PRE-FEASIBILITY REPORT -...
-
Upload
phungtuong -
Category
Documents
-
view
215 -
download
1
Transcript of PRE-FEASIBILITY REPORT -...
PRE-FEASIBILITY REPORT
OF
Quartz & Feldspar Mining Project
(ML No 21/2001, Area- 4.50 ha)
At
Near Village: Kaliba Ki Dhani,
Tehsil- Kotputli, Dist.-Jaipur (Raj.)
PROJECT PROPONENT
Shri Mohan Singh Rajput S/o Shri Bhanwar Singh R/o Village – Bhonawas, Tehsil – Kotputli, Dist. - Jaipur (Raj)
Contact Person: Shri Mohan Singh
INDEX
S. NO. PARTICULARS PAGE NO.
1.0 EXECUTIVE SUMMARY 1
2.0
INTRODUCTION OF THE PROJECT/ BACKGROUND
INFORMATION
2
3.0 PROJECT DESCRIPTION 3
4.0 SITE ANALYSIS 9
5.0 PLANNING BRIEF 12
6.0 PROPOSED INFRASTRUCTURE 12
7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN 13
8.0 PROJECT SCHEDULE & COST ESTIMATES 13
9.0 ENVIRONMENTAL MANAGEMENT PLAN 14
10.0 ANALYSIS OF PROPOSAL 15
Quartz & Feldspar Mining Project, M.L. No. 21/2001, ML Area 4.50 ha
Near Village: Kaliba ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan)
Pre- Feasibility Report
Shri Mohan singh Rajput S/o Shri Bhawar Singh 1
PRE – FEASIBILITY REPORT
1.0 EXECUTIVE SUMMARY
This is a existing mining lease for proposal for obtaing Environmnetal Clearance of
Quartz & Feldspar Mining Lease,producation Capacity 131040 TPA Near Village: Kaliba
ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan). The lease area is 4.50 ha which is an
Sawai Chak land.
The lease was granted in favor of Shri Mohan singh Rajput S/o Shri Bhanwar Singh on
dated 02/02/2008 TO 30 Year
Table-1
Salient features of the Project
S.
No.
Particulars Details
A. Mining Lease Details
1. Name of the Project Quartz & Feldspar Mining project
2. Mineral Quartz & Feldspar
3. Mining Lease Number M.L. No 21/2001
4. Mining Lease Area 4.50 ha
5. Applicant Shri Mohan singh Rajput S/o Shri Bhawar Singh
6. Lease Validity 30 Years
B. Location
7. Village Kaliba Ki Dhani
8. Tehsil Kotputli
9. District Jaipur
10. State Rajasthan
11. Latitude & Longitude
Latitude- 27034’16.72’’ TO 27034’6.93’’
Longitude-75058’0.33 ‘’ TO 75057’56.67’’
Quartz & Feldspar Mining Project, M.L. No. 21/2001, ML Area 4.50 ha
Near Village: Kaliba ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan)
Pre- Feasibility Report
Shri Mohan singh Rajput S/o Shri Bhawar Singh 2
S.
No.
Particulars Details
C. Other details
12. Bulk Density 2.6 tonnes/cum.
13. Ultimate Working Depth 20 m bgl
14. Cost of the project Rs. 50 Lacs
15. Cost for Environmental
Protection Measures
Rs. 1.00 Lac per annum
16. Annual Rainfall 300mm to 350 mm
17. Seismic Zone II
2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION
(i) Identification of Project and Project Proponent
This is a existing mining lease of proposal, with production capacity 131040 TPA Near
Village: Kaliba ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan).
(ii) Brief Description of the Nature of Project
This is a existing Quartz & Feldspar mining lease with production capacity 131040 TPA
Near Village: Kaliba ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan).Environmental
Clearance is required as per EIA Notification dated 2006, as amended time to time and
this project is comes under B Category.
(iii) Need for the Project & Its Importance to the Country/ Region
Quartz & Feldspar is mainly the basic raw material used in various manufacture of
different types of glass,plate glass ,glass shells etc.are the main consumers of this
quality of glass and the manufacture industries located at Rajasthan, Haryana, Punjab,
uttranchal, MP, UP etc to fulfill the requirements in grinding units.
(iv) Demand – Supply Gap
Considering the demand of mineral sufficient availability of the mineral in the area, it
is essential to have Quartz & Feldspar mine to sustain the supply of mineral for
manufacture purpose.
(v) Imports vs. Indigenous Production
Quartz & Feldspar Mining Project, M.L. No. 21/2001, ML Area 4.50 ha
Near Village: Kaliba ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan)
Pre- Feasibility Report
Shri Mohan singh Rajput S/o Shri Bhawar Singh 3
It is a Quartz & Feldspar mineral used in manufacture purpose in therefore export in
glass industries located at Rajasthan, Haryana, Punjab, uttranchal, MP, UP etc.
(vi) Export Possibility
There is export possibility as these mineral is Quartz & Feldspar mineral used in
manufacturing purpose in Glass industry therefore export at Rajasthan, Haryana,
Punjab, Uttranchal, MP, UP etc.
(vii) Domestic/Export Markets
Quartz & Feldspar has only domestic market and will fulfill the requirement of the
main consumers of this quality of glass and the manufacture industries.
(viii) Employment Generation (Direct and Indirect) due to the Project
The total 71 skilled and semiskilled manpower needed to run the mine
3.0 Project Description
(i) Type of Project Including Interlinked And Independent Projects, If Any
There is no interlinked or interdependent project based on mineral produced.
The Quartz & Feldspar will be sold directly to industries.
(ii) Location (map showing general location, specific location, and project
boundary & project site layout) with coordinates
Quartz & Feldspar Mining Project, M.L. No. 21/2001, ML Area 4.50 ha
Near Village: Kaliba ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan)
Pre- Feasibility Report
Shri Mohan singh Rajput S/o Shri Bhawar Singh 4
Figure1: Location Map
Quartz & Feldspar Mining Project, M.L. No. 21/2001, ML Area 4.50 ha
Near Village: Kaliba ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan)
Pre- Feasibility Report
Shri Mohan singh Rajput S/o Shri Bhawar Singh 5
(iii) Details of Alternate Sites Considered
No alternative site has been taken into consideration due to availability of mineral
resources in the area and State Govt. has invited applications. The mining lease was
allotted by lottery system to the applicant.
(iv) Size and magnitude of operation
Production Capacity of Quartz & Feldspar 131040 TPA, at Near Village: Kaliba ki
Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan).
(v) Project Description with Process Detail
1. Salient features along with project vicinity details of the Mining project is given
below:
Table - 2
Salient Features of the Project
S. No. Particulars Details
1 Name of the Project Quartz & Feldspar Mining Lease
2 Mineral Quartz & Feldspar
3 Mining Lease Number M.L. No21/2001
4 Mining Lease Area 4.50 ha
5 Lease Holder (Proposed) Shri Mohan singh Rajput S/o Shri Bhawar Singh
6. Lease Period 30 Years
7. Total Geological reserve 921960 Tonnes
8. Mineable reserve 663000 Tonnes
9. Life of Mine 5 years@131040 TPA
10. Bench Height & Length 6 meters
11. Elevation Range in the area 431 mRL to 413 mRL
12. General ground level 400 mRL
13. Ground water table 50m bgl (350 m RL)
Quartz & Feldspar Mining Project, M.L. No. 21/2001, ML Area 4.50 ha
Near Village: Kaliba ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan)
Pre- Feasibility Report
Shri Mohan singh Rajput S/o Shri Bhawar Singh 6
2. GEOLOGY OF THE AREA
Mineral resource map of district the rocks of the area belong to Ajabgarh group of Delhi
Supeer Group.
Strategraphic sequence of Regional Geology is given below:
Recent Soil
Post Delhi Pegmatite, Granite, albetite
Delhi Super
Group
Ajabgarh Group Brecciated quartzite,quartzite,Ortho
Quartzite, Phyllite, Impure
marble,amphibolites,Carbonaceous
Phyllite,Quartzite, calc silicate
Alwar Group Massive quartzite,schist,conglomerate
quartzite,calc-silicate
LOCAL GEOLOGY
Recent Soil
Post Delhi Granite,grnnite
gneiss,Pegmatite
Delhi Super Group Alwar Group Calc silicate
3 Estimated Reserves
Proved : 185000 T
Probable : 478000 T
Total reserves :663000 T
4. Method of Mining
Proposed method of mining will be semi mechanized opencast by forming proper benches.
The mining is proposed as per present situation of the deposit.
Excavation is proposed by blasting. Hydraulic excavator/loader is proposed for removal and
loading of blasted Quartz & Feldspar.The haul/ approach roads have been provided up to the
proposed working faces and will be provided in future also. The Quartz & Feldspar and waste
are proposed to be transported by tractor trolley and tippers.
The mining will be carried out by opencast method by developing the bench of height 6-6 m
height and width. Four slices are considered in a bench. The calculations are as per the four
Quartz & Feldspar Mining Project, M.L. No. 21/2001, ML Area 4.50 ha
Near Village: Kaliba ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan)
Pre- Feasibility Report
Shri Mohan singh Rajput S/o Shri Bhawar Singh 7
slices of a bench. Thus the end position of the bench is 6 meter height. Width is also proposed
6 meter.
5. PROPOSED YEAR WISE PRODUCTION DETAILS OF THE NEXT FIRST FIVE YEARS
The proposed Year-wise production plan for next five years is mentioned in the table
given below: Table – 3
Year Wise Production for Next Five Years
Year Total Excavation
Of Quartz & Feldspar
First year Year passed out
Second year 69680
Third year 95160
Fourth year 131040
Fifth year 126360
MINING METHOD FLOW
CHART
TOP SOIL & O.B. REMOVAL
LOADING
TRANSPORT TO
CONSUMERS
DRILLING
BLASTING
As and when required
Quartz & Feldspar Mining Project, M.L. No. 21/2001, ML Area 4.50 ha
Near Village: Kaliba ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan)
Pre- Feasibility Report
Shri Mohan singh Rajput S/o Shri Bhawar Singh 8
6. LOADING & TRANSPORT
Tyre mounted Hydraulic machinaries will be deployed from time to time and when
required. Trucks and tracor troley will be deployed for transportation of Quartz &
Feldspar from working to consumer.
7. WASTE GENERATION & DISPOSAL
There is no top soil and the generated waste will be second grade mineral and sold
out for other purpose.
8. CONCEPTUAL PLAN
At the conceptual stage, total waste material of about 173650 tonnes. At the end of life
of mine, total excavated area will be 2.52 ha. and 0.44 ha area use in Roads,
overburden dump, Infrastructure etc Which will converted as water reservoir and 1.48
ha. Area will be used in green belt around the lease periphery.
(vi) Raw Material Required Along With Estimated Quantity, Likely Source, Marketing
Area of Final Products, Mode of Transport of Raw Material and Finished Product
This is Quartz & Feldspar Mining Lease. The mineral will be used for manufacture
purposes. No raw material will be required to dependent industries.
(vii) Resources Optimization/ Recycling and Reuse Envisaged in the Project, if any,
should be briefly Outlined
Domestic sewage water generated from office toilet will be disposed in soak pits via
septic tank.
(viii) Availability of Water Its Source, Energy /Power Requirement and Source
A. Water requirement:
Total water requirement for the proposed project will be 4 KLD which will be
sourced from nearby villages.
B. Power requirement:
The electric power will not be use for the process of mining. Only HSD Fuel will be
required for operating machineries.
Quartz & Feldspar Mining Project, M.L. No. 21/2001, ML Area 4.50 ha
Near Village: Kaliba ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan)
Pre- Feasibility Report
Shri Mohan singh Rajput S/o Shri Bhawar Singh 9
(ix) Quantity of Waste to Be Generated (Liquid and Solid) And Scheme for Their
Management/Disposal:
Domestic sewage water generated from office toilet will be disposed in soak pits via
septic tank.
4.0 SITE ANALYSIS
(i) Connectivity
The lease area about ~26.0 km from Kotputli in NE direction.Nearest Railway Station
is situated at Neem ka Thana RS ~27 km in SW direction. The lease area is well
connected through roads.
(ii) Land Form, Land Use and Land Ownership
Existing Land Use Pattern
The total ML area of 4.50 ha comprises of Sawai chak land.
(iii) Topography
The lease area is undulated terrains .The highest contour is 431 mRL and lowest is
413 mRL.
(iv) Existing Land Use Pattern {Agriculture, Non-Agriculture, Forest, Water Bodies
(Including Area Under CRZ)}, Shortest Distances From The Periphery Of The
Project To Periphery Of The Forests, National Park, Wild Life Sanctuary, Eco
Sensitive Areas, Water Bodies (Distance From The HFL Of The River), CRZ. In
Case Of Notified Industrial Area, A Copy Of The Gazette Notification.
Table – 4
Environmental Settings
S.
No.
Particular Details
1 Nearest Village Buchara(~3.0 km, SE)
2 Nearest city/ town Kotputli(~27km, NE)
3 Nearest Railway Station Neem Ka Thana RS (~27 km, NW)
4 Nearest Airport Jaipur international Airport, Jaipur (~86.0 km,SE)
5 Archaeological Important Place None, within 10 km radius area of mine site.
Quartz & Feldspar Mining Project, M.L. No. 21/2001, ML Area 4.50 ha
Near Village: Kaliba ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan)
Pre- Feasibility Report
Shri Mohan singh Rajput S/o Shri Bhawar Singh 10
6 Ecological Sensitive Areas
(National Park, Wildlife
Sanctuary, Biosphere Reserve
etc.)
There is no National Park, Wild Life Sanctuaries,
Biosphere Reserves, Tiger Reserves, Wildlife
Corridors, etc. within 10 km radius
7 Reserved/Protected Forest
within 10 km radius
There is no protected forest within 15.0 km radius.
8 Nearest River / water body None
Quartz & Feldspar Mining Project, M.L. No. 03/1999, ML Area 4.95 ha
Near Village: Chotkiyon ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan)
Pre- Feasibility Report
Figure-2 Key Plan
Shri Suresh Kumar S/o Shri Gordhan Singh 11
Quartz & Feldspar Mining Project, M.L. No. 03/1999, ML Area 4.95 ha
Near Village: Chotkiyon ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan
Pre- Feasibility Report
Shri Suresh Kumar S/o Shri Gordhan Singh 12
(V) Existing Infrastructure:
The lease area about ~3.0 km from Village- Buchara and nearest city ~26.0 km from
Kotputli in NE direction.Nearest Railway Station is situated at Neem ka Thana RS ~27 km
in SW direction. The lease area is well connected through roads.
5.0 PLANNING BRIEF
(i) Planning Concept (Type of Industries, Facilities, and Transportation etc.) Town and
Country Planning/Development Authority Classification
Uses: This is a mining Project
(ii) Population Projection
Manpower required will be engaged from nearby areas. No significant influx of people is
anticipated in the area.
(iii) Assessment of Infrastructure Demand (Physical & Social)
Lessee will assess the demand of manufacuture (Physical & Social) in nearby area of the
proposed mine site and same will be developed under social work
(iv) Amenities/Facilities
Mining Management will develop the Amenities/Facilities in the nearby area of the
proposed mine site as per requirement of local people of the nearby area under
corporate social responsibility programs.
6.0 PROPOSED INFRASTRUCTURE
(i) Residential Area (Non Processing Area)
This is not required as mine workers comes from nearby villages. Rest shelter to the
workers already exists in the major mining lease of the lessee.
(ii) Green Belt
� Green belt will be developed on the approach road, surrounding the pit and also
be done outside the lease area equal to 33% of the lease area.
(iii) Connectivity
The lease area about ~3.0 km from Village- Buchara and nearest city ~26.0 km from
Kotputli in NE direction.Nearest Railway Station is situated at Neem ka Thana RS ~27 km
in SW direction. The lease area is well connected through roads.
Quartz & Feldspar Mining Project, M.L. No. 03/1999, ML Area 4.95 ha
Near Village: Chotkiyon ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan
Pre- Feasibility Report
Shri Suresh Kumar S/o Shri Gordhan Singh 13
(iv) Water Management (Source & Supply of water)
� Total water requirement for the project will be 4 KLD which will be used for
domestic as well as dust supression purpose and sourced from nearby village .
(v) Sewerage System
� Domestic sewage water generated from office toilet will be disposed in soak pits
via septic tank. Outside discharge is not envisaged.
(vi) Industrial Waste Management
� No industrial waste water will be generated from this mine mining operation.
(vii) Solid Waste Management
� The generated solid waste will be second grade mineral and sold to the nearby
market
(viii) Power Requirement & Supply/Source
� Electric power will not be required in mining operations.
7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN
(i) Policy To Be Adopted (Central/State) In Respect Of The Project Affected Persons
Including Home Oustees, Land Oustees And Landless Laborers (Brief Outline To Be
Given)
The mining activity will be started after obtaining Environmental Clearance from
Ministry of Environment, forest & climate change
8.0 PROJECT SCHEDULE & COST ESTIMATES
(i) Likely Date Of Start Of Construction And Likely Date Of Completion (Time
Schedule For The Project To Be Given)
The mining activity is done in the area and enhancement in production will be done after
Environmental Clearance from MoEF, Rajasthan and consent to establish and operate
from RSPCB.
Quartz & Feldspar Mining Project, M.L. No. 03/1999, ML Area 4.95 ha
Near Village: Chotkiyon ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan
Pre- Feasibility Report
Shri Suresh Kumar S/o Shri Gordhan Singh 14
(ii) Estimated Project Cost Along With Analysis In Terms Of Economic Viability of the
Project
(i) Total Project Cost : 50.0 Lacs
(ii) Environment Protection Cost : 1.0 Lakh Per annum
9.0 ENVIRONMENTAL MANAGEMENT PLAN
AIR POLLUTION CONTROL
���� Plantation will be developed within ML areas and will also be developed outside
the ML area equal to 33% of the lease area.
���� Periodical water spraying on the roads will be done.
���� Proper maintenance of all machines will be carried out that will control emission
of gaseous pollutant.
WATER MANAGEMENT
���� There is no surface water body in and around the mining lease area.
���� The rain water collected in mining pit will be used in plantation and dust
suppression.
NOISE POLLUTION CONTROL
���� Proper maintenance of all machines will be carried out which will reduce noise
generation during operations.
LAND RECLAMATION
. At the end of life of mine, total excavated area will be 2.52 ha. and 0.44 ha area use
in Roads, overburden dump, Infrastructure etc Which will converted as water
reservoir and 1.48 ha. Area will be used in green belt around the lease periphery.
SOLID WASTE MANAGEMENT
� The generated solid waste will be used for construction of infrastructer and
maintenances of kucha approach road time to time. There will no waste dump at
the end of life of the mine.
GREEN BELT DEVELOPMENT
Green Belt/plantation will be developed equal to 33% of total lease area. The trees
will be planted at suitable spacing to encourage proper growth around the lease
Quartz & Feldspar Mining Project, M.L. No. 03/1999, ML Area 4.95 ha
Near Village: Chotkiyon ki Dhani, Tehsil- Kotputli , District -Jaipur (Rajasthan
Pre- Feasibility Report
Shri Suresh Kumar S/o Shri Gordhan Singh 15
boundary. The dead plants will be replaced by fresh plants. Native Plant species
will be planted
SOCIO ECONOMIC IMPROVEMENT
���� As the mining activities will increase, better employment opportunity.
���� Semi skilled & unskilled workers will be recruited from the nearby villages.
���� Adult Education programme are proposed for up-gradation of literacy level.
���� The leesee will associate awarness programe.
HEALTH & SAFETY
���� Protective respiratory devices will be provided to personnel working in dusty
areas with adequate training.
���� The lessee will associate in various health and safety awarness program in
nearby villages.
10.0 ANALYSIS OF PROPOSAL
� Proposed Masonry Mining Lease will result in growth of the surrounding areas by
increasing direct and indirect employment opportunities in the region including
ancillary development and supporting infrastructure. Special emphasis on Financial
and Social benefits will be given to the local people including tribal population, if any,
in the area.
� Development of social amenities will be in the form of medical facilities, education to
underprivileged and creation of self help groups.
� No major adverse effect on environment is envisaged as the required mitigation
measures are inbuilt in the project.