PRE-FEASIBILTY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/18...Sy.No. 07, Sompuram...

14
PRE-FEASIBILTY REPORT OF OF OF OF Lease Area : 1.100 Hec Sy.No. Mandal Vepada Village, Sompuram 07, Vizianagaram District Andhra Pradesh LEASE PERIOD: 10 YEARS PREPARED BY M/s. Parameswari crusher stone Parameswari Crusher Stone (Mining ) Stone Building & Metal Raod of

Transcript of PRE-FEASIBILTY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/18...Sy.No. 07, Sompuram...

Page 1: PRE-FEASIBILTY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/18...Sy.No. 07, Sompuram Village, Vepada Mandal Vizianagaram District Andhra Pradesh LEASE PERIOD: 10 YEARS

PRE-FEASIBILTY REPORT

OFOFOFOF

Lease Area : 1.100 Hec

Sy.No. Mandal Vepada Village, Sompuram 07,

Vizianagaram District

Andhra Pradesh

LEASE PERIOD: 10 YEARS

PREPARED BY

M/s. Parameswari crusher stone

Parameswari Crusher Stone (Mining ) Stone Building & Metal Raod of

Page 2: PRE-FEASIBILTY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/18...Sy.No. 07, Sompuram Village, Vepada Mandal Vizianagaram District Andhra Pradesh LEASE PERIOD: 10 YEARS

1.0 INTRODUCTION

M/s. crusher stone Parameswari was granted Q.L. for Road Metal & Building stone

overan extent of 1 100. Hec in Sy.No 07. of Sompuram (V), Vizianagaram District, A.P

by theDDM&GVisakhapatnam District for a period of 10 year .s

The lease deed was executed before the Asst. Director of Mines & Geology,

Vizianagaram, vide proceedings No. 4294 /Q/20 71 , dated. 50 08. .2 170 for 10 years lease

period from 50 08. .2 170 to 40 08. .20 72 .

1.1 SALIENT FEATURES OF THE PROJECT

The mine lease area falls under the Topo sheet No. 65N/8 bearing following Toposheet

details:

Toposheet No: 65N/8

The nearest railway station is Alamanda is at 4.98 kms from the mine lease area. The nearest

airport isVisakhapatnamairportat 37.02kms from the mining site.

Page 3: PRE-FEASIBILTY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/18...Sy.No. 07, Sompuram Village, Vepada Mandal Vizianagaram District Andhra Pradesh LEASE PERIOD: 10 YEARS

SAILENT FEATURES OF THE PROJECT

Nature of the project M/s. Crusher Stone Parameswari Mining of Road Metal & Building Stone

Size of the Project Maximum Production: 10440.768Cu.m/Annum

LOCATION OF PROJECT

District & State Vizianagaram District, Andhra Pradesh

Village & Mandal Sompuram Village & Mandal, Vepada Land Availability 1 100. Ha.,

Nearest Village Sompuram Village at 2 km Ownership Government Land

Toposheet No. 65N/8

GENERAL CLIMATIC CONDITIONS

Annual rainfall 955 mm

Min and max temp. 28° C and 35° C

Avg. relative humidity 71%

Predominant wind direction SW to NE & SE to NW

HISTORICAL / IMPORTANT PLACES

Nearest human settlement Sompuram Village at a distance of 2 kms Nearest town Vepada Mandal at a distance of 2 kms

Nearest railway station Alamanda Railway Station at 4.98 kms

Archaeological/Historically

Important Site

No historical movements exist in and around the

quarry lease proposed area.

Infrastructure Facilities Hospitals, schools and community facilities are

available at 2 kms away from the mine site.

Page 4: PRE-FEASIBILTY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/18...Sy.No. 07, Sompuram Village, Vepada Mandal Vizianagaram District Andhra Pradesh LEASE PERIOD: 10 YEARS

2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION

2.1 Identification of project and project proponent. In case of mining project, a copy of

mining lease/letter of intent should be given.

Details of Project Proponent:

Name of Mine : M/s.Prop: Satyanarayana Alla

Crusher Stone parameswari

ADDRESS OF THE MINE

M/s. Crusher Stone Parameswari Sy.No 07.

Sompuram Village& Vepada Mandal Vizianagaram District

Andhra Pradesh

Sr .i Satyanarayana Alla Lessee

D.No.13-26,

Sompuram Mandal Vepada Village,

Vizianagaram District

2.2 Brief Description of nature of the project

Parameswari was crusher stone granted .Q L, for Road Metal & Building stone

over an extent of 1 1. Hectares in Sy.No 07. of Sompuram (V), Vizianagaram District, A.P

by theDDM&GVisakhapatnam District for a period of 10 years,

The lease deed was executed before the Asst. Director of Mines & Geology,

Vizianagaram, vide proceedings No. 4294 /Q/20 71 , dated. 50 08. .20 71 for 10 years lease

period from 50 08. .20 71 to 40 08. .20 72 .

2.3 Need for the project and its importance to the country and or region.

In the present scenario, the Road Metal has good market in the country for construction

of buildings, roads, dams, etc., The available of 100% of Road Metal is useful.Therefore,

there won’t be any wastage.

Page 5: PRE-FEASIBILTY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/18...Sy.No. 07, Sompuram Village, Vepada Mandal Vizianagaram District Andhra Pradesh LEASE PERIOD: 10 YEARS

2.4 Demand-supply Gap.

There is a demand forRoad Metal & Building Stone and is ever growing with the growth

of industrialsector in the country. The requirement of the mineral is always found high in

adjoining areas.

2.5 Imports V/s Indigenous production

Road Metal mined from the proposed project will neither be exported nor imported. It is

an indigenous production and will be supplied within the country.

2.6 Export Possibility

No export.

2.7 Domestic/ Export Markets

100% of the excavated road metal will be supplied to consumers for roads laying, earth

filling, infrastructure works etc.

2.8 Employment generation (Direct and Indirect due to the project)

The proposed project will generate direct employment to 07people of the poorest section

of the society, while benefitting more people indirectly.

3.0 PROJECT DESCRIPTION

3.1 Type of project including interlinked and interdependent projects, if any

The proposed mining project is mining of Road Metal & Building Stoneis open cast

method.

3.2 Location

The above said quarry lease falls in Toposheet No. 65N/8. The Quarry lease area is

located at a distance of about 2 kms from sompuram ( )V to its South-East Side. The Q.L

area is connected by Sompuram -Vizianagaram road.

Page 6: PRE-FEASIBILTY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/18...Sy.No. 07, Sompuram Village, Vepada Mandal Vizianagaram District Andhra Pradesh LEASE PERIOD: 10 YEARS

GOOGLE MAP

3.3 Details of alternate sites considered

The mineral is site specific, hence there are no alternative sites considered. Mining

activities are carried out based on local geology and availability of the mineral.

3.4 Size or magnitude of operation

The firm intends to extract the Road Metal & Building Stone production for the tune of

10440.768Cu.m during the next five years scheme period.

During the scheme period it is proposed to exploit the Road Metal & Building stone from

the total area of 10000 M2to an average depth of 6 M. The mining will be initiated from

NE & SW of the mining lease area covering under Cross sections A-A’.

Page 7: PRE-FEASIBILTY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/18...Sy.No. 07, Sompuram Village, Vepada Mandal Vizianagaram District Andhra Pradesh LEASE PERIOD: 10 YEARS

The year wise production proposed is shown in the following table.

Year Wise Production for five years

Year of

Production

Pit

No.

Total

tentative

excavation

(Cum)

Top

Soil

(Cum)

OB/SB/

IB (Cum)

ROM from Mineralized Zone ROM

Waste

ratio

Clean

Ore

(Cum)

Sub

grade

ore

(cum)

Mineral

reject

(cum)

1 2 3 4 5 6 7 8 9

1st Year

(2017-18)

1 6290.076 629.0076 5661.068

4

- - 9:1

2nd Year

(2018-19)

1 10425.324 1042.5324 9382.791

6

- - 9:1

3rd

Year

(2019-20)

1 10307.31 1030.731 9276.579 - - 9:1

4th

Year

(2020-21)

1 10223.148 1022.3148 9200.833

2

- - 9:1

5th Year

(2021-22)

1 10440.768 1044.0768 9396.691

2

- - 9:1

Total 47686.626 4768.6626 42917.96

RESERVES:

Categorization of reserves under UNFC code :

Sl.

No.

Category of reserves UNFC

code

Reserves in M3

Road metal

1 Proved 111 154338.2

2 Probable 112 143866.32

Total : 298204.52

Life of Mine/Quarry:

Total Geological Proved Reserves : 154338.2 Cu.m

Average Production per year : 10435.907Cu.m

Life of Mine /Quarry : 154338.2 / 10435.907

= 14 years

Page 8: PRE-FEASIBILTY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/18...Sy.No. 07, Sompuram Village, Vepada Mandal Vizianagaram District Andhra Pradesh LEASE PERIOD: 10 YEARS

3.5 Project description with process details

Opencast Mining:

The proposed mining is an open cast method of mining. The Road Metals by nature it is

medium hard. So blasting is mandatory for excavation of Road Metals.

The operations will involve drilling, blasting and excavators and directly loads into the

tippers/tractors. The same will be transporting to crushing units. The excavations will be

carried with bench height 5 to 10 meters and width 6 to 12 meters minimum. Haul roads

gradient will be 1:16.

The following machinery will be deployed by the company on hire basis

S. No Name of the Machinery

1. Excavator – 200 on Hire Basis

2. Tippers

3. Air Compressors

4. Jack Hammers

5. Tractor with water tanker and Sprinkler

3.6 Raw Material Required Along With Estimated Quantity, Likely Source, Marketing

Area of Final Product/S, Mode of Transport of Raw Material and Finished Product

No raw material will be required in the proposed project.

3.7 Resource optimization/ recycling and reuse.

Generation of Sub-Grade or reject material and waste is nil. 100% of material will be

utilizedincluding dust or soil.

Page 9: PRE-FEASIBILTY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/18...Sy.No. 07, Sompuram Village, Vepada Mandal Vizianagaram District Andhra Pradesh LEASE PERIOD: 10 YEARS

3.8 Availability of water its source, energy/ power requirement and source

3.8.1 Water Requirement

S.No Description Fresh water Waste water Disposal

1. Domestic 0.5 KLD 0.4 KLD Septic tank

followed by soak pit

2. Green belt 0.5KLD -- --

3. Dust suppression 0.5KLD -- --

Around 1.5KLD of water will be required for the proposed project and will be met

through water tankers.

Water is required in the mine for spraying on the roads and working faces to suppress the

dust. Also a small quantity of drinking water is required.

3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their

management/ disposal.

0.4 KLD of domestic waste water will be generated and disposed to septic tank followed

by soak pit and generation of sub grade or reject material and waste is nil.

3.9.1 Solid Waste Generation& its Disposal

100% of the produced Road Metal will be useful. Hence no needs of waste dump

management. The top soil will be preserved within the lease area for using reclamation of

the pit at the time of closure.

3.9.2 Liquid Effluent

0.4 KLD ofdomestic effluent will be generated at the mine site. Domestic Waste Water

generated will be send to septic tank followed by soak pit.

Page 10: PRE-FEASIBILTY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/18...Sy.No. 07, Sompuram Village, Vepada Mandal Vizianagaram District Andhra Pradesh LEASE PERIOD: 10 YEARS

4.0 SITE ANALYSIS

4.1 Connectivity

The quarry lease area is connected by Jami-Vizianagaram road.

4.1.1 Nearest Railway Station

The nearest rail head is Alamanda Railway Station is at 4.98kms from the mine location.

4.1.2 Nearest Airport

The nearest airport facility is available at Visakhapatnam airport which is about 37.02

kms away from mine.

4.1.3 Nearest Highway

Nearest State Highwayat a distance of 11.02 kms from the mine site.

4.2 Land form, land use and land ownership

During the ensuing scheme period an area of 1.00 Ha.,mining will be done as per

approved mining plan. Measures will be taken for the reclamation only after the end of

mining scheme period.

4.3 Topography

Topographically the quarry lease area is covered with denudations in the range of 92 m to

140 m above mean sea. With reference to the Topomap 65N/8, the quarry lease area

covered between the 92 m and 140 m hills to the North-East side of mine area, 100 m hill

South-East side of mine area

4.4 Existing land use pattern

This Road Metal & Building Stone Quarry Lease area is surrounded by road metal

Quarries and open lands.

4.5 Existing infrastructure

There is no major construction is seen near to the mining lease area. An office/rest shelter

for the laborers shall be made.

Page 11: PRE-FEASIBILTY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/18...Sy.No. 07, Sompuram Village, Vepada Mandal Vizianagaram District Andhra Pradesh LEASE PERIOD: 10 YEARS

4.6 Soil classification

� Weathered Rock and Soil cover up 0 to 1M from Surface Level.

� Road Metal 1 to 33 M.

4.7 Climatic data from secondary sources

CLIMATE & RAINFALL

The mining lease area experience semi-arid climatic condition. The mining lease area

experience 955mm average annual rainfall. The day temperature varies 28°C in winter

and about 35°C in summer season. The general wind direction is SW to NE & SE – NW.

4.8 Social infrastructure available

All the social infrastructure facilities like hospitals, schools, colleges etc are available

nearby villages, Mandalheadquarters.

Employment generation, Infrastructure development viz roads, power & water supply,

medical facilities in villages etc.

5.0 PLANNING BRIEF

5.1 Planning concept(Type of industries, facilities, transportation etc) Town and Country

Planning/Development authority Classification.

The lease area covers on hill slope on foot of the hill and topographically lowest and

highest contour elevations are RL 42M to RL 63 M respectively and arrived pit bottom

RL is about 33 M. The excavations will be carried with bench height 5 to 10 meters and

width 6 to 12 meters minimum.

5.2 Population projection

The project will employ nearly 08 workers from nearby villages. Thus, there will not be

any increase in population due to the project.

Page 12: PRE-FEASIBILTY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/18...Sy.No. 07, Sompuram Village, Vepada Mandal Vizianagaram District Andhra Pradesh LEASE PERIOD: 10 YEARS

5.3 Landuse planning:

S.No Head Area put on use at

start of Scheme of

Mining (ha)

Additional

requirement during

plan period (ha)

Total area (ha)

1 Area under mining 0.01 0.511 0.521

2 Storage for top soil - 0.1 0.1

3 Waste dump at site 0.024 0.105 0.129

4 Roads 0.015 0.003 0.018

Total 0.049 0.719 0.768

5.4 Assessment of Infrastructure Demand (Physical and Social)

Safety equipments, small rest shelter and first aid facilities will be made available for the

workers in the mine lease area.

5.5 Amenities/facilities

The following facilities will be extended by the mine management:

i. Direct and indirect Employment.

ii. Arrangement for safe and healthy working conditions.

iii. Provision of drinking water.

iv. Conducting medical camps for workers and nearby villagers at regular intervals.

v. Providing personal protective equipments (PPE)

6.0 PROPOSED INFRASTRUCTURE

6.1 Industrial area (Processing Area)

No Mineral processing will be carried out in the mine lease area. After excavation, the

Road Metals will be dispatched as per orders.

6.2 Residential area (Non Processing Area)

The mine workers will be hired from nearby villages, so residential areas will not be

made.

Page 13: PRE-FEASIBILTY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/18...Sy.No. 07, Sompuram Village, Vepada Mandal Vizianagaram District Andhra Pradesh LEASE PERIOD: 10 YEARS

6.3 Green belt

Plantation will be made at open places and along the approach road.

6.4 Drinking Water Management

Water Requirement for drinking purpose is1.5 KLDwhich will be supplied by water

tankers.

6.5 Sewerage System

Domestic waste water generated will be send to septic tank followed by soak pit.

6.6 Industrial Waste Management

Not Applicable

6.7 Solid Waste management

100% of the produced Road Metal will be useful. Hence no needs of waste dump

management. The top soil will be preserved within the lease area for using reclamation of

the pit at the time of closure.

6.8 Power Requirement & Supply/ Source

Not Applicable.

7.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN

7.1 Policy to be adopted (Central/State) in respect of the project affected persons

including home out sees, land out sees and landless laborers (a brief outline to be

given)

No human settlements are existing in the ML area and no humans will be displaced from

the area so the proposed project does not involve any rehabilitation and resettlement.

Page 14: PRE-FEASIBILTY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/18...Sy.No. 07, Sompuram Village, Vepada Mandal Vizianagaram District Andhra Pradesh LEASE PERIOD: 10 YEARS

8.0 PROJECT SCHEDULE & COST ESTIMATES

8.1 Likely date of start of construction and likely date of completion (Time schedule for

the project to be given)

The project will commence once Environmental Clearance and other necessary

certificates are obtained from the respective departments.

8.2 Estimated project cost along with analysis in terms of economic viability of the

project.

The cost of the project : 5.0 Lakhs

EMP Cost : 0.50 Lakhs

9.0 ANALYSIS OF PROPOSAL (Final recommendations)

9.1 The quarry lease applied area is surrounded by 5 villages within a distance of

5kms.Agriculture and sheep breeding are important profession of the people living in the

village besides involving themselves in quarrying activity. There is no adverse Socio

Economic Impact on the persons in the villages, due to the quarrying operations there is a

positive impact of the quarry operations on the socio economic standards of the villagers.

The quarrying activity in this area improved the socio-economic status of the local people

by virtue direct and indirect employment.