Basdew Rooplal
Pre- feasibility study of a low grade / sub economic Iron ore
deposit
![Page 2: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/2.jpg)
Contents
1. Introducion
2. Analysis of Given Information
3. Preliminary flowsheet options
4. Testwork Program
5. Other factors for consideration
6. Examples of detailed flowsheets
7. Conclusions
8. Recommendations
![Page 3: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/3.jpg)
Introduction
• This is a Greenfield project in the Northern Cape, with an exploration licence.
• Available information after a year of exploration drilling and conceptual phase results:
• Discovered resource size enough for 25 years at a planned product rate of
• 30 000 000 tons product per annum.
•
• Low grade ore with a % Fe in resource varying between 40% and 50%.
• Conceptual phase results indicated a possible top size of 6.3mm.
![Page 4: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/4.jpg)
Aims and Objectives
• To Outline a program that will take the project from a conceptual stage to the feasibility stage.
![Page 5: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/5.jpg)
Given info – Production / Grade
• Production– 30 million tons per
annum– 2.5 million tons per
month– 100 000 tons per day– 4000 tons per hour
• Grade • 40 – 50 % Fe• On grade• > 65 % Fe• Off Grade• > 60 < 65 High• > 39 < 60 Low• Waste• < 39 % Fe
![Page 6: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/6.jpg)
Size Distribution
• Given < 6.3 mm• > 10 mm subjected to
direct smelting
• Possible upgrade methods available < 10 mm
• Gravity Separation• Magnetic Separation• Flotation• Online elemental
analysis / Scanning
![Page 7: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/7.jpg)
Gravity Separation
• Mineral Densities• Hematite 5.1• Magnatite 5.2• Goetite 4.2• Siderite 3.8
• Gangue 2.65• Cut Point 2.9 – 3.2
• Equipment Available• DMS Cyclones - 120 tph• - 6 + 0.2 mm• Batac Jigs 500 tph• - 30 + 0.5 mm• Spirals 3 tph• -1 + 0.03 mm• Tables 2 tph• - 1 + 0.03 mm
![Page 8: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/8.jpg)
Magnetic Separation / Flotation
• Wet / Dry Magnetic Separators
• High Intensity • 7 000 – 20 000 Gauss• Medium Intensity• 2000 – 7000 Gauss• Low Intensity• 1000 – 2000 Gausss
• Flotation• - 65 micron Fraction• Fatty Acids• Petroleum sulfonate
collectors
![Page 9: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/9.jpg)
Online Elemental Analysis / Scanning
• Khumani Iron ore• Elemental Analysis• Fe
• Al2O3
• K2O + Na2O
• SiO2
• Estimated Yields• Ongrade > 80 %• Off Grade High• >65 < 80 %• Off Grade low• > 45 < 60 %
![Page 10: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/10.jpg)
Flowsheet Options – Elemental Scanning
ROM Elemental Analyser
On Grade > 65% Fe
Waste < 39% Fe
Off Grade >39 < 65 % Fe
Crushing / ScreeningCrushing / Screening
Further Beneficiation
Pelletiing Smelting
![Page 11: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/11.jpg)
Off Grade Beneficiation Option
Crushing / Screening
Jigs / DMS Spiral / Tables
WLIMS / WHIMS
+1 mm - 1 mm
CoarseConcentrate
Regrind / Ball Mill
WLIMS / WHIMS
TailsTails
Tails
Fine Concentrate
Tailings to Waste
![Page 12: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/12.jpg)
Waste < 39 % Fe Option
Tailings from Elemental Scan
Tailings from WHIMS
Tailings from Spirals
Semi Autogeneous Milling
Flotation
Filteration / Pelletising Thickeners / Slimes Dam
TailsFloat Conc
![Page 13: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/13.jpg)
Testwork Program
• Elemental Analysis• XRF X-Ray florence
spectroscopy• Necessary to determine
the components of the mineral and its behaviour during processing
• Mineralogy• QEMSCAN, MLA, X-ray
diffraction (XRD), HyLogging and optical microscopy
• Important in choosing the method of upgrading via comminution, gravity, flotation and/or other beneficiation processes
![Page 14: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/14.jpg)
Testwork Program
• HyLogging • spectral analysis
technology for rapid, automated scanning of iron ore drill core, chips and powder.
• This technology is used for a range of applications from logging and archiving core, mineral exploration, and mine planning, to geometallurgy and mineral processing
• The instrument generates digital images and surface spectra which is interpreted by software to produce mineralogical information.
![Page 15: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/15.jpg)
Metallurgical Testwork
• 15 metre drop test to estimate lump/fines ratios and the particle size distribution expected from blasting and processing
• Lump and fines products - beneficiation testwork or characterisation
• iron ore physical testing- Tumble Strength Testingo iron ore thermal testing- Reduction Disintegration Index - Reducibility - Decrepitation Index
![Page 16: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/16.jpg)
Metallurgical Testwork
• Magnetite testing, including wet and dry magnetic separation (LIMS)
• Beneficiation testing - spirals, up-current classifiers, jigging, WHIMS
• Flotation testing - direct and reverse for silica removal
• stage pulverized and optimisation tests versus grind size
• Magnetic susceptibility
• Densimetric testing• Granulometric• Online measurement
& Ore sorting technologies
![Page 17: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/17.jpg)
Metallurgical Testwork
• Agglomeration including pellet and sinter testing
• Wet and dry rare earth drum capacity
• Advanced screen
• Comminution– Autogenous media
competency– Bond abrasion index– Bond ball mill work index– Bond impact crushing work
index– Bond rod mill work index– Comparative work index– High pressure grinding rolls
(HPGR
![Page 18: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/18.jpg)
Metallurgical Testwork• JK drop-weight test and SAG
mill comminution (SMC) test• Levin open circuit grindability• Point load test• SAGDesign (Starkey)• Ultra fine grinding• Unconfined compressive
strength
• Pilot testing• Bulk crushing and screening• AG/SAG milling• Ball milling• HPGR• Hydrocyclones• Spiral Pilot Rig • Magnetic separation• Dense medium cyclone plant• Gravity separation• Flotation• Scrubbing• Dewatering and tailings
management
![Page 19: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/19.jpg)
Other Investigations
• Logistics of transporting of finished products
• Water management requirements
• Power and raw material requirements
• Skilled labour manning and training
• Waste material storage capacity and management
• Opportunity for other value add benefits at the source
![Page 20: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/20.jpg)
Detailed Flowsheet
![Page 21: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/21.jpg)
360 – 800 tph WHIMS
![Page 22: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/22.jpg)
Comparison of Underbed / Side air pulsed Jigs
![Page 23: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/23.jpg)
![Page 24: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/24.jpg)
![Page 25: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/25.jpg)
Conclusions
• Careful consideration should be given to the Elemental and mineralogical Analysis as this can yield valuable design information
• Well chosen combinations of gravity and magnetic separation units can provide for successful upgrade methods for a low grade deposit.
• Conceptual phase of logistics of ore / product transportation and movement needs to be completed as large volumes are under consideration.
• Conceptual requirements for process water to support a Wet processing plant needs to be evaluated.
![Page 26: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/26.jpg)
Conclusions
• Lab scale testing will provide sufficient results for a pre-feasibility stage
• Process simulation and pilot tests should be carried out during the feasibility stage for more accurate results.
• Sufficient Consideration should be given to Elemental scanning techniques at source or at an early stage of the flowsheet as this can reduce the volume to be processed and capital cost.
![Page 27: Pre- Feasibility study of a low grade iron ore](https://reader035.fdocuments.net/reader035/viewer/2022062615/5481ecc7b47959e70c8b4678/html5/thumbnails/27.jpg)
Recommendations
• Sufficient work should be put into the logistics of the project.
• Laboratory scale test work should be carried out on process beneficiation techniques using elemental scanning / gravity separation and wet magnetic separation techniques on available material.
• More emphasis should be placed on elemental and mineralogical Analysis at this stage of the project.