PPES WORKS (SARAWAK) SDN BHD2
Principal Activities
Design & Construction o Inrastructure & Building Works
Vision
To be a leading provider in Sarawaks construction industry.
Mission
We are committed to meeting the requirements o our clients bysaely completing their projects on time, within budget, and to therequired standards o quality, whilst saeguarding the environment andconsidering the best interests o the community.
Core Values
Responsibility and AccountabilityQuality ServicesCustomer Satisaction
EntrepreneurshipOwnershipCost Leadership
-
8/2/2019 Ppes Works Corporate Profile
3/20
PPES WORKS (SARAWAK) SDN BHD 3
Reliable, ecient and proessional,PPES Works (Sarawak) Sdn Bhd isat the oreront o Sarawaks quest
or continuous development andprogress.
Incorporated in 1990, PPES Workscore business activities are civilengineering, building and complexor unique inrastructure works.Its core unctions relate to acomprehensive range o design,construction, commissioning,operation and maintenance oprojects. PPES Works also maintainsa series o road networks in
Sarawak.
The Companys major projectsinclude the rst o its kind in SouthEast Asia, the award winning SungaiSarawak Regulation Scheme, theMulu Airport upgrading, TanjungKidurong-Suai-Bakam coastal road,Tubau-Bakun access road, ASSARSenari Independent Oil Terminalproject, Mukah Coal-Fired PowerPlant project, the New Sarawak
State Legislative Assembly Buildingand Borneo Convention CentreKuching.
PPES Works is a Class A Bumiputra-status contractor registered withPusat Khidmat Kontraktor (PKK)and Unit Pendataran Kontraktor(UPK). In addition, the Companyis registered with the ConstructionIndustry Development Board (CIDB)with Grade G7. PPES Works isqualied to undertake works o anyvalue.
The Companys commitment to
quality, occupational saety andhealth, care or the environmentand corporate social responsibilityis widely acknowledged. PPESWorks was the rst construction-based company in Sarawak to beaccredited with the IntegratedManagement System (IMS).
PPES Works is the main constructionarm o Cahya Mata SarawakBerhad (CMS), which is listed on
the Main Board o the Malaysianstock-exchange. PPES Works is51% owned by CMS and 49%
owned by the Sarawak EconomicDevelopment Corporation (SEDC).
As a member o the CMSgroup, PPES Works enjoys thesynergy provided by CMSvarious businesses. These includeconstruction materials (cement,clinker, concrete products,quarrying, premix steel abrication,pipes and wires), propertydevelopment, road maintenance,trading, nancial services and
others.
Associate investments o CMSinclude steel engineering andniche construction capabilities inwater works (dam construction)and energy ecient buildings.
PPES WORKS (SARAWAK) SDN BHD 3
-
8/2/2019 Ppes Works Corporate Profile
4/20
PPES WORKS (SARAWAK) SDN BHD4
Builder o Landmark Projects
PPES Works capabilities have been showcased in recentwork which has involved much specialised technical civil,mechanical and electrical engineering, such as in theconstruction o the New Dewan Undangan Negeri (DUN)
Sarawak or State Legislative Assembly building, BorneoConvention Centre Kuching and at the Islamic InormationCentre in Kuching.
-
8/2/2019 Ppes Works Corporate Profile
5/20
PPES WORKS (SARAWAK) SDN BHD 5
PPES Works together with its joint-venture partner constructed the New DUN Sarawakbuilding located on the banks o Sungai Sarawak in Kuching. The RM296.5 millionDesign & Build contract was awarded by the State Government o Sarawak. As parto an overall masterplan covering a 172-acre development, the New DUN Sarawakbuilding comprises a 9-level building surrounded by special cluster columns resemblingtrees o the rainorest, a glass curtain wall covering the entire Tower Block, a ribbedatrium ceiling and a massive Payung Negara roo.
-
8/2/2019 Ppes Works Corporate Profile
6/20
PPES WORKS (SARAWAK) SDN BHD6 PPES WORKS (SARAWAK) SDN BHD
PPES Works constructed the Borneo Convention Centre Kuching (BCCK)or the Sarawak State Government (Contract value: RM195 million).Located on The Kuching Isthmus, the States rst major convention andexhibition centre showcases its unique theme inspired by Sarawaks lushrainorests as eatured in a giant green ririg lea rootop, landscapingand water recycling eatures. With BCCKs total foor area o 36,500 sqm, its largest unction hall will be able to accommodate up to 5,000delegates or a 200-table banquet or a 200-exhibition booth venue. Anadditional 14 meeting rooms make up alternative venues or unctions.
6
-
8/2/2019 Ppes Works Corporate Profile
7/20
PPES WORKS (SARAWAK) SDN BHD 7
PPES Works constructed the uniquely designed andtechnically challenging new Islamic Information Centrein Kuching comprising a cluster o six inter-connectedbuildings eaturing ethnic design elements rom the manydierent communities o Sarawak. The Project includedthe incorporation o Iban moti carvings on the buildingacade, a Bidayuh Barok, tall Melanau main columns inthe auditorium, Malay house roos gable ends, Chineseroong, and Orang Ulu motis on columns.
PPES WORKS (SARAWAK) SDN BHD 7
-
8/2/2019 Ppes Works Corporate Profile
8/20
PPES WORKS (SARAWAK) SDN BHD8
Developing Transportation Corridors & BridgingCommunities
Sarawaks unique topography o vast undeveloped landand an extensive network o river tributaries pose a naturalchallenge or inrastructure development projects especiallyroad networks. In many instances, bridges, causeways anderry ramps have been built to complement the road system.PPES Works eorts in road construction have linked previouslyinaccessible rural areas to urban communities and opened
up vast areas or economic growth in Sarawak.
The Tanjung KidurongSuaiBakam (TKSB)coastal road rom Bintulu in centralSarawak up to Miri in north Sarawak wasthe single largest Federal Governmentroad project ever awarded in Sarawak atthat time (2002). Valued at RM581 million,the TKSB coastal road today providesa shorter traveling time and distanceby 48 km. Construction o the 178 kmroad included 3 major bridges, 22 minorbridges, over 300 pipe culverts and 68 boxculverts.
The TubauBakun access road, valued atRM 219 million, serves as the main accessroad to the Bakun Dam. One o the manychallenges o the project was havingto cut through hilly areas the deepestroad cut in Sarawak was made at BukitMenjawa comprising 18 steps o morethan 100 m height.
PPES WORKS (SARAWAK) SDN BHD8
-
8/2/2019 Ppes Works Corporate Profile
9/20
PPES WORKS (SARAWAK) SDN BHD 9
Airports & Sea ports
The construction o airports and sea ports plays a vital role inpromoting overall growth and development. This is particularlycrucial or interior areas without any existing road network.With the upgrading o Mulu Airport by PPES Works, it is nowable to accommodate larger aircrat bringing in more touriststo the world amous Mulu National Park. The Tanjung ManisAirport (completed in 2001) and the upgrading o MukahAirport (completed in 2005) provides an important air link
to the Tanjung Manis Timber Processing Zone which is a keygrowth area o the Sarawak Corridor o Renewable Energy(SCORE). The 950 m berth acility at Bintulu Port (completedin 2000) has considerably expanded the Ports capacity orvessel-handling.
Water works
PPES Works expertise includes water-related works such asthe construction o water treatment plants, pipe-laying works,tunnel construction and dams.
PPES Works won theprestigious MalaysianConstruction IndustryExcellence Award 2003(Medium-scale project)or its work in upgradingthe Mulu Airport besidethe United Nationsdesignated WorldHeritage Area MuluNational Park.
PPES Works built the Gerugu Dam as parto the larger Sarikei Regional Water Supplyproject which also included construction oa 21.45 km main pipe along the Sarikei - Sibu
trunk road, distribution mains, three servicereservoirs, and a booster pumping station.
PPES WORKS (SARAWAK) SDN BHD 9
-
8/2/2019 Ppes Works Corporate Profile
10/20
PPES WORKS (SARAWAK) SDN BHD10
The extension o Swinburne Universitys
campus in Kuching included newclassroom blocks, conerence and multi-purpose halls, sports acilities, studenthostels and a multi-storey car park. PPESWorks was proud to have been ableto keep the Universitys acilities ullyoperational during construction o thecampus extension, despite physical andsaety constraints within a very congestedconstruction site.
10
The Company has a long history o undertaking buildingworks such as educational institutions (Swinburne University[Sarawak Campus] Extension, UNIMAS Campus, Tunku PutraSchool and hospitals in Dalat and Sarikei). Also included inits expertise is the construction o commercial premises suchas actory plants (CMS Cement Bintulu plant, CMS Steelplant).
PPES Works is proud to have been tasked to constructseveral Government hospitals as part o its eort to provideadequate acilities or the Rakyat throughout the large state
o Sarawak.
With the completion o the Dalat Hospital in 2003, apopulation o 10,000 people in the surrounding areas nowhave access to general health care without having to travelar to the nearest large town in Mukah. Similarly, PPES Works,together with its joint-venture partner, was also involved inthe construction o the 268-bed Sarikei Hospital, which hasenabled more rural communities to seek proper medicalcare nearer to their villages.
-
8/2/2019 Ppes Works Corporate Profile
11/20
PPES WORKS (SARAWAK) SDN BHD 11PPES WORKS (SARAWAK) SDN BHD 11
PPES Works undertook civil works andconstruction o inrastructure and residentialbuildings o the Sarikei Hospital development.
Set on a 22-acre site, the new Tunku Putra Schoolcampus in Petra Jaya, Kuching, compromisesnumerous single-storey buildings with classroomsand specialist labs, as well as a multi-purposehall and administration block.
-
8/2/2019 Ppes Works Corporate Profile
12/20
PPES WORKS (SARAWAK) SDN BHD12
Following a competitive bidding exercise, a JV between PPES Works and ChiyodaMalaysia was awarded the RM120 million contract by ASSAR Chemicals to developPhase 3 and 4 o the Independent Oil Terminal (IOT) project adjacent to SenariPort in Kuching. The project included engineering, procurement, constructionand commissioning o the bulk depot acilities. PPES Works also undertook sitepreparation works on the 16.2 hectare site which involved land reclamation.
PPES Works was tasked to undertake thecivil works or both the Plant and Non-Plant zones o the 2 X 135 MW MukahCoal-Fired Power Station (in Sarawak). Asthe turnkey contractor or the Non-PlantZone, PPES Works scope o works includedinrastructure works, site-clearing, earthworks, construction o the administrationzone, stores, workshop, sta housing andsupporting amenities. In the Plant Zone,PPES Works was responsible or civil worksat the Main Power block, fue gas system,coal-handling system, other inrastructureand water-related systems including the ashpond and cooling ponds.
PPES WORKS (SARAWAK) SDN BHD12
-
8/2/2019 Ppes Works Corporate Profile
13/20
PPES WORKS (SARAWAK) SDN BHD 13
In 2003, PPES Works was awarded a 15-year contract by the FederalGovernment o Malaysia to maintain over 600 km o roads in Sarawak,specically rom Sematan to Sarikei in the southern hal o the State.Through a proessional maintenance management system, theCompany conducts ecient and eective routine and periodicinstructed works in its eort to be a true partner to the Government by
ensuring better quality and saer roads.
PPES WORKS (SARAWAK) SDN BHD 13
-
8/2/2019 Ppes Works Corporate Profile
14/20
PPES WORKS (SARAWAK) SDN BHD14
PPES Works is committed to deliveringquality services through compliancewith customer requirements, qualityprocedures, best practices and workethics in the day-to-day running o each
project.
It was the rst construction-basedcompany in Sarawak to be accreditedwith the Integrated ManagementSystem (IMS) which incorporates theISO9001:2000 Quality Management
System, the ISO14001:1996 EnvironmentalManagement System and theOHSAS18001:1999 Occupational Health& Saety Assessment Series under a singledocumented procedure in 2004. The
IMS represents the clear commitment othe Company to improve and enhanceits management systems by ocusingon three key customer requirements Quality, Health & Saety andEnvironment.
PPES WORKS (SARAWAK) SDN BHD14
PPES Works gives serious attentionto its responsibility to be a goodcorporate citizen. Doing Good
or the community takes manyorms rom constructing the rstmosque or the Oya communityin Mukah, to re-building homes orlandslide victims in Simunjan, andcontribution o school suppliesor underprivileged childrenat Kampung Sinar Baru nearKuching.
With the children o Kampung SinarBaru, Padawan, Kuching
Construction o temporary shelter orre victims at Rumah Mani Pelasok,Skrang
-
8/2/2019 Ppes Works Corporate Profile
15/20
Item Project NameContract
Value(RM Million)
Year oCompletion
Client
1 Bako Causeway, Kuching 15 1993 JKR Sarawak
2 Carpenter Street By-Pass, Kuching 3.8 1993 JKR Sarawak
3 Tanjung Manis Water Supply, Mukah 41.5 1994 JKR Sarawak
4 Pasir Pandak Road, Kuching 8.01 1994 JKR Sarawak
5 Rejang - Sekumang Loop Road & Bridges, Sarikei 15 1994 JKR Sarawak
6 Grigat - Selalang Road, Sarikei Division 35.7 1994 JKR Sarawak
7 Tun Ahmad Zaidi Road Improvement Works, Kuching 20 1995 Dewan Bandaraya Kuching Utara
8 Satok Flyover, Kuching 23.5 1995 Dewan Bandaraya Kuching Utara
9 Batu Kawa Resettlement Scheme (Phase III / Stage1), Kuching
2.82 1995 JKR Sarawak
10 Improvement & Rehabilitation o Astana Road,Kuching
0.85 1996 Dewan Bandaraya Kuching Utara
11 Cement Brick Factory at Jalan Old Airport, Kuching 0.23 1996 CMS Concrete Sdn Bhd
12 Jetty Extension at CMS Cement Plant, Bintawa,Kuching
0.82 1997 JKR Sarawak
13 Mulu Airport Extension (Phase 1), Miri 15.36 1997 JKR Sarawak
14 Improvement & Rehabilitation o Matang Road,Kuching
6.3 1997 JKR Sarawak
15 Kuching Outer Ring Road, Kuching 78.08 1997 JKR Sarawak
16 Access Road rom Tubau to Bakun (Package 1),Bintulu
42.77 1997 JKR Sarawak
17 Sungai Sarawak Regulation Scheme, Kuching 150 1998 JKR Sarawak
18 Sarikei / Serdeng / Pulau Bruit / Tebaang Road,Mukah
41.81 1998 JKR Sarawak
19 Miri - Water Supply Scheme (Phase 1), Miri 90.7 1998 JKR Sarawak
20 Sarikei Regional Water Supply Short TermImprovement Works, Sarikei
19.9 1998 JKR Sarawak
21 Sandflling For 1st Silicon Sdn Bhd site, Kuching 34.26 1998 Ministry o Industrial DevelopmentSarawak
22 Delivery, Laying, Installation & Commissioning oWater Pipe & Pumping Main along Santubong/Teluk Bandung Road, Kuching
3.51 1998 JKR Sarawak
23 CMS Steel Plant at Senari, Kuching 63.83 1998 SIS Berhad
24 Stapok / Sungai Maong Utama Road, Kuching 9 1999 JKR Sarawak
25 Gedong Rural Growth Centre, Simunjan 6.8 1999 DID Sarawak
26 Kidurong Shore Line Protection at Tanjung Kidurong,Bintulu
3.43 1999 Malaysia LNG Sdn Bhd
27 Belawai Water Supply, Mukah 10.83 2000 JKR Sarawak
-
8/2/2019 Ppes Works Corporate Profile
16/20
Item Project NameContract
Value(RM Million)
Year oCompletion
Client
28 Matang Septic Sludge Treatment Plant, Kuching 11.43 2000 DID Sarawak
29 Batu Kitang Water Treatment Plant (Module 6),Kuching
21.34 2000 Kuching Water Board
30 Miri Water Supply Third Expansion Scheme (PhaseII) - Raw Water Transer System rom Bakong to Sg.Liku, Miri
79.9 2000 JKR Sarawak
31 Dalat Water Supply, Mukah 4.98 2001 JKR Sarawak
32 950m Berth at Bintulu Port, Bintulu 210 2001 Bintulu Port Authority
33 Lundu / Selang / Sampadi Road, Kuching 65 2001 JKR Sarawak
34 Access Road rom Tubau to Bakun (Package 2),Bintulu
176.06 2001 JKR Sarawak
35 Beladin Rural Growth Centre, Sri Aman 4.9 2001 Sarawak Land DevelopmentBoard
36 Upgrading o Bintulu Substation, Bintulu Division 3.16 2001 SESCO, Sarawak
37 Tanjung Manis Airport, Mukah Division 53.24 2001 Sarawak Timber IndustryDevelopment Corporation(STIDC)
38 Kubah Ria / Merdeka Road Link, Kuching 3.68 2001 Dewan Bandaraya Kuching Utara
39 Inrastructure Works or Phase 1 Universiti Malaysia
Sarawak (UNIMAS) Permanent Campus, Samarahan
108.89 2002 Universiti Malaysia Sarawak
40 Kuala Lawas - Merapok Road, Limbang 15.4 2002 Kementerian Pembangunan LuarBandar Malaysia
41 Miri By-Pass Road, Miri 26.4 2003 JKR Sarawak
42 Dalat Hospital, Mukah 41.56 2003 JKR Malaysia / KementerianKesihatan Malaysia
43 Upgrading o Mulu Airport 47.52 2003 JKR Sarawak
44 Sarikei Hospital 64.01 2003 UEM / SEDC JV
45 Improvement & Sealing o Jalan Kabong / Nyabor /
Roban, Betong Division, Sarawak
12 2004 JKR Sarawak
46 Improvement & Sealing o Jalan Pusa, Betong 10 2004 JKR Sarawak
47 Jalan Bintulu / Similajau (Section B), Bintulu 27.86 2004 JKR Sarawak
48 EPCC o Miri Pipeline (Sector IV) Protection /Relocation Project
2.01 2004 Petronas Gas Berhad
49 Package 1 Independent Oil Terminal Project Senari,Kuching
20.76 2004 ASSAR Chemicals Sdn Bhd
50 Tanjung Gelang-Kampung Sungai Nai CoastalRoad, Sarikei
32.48 2005 JKR Sarawak
51 Upgrading o Mukah Airport 8.66 2005 Sarawak Timber Industry
Development Corporation(STIDC)
52 Tanjung Kidurong / Suai / Bakam Coastal RoadProject
581 2005 JKR Sarawak
-
8/2/2019 Ppes Works Corporate Profile
17/20
Item Project NameContract
Value(RM Million)
Year oCompletion
Client
53 Jalan Baru Pantai Triso / Melebu / Pusa Pakej A, B, C& D, Sri Aman
127.5 2005 JKR Sarawak
54 Jalan Ng. Bangkit / Muara Lebaan, Bintangor, Sarikei 50.3 2005 JKR Sarawak
55 26 Units o 3 Storey Shophouses & AssociatedInrastructure Works on Lot 3284, Blk 9, Salak LandDistrict, O Jalan Sultan Tengah, Kuching
6.8 2005 CMS Properties Sdn Bhd
56 Kampung Buloh / Sebuyau Coastal Road,Samarahan
52.69 2006 JKR Sarawak
57 EPCC Package Bulk Depot Facilities & Package 4LPG Bottling Facilities or Independent Oil TerminalProject at Kampung Senari, Kuching
120 2006 Assar Chemicals Sdn Bhd
58 Tunku Putra International School - New Campus,Kuching
17.92 2006 Cahya Mata Sarawak Berhad
59 Jalan Mulukun / Ng. Gaat (Phase 1), Kapit 109.77 2007 JKR Sarawak
60 Long Term Development Works Phase 3, Stage 2Works or Sarikei Regional Water Supply, Sarikei
21.8 2007 JKR Sarawak
61 Rehabilitation o Airfeld Pavement at KuchingInternational Airport, Kuching
11.32 2007 Malaysia Airports Sdn Bhd
62 Construction & Completion o 4-Storey Hostelsor Swinburne University o Technology (SarawakCampus), Kuching
8.5 2007 Pometia Sdn Bhd
63 Pusat Islam, Kuching 10.7 2008 Pejabat Majlis Islam Sarawak
64 Swinburne University o Technology (SarawakCampus) Extension, Kuching
60 2008 Pometia Sdn Bhd
65 Mukah Coal-Fired Power Station
1. Non-Plant Zone
2. Plant Zone
38
127
2008
2009
Sarawak Energy Berhad
Sarawak Energy Berhad
66Gerugu Dam, Access Road & Ancillary Facilities orSarikei Regional Water Supply, Sarikei
67.2 2009 JKR Sarawak
67New Dewan Undangan Negeri Sarawak Building,Kuching
296.5 2009 JKR Sarawak
-
8/2/2019 Ppes Works Corporate Profile
18/20
PPES Works (Sarawak) Sdn Bhd is registered with the ollowing agencies/corporations under the ollowing
classifcations:
Pusat Khidmat Kontraktor
(PKK)
Kementerian Pembangunan
Usahawan Malaysia
Unit Pendataran
Kontraktor (UPK)
Negeri Sarawak
Construction Industry
Development Board (CIDB)
Lembaga Pembangunan
Industri Pembinaan
Malaysia
STATUS Bumiputera Bumiputera -
CLASS/GRADE A A G7 (NO LIMIT)
HEAD I II III IV VI I II III B CE ME
SUB HEAD/CODE 1 1 3 1 2 1 1 1 B 02 CE 01 M15
2 2a 171 2a 7 2 2 2 B 04 CE 02
3a 2b 2b 8 3 3 3 CE 17
5 5 2d 4 6 CE 20
7a 7a 2e CE 21
7b 7b 3a
9 3b
3c3d
5
8
PPES WORKS (SARAWAK) SDN BHD(209892-K)
Date of Incorporation : 20 December 1990Registered Address : Level 6, Wisma Mahmud
Jalan Sungai Sarawak,
93100 Kuching, Sarawak, Malaysia.
Business Address : Lot 619-623, Section 62,
Jalan Padungan,
93100 Kuching, Sarawak, Malaysia.
Telephone : +60 82 340 588
Fax : +60 82 340 695
Website : www.cmsb.com.my/works
Email : [email protected]
Authorised & Paid-upCapital : RM10 Million
-
8/2/2019 Ppes Works Corporate Profile
19/20
PPES WORKS (SARAWAK) SDN BHD 15
-
8/2/2019 Ppes Works Corporate Profile
20/20