PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance “Capacity-Building Workshop on Public Private Partnerships” Intercontinental Hotel Amman, Jordan April 28-29, 2008 Overview on the Development Overview on the Development of the Egyptian PPP Program of the Egyptian PPP Program

Transcript of PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit...

Page 1: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central UnitMinistry of Finance

Bassel ShoirahUtilities Sector Officer

PPP Central UnitMinistry of Finance

“Capacity-Building Workshop on Public Private Partnerships”

Intercontinental HotelAmman, Jordan

April 28-29, 2008

Overview on the Development Overview on the Development of the Egyptian PPP Programof the Egyptian PPP Program

Page 2: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

2

Ministry of Finance

Agenda

PPP Program in Egypt

PPP Policy Framework – Implementation

Main Legal & Commercial Aspects of PPP Transactions

Role of the PPP Central Unit

Key Problems and Issues

Goals and Expectations

PPP Pilot Projects

Page 3: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

3

Ministry of Finance

PPP Program in Egypt

PPPs are key to the Government’s economic reform agenda and strategy to increase private sector involvement in public services through leveraging private spending against public spending

Provide a new source of investment capital for required

infrastructure projects

Reduce Government sovereign borrowings and associated risks

Drive the creation of local long term funding market

Utilize efficiencies of private sector in running public services

Expand economy and stimulate job creation

Increase quality of public services to the Egyptian citizen

Page 4: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

4

Ministry of Finance

Fundamental Aspects of Egypt’s PPP Policy Framework

Performance-based contract under which the Private Sector supplies public services over time and is paid by the Public Sector, end user or a hybrid of both. Output is specified by Line Ministries while input is the responsibility of the private sector

Under the PPP contract:

The Government retains total strategic control on the service

The Government secures new infrastructure which becomes Government

assets at the end of contract life

Project and performance risks are allocated to the party best able to

manage or mitigate

PPP Program in Egypt (cont’)

Page 5: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

5

Ministry of Finance

Egypt is providing the right environment for implementation

Adoption and localisation of international successful PPP models

(UK)

Provision of Supportive Legislative Environment

New Legal Framework for PPP Projects

(Draft under finalization for Submission to Cabinet and Parliament)

Standard PPP Contracts

Standardization of procurement documentation and procedures

Creation of regulatory bodies for post contract implementation

PPP Policy Framework

Page 6: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

6

Ministry of Finance

PPP Policy Framework (cont’)

Implementation Strategy

Placing clearly PPP initiative within reform macro fiscal agenda

Establishing a PPP Central Unit at Ministry of Finance as well as Satellite Units in Line Ministries

Identifying PPP’able projects as part of Line Ministries’ 5 years Strategic Plan

Providing legislative framework – PPP Law

Developing Tool Kit for implementation of projects

Page 7: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

7

Ministry of Finance

PPP Policy Framework (cont’)

Implementation Strategy (cont’)

Finalizing budgetary and accounting practices to capture PPP transactions

Setting “Best Practice” precedence through pilot projects

Arranging for Credit Enhancement mechanisms

Stimulating domestic banking sector to offer longer tenors and competitive pricing

Page 8: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

8

Ministry of Finance

Main Commercial & LegalAspects of PPP Transactions

Risk mitigation

Availability payments upon acceptance certificate

Inflation and interest rate indexation

Ministry of Finance support to contractual payments

Conflict Resolution techniques

Direct Agreement and step-in rights for Funders

Compensation for termination/ extra-ordinary events/ direct

impact on change of Laws

All transactions are in local currency

Page 9: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

9

Ministry of Finance

Role of PPP Central Unit

Act as a Public face of PPP initiative in Egypt since June 2006

Establish a national PPP policy framework for implementation

Set PPP guidelines and methodologies appropriate to Egypt

Draft and issue standard project documents, contracts and PPP

laws

Coordinate the PPP program and process across Line

Ministries, private sector and funding market

Report to Ministerial Committee for projects approval and

recognize issues that may impede the PPP program

Identify PPP able projects as part of Line Ministries’ 5 years

strategic plan

Page 10: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

10

Ministry of Finance

Manage PPP transactions and provide technical and advisory

support as well as ensure compliance with legislative

framework

Supervise Tendering and Performance Monitoring

Committees

Act as:

Center of PPP Expertise, Support and Intelligence Gatherer

Center for Capacity Building

Central Complaints Resolution Office for PPP Investors

Role of PPP Central Unit (cont’)

Page 11: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

11

Ministry of Finance

Key Problems and Issues

Public perception of PPP's as privatization

Resistance to change / Project ownership issues

Project screening

Bankability of projects

Project execution and performance monitoring

Local funding accommodating PPP transactions

Page 12: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

12

Ministry of Finance

Goals and Expectations

Develop action plan to overcome obstacles and key

impediments

Share Egyptian experience internationally

Acquire academic aspects of PPP project structuring

Enhance strategies‘ & setting capabilities of team members

Act as a Center of Expertise on a national & regional basis

Provide ownership for PPP projects amongst both Public &

Private Sectors

Page 13: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

13

Ministry of Finance

PPP Pipeline Projects

Social Infrastructure

Education Sector

Health Sector

Educational Medical Facilities

General Medical Facilities

Utilities Sector

Wastewater Treatment Plants

Transportation Sector

Page 14: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

14

Ministry of Finance

• Location: 27 Governorates

• Project Duration : 15 Years

Overview

Timeline

• 1st Batch Launch date: November 2007

• Project Awarding date : June 2008

• Schools availability date: 2009 / 2010

6 Batches of Approx 350 to be tendered over 5 years

Project Structure SP to finance, design, build, furbish & maintain schools, provide non educational services & transfer ownership to government at contract end.

1800 Public Schools

Education Sector

Page 15: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

15

Ministry of Finance

• Location: University of Alexandria

• Capacity : 230 Beds

• Project Duration : 20 Years

Overview

Timeline

• Launch Date : May 2008

• Project Awarding date : January 2009

• Operation date: December 2011

Construction of a new Specialized University Hospital (Al Mowassat) in Alexandria Governorate as:i) Neuro - Center ii) Urology / Nephrology Center

Project Structure SP to finance, design, build, equip, furnish, maintain, provide non clinical services & transfer ownership to Government at contract end.

Health Sector

Educational Medical Facility - 1

Page 16: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

16

Ministry of Finance

• Location: University of Alexandria

• Capacity : 200 Beds

• Project Duration : 20 Years

Overview

Timeline

• Launch Date : May 2008

• Project Awarding date : January 2009

• Operation date: December 2011

Construction of a Gynecology / Obstetrics University Hospital as part of Smouha Medical Complex, as well as a Blood Bank with a capacity of 200,000 bags / year, in Alexandria Governorate

Project Structure SP to finance, design, build, equip, furnish, maintain, provide non clinical services & transfer ownership to Government at contract end.

Educational Medical Facility - 2

Health Sector

Page 17: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

17

Ministry of Finance

• Location: Cairo Governorate

• Capacity : 300 Beds - General Hospital

100 Beds - Oncology Center

• Project duration : 20 Years

Overview

Timeline

• Launch Date : July 2008

• Project Awarding date : July 2009

• Operation date: December 2011

Demolition and Re-construction of Al Abassia Chest Hospital and change scope to a General Hospital, plus a separate building for Oncology Center

Project Structure SP to finance, design, build, equip, furnish, maintain, provide non clinical services & transfer ownership to Government at contract end.

General Medical Facilities - 1

Health Sector

Page 18: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

18

Ministry of Finance

• Location: Cairo Governorate

• Capacity : 230 Beds

• Project duration : 20 Years

Overview

Timeline

• Launch Date : July 2008

• Project Awarding date : July 2009

• Operation date: December 2011

Demolition and Re-construction of Boulak General Hospital

Project Structure SP to finance, design, build, equip, furnish, maintain, provide non clinical services & transfer ownership to Government at contract end.

Health Sector

General Medical Facilities - 2

Page 19: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

19

Ministry of Finance

• Location: Beheira Governorate

• Capacity : 100 Beds / hospital

• Project duration : 20 Years

Overview

Timeline

• Launch Date : September 2008

• Project Awarding date : September 2009

• Operation date: December 2011

Construction of 3 Central Hospitals

Project Structure SP to finance, design, build, equip, furnish, maintain, provide non clinical services & transfer ownership to Government at contract end.

Health Sector

General Medical Facilities - 3

Page 20: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

20

Ministry of Finance

• Location: Cairo Governorate

• Capacity : 100 Beds

• Project duration : 20 Years

Overview

Timeline

• Launch Date : September 2008

• Project Awarding date : September 2009

• Operation date: December 2011

Construction of a Re-habilitation Center

Project Structure SP to finance, design, build, equip, furnish, maintain, provide non clinical services & transfer ownership to Government at contract end.

Health Sector

General Medical Facilities - 4

Page 21: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

21

Ministry of Finance

• Location: Alexandria Governorate

• Capacity : 100 Beds

• Project duration : 20 Years

Overview

Timeline

• Launch Date : December 2008

• Project Awarding date : December 2009

• Operation date: December 2011

Construction of Oncology Center

Project Structure SP to finance, design, build, equip, furnish, maintain, provide non clinical services & transfer ownership to Government at contract end.

Health Sector

General Medical Facilities - 5

Page 22: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

22

Ministry of Finance

• Location: New Cairo

• Capacity : 250,000 m3/day

• Project duration : 25 Years

Overview

Timeline

• Launch Date : October 2008

• Project Awarding date : September 2009

• Operation date : December 2011

Project StructureSP to finance, design, build, operate, maintain plant & transfer ownership to Government at contract end.

Wastewater Treatment Plant - 1

Utilities Sector

Page 23: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

23

Ministry of Finance

• Location: Abo Rawash - Giza

• Capacity : 800,000 m3/day

• Project duration : 25 Years

Overview

Timeline

• Launch Date : December 2008

• Project Awarding date : September 2009

• Plant Operation date: December 2011

Expansion of a waste water treatment plant in Giza Governorate to raise capacity up to 2,000,000

m3/day

Project StructureSP to finance, design, build, operate, maintain plant & transfer ownership to Government at contract end.

Wastewater Treatment Plant - 2

Utilities Sector

Page 24: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

24

Ministry of Finance

• Location: Gabal Asfar - Cairo

• Capacity : 500,000 m3/day

• Project duration : 25 Years

Overview

Timeline

• Launch Date : January 2009

• Project Awarding date : September 2009

• Plant Operation date: September 2012

3rd phase expansion of a wastewater treatment plant with capacity of 500,000 m3/day to raise capacity up to approx. 3,000,000 m3/day

Project StructureSP to finance, design, build, operate, maintain plant & transfer ownership to Government at contract end.

Utilities Sector

Wastewater Treatment Plant - 3

Page 25: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

25

Ministry of Finance

• Location: Helwan

• Capacity : 500,000 m3/day

• Project duration : 25 Years

Timeline

Project StructureSP to finance, design, build, operate, maintain plant & transfer ownership to Government at contract end.

• Launch Date : January 2009

• Project Awarding date : September 2009

• Plant Operation date: September 2012

Overview

Utilities Sector

Wastewater Treatment Plant - 4

Page 26: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

26

Ministry of Finance

• Location: 6th October city - Giza

• Capacity : 450,000 m3/day

• Project duration : 25 Years

Overview

Timeline

Project StructureSP to finance, design, build, operate, maintain plant & transfer ownership to Government at contract end.

• Launch Date : October 2008

• Project Awarding date : April 2009

• Plant Operation date: April 2012

Utilities Sector

Wastewater Treatment Plant - 5

Page 27: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

27

Ministry of Finance

• Location: Nahia - Giza

• Capacity : 200,000 m3/day

• Project duration : 25 Years

Overview

Timeline

Project StructureSP to finance, design, build, operate, maintain plant & transfer ownership to Government at contract end.• Launch Date : October 2008

• Project Awarding date : April 2009

• Plant Operation date: April 2012

Utilities Sector

Wastewater Treatment Plant - 6

Page 28: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

28

Ministry of Finance

• Length : Cairo / Alex 162 kms

Link to Coastal Road 25 kms

Alex / Matrouh 280 kms

Port Said / Alex 285 kms

• Description: Connection of all of

Egypt’s Mediterranean Ports

• Project duration : 20 Years

Overview

Timeline

• Launch Date : June 2008

• Project Awarding date : January 2009

• Project Operation date: June 2012

Project is to build & upgrade existing roads and transfer to free roads

Project StructureSP to finance, design, build, operate & maintain road & transfer ownership to Government at contract end.

Transport SectorCairo / Alexandria free roadPort Said / Matrouh free road

Page 29: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

29

Ministry of Finance

• Location: Cairo / 10th of Ramadan City

• Length: 77 km

• Description: Double track line

• Project duration : 20 Years

Overview

Timeline

• Launch Date : August 2008

• Project Awarding date : January 2010

The Project is to Double the current line from Ain Shams to El- Roubaky (45 km) & Build a new line from El- Roubaky to 10th of Ramadan City (32 km)

Project StructureSP to finance, Upgrade existing tracks & stations, Construct new tracks & stations, Operate, Maintain & transfer ownership to Government at contract end.

Railway Project -1

Transport Sector

Page 30: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

30

Ministry of Finance

• Location: Alexandria / Borg El Arab

• Length: 50 km

• Description: Double track line

• Project duration : 20 Years

Overview

Timeline

Under Due-Diligence

The Project is to Double the current line from Alexandria to Borg El-Arab (50 km)

Project StructureSP to finance, Upgrade existing tracks & stations, Construct new tracks & stations, Operate, Maintain & transfer of ownership to Government at contract end.

Railway Project - 2

Transport Sector

Page 31: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

31

Ministry of Finance

•Description: Investment opportunities

include:

• New container terminals

• Multi purpose terminals

• Liquid bulk terminals

• General cargo terminals

• Vessels bunkering

• Tugging and marine services

• Stevedoring

• Value added activities and services

• Shipyard, Ship repair

Overview

Timeline

Under Due-Diligence

Maritime Projects

Transport Sector

Location

•Sokhna, Damietta

•Alexandria & Dekhela

•Port Said – East Ports

Page 32: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

32

Ministry of Finance

•Description:

Developing river transportation fleet

• 4 main routes:

•Cairo / Alexandria 220 km

•Cairo / Damietta 240 km

•Cairo / Aswan 960 km

•Aswan / Wadi Halfa 350 km

Overview

Timeline

Under Due-Diligence

River Transport Project - 1

Transport Sector

These routes creates

multiple development

opportunities,

commercial & services

centers, added value

services & also the fleet

could serve commercial

transportation to Sudan.

Aswan / Wadi Halfa Aswan / Wadi Halfa 350 km.350 km.

CAI / Aswan CAI / Aswan 960 km.960 km.

CAI / Damitte CAI / Damitte 240 km.240 km.CAI / Alex. CAI / Alex.

220 km.220 km.

Page 33: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

33

Ministry of Finance

•Description:

Developing new river ports terminals

• 7 main ports:

•Upper Egypt

•Sohag River Port

•Assiut River Port

•El Tebeen River Port

•Kena River Port

•Delta

•El Nahda River Port

•El Nahda Port Extension

•Meat Ghamr River PortTimeline

Under Due-Diligence

River Transport Project - 2

Transport Sector

Page 34: PPP Central Unit Ministry of Finance Bassel Shoirah Utilities Sector Officer PPP Central Unit Ministry of Finance Capacity-Building Workshop on Public.

PPP Central Unit

34

Ministry of Finance

Thank You