PRESENTATION ON TENUGHAT THERMAL POWER PLANT
By: ABHINAW KAPOOR 12EEJEE001 B-TECH 4th year(7th sem.) ELECTRICAL ENGG. GEC JHALAWAR
SUBMITTED TO:MR. ASHISH KHANDELWALHOD-EEGECJ
SUBMITTED TO:GOVERNMENT ENGINEERING COLLEGE JHALAWAR
2
TENUGHAT THERMAL POWER PLANT
3
Tenughat Vidyut Nigam Limited is a power generating company incorporated on 26.11.1989 of Jharkhand .
The project site known as Tenughat Thermal Power Station (TTPS) is located at village.Lalpania in Dist‐Bokaro. The project is situated on the bank of Tenughat reservoir.
The total installed capacity of Tenughat Thermal Power Station is 420MW having two units of 210 MW capacity each.
The daily requirement of coal for full load generation from its 2x210 MW units is a approximately 7000 MTs which is met from coal mines of CCL situated in the vicinity of plant within 50 Kms..
TTPS has an acquired land of approx. 1800 acre
ABOUT PLANT
4
• Layout• Principle• Coal handling plant• Boiler• Steam Turbine• Economizer• Generator• Control Room
Main Parts of Tenughat Thermal Power Plant
5
PLANT LAYOUT
6
RANKINE CYCLE
7
COAL:- Plant needs 7000 mt coal per day for the
running of 2x210 mw plant It is supply by coal block ccl which is 50 kms
away from the plantWATER:-Plant get water from tenughat dam
RAW MATERIALS
8
9
Coal Handling Plant
• Crushing system• Conveying system
Coal handling plant section
10
CRUSHER HOUSE:- It consists of crushers which are used to crush the coal to 20 mm size.
Two typesPrimary crusher
oRail crusheroRotary breaker
Secondary crusher
Crushing system
11
Belt are used to convey coal from coal handling plant to furnace.
Specification:-◦ Belt width : 1400mm◦ Speed : 2.2m/sec◦ Total install power : 360kw ◦ Capacity : 1350/750 ton/hr◦ No. of conveyor: 38
Conveying system
12
It is a closed vessel in which water under pressure is converted into steam.
Hot water or steam used to transfer heat to a process.
A boiler is always designed to absorb maximum amount of heat released in process of combustion.
Furnace:- It is primary part of boiler where the fuel is burnt to liberate the heat energy.
Boiler
13
LINE DIGRAMOF BOILER
14
Figure Boiler
15
TURBINE
FUNCTION- Turbine is a machine in which shaft is rotated by the impact of the working fluid such as steam, water etc.
Type – Reaction
TECHNICAL SPECIFICATION- Rated output -- 110 MW Rated speed – 3000 rpm Direction of rotation – clockwise Type -3 cylinder, impulse reaction Heat flow at rated output – 2152.5 kcal/kHz Quantity of oil - 1800 liters
TURBINE
16
17
GENERATOR
It converts mechanical power into electrical power.
PRINCIPLE- Electromechanical energy conversion
TECHNICAL SPECIFICATION- Active output - 110 MW Power factor – 0.85 lag Excitation voltage - 230 Volt Rated voltage – 11 KV Rated speed – 3000 rpm Phase connection – star-star
18
ELECTROSTATIC PRECIPATOR
Used for the removal of suspended particles and fly ash from industrial flue gases PRINCIPLE- Produces an electrostatic field which attracts the ionized carbon particles and other such particulates which cause environmental pollution.
19
Main Equipment Of Switchyard Bus Bar Bus Coupler Isolating switch Earthling Switch Lightning Arrester Current & Potential Transformer (CT&PT) Circuit Breaker Capacitive Voltage Transformer (CVT)
220KV SWITCHYARD
20
SWITCH YARD
21Control Room
22
CONCLUSION:
The first stage of training is quite fruitful and knowledgeable.we see lots of heavy machines like generator,turbine,wagon trippler e.t.c. we also see switchyard which makes us know about transmission and distribution and various connections.The architecture of powerplant make us to realise that it is not only to learn about machine and its structure but the great part is how to maintain and manage it and without proper planning it is not possible. Basically during this period we learn everything about management and operation of power plant.
23
REFERENCE:
TTPS (www.tvnlonline.com)IEEE sitesWikipediaGeneration of electrical power by “BR GUPTA”