PRAC Project Phase III: Sour Service Evaluation of ISO TR 10400 FAD Equation

8
PRAC Project Phase III: Sour Service Evaluation of ISO TR 10400 FAD Equation API Production Research Advisory Committee Pete Moore – API PRAC Chairman Peter Ellis – Program Manager

description

PRAC Project Phase III: Sour Service Evaluation of ISO TR 10400 FAD Equation. API Production Research Advisory Committee Pete Moore – API PRAC Chairman Peter Ellis – Program Manager. PRAC III C110 Test Pipe Were Donated and Shipped to Honeywell by Tenaris. Detailed Mill Test Report - PowerPoint PPT Presentation

Transcript of PRAC Project Phase III: Sour Service Evaluation of ISO TR 10400 FAD Equation

Page 1: PRAC Project Phase III:  Sour Service Evaluation of  ISO TR 10400 FAD Equation

PRAC Project Phase III: Sour Service Evaluation of ISO TR 10400 FAD Equation

API Production Research Advisory CommitteePete Moore – API PRAC Chairman

Peter Ellis – Program Manager

Page 2: PRAC Project Phase III:  Sour Service Evaluation of  ISO TR 10400 FAD Equation

PRAC III C110 Test Pipe Were Donated and Shipped to Honeywell by Tenaris

Detailed Mill Test ReportDocumenting the Pipe

Characterization Attributes

Page 3: PRAC Project Phase III:  Sour Service Evaluation of  ISO TR 10400 FAD Equation

3

PRAC III – Phase 3 Details

• Testing Details:

NACE Standard TM0177 Method A – Tensile tests complete

NACE Standard TM0177 Method D – DCB tests complete

Mini/Tiny-Pipe SSC Tests – Machining Complete

– EDM Notch cutting Complete – H2S Depletion test Complete

– Klimit in 7% H2S solution, In-progress – Tiny Pipe testing, expected to begin 4th Qtr 2013

Full Scale Tests with Man-made OD Surface Imperfections• ID/OD and OD only or ID only H2S Exposure – Pressurized ID

environment and OD exposure with replenishment/purging of 7% H2S in solution held in annular volume between plastic sleeve and OD of sample.

– Testing to begin 2nd quarter 2014

Page 4: PRAC Project Phase III:  Sour Service Evaluation of  ISO TR 10400 FAD Equation

Machining of Tiny Pipe Complete EDM Notching Complete

EDM OD NotchEDM OD Notch

~ 4 inches~ 4 inches

Page 5: PRAC Project Phase III:  Sour Service Evaluation of  ISO TR 10400 FAD Equation

Tiny Pipe H2S Depletion Test

Tiny Pipe H2S Depletion Test

4.05, 51.09

0, 85.15

4.05, 68.12

0, 173.3

0

20

40

60

80

100

120

140

160

180

200

0 1 2 3 4 5 6

Hours

pp

m H

2S

40% Depletion

60% Depletion

Soaked in 100% H2S for 17.72 hours, then flushed with distilled H2O

Page 6: PRAC Project Phase III:  Sour Service Evaluation of  ISO TR 10400 FAD Equation

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

% K

limit

Inte

rnal

Pre

ssur

e

Time in Days

Load and Refresh Schedule

7% NACE A Enviroment

Page 7: PRAC Project Phase III:  Sour Service Evaluation of  ISO TR 10400 FAD Equation

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

% K

limit

Inte

rnal

Pre

ssur

e

Time in Days

Load and ID Refresh Schedule

100%NACE-A

7%NACE-A

Page 8: PRAC Project Phase III:  Sour Service Evaluation of  ISO TR 10400 FAD Equation

Testing of Full Size PipeTo Begin 2nd Quarter 2014