PowerPoint Presentationhro-cigre.hr/downloads/SEERC_CD/papers/posters/P26_poster.pdf · The...

1
First South East European Regional CIGRÉ Conference - Portoroz, Slovenia, 7—8 June 2016 SEERC Upgrade of SCADA system in remote control centres of Elektra Zagreb and Elektroslavonija Osijek A. PIVČEVIĆ, I. KRAPIĆ, A. PREVIŠIĆ, A. VARŽIĆ Končar-KET d.d. Croatia P26 INŽENJERING ZA ENERGETIKU I TRANSPORT Z A G R E B INŽENJERING ZA ENERGETIKU I TRANSPORT Z A G R E B DC Elektroslavonija Osijek Operator workstations GPS antena VN dispečeri SCADA server oskas01 oskas02 PCU server oskpcu01 oskpcu02 UDW server oskudw01 oskudw02 S/COM server oskscom01 oskscom02 oskntp01 Time server Switch osksw01 osksw02 oskpc01 oskpc02 Administor workstations oskpc03 oskpc04 oskpc05 DE/LF server oskde01 oskbkp01 AD server oskad01 oskad02 Backup device WS500 Thin Client server oskweb01 Usmjernik/vatrozid .17 .18 .19 .20 .49 .50 .51 .52 .1 .2 .2 .3 .1 .17 .18 .1 .17 .18 .17 .1 .17 .18 .1 .17 .18 .19 .1 .1 .1 .1 .1 .1 .1 .17 .17 .17 .17 .17 .17 oskpc06 CUP Beli Manastir Operator workstations oskpc07 CUP Valpovo Operator workstations oskpc08 CUP Donji Miholjac Operator workstations oskpc09 CUP Orahovica Operator workstations oskpc10 CUP Našice Operator workstations oskpc11 CUP Đakovo Operator workstations LKKU server „Spliteri” osklkku01 osklkku02 .53 .54 1. INTRODUCTION Elektra Zagreb (Distribution System Operator) spans the area of 2 550 square kilometers. In addition to a plant placed in the center of Zagreb, plants at Sv. Ivan Zelina, Samobor, Velika Gorica, Zaprešić, Dugo Selo and Sveta Klara take care on the supply of the electric energy to buyers. Elektroslavonija Osijek (Distribution System Operator) spans the area of 4152 square kilometers representing the fourth biggest Distribution System Operator of the Croatian Power Authority (HEP ODS). Investments into upgrading of the existing equipment are indispensable to fulfil these basic DSO targets as well as its new roles which have come to light due to the liberalization of the electric energy market. The main reasons for the upgrade are: The producer of the hardware server equipment seized support for the stated equipment in 2013 [1] and the hardware equipment had to be replaced which automatically meant the replacement of the software equipment; The producer of SCADA applications has been abandoning its support to Tru64 UNIX software platform; Implementation of new and enhanced existing SCADA software functionalities. Figure 1 Block diagram of the new SCADA system at Elektroslavonija Osijek The logical scheme of the new control system can be seen on the following picture: 2. HW AND SW UPGRADE New hardware system components (not existing in their current system configuration) on which part of functionality of the new SCADA software is distributed are the following: Active Directory servers – servers intended for user account control; and Process Communication Unit (PCU) 400 servers – communication so-called front-end servers. Computer Operating Systems in the new SCADA System have been upgraded to new versions in accordance with Table I while the Data Engineering and Utility Data Warehouse data bases are based on the most recent technology of Oracle Data Base. Computers OS (existing system) OS (new system) SCADA, UDW True64 UNIX Red Hat Enterprise Linux 6.5 64b PCU400, Web, DE Windows Server 2003 Windows Server 2008 R2 64b Operating stations Windows XP Windows 7 64b Pro Table 1 Existing and new SCADA system Operating Systems The existing SCADA system software has been upgraded from version 2.3 to version 6.4 enabling the Employer to work with a whole range of new and enhanced functionalities: Counting of events in the alarm list as well as in the event list on the basis of various criteria (priority, etc.); User friendly lists – alarms, events, chronology (sorting, filtering, easier creation of own filtered lists, export to Excel files, etc.); Dynamic Contour Coloring on the basis of measurement levels: clear and intuitive visualization of voltage disturbances; Advanced Real Time Calculations user oriented interface for defining complex calculations on real time data and historical data based on the MATLAB software package; Tabular presentations – software module that enables users to define complex interfaces based on real time data: list extracts, positioning in a certain queue, defining of the display size, hiding of selected columns, etc.; Multilanguage support; Numerous “smaller”, but important novelties (permitted manual entry without blocking of data collection, possibility to configure an alternative data source for individual indications, etc.); The number of characters for EXTERNAL_IDENTITY parameter has been increased to 40, while for the IDENTIFICATION_TEXT it has been increased to 60; 3. PARALLEL SYSTEM OPERATION Končar has developed its own in-house solution for the needs of the migration process (the transitional period during which simultaneous operation of the existing and the new SCADA system is required) and to solve the problem of existing remote terminal units that do not have a possibility of a simultaneous communication with more than one supervising center Figure 2 Parallel system operation 4. CONCLUSION The upgrade of the SCADA systems in the remote control centers of Elektra Zagreb and Elektroslavonija Osijek has given the users a modern SCADA system keeping up with the latest operating systems and advanced SCADA and DMS functions.

Transcript of PowerPoint Presentationhro-cigre.hr/downloads/SEERC_CD/papers/posters/P26_poster.pdf · The...

Page 1: PowerPoint Presentationhro-cigre.hr/downloads/SEERC_CD/papers/posters/P26_poster.pdf · The existing SCADA system software has been upgraded from version 2.3 to version 6.4 enabling

First South East European Regional CIGRÉ Conference - Portoroz, Slovenia, 7—8 June 2016 SEERC

Upgrade of SCADA system in remote control centres of Elektra Zagreb and Elektroslavonija Osijek

A. PIVČEVIĆ, I. KRAPIĆ, A. PREVIŠIĆ, A. VARŽIĆKončar-KET d.d.

Croatia

P26INŽENJERING ZA ENERGETIKUI TRANSPORTZ A G R E B

INŽENJERING ZA ENERGETIKUI TRANSPORTZ A G R E B

DC Elektroslavonija Osijek

Works

tation

HP LP3065 HP LP3065 HP LP3065

Works

tation

HP LP3065 HP LP3065 HP LP3065

Operator workstations

GPS antena

VN dispečeri

SCADA server

oskas01 oskas02

PCU server

oskpcu01 oskpcu02

UDW server

oskudw01 oskudw02

S/COM server

oskscom01 oskscom02

oskntp01

Timeserver

Switchosksw01 osksw02

oskpc01 oskpc02

Administor workstations

oskpc03

Works

tation

HP LP3065 HP LP3065

oskpc04

Works

tation

HP LP3065 HP LP3065

oskpc05

Works

tation

HP LP3065 HP LP3065

DE/LF serveroskde01 oskbkp01

AD server

oskad01 oskad02

Backup device

WS500 Thin Clientserver

oskweb01

Usmjernik/vatrozid

Works

tation

HP LP3065

Works

tation

HP LP3065

Works

tation

HP LP3065

Works

tation

HP LP3065

Works

tation

HP LP3065

Works

tation

HP LP3065

.17 .18 .19 .20

.49 .50 .51 .52 .1

.2 .2.3.1

.17 .18

.1

.17 .18

.17.1

.17 .18.1

.17 .18 .19 .1

.1

.1 .1

.1

.1 .1

.17 .17

.17 .17 .17

.17

oskpc06CUP Beli Manastir

Operator workstations

oskpc07CUP Valpovo

Operator workstations

oskpc08CUP Donji Miholjac

Operator workstations

oskpc09CUP Orahovica

Operator workstations

oskpc10CUP Našice

Operator workstations

oskpc11CUP Đakovo

Operator workstations

LKKUserver

„Spliteri”

osklkku01 osklkku02

.53 .54

1. INTRODUCTIONElektra Zagreb (Distribution System Operator) spans the area of 2 550 square kilometers. In addition to a plant placed in the center of Zagreb, plants at Sv. Ivan Zelina, Samobor, VelikaGorica, Zaprešić, Dugo Selo and Sveta Klara take care on the supply of the electric energy to buyers.

Elektroslavonija Osijek (Distribution System Operator) spans the area of 4152 square kilometers representing the fourth biggest Distribution System Operator of the Croatian Power Authority (HEP ODS).

Investments into upgrading of the existing equipment are indispensable to fulfil these basic DSO targets as well as its new roles which have come to light due to the liberalization of the electric energy market. The main reasons for the upgrade are:

• The producer of the hardware server equipment seized support forthe stated equipment in 2013 [1] and the hardware equipment had tobe replaced which automatically meant the replacement of thesoftware equipment;

• The producer of SCADA applications has been abandoning itssupport to Tru64 UNIX software platform;

• Implementation of new and enhanced existing SCADA software functionalities.

Figure 1 Block diagram of the new SCADA system at ElektroslavonijaOsijek

The logical scheme of the new control system can be seen on the following picture:

2. HW AND SW UPGRADE

New hardware system components (not existing in their current system configuration) on which part of functionality of the new SCADA software is distributed are the following:

• Active Directory servers – servers intended for user account control; and

• Process Communication Unit (PCU) 400 servers – communicationso-called front-end servers.

Computer Operating Systems in the new SCADA System have been upgraded to new versions in accordance with Table I while the Data Engineering and Utility Data Warehouse data bases are based on the most recent technology of Oracle Data Base.

Computers OS (existing system) OS (new system)

SCADA, UDW True64 UNIX Red Hat Enterprise Linux 6.5 64b

PCU400, Web, DE Windows Server 2003 Windows Server 2008 R2 64b

Operating stations Windows XP Windows 7 64b Pro

Table 1 Existing and new SCADA system Operating Systems

The existing SCADA system software has been upgraded from version 2.3 to version 6.4 enabling the Employer to work with a whole range of new and enhanced functionalities:

• Counting of events in the alarm list as well as in the event list on the basis ofvarious criteria (priority, etc.);

• User friendly lists – alarms, events, chronology (sorting, filtering, easiercreation of own filtered lists, export to Excel files, etc.);

• Dynamic Contour Coloring on the basis of measurement levels: clear andintuitive visualization of voltage disturbances;

• Advanced Real Time Calculations – user oriented interface for definingcomplex calculations on real time data and historical data based on theMATLAB software package;

• Tabular presentations – software module that enables users to define complexinterfaces based on real time data: list extracts, positioning in a certain queue,defining of the display size, hiding of selected columns, etc.;

• Multilanguage support;• Numerous “smaller”, but important novelties (permitted manual entry without

blocking of data collection, possibility to configure an alternative data sourcefor individual indications, etc.);

• The number of characters for EXTERNAL_IDENTITY parameter has beenincreased to 40, while for the IDENTIFICATION_TEXT it has been increasedto 60;

3. PARALLEL SYSTEM OPERATION

Končar has developed its own in-house solution for the needs of the migration process (the transitional period during which simultaneous operation of the existing and the new SCADA system is required) and to solve the problem of existing remote terminal units that do not have a possibility of a simultaneous communication with more than one supervising center

Figure 2 Parallel system operation

4. CONCLUSIONThe upgrade of the SCADA systems in the remote control centers of Elektra Zagreb and Elektroslavonija Osijek has given the users a modern SCADA system keeping up with the latest operating systems and advanced SCADA and DMS functions.