- PRODUCTION PART APPROVAL PROCESS (PPAP)
- Production Part Approval Process
- Understanding ISO/TS 16949:2002 Basic requirements
- Overview of PPAP requirements
- Understanding of
-
- Submission Level
-
- Process Flow
-
- Process FMEA
-
- Capability Study
-
- MSA
- Production Part Approval Process Objectives: Understand when PPAP submissions are required Understand requirements for PPAP submissions Understand the different PPAP submission levels Understanding of the forms used for PPAP submissions Understanding where the PPAP submission fits into the APQP cycle
- The Purpose of PPAP
- is to determine
- A) If all customer engineering design records and specification requirements are properly understood by the supplier (Customer and Supplier have a common understanding of Customer requirements )
- B)The process has potential to produce parts consistently meeting the requirements during an actual production run at the quoted production rate (Is the process capable of meeting customer requirements during on going production process)
-
- Applicability of PPAP
- PPAP shall apply to External and internal suppliers sites of:
- Bulk Material Production Material
- Production Parts Service Parts
- For Bulk material PPAP is not required unless asked by the customer.
- A supplier of production parts / service parts shall comply with the PPAP requirements unless the same is formally waived by the Customer (documented evidences should be available)
- Application
- AIAG PPAP manual defines when PPAP submission is required
-
- New part
-
- Correction to discrepancy in previous submission
-
- Design or process change
-
- Change in source of subcontracted materials or services
-
- transfer or rearrangement of tooling & equipment
-
- WHEN A PPAP IS REQUIRED ?
- A PPAP is required to be submitted in the following conditions also :
-
- WHEN A PPAP IS REQUIRED ?
-
- WHEN A PPAP IS REQUIRED ?
-
- WHEN A PPAP IS REQUIRED ?
-
- WHEN A PPAP IS REQUIRED ?
-
- WHEN A PPAP IS REQUIRED ?
-
- WHEN A PPAP IS REQUIRED ?
- Methodology
- Buyer enters PPAP submission date on purchase order
- Approver determines submission level
-
- default level 3
-
- Supplier submits PPAP
- Approver determine part submission status
- Approver evaluates PPAP package
- Notify supplier and manufacturing of status
-
- PPAP Process Requirements
-
- PPAP Process Requirements
- Submission Levels
- The supplier shall use level 3 as the default level for all submissions unless specified otherwise by the responsible customer product approval activity. A supplier of bulk material only shall use level 1 as the default level for all bulk material PPAP submissions unless specified otherwise by the responsible customer product approval activity.
- The customer will identify the submission level that will be used with each supplier, or supplier and customer part number combination. Different customer locations may assign different submission levels to the same supplier manufacturing location.
- All of the forms referenced in this document may be replaced by computer-generated facsimiles is to be confirmed with the responsible part approval activity prior to the first submission.
-
- PPAP Process Requirements
-
- PPAP Process Requirements
-
- DFMEA
- Control Plan
- Early Production Containment Plan (Pre-Launch Control Plan)
- Process capability studies
- Gage Measurement System Analysis
- Lab Accreditation & scope
- Restricted & Reportable Materials form
- Interim Worksheet, if required
- Warrant
- Appearance Approval Report (AAR), as required
- Sample Parts
- Print/Design Record
- Engineering Change Documents
- Check fixtures/aids
- Process Flow Diagram
- PFMEA