3.0 • Over 14 years experience providing Data Center and related services in India:
Sify built India’s 1st Tier III Data Center (Vashi)
• Sify understands DC and ICT – not just Telco with a DC as a sideline business – Sify has Dedicated COE on Datacenter Engineering
• Sify has hands-on experience -- DCs are Designed, Built and Operated in-house by Sify
• Proven track record of meeting guaranteed uptime:
• 100 % in Mumbai Airoli till date (2007)
• 99.982%+ in Vashi(2000), Bangalore (2006) and Chennai (2001)
• Mature operational processes & vendor relationships
• Sify has Managed Services resources, capable of handling all IT support functions
• Design based on 4th generation SDA (Sify Datacenter Architecture) for better Availability
Sify has 300 Enterprise-level Sales and Professional Services; can distribute Amazon services to customers requiring greater support
Sify is the only non-Telco that can also provide access to local Fiber, IP Peering, Submarine cable, and Cable Landing Station
So how are we the right partner?
3.0
Vashi Mumbai
TIER III
TIDEL Park Chennai
Electronic city Bangalore Airoli Mumbai
Noida Delhi
Rabale Mumbai
data centre presence
6 Owned
Multilayer, Multi-point
6 SDC BOT
Thrice awarded
1.9 L sq.ft
20 MW
3.0
Spread across different seismic zones
data centre specs
• NOIDA, DELHI • 54,000 Sq.ft.* •Tier III specifications
• RABALE, MUMBAI • 59,400 Sq.ft * • Tier III specifications
• TIDEL Park, CHENNAI • 7,300 Sq.ft * • Tier III specifications • AIROLI, MUMBAI
• 44,562 Sq.ft * • Tier III specifications
• ELECTRONIC CITY, B’LORE • 13,450 Sq.ft * • Tier III specifications
• VASHI, MUMBAI • 11,125 Sq.ft * • Tier III specifications
Total capacity 20 MW *white space
3.0 vashi, mumbai
• Since 2000
• Term - Long Lease
• Period - 60 Years
• Whitespace:11,125 Sq ft
• CAPEX : $ 4.4 mln
• Design IT Power capacity: 720 KW
1 $= 50
3.0 electronics city, bangalore
• Since 2004
• Term - Long Lease
• Period - 66 Years
• Whitespace:13,450 Sq ft
• CAPEX : $ 8.0 mln
• Design IT Power capacity: 1080 KW
1 $= 50
3.0 TIDEL park , chennai
• Since 2000
• Term - Own premise – Office cum DC
• Whitespace:7,300 Sq ft
• CAPEX: $ 2.0 mln
• Design IT Power capacity: 320 KW
1 $= 50
3.0 airoli , mumbai
• Since 2009
• Term - Long Lease
• Period – 29 Years
• Whitespace:44,562 Sq ft
• CAPEX: $ 22.0 mln
• Design IT Power capacity: 4300 KW
1 $= 50
3.0 noida, delhi
• Since 2013
• Term - Own building
• Whitespace : 54,000 Sq ft
• CAPEX : $ 48 mln
including Land & Building
• Design IT Power capacity: 5760 KW
1 $= 50
3.0 rabale, mumbai (under implementation)
• Coming up – Dec 2013
• Term - Own building
• Whitespace : 59,400 Sq ft
• CAPEX : $ 59 mln
including Land & Building
• Design IT Power capacity: 8640 KW
1 $= 50
3.0 compliance & certifications
Data Center Services are certified in
Quality Management
ISO 9001:2008
SIFY TECHNOLOGIES LIMITED CERTIFIED TO ISO 9001:2008
CERTIFIED FROM: 16 Nov 2001 VALID TILL: 15 Nov 2016
SIFY TECHNOLOGIES LIMITED CERTIFIED TO ISO 27001:2005
CERTIFIED FROM: 08 June 2005 VALID TILL: 08 June 2014
Information Security
ISO 27001:2005
SIFY TECHNOLOGIES LIMITED CERTIFIED TO ISO 20000:2011 CERTIFIED FROM: 19 Feb 2009
VALID TILL: 16 June 2014
Service Management
ISO 20000:2011
Our hosting services are also
3.0 More than a decade of operations experience
DC Operations
Vashi - 13 Years (Sep 2000) Chennai Tidel - 12 Years (March 2001) Bangalore - 7 Years (July 2006) Mumbai Airoli - 5 years (July 2008) Delhi Noida - Launched (June 2013)
Higher Utilization
100 % occupancy at Mumbai and Tidel and 80% at Bangalore
Efficiency – PUE (Power usage Effectiveness) is maintained under 1.9 – Equipment selection, right sizing and loading pattern – Optimum Cooling – Mature operational processes
operational excellence
3.0
Multiple STM termination from Major Telecom and Connectivity providers
a true carrier neutral data centre
3.0 Business Requirements Right Solution Justify Technology Investment
Innovation and Efficiency Site selection Risk analysis Design Drawings Specifications Solution Document
Manage Project Cost Performance Schedule Performance Change Management Risk Management Vendor Management Procurement Quality Assurance
Integrated Testing Exception Management Factory Tests Documentation Training Knowledge base
Evaluate Infrastructure Audit Gap Analysis Risk Analysis Alternate Solutions Alternate Technology
Improvements Operational efficiency Energy Efficiency Process improvement Training Continuous monitoring Datacenter
Lifecycle
Budgeting Future Planning
DC build - framework
3.0 Green Grid – The international organization that defines data center energy efficiency matrices. Sify is a member of Greengrid
Uptime Institute, the owner of datacenter tier topologies. Sify has certified professionals from the UI
ASHRAE, the international organization that sets the cooling standards and specifications. Sify is a member of ASHRAE
Sify works closely with the organizations that defines standards and frameworks. Equipped to quickly adapt and practice the latest recommendations and standards
process framework
3.0 DC build experience – government
Customer Area (Sq ft) SFA
National Informatics Centre through CPWD, Pune 10,000 5,500
IMD through CPWD, Pune 3,000 1,000
DIMTS, Delhi 2,500 400
Tripura State Data Center, Agartala 2,220 904
Sikkim State Data Center, Gangtok 1,600 620
Meghalaya State Data Center, Shillong 1,368 728
Kerala State Data Center, Thiruvananthapuram 2,900 900
Jharkhand State Data Center, Ranchi 3,600 934
Chhattisgarh State Data Centre 5850 1921
AMTRON, Assam Electronics, Guwahati 1,000 460
NISCAIR, Delhi 2000 400
As a standard practise,
orders were for…
Supply, Installation,
Commissioning and
Maintenance of UPS,
Civil, BMS, Electrical,
Racks, Cabling, PAC,
and CAC
3.0 Customer DC Area
(Sq ft) SFA Racks Remarks
HPCL, Hyderabad 40,000 10,000 280 Design and consultancy of 40,000 Sq. Ft. of DC facility
Trimax DC, ITI Bangalore 40,000 11,337 301 Design, Consultancy & Vendor Selection
RAK Bank, UAE 10,000 2,000 65 Design, Consultancy and Project Management
RAK FTZ, UAE 20,000 8,000 270 Design, Consultancy and Project Management
Bank of Dofar, Oman (through E&Y) 4,500 2,200 70 IT & NON-IT audit, redesign consultancy, vendor selection
Vodafone 3,000 1,850 50 Supply, installation and commissioning of UPS, Civil, BMS, Electrical, Racks, Cabling, PAC & CAC
MSEDCL – Maharashtra State Electricity Board (both Primary & DR sites)
DC: 3600 DC: 1600 DC: 44 Primary Data Center is at Mumbai & DR site is at Nagpur.
DR: 4000 DR: 1200 DR: 44 Deliverables includes Supply, installation and commissioning of UPS,
Civil, BMS, Electrical, Racks, Cabling, PAC & CAC for 5 years.
Other recent DC Projects include Indian Institute of Astro Physics (IIAP), Shell, Exon Mobile in Bangalore
DC build experience – private sector