC SIGNALEXISTING

TRAFFIC SIGNALPROPOSED

EXISTING RIGHT OF WAY

BUILDINGS

CEMETERY

LAKES, RIVERS, STREAMS, AND PONDS

PROPOSED RIGHT OF WAY

PROPOSED ROADWAY

EXISTING ROADWAY TO BE RESURFACED

EXISTING ROADWAY TO BE REMOVED

PROPOSED FUTURE ROADWAY

0000

0000 PRESENT ADT

FUTURE ADT

PROPERTY LINES

PROPOSED STRUCTURES, ISLAND, SIDEWALK,

RAISED MEDIAN, CURB AND GUTTER

EXISTING UTILITY EASEMENT

AND UTILITY)PROPOSED EASEMENTS (DRAINAGE, CONSTRUCTION,

EXISTING ROADWAY

TRAFFIC SIGNALEXISTING

TRAFFIC SIGNALPROPOSED

DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

NOTES:

CONNECTIONS ALLOWED. CROSS-STREETS ARE GRADE-SEPERATED. NO PRIVATE DRIVEWAY A FACILITY PROVIDED ONLY VIA RAMPS AT INTERCHANGES. ALLFULL CONTROL OF ACCESS IS DEFINED AS A CONNECTION TO

UTILITY INFORMATION

SUBJECT TO CHANGE. INCLUDING UTILITY EASEMENTS, ARE PRELIMINARY AND AREUTILITY EASEMENTS. THE DESIGNS SHOWN ON THESE MAPS,LIMITED TO LOCATION OF MAJOR EXISTING AND POTENTIALDISPLAYS. THE UTILITY INFORMATION SHOWN ON THESE MAPS ISUTILITIES ARE NOT SHOWN ON THESE MAPS OR ON OTHERTO PROVIDE GREATER VISUAL CLARITY, EXISTING AND PROPOSED

IMPACTS AND DRIVEWAY TIES

BE DETERMINED DURING FINAL DESIGN USING FINAL SURVEYS. USING FINAL GROUND SURVEYS. DRIVEWAY LOCATIONS WILL ALSODESIGNERS WILL ATTEMPT TO MINIMIZE IMPACTS WHERE FEASIBLEPRELIMINARY GROUND SURVEYS. DURING THE FINAL DESIGN STAGE,HEARING MAP ARE BASED OFF OF PRELIMINARY DESIGNS ANDLIMITS OF CONSTRUCTION AND THEIR IMPACTS SHOWN ON THIS

NOTES:

CONNECTIONS ALLOWED. CROSS-STREETS ARE GRADE-SEPERATED. NO PRIVATE DRIVEWAY A FACILITY PROVIDED ONLY VIA RAMPS AT INTERCHANGES. ALLFULL CONTROL OF ACCESS IS DEFINED AS A CONNECTION TO

10+

00

10+

00

MATC

H

TO

SH

EET 2

10+

00

PUBLIC MEETING MAP

PU

BLIC

ME

ETIN

G

MA

PP

UB

LIC

ME

ETIN

G

MA

P

TIP NO. 46384.1.1 (U-5857)

HOKE COUNTY

HO

KE

CO

UN

TY

HO

KE

CO

UN

TY

APRIL 2019

AP

RIL 2019

AP

RIL 2019

TIP

NO. 46384.1.1 (

U-5857) T

IP

NO. 4

6384.1.1 (U

-5857)

DESIGN DATA

SCALE

DESIGN DATA

SCALE

TO (E

AS

TFIE

LD

DR. / W

ES

TFIE

LD

DR.)

FR

OM

SR

1003 (C

AM

DE

N

RD.)

RO

CK

FIS

H

RD. W

ID

ENIN

G

TO (EASTFIELD DR. / WESTFIELD DR.)

FROM SR 1003 (CAMDEN RD.)

ROCKFISH RD. WIDENINGT

O (E

AS

TFIE

LD

DR. / W

ES

TFIE

LD

DR.)

FR

OM

SR

1003 (C

AM

DE

N

RD.)

RO

CK

FIS

H

RD.

WID

ENIN

G

6%=Max. Superelev.

= 50 mphDesign Speed

Arterial=Functional Class.

6%=Max. Superelev.

= 50 mphDesign Speed

Arterial=Functional Class.

AERIAL DATA

FLIGHT DATE: JANUARY 2017

FLIGHT #: M8091

AERIAL DATA

FLIGHT DATE: JANUARY 2017

FLIGHT #: M8091

FF

F

F

F

F

FF

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F F

FF

F

F

C

C

C

C

C

C

C

C

C

F

C

C

C

C

F

F

F

F

F

C

F

F

F

C

C

C

F

F

F

FF

F

F

C

C

F

FC

FC

F

C

F

C

CF F

ET UXCHARLES MORALES,

JOHN S. CHARLESWORTH, ET UX

, LLCMETES & BOUND

CO, INC.PARNELL OIL

STRANGER, ET UXROBERT N.

AYCOCKJEFFERY

PODLUSKYKRISTA

YORKB.

AMANDA

M

CA

ULE

YN

ATH

ANIE

L

MCNEILLLEE

DARRIN

YOURELLDAVID SHOUSE

RALPH

ASBRAE.

DUANE

SHOEMAKERBRITTNEY

JONESEARL

PARTRICK

MILLERA.

KARMA

BURKSR.

ERNEST

HO

USIN

GO

F

SEC

UTA

RY

YA

RB

OR

OU

GH

WIL

LIA

M

THOMASPATRICIA

KITTLESUE A.

NEIG

HB

ORS

MIC

HA

EL

CRUDUPMARIO

HAYNESMONICA

HO

USTO

N

RIC

KY

ELIASMATIAS

IRAN

BRE

NN

EM

AN

JOS

HU

A

R.

CO

VIN

GTO

N

TERES

A

A.

MARLOWEWILLIAM T.

HAIRSTONDOMINIQUE M.

RICHARDSONTERRY J.

JONESLASHANDICE

BOWDENN.

GEOVANNA

BRYMERMARY N.

NELSONDANIEL R.

FRUEHLINGMICHAEL W.

CARTRETTETEANA

YOUNGJAYNE

WRIGHTF.

THOMAS

WRIGHTF.

THOMAS

BROOKSBLAKE

WHIT

TIN

GTO

N

V.

HO

WA

RD

BOLTONDAVID A. BOLTON

DAVID A.

JAMES A. GUY

A. GUYJAMES

ET UXJACKSON,

J. WELTON

YOUNGAMBER D.

NEWKIRKTHOMAS N.

JOHNSONJACONNIE N.

W. BADERRICHARD

JORDANERIC R.

K. DOWNSBRANDON RODRIGUEZ

SIMON E.

CATALAGOTAY

HECTOR L.

YAMBAOFRANCIS

REYESBRYAN

HARWOODMICHAEL A.

HARBOUR,JR.WINSTON K. HOELL

HENRY W. WILLISJAMES C.

BUNDYRONALD A.

I. DAVISBARBARA

BURGOSORTIZ

GERARDO

CAROL F. DURHAM

KATHY MARIE FOWLER

FOWLERKATHY MARIE

RACHEL S. CLARK

MILLERMARGERY

WOODDAVID

WILLIAM

BRUNNETJAMES JACOB

VENTERSTODDRANDY

LANEMALLERNEE

MERRETTE S. GIBSON

ALFRED J. KOZIK

PLAYERCOX

SHIRLEY

MERRETTE S. GIBSON

FOX JR.ROBERT L.

BUNDY LINDA G.

KELCHNER

JESSE SCOTT

LINDA G.KELCHNER

WILLIAMSKLYE ALFRED

WILLIAMSKLYE ALFRED

WRIGHT JR.DANIEL V.

FOUNTAINERNEST J.

FOUNTAINERNEST J.

RIV

ER

A-O

TER

O

RO

SE

ND

O

BAREFOOTDEENIE J.

J. G. HUGHES, INC.

TANNER

HENRIETTA GIBSON

BOMMELE

ROBERT

PI Sta 15+70.40

D

L = 617.72'

T = 309.26'

R = 4,990.00'

PI Sta 12+15.57

D

L = 335.52'

T = 168.86'

R = 1,200.00'

-L- CURVE DATA

PI Sta 63+32.08

D

L = 637.04'

T = 324.75'

R = 1,330.00'

-Y1- CURVE DATA

-L- POT STA. 10+40.00

-L- PC Sta. 12+61.14

-L- PT Sta. 18+78.86

-Y1- POT Sta. 10+00.00

-Y1- PC Sta. 10+46.70

-Y1- PT Sta. 13+82.23

-Y1- POT Sta. 21+84.10

-L- PC Sta. 60+07.33

-L- PT Sta. 66+44.36

10

15 20

25

30

35

40

45

50

55

60

65

70

75

15

20

ROCKFISH RD.

CA

MD

EN

RD.

MY

RA

RD.

KER

NSTO

WN

RD.

OVERTO

N

RD.

ETH

ELA

ND

DR.

BELLE BOYD DR.

STONEWALL ST.

CH

URC

H

RD.

PIT

TM

AN

GRO

VE

COPP

ER C

REEK D

R.

ROCKF

ISH R

D.

JACKSON LN.

N.

CO

PPER C

REE

K

DR.

-L-

-Y1-

TRAFFIC VOLUME DATA

20402019

CHURCH RD.

PITTMAN GROVE

RD.

ROCKFISH

RD.

ROCKFISH

6,9003,400

23,00013,600

24,30014,600 2,800

1,2004,1002,400

TRAFFIC VOLUME DATA

20402019

CAMDEN RD.

RD.

ROCKFISH

RD.

ROCKFISH

22,5007,300

16,1008,500

23,00013,600

7,8001,100

14,7006,200

TRAFFIC VOLUME DATA

20402019

RD.

ROCKFISH

RD.

ROCKFISH

16,3007,600

16,1008,500

MYRA RD.

400220

200110

600330

TRAFFIC VOLUME DATA

20402019

RD.

ROCKFISH

RD.

ROCKFISH

17,0009,200

16,3009,000

RD.

KERNSTOWN 1,100560

900170

200110

TO DAVIS BRIDGE RD.

BEGIN PROJECT U-5857

GU

LLY

BR

AN

CH

TRAFFIC VOLUME DATA

20402019

RD.

ROCKFISH

RD.

ROCKFISH

17,0009,100

CREEK DR.

COPPER 300120

17,1009,200

200110

100100

-L-

NATURAL GAS

CP&L T

RA

NS

MIS

SIO

N

LINE

SHEET 1 OF 2

SH

EE

T 1

OF 2 S

HE

ET 1 O

F 2