OVERHEAD PERGOLA # 4000 2500 2174 8674 1250 2255 1750 10005 3505 745 1000 2255 2500 10005 2500 4000 1000 1000 650 1850 2174 1826 250 1924 5850 2174 1550 9574 D D HUB 1 2 3 4 5 # FFL 765mm MARINE PLY FFL 1115mm MARINE PLY FFL 450mm MARINE PLY FFL 120mm MARINE PLY x THE DRAWINGS MUST BE READ IN CONJUNCTION WITH THE BILLS OF QUANTITIES FOR A FULL DISCRIPTION OF THE EXTENT OF THE WORK TO BE DONE. THE CONTRACTOR MUST REPORT ANY DISCREPANCIES BETWEEN THE EXISTING BUILDING, THE SPECIFIED BILLS OF QUANTITIES AND THE DRAWINGS, TO THE ARCHITECT OR PROJECT LEADER, BEFORE THE WORK COMMENCES. x IT IS ACCEPTED THAT THE CONTRACTOR IS A EXPERT IN THE BUILDING PROFESSION AND THAT THE QUALITY OF THE WORKMANSHIP WILL BE OF THE HIGHEST STANDARD AS REQUIRED, AND AT LEAST TO A STANDARD ACCEPTABLE IN THE GENERAL BUILDING TRADE. x THE CONTRACTOR MUST ENSURE THE SAFETY, ON SITE, OF THE WORKMEN AND OTHER VISITORS, AND COMPLY WITH THE SAFETY REQUIREMENTS OF THE DEPARTMENT OF INDUSTRIES. x IT IS ACCEPTED THAT THE CONTRACTOR FAMILIARISE HIMSELF WITH THE CONDITIONS ON SITE BEFORE HAVING QUOTED FOR THE WORK. x THE CONTRACTOR MUST FAMILIARISE HIMSELF WITH THE SCOPE OF THE WORK AND VERIFY ALL DIMENSIONS ON SITE BEFORE THE WORK COMMENCES. x THE DRAWINGS IS NOT TO BE SCALED. x FIGURED DIMENSIONS TO BE USED AT ALL TIMES. x PROFESSIONAL LAND SURVEYOR TO LOCATE AND FLAG ALL BOUNDARY BEACONS IF NECESSARY x CONTRACTOR TO VERIFY ALL LEVELS, HEIGHTS & DIMENSIONS ON SITE AND TO CHECK THE SAME AGAINST DRAWING BEFORE COMMENCING ANY WORK. x ALL CONTRACTORS TO CHECK DETAILS SHOWN ON THIS DRAWING FOR COMPLIANCE WITH STANDARDS OF GOOD BUILDING PRACTICE WITH PARTICULAR REFERENCE TO SPECIAL REQUIREMENTS NECESSITATED BY LOCAL AND/OR NATIONAL CRITERIA AND SITE CONDITIONS AND REPORT ANY COMMENT TO THE AUTHOR. x ANY ERROR, DISCREPANCIES OR OMMISIONS TO BE REPORTED TO THE AUTHOR IMMEDIATELY. x FINAL DIMENSIONS TO BE TAKEN ON SITE BEFORE ORDERING, SUPPLYING AND FIXING PROPRIETARY ON DETAILED FITTINGS. x CONTRACTORS ARE TO LOCATE AND IDENTIFY EXISTING SERVICES ON SITE AND TO PROTECT THESE FROM DAMAGE THROUGHOUT THE DURATION OF THE WORKS. x CONTRACTOR TO BUILD ALL D.P.C.'s WHETHER OR NOT THESE ARE SHOWN ON DRAWING, TO ALL EXTERNAL WALLS AT EACH FLOOR, AND TO ALL WINDOWS, DOORS OR OTHER OPENINGS IN EXTERNAL WALLS. x BRICK FORCE TO BE BUILT IN EVERY 5TH COURSE OF BRICKWORK AND IN EVERY 2ND COURSE OF BRICKWORK ABOVE WINDOWS, DOORS AND ALL OTHER OPENINGS IN EXTERNAL WALLS. x ALL GLASS TO BE ACCORDING TO N.B.R. AND S.A.B.S. SPECIFICATIONS. x ANY QUERIES ARISING FROM ALL THE ABOVE MUST BE REPORTED TO THE ARCHITECT FOR CLARIFICATION BEFORE ANY WORK IS PUT ON HAND. x QUALITY OF ALL MATERIALS AND WORKMANSHIP TO COMPLY WITH THE RELEVANT S.A.B.S. AND B.S.S. SPECIFICATIONS. GENERAL NOTES: BY REVISION DETAILS XXXXXXXXXXXXXXXXXXXXXXXXXX MD 28 MAY 2012 1:25 PLAN EXERCISE 5 210041366 ROBYNN LOUW 2.#0 5%#.' N A COMMUNITY HUB- Knowledge is power

description

A COMMUNITY HUB- Knowledge is power EXERCISE 5 PLAN 210041366 1 2 3 4 5 HUB FFL 450mm MARINE PLY FFL 120mm MARINE PLY FFL 765mm MARINE PLY BYREVISIONDETAILS FFL 1115mm MARINE PLY 28 MAY 2012 1:25 8674 1000 9574 1000 XXXXXXXXXXXXXXXXXXXXXXXXXX MD GENERAL NOTES: IT IS ACCEPTED THAT THE CONTRACTOR IS A EXPERT IN THE BUILDING PROFESSION AND THAT THE QUALITY OF THE WORKMANSHIP WILL BE OF THE HIGHEST STANDARD AS REQUIRED, AND AT LEAST TO A STANDARD ACCEPTABLE IN THE GENERAL BUILDING TRADE.

Transcript of Precedent sections and details_recover-PLAN

OVERHEAD PERGOLA

400025002174

8674

1250

2255

1750

10005

3505

745

1000

2255

2500

10005

2500

4000

1000

1000

6501850217418262501924

58502174 1550

9574

HUB

1

2

3

4

5

FFL 765mm

MARINE PLY

FFL 1115mm

MARINE PLY

FFL 450mm

MARINE PLY

FFL 120mm

MARINE PLY

THE DRAWINGS MUST BE READ IN CONJUNCTION WITH THE

BILLS OF QUANTITIES FOR A FULL DISCRIPTION OF THE EXTENT

OF THE WORK TO BE DONE. THE CONTRACTOR MUST REPORT

ANY DISCREPANCIES BETWEEN THE EXISTING BUILDING, THE

SPECIFIED BILLS OF QUANTITIES AND THE DRAWINGS, TO THE

ARCHITECT OR PROJECT LEADER, BEFORE THE WORK

COMMENCES.

IT IS ACCEPTED THAT THE CONTRACTOR IS A EXPERT IN THE

BUILDING PROFESSION AND THAT THE QUALITY OF THE

WORKMANSHIP WILL BE OF THE HIGHEST STANDARD AS

REQUIRED, AND AT LEAST TO A STANDARD ACCEPTABLE IN THE

GENERAL BUILDING TRADE.

THE CONTRACTOR MUST ENSURE THE SAFETY, ON SITE, OF THE

WORKMEN AND OTHER VISITORS, AND COMPLY WITH THE

SAFETY REQUIREMENTS OF THE DEPARTMENT OF INDUSTRIES.

IT IS ACCEPTED THAT THE CONTRACTOR FAMILIARISE HIMSELF

WITH THE CONDITIONS ON SITE BEFORE HAVING QUOTED FOR

THE WORK.

THE CONTRACTOR MUST FAMILIARISE HIMSELF WITH THE SCOPE

OF THE WORK AND VERIFY ALL DIMENSIONS ON SITE BEFORE

THE WORK COMMENCES.

THE DRAWINGS IS NOT TO BE SCALED.

FIGURED DIMENSIONS TO BE USED AT ALL TIMES.

PROFESSIONAL LAND SURVEYOR TO LOCATE AND FLAG ALL

BOUNDARY BEACONS IF NECESSARY

CONTRACTOR TO VERIFY ALL LEVELS, HEIGHTS & DIMENSIONS

ON SITE AND TO CHECK THE SAME AGAINST DRAWING BEFORE

COMMENCING ANY WORK.

ALL CONTRACTORS TO CHECK DETAILS SHOWN ON THIS

DRAWING FOR COMPLIANCE WITH STANDARDS OF GOOD

BUILDING PRACTICE WITH PARTICULAR REFERENCE TO SPECIAL

REQUIREMENTS NECESSITATED BY LOCAL AND/OR NATIONAL

CRITERIA AND SITE CONDITIONS AND REPORT ANY COMMENT

TO THE AUTHOR.

ANY ERROR, DISCREPANCIES OR OMMISIONS TO BE REPORTED

TO THE AUTHOR IMMEDIATELY.

FINAL DIMENSIONS TO BE TAKEN ON SITE BEFORE ORDERING,

SUPPLYING AND FIXING PROPRIETARY ON DETAILED FITTINGS.

CONTRACTORS ARE TO LOCATE AND IDENTIFY EXISTING

SERVICES ON SITE AND TO PROTECT THESE FROM DAMAGE

THROUGHOUT THE DURATION OF THE WORKS.

CONTRACTOR TO BUILD ALL D.P.C.'s WHETHER OR NOT THESE

ARE SHOWN ON DRAWING, TO ALL EXTERNAL WALLS AT EACH

FLOOR, AND TO ALL WINDOWS, DOORS OR OTHER OPENINGS IN

EXTERNAL WALLS.

BRICK FORCE TO BE BUILT IN EVERY 5TH COURSE OF

BRICKWORK AND IN EVERY 2ND COURSE OF BRICKWORK ABOVE

WINDOWS, DOORS AND ALL OTHER OPENINGS IN EXTERNAL

WALLS.

ALL GLASS TO BE ACCORDING TO N.B.R. AND S.A.B.S.

SPECIFICATIONS.

ANY QUERIES ARISING FROM ALL THE ABOVE MUST BE

REPORTED TO THE ARCHITECT FOR CLARIFICATION BEFORE

ANY WORK IS PUT ON HAND.

QUALITY OF ALL MATERIALS AND WORKMANSHIP TO COMPLY

WITH THE RELEVANT S.A.B.S. AND B.S.S. SPECIFICATIONS.