Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

22
Pre-Fire Survey NAME HERE

Transcript of Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Page 1: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Pre-Fire Survey

NAME HERE

Page 2: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Amidships Crane- 01 Qtr Deck Midships

Zone: 3

Page 3: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Adjacent Spaces: FWD

• Fwd House:• Damage Control Locker #1• C/M Office• State Rooms• Fan Room • QTR Deck Office

Page 4: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Adjacent Spaces: Aft

• Aft House• Medical Wardroom• Sick Bay• State Rooms• Linen Locker• Fan Room• X-Ray room • Medical Laundry Room

Page 5: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Adjacent Spaces: PT/STBD

• PT/STBD Sides• Deck Lockers• Cranes• Lifeboats

Page 6: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Adjacent Spaces: Above

• Staterooms• Open Space• Fast rescue boats

Page 7: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Adjacent Spaces: Below

• Lower Class Mess• Chill Rooms• Purser’s Office• Crane Electrical Panels,

transformers, breakers

Page 8: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Fuel Loads:

Class A:• PFD’s• Lifeboat lines and rescue boat covers• Linen locker• Mattresses, State room items, Personal effectsClass B: • Hydraulic fluid,• Gasoline in rescue boats and power washer • Diesel in Lifeboats #1, #2• Freon refrigerant gas• Medical suppliesClass C: • Electrical circuitry in passage ways• Crane electrical panel (Main deck)Class D: None Nearby *Other Hazards: • Oxygen tanks in medical ward

Page 9: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Nearest Fire Stations

Fire Stations• F.S. #21:FWD House

STRB Side (1 ½ inch adj. nozzle)

• F.S. #22:FWD House PT Side (1 ½ inch adj. nozzle)

• F.S. #23:Interior-Aft House PT Side (1 ½ inch adj. nozzle)

• F.S. #24: Interior-Aft House STRB Side (1 ½ inch adj. nozzle)

• F.S. #25:Aft House STRB Side (1 ½ inch adj. nozzle)

• F.S. #26:Aft House PT Side (1 ½ inch adj. nozzle)

• *All fire stations have a 50 ft. hose

Page 10: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Nearest Fire Extinguishers

Powder

• (6)10 lb

CO₂

• (2) 15 lb

Page 11: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Accessibility

Primary Fire Stations

• Fire Stations 21 & 22

Secondary Fire Stations

• Fire Stations 25 & 26• Additional hoses may be

used from interior Fire Stations 23 & 24

Page 12: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Size and Capacity

Page 13: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Shutoffs: Fuel

• Crane Shut Offs• EOS• Main Deck Electrical Panel • Valve shut off at crane

Page 14: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Shutoffs: Ventilation

Page 15: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Shutoffs: Electrical

• Cargo Crane • Electrical Shut Off

Page 16: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Drains

• Scuppers are located along the port and starboard sides

(Main deck to 04)

Page 17: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Exposures

• 02 FWD House Electrical Locker• Medical Wardroom & Exam Room• 01 FWD House Deck Lockers

Page 18: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Divisions: Deck and Deckhead

• Fwd A-Class 0• Aft B-Class 0

Bulkhead Class: ARequirements: A-0 60 min test no passage of flame or smoke 3mm thick steel and suitably stiffened

Bulkhead Class: BRequirements: A-0 60 min test no passage of flame or smoke 1.5 mm thick steel and suitably stiffened

Page 19: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Divisions: Doors

• B-Class Aft (15)• A-Class Fwd (15)

Page 20: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Divisions: Bulkheads

• A-Class 0 Fwd • B-Class 0 Aft

Bulkhead Class: ARequirements: A-0 60 min test no passage of flame or smoke 3mm thick steel and suitably stiffened

Bulkhead Class: BRequirements: A-0 60 min test no passage of flame or smoke 1.5 mm thick steel and suitably stiffened

Page 21: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Fire Systems

Fixed Fire Suppression Systems

• N/A

Fire Detection Systems

• Smoke Detectors: FWD and Aft passage ways and all rooms

• Heat Detectors: N/A

Page 22: Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Mid Ships Crane Pre-Fire Survey