PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional...

34
https://ntrs.nasa.gov/search.jsp?R=20140017497 2020-01-11T19:24:12+00:00Z

Transcript of PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional...

Page 1: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

https://ntrs.nasa.gov/search.jsp?R=20140017497 2020-01-11T19:24:12+00:00Z

Page 2: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design
Page 3: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

NASA/KSC

Page 4: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

Granular Mechanics and Regolith Operations Explores ways to use regolith (dirt, gravel, rocks) on the surfaces of other planets for ISRU. Studies blasting effects of rocket plumes; robotics; mining; regolith transportation; additive manufacturing; physics and geology.

Applied Chemistry Studies ISRU chemical processes: toxic vapor detection; hydrogen detection; self-healing wire insulation; prospecting for water on the moon; resource extraction methods; ground water cleaning.

Electrostatics and Surface PhysicsElectrostatic charging solutions; high density, rapid charging energy storage devices; dust repulsion off surfaces, such as solar panels.

Advanced Life SupportDevelops technologies for human exploration life support and habitations. Water recovery systems; ammonia removal; microbial characterization; in-situ production of advanced biological materials and composites; advanced environmental control.

Page 5: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design
Page 6: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

Simulated Moon Hazard Field

Page 7: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

aerial view

Page 8: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design
Page 9: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design
Page 10: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

1.2.

3.4.

5.6.

7.8.

9.

Tran

sitio

n fr

om s

cien

tific

res

earc

h to

app

lied

rese

arch

App

lied

rese

arch

Proo

f-of

-con

cept

val

idat

ion

Stan

dalo

ne p

roto

typi

ng im

plem

enta

tion

and

test

Thor

ough

pro

toty

pe te

stin

g in

rel

evan

t env

ironm

ent

Prot

otyp

ing

on f

ull-s

cale

rea

listic

pro

blem

s

Syst

em f

unct

ions

in o

pera

tiona

l env

ironm

ent

Syst

em c

ompl

eted

and

“m

issio

n qu

alifi

ed”

Miss

ion/

grou

nd o

pera

tions

Page 11: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design
Page 12: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

Design

Build

Test

Credit: Astronaut Mike Gernhardt, NASA JSC

Functional Requirements

Expanded Functional

Requirements

Preliminary Design

RequirementsFlight Design Requirements

Gen I Gen II Gen III Flight

Begin with a clear vision of what the technology will do and won’t do

By the Preliminary Design Review (PDR), we will know exactly what we want, how we’re going to build it, and how we’re going to operate it

Design-build-test conducted iteratively with increasing knowledge of the operating environment will result in an end product that optimizes safety and performance.

Page 13: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design
Page 14: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

”http://spectrum.ieee.org/automaton/robotics/military-robots/nasa-training-swarmie-robots-for-space-mining

Page 15: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design
Page 16: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design
Page 17: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

for as many uses as possible. We take one of two approaches:

1. Extracting resources out of the regolith, usually with chemical processes

2. Using the regolith as a raw material for building structures

Page 18: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

Moon Mineralogy Map. NASA/JPL

• 42% oxygen by mass• Water• Hydrogen• Helium & helium 3• Carbon monoxide• Metals (aluminum, titanium, iron…)• Silica � glass, optical communication fibers

blue = water signature

Chemical composition of surface regolith (dirt, gravel, rocks)

Compound Formula Composition (wt %)Maria Highlands

silica SiO2 45.4% 45.5%alumina Al2O3 14.9% 24.0%lime CaO 11.8% 15.9%iron(II) oxide FeO 14.1% 5.9%magnesia MgO 9.2% 7.5%titanium dioxide TiO2 3.9% 0.6%sodium oxide Na2O 0.6% 0.6%

Total 99.9% 100.0%

Page 19: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

fuel for rovers

oxygen for breathing airdrinking water

rocket engine propellant consumable

gases

Page 20: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

RESOLVE payload on the rover Artemis. Image Credit: NASA/Joe Bibby

Page 21: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design
Page 22: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

Artist concept of heat shield fabrication. NASA/KSC

Page 23: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

Clockwise from top left: Regolith-derived heat shield sample undergoing flame testing; regolith samples post-test; artist concept. Image Credit: NASA/KSC

Page 24: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

JPL ATHLETE Robot

KSC Print Head & Regolith Feed

System

Solar Power Concentrators

Page 25: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

Image credit: Contour Crafting

Page 26: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

Image Credit: heavyequipment.com

Page 27: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

RASSOR (the Regolith Advanced Surface Systems Operations Robot) is a mining robot that can load, haul, and dump regolith to its appropriate destination.

To accomplish this, it features two counter-rotating bucket drums, designed specifically to minimize excavation forces.

Page 28: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design
Page 29: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

RASSOR Acrobatics. Image Credit: NASA/Rachel Hardy

Page 30: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

RASSOR Lunar Testing. Image Credit: Gina Chitko/NASA/KSC

Page 31: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design
Page 32: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design
Page 33: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design

FUTURE RASSOR TECHNOLOGY

Page 34: PowerPoint Presentation - NASA · Credit: Astronaut Mike Gernhardt, NASA JSC Functional Requirements Expanded Functional Requirements Preliminary Design Requirements Flight Design