High Pressure Piping in Power Plants – Water / Steam Cycles

Capital Markets Day “Power Services“ at Moorburg Power Plant

December 2, 2010

Ronald Diehl, Member of the Executive Board of BB Power Services GmbH

Page 2: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 2/28

 A enda

1. Overview division

Piping Technology

2. High-Pressure Piping Systems

3. Service Range

4. Market Structure

5. Clients

.

7. Competitive differentiators

and success factors

8. References

Page 2

Bilfinger Berger Capital Markets Day December 2, 2010

Page 3: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 3/28

1. Overview division Piping Technology

 

Fields of 

competence

Service range

DetailPro ectManufactu-

Construction,Commission-

BasicEngineering

(ProcessQuality

assurance,

Steelconstruction,

engineeringmanagement,

Fabrication

Erection

,

into operation

,

E/I&C, Arrangementplanning)

welding

technology

,

facades,hoists

DeNOx

Planning teams

Electrostatic

precipitator 

DesulfurizationInduced draft fan

Forced draft fan

Steam generator,

firing system

Components:

coaling, mill, ashremoval,

heat recovery

Construction

services

(Bilfinger Berger

Civil)

Piping

HP system

IP systemLP system

Page 3

Bilfinger Berger Capital Markets Day December 2, 2010

Page 4: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 4/28

1. Overview division Piping Technology

 

Bilf inger Berger Power Services GmbH

Bilf inger Berger SE

Steam GeneratorsEnergy and

Environmental Piping TechnologyMechanical ApparatusSteam Generators

Engineering 

Babcock Borsig Service

GmbH

BHR Hochdruck-

Rohrleitungsbau GmbH

Bilfinger Berger Power

Holdings (Pty) Ltd.Babcock Noell GmbH

MCE Maschinen-

und Apparatebau GmbH& Co. KG (Austria)

 

Steinmüller Instand-

setzung Kraftwerke

Gesellschaft für Energie-

und Umwelttechnik mbH

PKB Planungsbüro

Rohrleitungs- und

 Anlagentechnik GmbH

BHR Piping Systems

Steinmüller Africa

(Pty) Ltd.

Steinmüller Engineering

MCE Industrietechnik Aschersleben GmbH

 

Middle East FZE(UAE)

Duro Dakovic Montaza

d.d. (Croatia)

(Pty) Ltd. (South Africa)  .

MCE Berlin GmbHKOG Group

Page 4

Bilfinger Berger Capital Markets Day December 2, 2010

Rotring Engineering AG

Intervalve (Pty) Ltd. 50%

Page 5: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 5/28

1. Overview division Piping Technology

 

600

Orders received Output volume

600 600

 € million € million

400

500

400

500

400

500

100

200

100

200

100

200

00   0

Orders received and output volume include between €120m and €150m / yearstandard business service .

Page 5

Bilfinger Berger Capital Markets Day December 2, 2010

Page 6: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 6/28

2. High-Pressure Piping Systems

 

plants are the connections between

the feed water pumps, the boiler / heat

exchanger and the turbine.

Coal-fired power plants Lignite-fired power plants

 

Combined-cycle power stations

Biomass power plants

Surrogate fuel power plants

Page 6

Bilfinger Berger Capital Markets Day December 2, 2010

Page 7: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 7/28

2. High-Pressure Piping Systems

 – 

RWE Neurath lignite-fired power plant(optimised plant design, BoA),

1,100 MW

Total material approx. 3,100 t / unit

Pipes approx. 2,200 t

  .

Fittings approx. 190 t

Supports/hangers approx. 600 t

Total pipe length approx. 11,000 m

Main piping approx. 4,400 m

Total circumferential welds

approx. 7,000

Total circumferential welds

Page 7

Bilfinger Berger Capital Markets Day December 2, 2010

  . ,

Page 8: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 8/28

2. High-Pressure Piping Systems

 – 

RWE Neurath lignite-fired power plant 172 m level

 

(optimised plant design, BoA),

1,100 MW

 

Feed water 

430 bar, 250 °C, Ø 588 mm, w.th. 44

  Main steam

295 bar, 610 °C, Ø 549 mm, w.th. 97

 

Cold reheat

75 bar, 435 °C, Ø 824 mm, w.th. 31

 

Hot reheat

70 bar, 615 °C, Ø 806 mm, w.th. 43

Page 8

Bilfinger Berger Capital Markets Day December 2, 2010

Page 9: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 9/28

3. Service range

,

Fabrication of pipingspoolsFabrication of pipingspools

 Assembly of theprefabricated pipe

 Assembly of theprefabricated pipe

Plant maintenanceconsulting service

Plant maintenanceconsulting service

Pi in conce tual / Pi in conce tual /

Bending

Welding

Bending

Welding

spoo s an angers

Power plant newbuilds

spoo s an angers

Power plant newbuilds

Plant maintenanceengineering

Plant maintenanceengineering

basic design

Piping detail design

basic design

Piping detail design

Heat treatment

Machining

Heat treatment

Machining

Replacement duringpower plant outages

Replacement duringpower plant outages

an op m za on

Power plant retrofits

an op m za on

Power plant retrofits

 

System analysis

Stress calcluation

 

System analysis

Stress calcluation

Destructive and non-

destructive material

testing

Destructive and non-

destructive material

testing

ssessmen oresidual service life

ssessmen oresidual service life

ProcurementProcurement

Expediting

Specifications

Expediting

Specifications

Pipe hangerdesign

Pipe hangerdesign

Quality Assurance

Scheduling

Quality Assurance

Scheduling

Page 9

Bilfinger Berger Capital Markets Day December 2, 2010

 

Page 10: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 10/28

4. Market Structure

 

-

Market leader in Europe

Market leader in South Africa

One of six leading contractors worldwide

Piping Systems in Nuclear Power Plants

Market leader in Europe

Main Coolant Piping in Nuclear Power Plants

n erna y c a e p pes

One of three contractors worldwide

Page 10

Bilfinger Berger Capital Markets Day December 2, 2010

Page 11: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 11/28

4. Market Structure

 BIP (Babcock Industry and Power)

E.ON AnlagenserviceWWV Wärmeverwertun

Europe YIT (Industrial and Network Services), Finland

Fives Nordon France 

Fabricom (Suez Gaz de France), BelgiumBoccard, FranceBassi, Italyn egra , us r a

World Shaw / Stone & Webster, USA

, ATE (Atomtech Energy & Industrials), TaiwanBHEL (Bharat Heavy Electricals Ltd.), IndiaSeongwha Industrial, Korea

Page 11

Bilfinger Berger Capital Markets Day December 2, 2010

Fabricom / Endel (Suez Gaz de France), Belgium/France

Page 12: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 12/28

5. Clients

 

Page 12

Bilfinger Berger Capital Markets Day December 2, 2010

Page 13: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 13/28

.

Billing on basis of hours and

material spent according to unit rate list

Service contract

en

Lump sum fixed price for exactly defined

scope of supplies and services

e. . water/steam c clesLump sum

ClientBBPS

Unit rate lists with defined quantities

e.g. major contract OL3 FinlandClientBBPS

• AREVA reactor building• SIEMENS turbine hall

Hours s ent with hour char e rates

 

all materials and third-party services (cost plus fee)

 – no major contracts – Cost plus fee

Page 13

Bilfinger Berger Capital Markets Day December 2, 2010

Page 14: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 14/28

7. Competitive differentiators and success factors

Coal-Fired Power Plants

g er processtemperatures and

pressures …   e  r

   k   W   h

Process temperature

  n  c  y

… increase netEfficiency andreduce CO2 emissions.   m

   C   O   2

  e   f   f   i  c   i

… require better materialswith higher demandsfor develo ment

  g

  r

manufacturing andfabrication.

Page 14

Bilfinger Berger Capital Markets Day December 2, 2010

Page 15: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 15/28

7. Competitive differentiators and success factors

 

know-how from

Mannesmann Anlagenbau (MAB),

Babcock Rohrbau, today BHR

 

Vallourec & Mannesmann (V&M), formerlyMannesmann Röhrenwerke

Global leader in e ui in ower lants with

seamless pipes for high-pressure piping systems

Joint research ro ects with Vallourec &Mannesmann (V&M)

Ongoing development and improvement of pipe

materials (V&M) and their process technologies

Page 15

Bilfinger Berger Capital Markets Day December 2, 2010

(BHR)

Page 16: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 16/28

Page 17: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 17/28

7. Competitive differentiators and success factors

Control of forces and loads

 

Detail engineering and calculation

Transfer of forces and loads into the

building steel structure by means of Lisega 

Rigids

Constant

angers

Shock absorbers

Spring hangers

Page 17

Bilfinger Berger Capital Markets Day December 2, 2010

Page 18: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 18/28

7. Competitive differentiators and success factors

The key technologies

Inductive bending

SAW socket welding

Submerged arc welding (SAW)

SAW-narrow gap welding

Weld claddin

Inert- as tun sten-arc weldin TIG

Manual arc welding

TIG pulse orbital narrow gap welding

 

Material testing non-destructive / destructive

Page 18

Bilfinger Berger Capital Markets Day December 2, 2010

Page 19: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 19/28

7. Competitive differentiators and success factors

 

Pipe bends

Production of bends with

flow optimised radii

= minimised pressure loss

Reduction of number of welds

= increased benefit

Page 19

Bilfinger Berger Capital Markets Day December 2, 2010

Page 20: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 20/28

7. Competitive differentiators and success factors

 

Movie Inductive Bending

Page 20

Bilfinger Berger Capital Markets Day December 2, 2010

Page 21: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 21/28

7. Competitive differentiators and success factors

 

Coal- and lignite-fired big sized

Number of power plant units (14)

power plant new builds in Germany

Number of BHR projects (12)

Page 21

Bilfinger Berger Capital Markets Day December 2, 2010

Page 22: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 22/28

8. References

-

Olkiluoto 3, Finland, EPR 1,600 MWe

Page 22

Bilfinger Berger Capital Markets Day December 2, 2010

Page 23: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 23/28

8. References

-

Olkiluoto 3, Finland, EPR 1,600 MWe

Page 23

Bilfinger Berger Capital Markets Day December 2, 2010

Page 24: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 24/28

8. References

-

Olkiluoto 3, Finland, EPR 1,600 MWe

main steamsilencer 

steam generator 

pressurization system

safety injection system

feed water 

nuclear reactor containment

reactor coolant system

Page 24

Bilfinger Berger Capital Markets Day December 2, 2010

Page 25: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 25/28

8. References

-

Water / Steam Cycles

Page 25

Bilfinger Berger Capital Markets Day December 2, 2010

Photo: Siemens press release

Page 26: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 26/28

8. References

-

Water / Steam Cycles

Page 26

Bilfinger Berger Capital Markets Day December 2, 2010

Page 27: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 27/28

8. References

 

Steel pipes for offshore foundations

Page 27

Bilfinger Berger Capital Markets Day December 2, 2010

Page 28: Praesentation Diehl

8/12/2019 Praesentation Diehl

http://slidepdf.com/reader/full/praesentation-diehl 28/28

Strong arguments for a successful expansionof the share in the worldwide power piping market