Pre Configuring an Item_SPD
-
Upload
larry-sherrod -
Category
Documents
-
view
227 -
download
0
Transcript of Pre Configuring an Item_SPD
-
8/14/2019 Pre Configuring an Item_SPD
1/31
System Process DocumentPreconfiguring an Item
Department
Responsibility/Role
File Name 27762076.docRevision
Document Generation Date 18/01/2010 09:40:00
Date Modified 1/18/2010 09:40:00 AM
Last Changed by
Status
Preconfiguring an Item
Trigger:
Concept
You can invoke Oracle Configurator from within Oracle Bills of Material to create a configured
bill of material and routing for a predefined available-to-order (ATO) item. This is very useful in
a business to business environment where the same configuration is ordered repeatedly.
Preconfigured items can be built to forecast and kept on hand. Customers can order the
preconfigured items directly, as they would order a standard ATO item.
Use the Oracle Inventory Master Items page to create a new item in the master organization andassign it to the appropriate manufacturing organization. In the manufacturing organization, create
a new bill of material for your item, without components, in the Bills of Material page. The
Configurator page enables you to pick your options. Once done, this item can be planned,ordered and stocked, just like a standard item.
In this topic, you will preconfigure an item.
Required Field(s) Comments
Output - Result(s) Comments
Additional Information
Last changed on: 1/18/2010 09:40:00 AM Page 1
-
8/14/2019 Pre Configuring an Item_SPD
2/31
System Process DocumentPreconfiguring an Item
Procedure
Step Action
1. Begin by navigating to the Master Itempage.
Click the vertical scrollbar.
Page 2 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Pre Configuring an Item_SPD
3/31
System Process DocumentPreconfiguring an Item
Step Action
2. Click the Manufacturing and Distribution Manager link.
Last changed on: 1/18/2010 09:40:00 AM Page 3
-
8/14/2019 Pre Configuring an Item_SPD
4/31
System Process DocumentPreconfiguring an Item
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Master Items link.
Page 4 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Pre Configuring an Item_SPD
5/31
System Process DocumentPreconfiguring an Item
Step Action
5. Use the Organizations page to select your organization.
Last changed on: 1/18/2010 09:40:00 AM Page 5
-
8/14/2019 Pre Configuring an Item_SPD
6/31
System Process DocumentPreconfiguring an Item
Step Action
6. Click the M1 Seattle Manufacturing list item.
Step Action
7. Click the OKbutton.
orPress [Alt+O].
Page 6 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Pre Configuring an Item_SPD
7/31
System Process DocumentPreconfiguring an Item
Step Action
8. Use the Master Item page to create a new item.
Last changed on: 1/18/2010 09:40:00 AM Page 7
-
8/14/2019 Pre Configuring an Item_SPD
8/31
System Process DocumentPreconfiguring an Item
Step Action
9. Click in the Item field.
Step Action
10. Enter the desired information into the Item field. Enter "RT_Config".
Page 8 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Pre Configuring an Item_SPD
9/31
System Process DocumentPreconfiguring an Item
Step Action
11. Click in the Description field.
Last changed on: 1/18/2010 09:40:00 AM Page 9
-
8/14/2019 Pre Configuring an Item_SPD
10/31
System Process DocumentPreconfiguring an Item
Step Action
12. Enter the desired information into the Description field. Enter "Preconfiguring an
Item".
Step Action
13. Click the Display Attributes: Master option.
Page 10 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Pre Configuring an Item_SPD
11/31
System Process DocumentPreconfiguring an Item
Step Action
14. Click the Bills of Material tab.
Last changed on: 1/18/2010 09:40:00 AM Page 11
-
8/14/2019 Pre Configuring an Item_SPD
12/31
System Process DocumentPreconfiguring an Item
Step Action
15. Click in the Base Model field.
Step Action
16. Enter the desired information into the Base Model field. Enter "AT22124".
Page 12 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Pre Configuring an Item_SPD
13/31
System Process DocumentPreconfiguring an Item
Step Action
17. Click the Tools menu.
orPress [Alt+T].
Last changed on: 1/18/2010 09:40:00 AM Page 13
-
8/14/2019 Pre Configuring an Item_SPD
14/31
System Process DocumentPreconfiguring an Item
Step Action
18. Click the Copy From... menu.
orPress [C].
Step Action
19. Use the Copy From page to copy information from an existing template.
Page 14 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Pre Configuring an Item_SPD
15/31
System Process DocumentPreconfiguring an Item
Step Action
20. Click in the Template field.
Last changed on: 1/18/2010 09:40:00 AM Page 15
-
8/14/2019 Pre Configuring an Item_SPD
16/31
System Process DocumentPreconfiguring an Item
Step Action
21. Enter the desired information into the Template field. Enter "Finished Good".
Step Action
22. Click the Apply button.
orPress [Alt+A].
Page 16 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Pre Configuring an Item_SPD
17/31
System Process DocumentPreconfiguring an Item
Step Action
23. Click the Done button.
orPress [Alt+D].
Last changed on: 1/18/2010 09:40:00 AM Page 17
-
8/14/2019 Pre Configuring an Item_SPD
18/31
System Process DocumentPreconfiguring an Item
Step Action
24. Click the Save button.
Step Action
25. Click the Tools menu.
orPress [Alt+T].
Page 18 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Pre Configuring an Item_SPD
19/31
System Process DocumentPreconfiguring an Item
Step Action
26. Click the Organization Assignment menu.
orPress [O].
Last changed on: 1/18/2010 09:40:00 AM Page 19
-
8/14/2019 Pre Configuring an Item_SPD
20/31
System Process DocumentPreconfiguring an Item
Step Action
27. Use the Organization Assignment region to assign the item to your manufacturing
organization.
Click the Assigned option.
Step Action
28. Click the Close Form button.
Page 20 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Pre Configuring an Item_SPD
21/31
System Process DocumentPreconfiguring an Item
Step Action
29. Use the Navigator page to navigate to the Bills of Material page.
Last changed on: 1/18/2010 09:40:00 AM Page 21
-
8/14/2019 Pre Configuring an Item_SPD
22/31
System Process DocumentPreconfiguring an Item
Step Action
30. Click the Bills list item.
Step Action
31. Use the Bills of Material page to enter an item and configure bills for it.
Page 22 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Pre Configuring an Item_SPD
23/31
System Process DocumentPreconfiguring an Item
Step Action
32. Click in the Item field.
Step Action
33. Enter the desired information into the Item field. Enter "RT_Config".
Last changed on: 1/18/2010 09:40:00 AM Page 23
-
8/14/2019 Pre Configuring an Item_SPD
24/31
System Process DocumentPreconfiguring an Item
Step Action
34. Click in the Alternate field.
Page 24 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Pre Configuring an Item_SPD
25/31
System Process DocumentPreconfiguring an Item
Step Action
35. Click in the Component field.
Step Action
36. Click the Tools menu.
orPress [Alt+T].
Last changed on: 1/18/2010 09:40:00 AM Page 25
-
8/14/2019 Pre Configuring an Item_SPD
26/31
System Process DocumentPreconfiguring an Item
Step Action
37. Click the Configure Bill menu.
orPress [B].
Page 26 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Pre Configuring an Item_SPD
27/31
System Process DocumentPreconfiguring an Item
Step Action
38. Use the Oracle Configurator page to pick your option, so that you can plan, order
and stock this item, just like a standard item.
Step Action
39. Click the Select option.
Last changed on: 1/18/2010 09:40:00 AM Page 27
-
8/14/2019 Pre Configuring an Item_SPD
28/31
System Process DocumentPreconfiguring an Item
Step Action
40. Click the Finish button.
Page 28 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Pre Configuring an Item_SPD
29/31
System Process DocumentPreconfiguring an Item
Step Action
41. You can enter the quantity of the bill that you need in the Quantity field.
Click the Finish button.
Step Action42. Click the Save button.
Last changed on: 1/18/2010 09:40:00 AM Page 29
-
8/14/2019 Pre Configuring an Item_SPD
30/31
System Process DocumentPreconfiguring an Item
Step Action
43. In the Component field, you can see the component that you configured being
displayed for the item.
Page 30 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Pre Configuring an Item_SPD
31/31
System Process DocumentPreconfiguring an Item
Step Action
44. You have completed the Preconfiguring an Item procedure.
End of Procedure.