Page 1 of 16 PRE - FEASIBILITY REPORT FOR MODERNIZATION OF CAPTIVE POWER PLANT WITHOUT INCREASING POLLUTION LOAD IN EXISTING UNIT OF M/S. GHCL LTD. SUTRAPADA-362 275, TAL. SUTRAPADA, DIST. GIR SOMNATH (GUJ.) NABL Accredited Testing Laboratory ISO 9001:2008 Certified Company Aqua-Air Environmental Engineers P. Ltd. 403, Centre Point, Nr. Kadiwala School, Ring Road, Surat - 395002 Prepared By: NABL Accredited Testing Laboratory ISO 9001:2008 Certified Company Aqua-Air Environmental Engineers P. Ltd. 403, Centre Point, Nr. Kadiwala School, Ring Road, Surat - 395002 NABL Accredited Testing Laboratory ISO 9001:2008 Certified Company Aqua-Air Environmental Engineers P. Ltd. 403, Centre Point, Nr. Kadiwala School, Ring Road, Surat - 395002 Prepared By:

Transcript of PRE - FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/21_Sep_2017... ·...

Page 1: PRE - FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/21_Sep_2017... · Road, Surat -395002 Prepared By: Page 2 of 16 CONTENTS Sr. No. Description Page No.

Page 1 of 16

PRE - FEASIBILITY REPORT

FOR

MODERNIZATION OF CAPTIVE POWER PLANT

WITHOUT INCREASING POLLUTION LOAD IN

EXISTING UNIT

OF

M/S. GHCL LTD.

SUTRAPADA-362 275,

TAL. SUTRAPADA, DIST. GIR SOMNATH

(GUJ.)

NABL Accredited Testing Laboratory

ISO 9001:2008 Certified Company

Aqua-Air Environmental Engineers P. Ltd.

403, Centre Point, Nr. Kadiwala School, Ring

Road, Surat - 395002

Prepared By:

NABL Accredited Testing Laboratory

ISO 9001:2008 Certified Company

Aqua-Air Environmental Engineers P. Ltd.

403, Centre Point, Nr. Kadiwala School, Ring

Road, Surat - 395002

NABL Accredited Testing Laboratory

ISO 9001:2008 Certified Company

Aqua-Air Environmental Engineers P. Ltd.

403, Centre Point, Nr. Kadiwala School, Ring

Road, Surat - 395002

Prepared By:

Page 2: PRE - FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/21_Sep_2017... · Road, Surat -395002 Prepared By: Page 2 of 16 CONTENTS Sr. No. Description Page No.

Page 2 of 16

CONTENTS

Sr.

No.

Description Page No.

1. Executive Summary 3

2. Introduction of the Project/Background information 6

3. Project Description 7

4. Site Analysis 12

5. Planning Brief 13

6. Proposed Infrastructure 14

7. Rehabilitation and resettlement (R & R) Plan 15

8. Project Schedule & Cost Estimates 15

9. Analysis of Proposal (Final Recommendations) 16

Page 3: PRE - FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/21_Sep_2017... · Road, Surat -395002 Prepared By: Page 2 of 16 CONTENTS Sr. No. Description Page No.

Page 3 of 16

1.0 Executive Summary

1.1 Project Details

M/s. GHCL Limited is located at Village: Sutrapada, Tal: Sutrapada, District: Gir Somnath

(Guj.) is engaged in commercial manufacturing of Soda Ash & Captive Power Plant.

1.2 Products along with Production Capacity

1.3 Water Requirement, Waste Water Generation and Treatment

Total water requirement will be 408600 m3/day; which will be met through Hiran Dam &

Sea. Total wastewater generation will be 384008 m3/day which includes process effluent &

cooling sea water.

FINAL EFFLUENT DISPOSAL SYSTEM

DIFFUSER SYSTEM

Liquid waste from distiller and salt purification section is conveyed through pipeline and pre

diluted with once through cooling seawater in a mixing pond. It is discharged through a

combination of open channel of approximate 810 meters length and a submarine pipeline

inside the Arabian Sea with special designated diffuser system for spontaneous dilution.

1.4 Air Pollution Source and Control Management

The flue gas emission through stack attached to boiler shall conform to the following

standards:

SR.

NO.

PRODUCT EXISTING TOTAL PROPOSED

1. Captive Power plant 2x11 MW + 1x4.2 MW +

1x12.5 MW (stand by)

= 38.7 MW

2x11 MW + 1x12.5 MW +

1x4.2 MW (stand by) =

38.7 MW

2. Soda Ash 11,00,000 TPA 11,00,000 TPA

Page 4: PRE - FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/21_Sep_2017... · Road, Surat -395002 Prepared By: Page 2 of 16 CONTENTS Sr. No. Description Page No.

Page 4 of 16

Common Stack

Attached to

Stack Height in

Meter

Air Pollution

Control System Parameters

Permissible

Limit

Boiler

(1 to 5 nos.)

1-Stand by

145 ESP with each

boiler

PM

SO2

NOx

150 mg/Nm3

100 ppm

50 ppm

The process emission through various stacks/vent of process shall confirm to the

following standards:

Stack

No.

Stack Attached

to

Stack Height in

Meter

Air Pollution

Control System Parameters

Permissible

Limit

1 Filter Gas

scrubber 30 Scrubber NH3

175 mg/Nm3

2 Tower gas

scrubber 35.1 Scrubber NH3

175 mg/Nm3

3 Lime mill A 59.6 Bag filter PM

150 mg/Nm3

4 Lime mill B 59.6 Bag filter PM

150 mg/Nm3

5 Lime mill C 59.6 Bag filter PM

150 mg/Nm3

6 Dense ash

scrubber (old) 34 Bag filter PM

150 mg/Nm3

7 Dense ash

scrubber (New) 34 Bag filter PM

150 mg/Nm3

8 Lignite Tippler 15 Bag filter and

Dry Fog system PM

150 mg/Nm3

9 Lignite screen

House 15

Bag filter and

Dry Fog system PM

150 mg/Nm3

10 Boiler Bunker

Top 15

Bag filter and

Dry Fog system PM

150 mg/Nm3

11 Lime stone

Tippler 15 Bag filter PM

150 mg/Nm3

12 Limestone

screen house 15 Bag filter PM

150 mg/Nm3

13 Lignite feed

Building 15

Bag filter/

Dry Fog system PM

150 mg/Nm3

Page 5: PRE - FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/21_Sep_2017... · Road, Surat -395002 Prepared By: Page 2 of 16 CONTENTS Sr. No. Description Page No.

Page 5 of 16

14 Belt 213 / lime

kiln DSL 15 Bag filter PM

150 mg/Nm3

1.5 Hazardous Waste Management

Non-hazardous Waste

1.6 Green Belt

Total 11,78,669 m2

land area is available at site; out of this 4,85,619 m2 (41%) area is

developed as greenbelt and other forms of greenery.

1.7 Power & Fuel Requirements

Total Power requirement:

SR.

NO.

NAME OF

WASTE

WASTE

CATEGORY

QUANTITY

MODE OF DISPOSAL

1 Used Oil 5.1 40.5 MT/Year Collection, Storage, Transportation

and selling to registered re-refiners

units

2 Used Battery 17 8 MT/Year Collection, Storage, Transportation

and selling to registered re-refiners

units

1 Fly Ash -- 88560 MT/Year Bricks manufacturing plant within

factory premises & sell to National

Highway Authority of India (NHAI)

for road construction.

Sr.

No.

Description Requirement

( MW)

Source

1 Existing:

2x11 MW + 1x4.2 MW +

1x12.5 MW (stand by) = 38.7

MW

26.2 MW Captive power plant

Page 6: PRE - FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/21_Sep_2017... · Road, Surat -395002 Prepared By: Page 2 of 16 CONTENTS Sr. No. Description Page No.

Page 6 of 16

Note: Two DG Sets (1000 KVA & 500 KVA) are kept for emergency power back up.

Total Fuel requirement:

Sr.

No.

Fuel Quantity

1 Existing - Coal/Lignite 1500 MT/Day

2 Total Proposed – Coal/Lignite 1500 MT/Day

Note: After modernization of CPP the quantity of fuel will remain unchanged.

2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION

2.1 Identification of the project and project proponent. In case of mining project, a copy

of mining lease/letter of intent should be given.

Identification of the project

M/s. GHCL Limited is located at Village: Sutrapada, Tal: Sutrapada, District: Gir Somnath

(Guj.) is engaged in commercial manufacturing of Soda Ash & Captive Power Plant.

Identification of the project proponent

Mr. N N Radia (COO)

2.2 Brief description of nature of the Project

M/s. GHCL Limited is located at Village: Sutrapada, Tal: Sutrapada, District: Gir Somnath

(Guj.) is engaged in commercial manufacturing of Soda Ash & Captive Power Plant.

2.3 Need for the project and its importance to the country and or region

The demand for products intended to be manufacture is increasing in the country.

2 Total Proposed :

2x11 MW + 1x12.5 MW +

1x4.2 MW (stand by) = 38.7

MW

34.5 MW Condensing turbine

in operation

Page 7: PRE - FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/21_Sep_2017... · Road, Surat -395002 Prepared By: Page 2 of 16 CONTENTS Sr. No. Description Page No.

Page 7 of 16

2.4 Demands-Supply Gap

Based on our informal survey, we have found that there is a good potential for increase in

CPP by Condensing turbine. This is addition to existing CPP.

2.5 Imports vs. Indigenous production

Not applicable.

2.6 Export possibility

Not applicable.

2.7 Domestic/Export Markets

Not applicable.

2.8 Employment Generation (Direct and Indirect) due to project.

M/s. GHCL Limited will give direct employment to local people based on qualification and

requirement. In addition to direct employment, indirect employment shall generate ancillary

business to some extent for the local population.

3.0 Project Description

3.1 Type of Project including interlinked and interdependent projects, if any.

No interlinked project has been submitted.

Page 8: PRE - FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/21_Sep_2017... · Road, Surat -395002 Prepared By: Page 2 of 16 CONTENTS Sr. No. Description Page No.

Page 8 of 16

3.2 Location (map showing general location, specific location and project boundary &

project site layout) with coordinates.

• Map showing general location

Page 9: PRE - FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/21_Sep_2017... · Road, Surat -395002 Prepared By: Page 2 of 16 CONTENTS Sr. No. Description Page No.

Page 9 of 16

• Plot Layout

Page 10: PRE - FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/21_Sep_2017... · Road, Surat -395002 Prepared By: Page 2 of 16 CONTENTS Sr. No. Description Page No.

Page 10 of 16

3.3 Details of alternate sites considered and the basis of selecting the proposed site,

particularly the environmental considerations gone into should be highlighted.

Major factors involved in the selection of site are listed below:

• Existing operational facility

• Site is very well connected by road

• Proximity to Raw Material

• Availability of power evacuation facilities

• Availability of water for industrial use

Modern infrastructure support and amenities at par with industrial estates in other global

markets, including:

� Efficient transport facilities within the industry and to & fro the city area.

� Environment-friendly zone.

� Uninterrupted power supply.

3.4 Size or Magnitude of Operation

Please refer Section-1.1.1, Page No. 3.

3.5 Project Description with process details (a schematic diagram/flow chart showing

the project layout, components of the project, etc. should be given)

Please refer Form-I, Annexure-III.

3.6 Raw Material required along with estimated quantity, likely source, marketing area

of final product/s, mode of transport of raw material and Finished product.

For raw material required along with quantity; Please refer Form-I, Annexure-IV.

3.7 Resource optimization/recycling and reuse envisaged in the project, if any, should

be briefly outlined.

Every effort will be put for resource optimization/recycling.

3.8 Availability of water its source, energy/power requirement and source should be

given.

Water Source

Total water requirement shall be met through Hiran Dam & Sea.

Page 11: PRE - FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/21_Sep_2017... · Road, Surat -395002 Prepared By: Page 2 of 16 CONTENTS Sr. No. Description Page No.

Page 11 of 16

Total Power requirement:

Note: Two DG Sets (1000 KVA & 500 KVA) are kept for emergency power back up.

Total Fuel requirement:

Sr.

No.

Fuel Quantity

1 Existing - Coal/Lignite 1500 MT/Day

2 Total Proposed – Coal/Lignite 1500 MT/Day

Note: After modernization of CPP the quantity of fuel will remain unchanged.

3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their

management/disposal.

Please refer Form-I, Annexure-IV.

Sr.

No.

Description Requirement

( MW)

Source

1 Existing:

2x11 MW + 1x4.2 MW +

1x12.5 MW (stand by) = 38.7

MW

26.2 MW Captive power plant

2 Total Proposed :

2x11 MW + 1x12.5 MW +

1x4.2 MW (stand by) = 38.7

MW

34.5 MW Condensing turbine

in operation

Page 12: PRE - FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/21_Sep_2017... · Road, Surat -395002 Prepared By: Page 2 of 16 CONTENTS Sr. No. Description Page No.

Page 12 of 16

3.10 Schematic representations of the feasibility drawing which give information of EIA

purpose.

4.0 Site Analysis

4.1 Connectivity

• Site is very well connected by road & rail

• Availability of power evacuation facilities

• Availability of water for industrial use

4.2 Land Form, Land Use and Land Ownership

It will be incorporated in EIA Studies.

4.3 Topography (along with map)

We will incorporate topography in EIA Studies.

RECONNAISSANCE SURVEY OF EXISTING PLANT ANNUAL REPORT

MARKET ASSESSMENT

FINANCIAL REPORT

PROJECT REPORT

INTRODUCTION

MONITORING OF AIR, WATER & SOIL QUALITY & NOISE

LEVELS. DATA ON METEOROLOGY SOCIO-ECONOMIC

STATUS & BASIC AMENITIES. SITE VISITS BY AND

INTERVIEWS WITH LOCALS

BASELINE

ENVIRONMENTAL

STATUS

ENVIRONMENTAL INFORMATION CENTRE

CENTRAL GROUND WATER BOARD

GUJARAT POLLUTION CONTROL BOARD (GPCB)

PUBLIC HEALTH ENGINEERING DEPT.

AGRICULTURE DEPARTMENT

FOREST DEPARTMENT

IRRIGATION DEPARTMENT

EMPLOYMENT EXCHANGE

HEALTH CENTER

CENSUS DEPT.

INDIAN METEOROLOGICAL DEPT.

SOCIOECONOMIC

STATUS &

INFRASTRUCTURE

PROPOSED

PLANT

FACILITY DESCRIPTION

IMPACTS

METHODOLOGY OF

IMPACT

ASSESSMENT

IDENTIFICATION & ASSESSMENT OF IMPACTS

EVALUATION OF IMPACTS BY MATRIX METHOD

SOURCE OF INFORMATION OVERVIEW OF

E. I. A. STUDIES

ACTIVITIES

ENVIRONMENTAL

MANAGEMENT

PLAN

DESCRIPTION OF EFFLUENT TREATMENT PLAN, AIR

POLLUTION CONTROL, HAZARDOUS WASTE

MANAGEMENT, GREEN BELT DEVELOPMENT

MONITORING PROGRAM

RISK ANALYSIS

STUDIES &

DISASTER

MANAGEMENT

PLAN

SAFETY, HEALTH & ENVIRONMENTAL POLICY, GUIDELINES BY

DIRECTOR GENERAL OF FACTORY SAFETY, MINISTRY OF

LABOR.

CONSEQUENCE ANALYSIS

PREPARATION OF DISASTER MANAGEMENT PLAN

Page 13: PRE - FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/21_Sep_2017... · Road, Surat -395002 Prepared By: Page 2 of 16 CONTENTS Sr. No. Description Page No.

Page 13 of 16

4.4 Existing land use pattern (agriculture, non-agriculture, forest, water bodies

(including area under CRZ)), shortest distances from the periphery of the project to

periphery of the forests, national park, wild life sanctuary, eco sensitive areas, water

bodies (distance from HFL of the river), CRZ. In case of the notified industrial area, a

copy of the Gazette notification should be given.

It will be incorporated in EIA Studies.

4.5 Existing Infrastructure

Existing Infrastructures facilities are listed below:

Site is very well connected by road

Proximity to Raw Material

Availability of power evacuation facilities

4.6 Soil Classification

It will be incorporated in EIA Studies.

4.7 Climatic data from secondary sources.

Primary source: our own weather station & Secondary Sources: Indian Meteorological

Department, Ahmedabad.

4.8 Social infrastructure available.

Depending on the growth of the company the required social infrastructure will be provided.

5.0 Planning Brief

5.1 Planning Concept (type of industries, facilities, transportation, etc.) Town and

Country planning/Development authority classification.

Type of Industry: M/s. GHCL Limited is located at Village: Sutrapada, Tal: Sutrapada,

District: Gir Somnath (Guj.) is engaged in commercial manufacturing of Soda Ash & Captive

Power Plant.

5.2 Population Projection

It will be incorporated in the EIA Study.

Page 14: PRE - FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/21_Sep_2017... · Road, Surat -395002 Prepared By: Page 2 of 16 CONTENTS Sr. No. Description Page No.

Page 14 of 16

5.3 Land use planning (breakup along with green belt, etc.)

Total 11,78,669 m2

land area is available at site; out of this 4,85,619 m2 area is developed as

greenbelt and other forms of greenery.

5.4 Assessment of Infrastructure Demand (Physical & Social)

• Employment would be as per prevailing norms of state government for skilled and

unskilled people for the proposed modernization project activity.

• Social Welfare

• Cordial relation with the industry shall be established and representation shall be made to

villagers for help for creation of facilities related to health, education, etc.

5.5 Amenities/Facilities

It will be incorporated in EIA Studies.

6.0 Proposed Infrastructure

Proposed Modernization is within the existing premises.

6.1 Green Belt

M/s. GHCL Limited shall develop 4,85,619 m2 (41%) area of green belt within the factory

and on periphery of the factory.

6.2 Social Infrastructure

Depending on the growth of the company the required social infrastructure will be provided.

6.3 Connectivity (Traffic and Transportation Road/ Rail/Metro/ Water ways, etc.)

Site is very well connected by road & railway.

6.4 Drinking water Management (Source & Supply of water)

Total water requirement shall be met through Hiren Dam & Sea.

6.5 Sewerage System

Industry has installed Sewage Treatment Plant for treatment of sewage and finally disposed

into sea.

Page 15: PRE - FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/21_Sep_2017... · Road, Surat -395002 Prepared By: Page 2 of 16 CONTENTS Sr. No. Description Page No.

Page 15 of 16

6.6 Solid Waste Management

Please refer Form-I, Annexure-VI.

6.7 Power Requirement & Supply/Source

Please refer Section 1.7, Page No. 6.

7.0 Rehabilitation and Resettlement (R & R) Plan

7.1 Policy to be adopted (central/state) in respect of the project affected including home

oustees, land oustees and landless laborers (a brief outline to be given)

There is no habitation on the proposed modernization project activity area. So R & R policy

is not applicable to this project.

There shall not be displacement of any population in project area. Any major activity that

may lead to resettlement of the people is considered as permanent impact. Hence, there is no

permanent impact on this account. The increasing industrial activity will boost the

commercial and economical status of the locality up to some extent.

8. Project Schedule & Cost Estimates

8.1 Likely date of start of construction and likely date of completion (Time schedule for

the project to be given).

All activities related to modernization shall be started soon after getting Environmental

Clearance.

8.2 Estimated Project cost along with analysis in terms of economic viability of the

project.

Total costs is Rs. 1,075.37 Crores

Existing = Rs. 1,041.64 Crores

Proposed = Rs. 33.73 Crores (Already installed)

Page 16: PRE - FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/21_Sep_2017... · Road, Surat -395002 Prepared By: Page 2 of 16 CONTENTS Sr. No. Description Page No.

Page 16 of 16

9. Analysis of Proposal (Final Recommendations)

9.1 Financial and social benefits with special emphasis on the benefit to be local people

including tribal population, if any, in the area.

• Employment would be as per prevailing norms of state government for skilled and

unskilled people for the proposed modernization project.

• Social Welfare shall be done.

• Cordial relation with the industry shall be established and representation shall be made to

villagers for help for creation of facilities related to health, education, etc.