This is a Masonry Stone Mining Project (ML No-64/2002, ML Area 1.0 ha near Village-
Meena Ki Nangal, Tehsil- Neem Ka Thana, District-Sikar (Rajasthan). Earlier mining
lease was granted by State Govt in favor of Shri Vikram Meena S/o Shri Rajendra
Prasad Meena on 09.04.2003 for 20 years which was registered on 16.04.2003. Mining
lease was transferred in favor of Shri Jitendra Yadav S/o Shri Dhan Singh Yadav by
State Govt Letter no KHA/SIKAR/MINOR/KHA .P/64/02/2982 dated 29.06.2005.
The simplified mining scheme has been approved by office of the Superintending
Mining Engineer, Jaipur Circle, Dept of Mines & Geology, Jaipur (Raj) vide letter no-
SME/JP/MP/P-1415/13/1255 dated 15.05.2014.
Table-1
Salient features of the Project
S. No. Particulars Details
A. Mining Lease Details
1. Name of the Project Masonry Stone Mining Project
2. Mineral Masonry Stone
3. Mining Lease Number 64/2002
4. Mining Lease Area 1.0 ha
5. Lease Holder Shri Jitendra Yadav
6. Lease Validity 20 Years
B Location
7. Village Meena Ki Nangal
8. Tehsil Neem Ka Thana
9. District Sikar
10. State Rajasthan
11. Latitude & Longitude Latitude- 27°50’ 12.35”N to 27°50'17.10"N
Longitude-76°01'41.72"E to 76°01'46.48"E
12. Toposheet No. 45 M/13 & 54A/1
C. Other details
13. Cost of the project Rs. 50.00 Lakh
14. Cost for Environmental
Protection Measures
Rs. 0.50 Lakh per annum
15. Seismic Zone II
Masonry Stone Mining Project (ML No-64/2002, ML Area 1.0 ha) with production capacity 1.5 Lacs TPA Near Village-Meena Ki Nangal, Tehsil- Neem Ka Thana, District-Sikar (Rajasthan)
Pre Feasibility Report
Shri Jitendra Yadav
S/o Shri Dhan Singh Yadav 15
2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION
(I) Identification of Project and Project Proponent
Shri Jitendra Yadav is an individual which is involved in the mining activities and
trading of minerals. The lessee has proposed the Masonry Stone Mining Project (ML
No-64/2002, ML Area 1.0 ha) near Village-Meena Ki Nangal, Tehsil- Neem Ka Thana,
District- Sikar (Rajasthan).
(ii) Brief Description of the Nature of Project
This is a Masonry Stone Mining Project (ML No-64/2002, ML Area 1.0 ha) near Village-
Meena Ki Nangal, Tehsil- Neem Ka Thana, District- Sikar (Rajasthan). Earlier mining
lease was granted by State Govt in favor of Shri Vikram Meena S/o Shri Rajendra
Prasad Meena on 09.04.2003 for 20 years which was registered on 16.04.2003. Mining
lease was transferred in favor of Shri Jitendra Yadav S/o Shri Dhan Singh Yadav by
State Govt Letter no KHA/SIKAR/MINOR/KHA .P/64/02/2982 dated 29.06.2005.
The simplified mining scheme has been approved by office of the Superintending
Mining Engineer, Jaipur Circle, Dept of Mines & Geology, Jaipur (Raj) vide letter no-
SME/JP/MP/P-1415/13/1255 dated 15.05.2014.
As per EIA Notification dated 2006, as amended till date, this project comes under
Mining of Minerals S. No. (1A)-5 Category A, as general condition is application due to
interstate boundary of Rajasthan & Haryana falling within 0.2 km in North direction
from mine site. Hence, environment clearance is required from Ministry of
Environment Forest & Climate Change.
(III) Need for the Project & Its Importance to the Country/ Region
Masonry Stone is mainly the basic raw material used in construction of building
material. Looking into the demand of masonry stone in nearby area, it is necessary to
have this mining project.
(IV) Demand – Supply Gap
Considering the demand of mineral sufficient availability of the mineral in the area, it
is essential to have Masonry stone mine to sustain the supply of mineral for
construction purpose.
(v) Imports vs. Indigenous Production
It is a Masonry Stone mineral used in building construction purpose in Rajasthan,
Haryana, Punjab, Uttaranchal, MP, UP etc.
(vi) Export Possibility
There is export possibility as Masonry Stone mineral used in building construction
purpose in Rajasthan, Haryana, Punjab, Uttaranchal, MP, UP etc.
Masonry Stone Mining Project (ML No-64/2002, ML Area 1.0 ha) with production capacity 1.5 Lacs TPA Near Village-Meena Ki Nangal, Tehsil- Neem Ka Thana, District-Sikar (Rajasthan)
Pre Feasibility Report
Shri Jitendra Yadav
S/o Shri Dhan Singh Yadav 16
(vii) Domestic/Export Markets
The Masonry Stone has only domestic market and will fulfill the requirement of the
main consumers of nearby area.
(viii) Employment Generation (Direct and Indirect) due to the Project
Approx. 10 skilled, semiskilled and unskilled manpower will be employed required in
the mine.
3.0 PROJECT DESCRIPTION
(i) Type of Project Including Interlinked And Independent Projects, If Any
There is no interlinked or interdependent project based on mineral produced. The
mineral will be sold directly.
Location (map showing general location, specific location, and project boundary &
project site layout) with coordinates
Masonry Stone Mining Project (ML No-64/2002, ML Area 1.0 ha) with production capacity 1.5 Lacs TPA Near Village-Meena Ki Nangal, Tehsil- Neem Ka Thana, District-Sikar (Rajasthan)
Pre Feasibility Report
Shri Jitendra Yadav
S/o Shri Dhan Singh Yadav 17
Figure1: Location Map
(ii) Details of Alternate Sites Considered
No alternative site has been taken into consideration due to availability of mineral
resources in the area and. The mining lease has already been granted by State Govt.
Masonry Stone Mining Project (ML No-64/2002, ML Area 1.0 ha) with production capacity 1.5 Lacs TPA Near Village-Meena Ki Nangal, Tehsil- Neem Ka Thana, District-Sikar (Rajasthan)
Pre Feasibility Report
Shri Jitendra Yadav
S/o Shri Dhan Singh Yadav 18
(iii) Size and magnitude of operation
Production of Masonry Stone {Production Capacity- 1.5 Lacs TPA} from this mine is
proposed and mining will be done by opencast semi mechanized method.
(iv) Project Description with Process Detail
(1) Salient features along with project vicinity details of the Mining project is given
below:
Table - 2
Salient Features of the Project
S. No. Particulars Details
1. Name of the Project Masonry Stone Mining Project
2. Mineral Masonry Stone
3. Mining Lease Number 64/2002
4. Mining Lease Area 1.0 ha
5. Lease Holder (Proposed) Shri Jitendra Yadav
6. Lease Period 20 Years
7. Mineable reserve 741913.30 Tonnes
8. Life of Mine 5 years@ 1.5 Lacs TPA
9. Elevation Range in the area 365 mRL to 374 mRL
10. General ground level 380 mRL
11. Ground Water table 70-75 m bgl
12. Ultimate Working Depth 45m
13. Stripping ratio (Mineral in
tone: waste in cu.m)
1:0.08
Mining will not intersect ground water table
Source- Approved Simplified Mining Scheme
(2) GEOLOGY OF THE AREA –
Regional Geology
Stratigraphy of the Mineral deposit in the area
Delhi Super
Group
Ajabgarh Group
Thanagaji formation Andalusite-Biotite-Schist
Sariska formation Brecciated ferruginous
quartzite
Kushalgarh
Formation
Calc-gneiss
Amphibole
Quartzite
Alwar Group Pratapgarh Massive Quartzite
Masonry Stone Mining Project (ML No-64/2002, ML Area 1.0 ha) with production capacity 1.5 Lacs TPA Near Village-Meena Ki Nangal, Tehsil- Neem Ka Thana, District-Sikar (Rajasthan)
Pre Feasibility Report
Shri Jitendra Yadav
S/o Shri Dhan Singh Yadav 19
Formation
Kankawarhi
Formation
Phyllite Schist
ESTIMATION OF RESERVES
Proved - 51913.30 Tonnes
Probable - 690000 Tonnes
Total Mineable Reserves - 741913.30 Tonnes
(3) Method of Mining
The mining will be done by opencast semi mechanized method. The bench height is
proposed to 6 meters. The ultimate pit slope will be 450. The transportation of
minerals and waste will be by hydraulic Tippers & Dumpers.
a. Excavation
The excavation of mineral and overburden in the lease area is by hydraulic
excavator.
b. Drilling
The drilling will be done with the help of compressor and drills.
c. Blasting
The hole will be blasted by using ANFO as and when required.
d. Loading and Transportation
Loading of mineral and overburden is by excavator. The transportation of
minerals and waste will be by hydraulic Tippers & Dumpers.
PROCESS FLOW CHART OF MINING
TOP SOIL & O.B. REMOVAL
DRILLING
BLASTING
LOADING
TRANSPORTTO CONSUMERS
Masonry Stone Mining Project (ML No-64/2002, ML Area 1.0 ha) with production capacity 1.5 Lacs TPA Near Village-Meena Ki Nangal, Tehsil- Neem Ka Thana, District-Sikar (Rajasthan)
Pre Feasibility Report
Shri Jitendra Yadav
S/o Shri Dhan Singh Yadav 20
Table-3 EXTENT OF MECHANIZATION
S.No. Machinery Number
1. Hydraulic Excer Tankeravator 1
2. Rock Breaker 1
3. Compressor 1
4. Ingersoll-Rand Dril Machine 1
5. Hydraulic Tipper/Dumpers 4
6. Water tanker 1
Source: Approved Simplified Mining Scheme
5. PROPOSED YEAR WISE PRODUCTION DETAILS OF THE NEXT YEARS
The proposed Year-wise production plan for next years is mentioned in the table
given below:
Table – 4
Year Wise Production for Next Five Years
Year Masonry Stone (in Lacs Tonnes)
1st Year 1.5
2nd Year 1.5
3rd Year 1.5
4th Year 1.5
5th Years 1.5
Total 7.5
Source: Approved Simplified Mining Scheme
6. WASTE GENERATION & DISPOSAL
Table – 5
Year Wise Waste Generation of Next Five Years
Year waste (In tonnes)
I 12000
II 12000
III 12000
IV 12000
V 12000
Total 60000
Source: Approved Simplified Mining Scheme
Masonry Stone Mining Project (ML No-64/2002, ML Area 1.0 ha) with production capacity 1.5 Lacs TPA Near Village-Meena Ki Nangal, Tehsil- Neem Ka Thana, District-Sikar (Rajasthan)
Pre Feasibility Report
Shri Jitendra Yadav
S/o Shri Dhan Singh Yadav 21
7. CONCEPTUAL PLAN
At the conceptual stage, total excavated area will be converted in to water
reservoir.
Total area covered under plantation will be 33% of total lease area.
Around 60,000 Tonnes of waste will be generated at the end of fifth year which
will be used for construction and maintenance of Kachha approach road time to
time. A temporary site of 0.01 ha will be provided for temporary dump.
(v) Raw Material Required Along With Estimated Quantity, Likely Source, Marketing
Area of Final Products, Mode of Transport of Raw Material and Finished Product.
This is a Masonry Stone Mining Project. No raw material will be required.
(vi) Resources Optimization/ Recycling and Reuse Envisaged in the Project, if any, should
be briefly Outlined
� No waste water will be generated from mining operation
� Domestic sewage water generated from office toilet will be disposed in soak
pits via septic tank.
(vii) Availability of Water Its Source, Energy /Power Requirement and Source
A. Water requirement:
Total Water requirement estimated is about 5 KLD which will be purchased
from nearby villages. This can be used for supply of water for mining work,
spraying, watering the plants and drinking purpose.
B. Power requirement:
No electrical energy will be required since mine will be operated in one shift
only.
(viii) Quantity of Waste to Be Generated (Liquid and Solid) And Scheme for Their
Management/Disposal:
Around 60,000 Tonnes of waste will be generated at the end of fifth year which will
be used for construction and maintenance of Kachha approach road time to time. A
temporary site of 0.01 ha will be provided for temporary dump.
4.0 SITE ANALYSIS
(i) Connectivity
Nearest city is Kotputli (~22 km in SE direction) & District headquarter is Sikar (~92 km
in WSW direction), Nearest Railway Station is Neem Ka Thana (~28 km in WSW
direction) from Mine site and Nearest Airport is Sanganer Airport, Jaipur (~115 Km in
SSW direction). The lease area is well connected through roads.
Masonry Stone Mining Project (ML No-64/2002, ML Area 1.0 ha) with production capacity 1.5 Lacs TPA Near Village-Meena Ki Nangal, Tehsil- Neem Ka Thana, District-Sikar (Rajasthan)
Pre Feasibility Report
Shri Jitendra Yadav
S/o Shri Dhan Singh Yadav 22
(ii) Land Form, Land Use and Land Ownership
Existing Land Use Pattern
The total ML area of 1.0 ha comprises of Gair Mumkin Pahar.
(iii) Topography
The lease area comprises undulated terrain. The highest contour is 374 mRL and
lowest is 365 mRL. The mining lease area is 1.0 ha which is Gair Mumkin Pahar.
Existing Land Use Pattern {Agriculture, Non-Agriculture, Forest, Water Bodies
(Including Area Under CRZ)}, Shortest Distances From The Periphery Of The Project
To Periphery Of The Forests, National Park, Wild Life Sanctuary, Eco Sensitive Areas,
Water Bodies (Distance From The HFL Of The River), CRZ. In Case Of Notified
Industrial Area, A Copy Of The Gazette Notification.
Table – 7
Environmental Settings
S. No. Particular Details
1. Nearest city/ town Kotputli (~22 km in SE direction)
2. Nearest Railway Station Neem Ka Thana (~28 km in WSW direction)
3. Nearest Airport Sanganer Airport, Jaipur (~115 Km in SSW direction)
4. Interstate boundary within 10
km radius of study area
Rajasthan & Haryana (~0.2 km in North direction)
5. Nearest National Highway/State
Highway
� SH-37B (~7.0 km in South direction)
� NH-8 (~20 km in SE direction)
6.
Ecological Sensitive Areas
(National Park, Wildlife
Sanctuary, Biosphere Reserve
etc.)
There is no National Park, Wild Life Sanctuaries,
Biosphere Reserves, Tiger Reserves, Wildlife Corridors,
etc. within 10 km radius
7. Reserved/Protected Forest
within 10 km radius
� Kharjo PF (~1.0 km in South direction)
� Mina Ki Nangal PF (~2.0 km in SE direction)
� Baneti PF (~6.0 km in SE direction)
� Bhopiya PF (~6.5 km in SSE direction)
� Patan PF (~6.5 km in SW direction)
� Hasampur PF (~8.5 km in South direction)
9. Nearest River / water body Krishnawati or Kasaunti Nadi (~5.0 km in SE direction)
10. Archaeological Important Place None, within 10 km radius area of mine site.
Source: SOI Toposheet
Masonry Stone Mining Project (ML No-64/2002, ML Area 1.0 ha) with production capacity 1.5 Lacs TPA Near Village-Meena Ki Nangal, Tehsil- Neem Ka Thana, District-Sikar (Rajasthan)
Pre Feasibility Report
Shri Jitendra Yadav
S/o Shri Dhan Singh Yadav 24
Figure 2: Map showing 10 km radius study area
Masonry Stone Mining Project (ML No-64/2002, ML Area 1.0 ha) with production capacity 1.5 Lacs TPA Near Village-Meena Ki Nangal, Tehsil- Neem Ka Thana, District-Sikar (Rajasthan)
Pre Feasibility Report
Shri Jitendra Yadav
S/o Shri Dhan Singh Yadav 25
(iv) Existing Infrastructure:
There is a small mine office cum rest shelter is available at site and some vegetations
existing in the lease area which will be cleared when required. Total lease area is Gair
Mumkin Pahar.
5.0 PLANNING BRIEF
(i) Planning Concept (Type of Industries, Facilities, and Transportation etc.) Town and
Country Planning/Development Authority Classification
This is a mining Project.
(ii) Population Projection
10 Manpower required will be engaged from nearby areas. No significant influx of
people is anticipated in the area.
(iii) Land Use Planning
The proposed mining lease area is 1.0 ha. The area comprises of Gair Mumkin Pahar.
At the conceptual stage, total excavated area will be converted in to water reservoir.
Total area covered under plantation will be 33% of total lease area. The local people
would use the buildings and roads for their infrastructure facilities.
(iv) Assessment of Infrastructure Demand (Physical & Social)
Lessee will assess the demand of infrastructure (Physical & Social) in nearby area of
the proposed mine site and same will be developed under social work.
(v) Amenities/Facilities
Lessee will develop the Amenities/Facilities in the nearby area of the proposed mine
site as per requirement of local people of the nearby area under corporate social
responsibility programs.
6.0 PROPOSED INFRASTRUCTURE
(i) Residential Area (Non Processing Area)
This is not required as mine workers will come from nearby villages. Rest shelter to
the workers already exists in the major mining lease of the lessee.
(ii) Green Belt
Green belt will be developed on the periphery of the lease area and outside the lease
area equal to 33% of the lease area.
(iii) Connectivity
Nearest city is Kotputli (~22 km in SE direction) & District headquarter is Sikar (~92 km
in WSW direction), Nearest Railway Station is Neem Ka Thana (~28 km in WSW
Masonry Stone Mining Project (ML No-64/2002, ML Area 1.0 ha) with production capacity 1.5 Lacs TPA Near Village-Meena Ki Nangal, Tehsil- Neem Ka Thana, District-Sikar (Rajasthan)
Pre Feasibility Report
Shri Jitendra Yadav
S/o Shri Dhan Singh Yadav 26
direction) from Mine site and Nearest Airport is Sanganer Airport, Jaipur (~115 Km in
SSW direction). The lease area is well connected through roads.
(iv) Water Management (Source & Supply of water)
Total Water requirement estimated is about 5 KLD which will be purchased from
nearby villages. This can be used for supply of water for mining work, spraying,
watering the plants and drinking purpose.
(v) Sewerage System
Domestic sewage water generated from office toilet will be disposed in soak pits via
septic tank. Outside discharge is not envisaged.
(vi) Industrial Waste Management
No industrial waste water will be generated from this mining operation.
(vii) Solid Waste Management
Around 60,000 Tonnes of waste will be generated at the end of fifth year which will
be used for construction and maintenance of Kachha approach road time to time. A
temporary site of 0.01 ha will be provided for temporary dump.
(viii) Power Requirement & Supply/Source
No electrical energy will be required since mine will be operated in one shift only. The
nearby area is electrified. It is proposed to connect the applied mine with power
supply connections in the near future.
7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN
(i) Policy To Be Adopted (Central/State) In Respect Of The Project Affected Persons
Including Home Oustees, Land Oustees And Landless Laborers (Brief Outline To Be
Given).
Not Applicable as the lease area Gair Mumkin Pahar and there is no habitation in the
area.
8.0 PROJECT SCHEDULE & COST ESTIMATES
(i) Likely Date Of Start Of Construction And Likely Date Of Completion (Time Schedule
For The Project To Be Given)
The mining activity will be started after obtaining Environmental Clearance from
MoEF&CC, New Delhi.
(ii) Estimated Project Cost Along With Analysis In Terms Of Economic Viability of the
Project
���� Total Project Cost : 50.0 Lacs Per annum
���� Environment Protection Cost : 0.50 Laks Per annum
9.0 ANALYSIS OF PROPOSAL
� Masonary Stone Mining Project will result in growth of the surrounding areas by
Masonry Stone Mining Project (ML No-64/2002, ML Area 1.0 ha) with production capacity 1.5 Lacs TPA Near Village-Meena Ki Nangal, Tehsil- Neem Ka Thana, District-Sikar (Rajasthan)
Pre Feasibility Report
Shri Jitendra Yadav
S/o Shri Dhan Singh Yadav 27
increasing direct and indirect employment opportunities in the region including
ancillary development and supporting infrastructure. Special emphasis on
Financial and Social benefits will be given to the local people including tribal
population, if any, in the area.
� Development of social amenities will be in the form of medical facilities, and
providing books and school uniforms to the poor students of nearby schools.
� No major adverse effect on environment is envisaged as the required mitigation
measures are inbuilt in the project.
10.0 ENVIRONMENTAL MANAGEMENT PLAN
10.1 AIR POLLUTION CONTROL MEASURES
���� Wet drilling with Sharp drill bits will be used for drilling to reduce generation of
dust.
���� Green belt will be developed on the periphery of the lease area and outside the
lease area equal to 33% of the lease area.
���� Periodical water spraying on the haul roads will be done.
10.2 WATER MANAGEMENT
���� There is no surface water body in and around the mining lease area.
���� The rain water collected in mining pit will be diverted in natural water channels.
���� Domestic waste water generated from office toilet will be disposed in soak pits
via septic tank.
10.3 NOISE POLLUTION CONTROL MEASURES
���� Proper maintenance of all machines will be carried out which will reduce noise
generation during operations.
���� Workers exposed to high noise levels will be provided with ear defenders.
10.4 LAND RECLAMATION
���� Total mining lease area is 1.0 hectares.
���� At the conceptual stage, total excavated area will be converted in to water
reservoir.
���� Total area covered under plantation will be 33% of total lease area.
10.5 SOLID WASTE MANAGEMENT
Around 60,000 Tonnes of waste will be generated at the end of fifth year which will
be used for construction and maintenance of Kachha approach road time to time. A
temporary site of 0.01 ha will be provided for temporary dump.
10.6 GREEN BELT DEVELOPMENT
���� Local species will be preferred for plantation.
���� Tree guards will be provided for protection from animals.
Masonry Stone Mining Project (ML No-64/2002, ML Area 1.0 ha) with production capacity 1.5 Lacs TPA Near Village-Meena Ki Nangal, Tehsil- Neem Ka Thana, District-Sikar (Rajasthan)
Pre Feasibility Report
Shri Jitendra Yadav
S/o Shri Dhan Singh Yadav 28
���� Green belt will be developed on the periphery of the lease area and outside the