Circuit Reliability Review Malibu 2020

Transcript of PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability...

Page 1: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

Circuit Reliability Review

Malibu

2020

Page 2: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

2

• Southern California Edison (SCE) is an Edison International company

• One of the nation’s largest electric utilities

• More than 130 years of history

• Headquartered in Rosemead, California

• Regulated by the California Public Utilities Commission (CPUC) and the Federal Energy Regulatory Commission (FERC)

• 50,000 square miles of SCE service area across Central, Coastal, and Southern California

• 15 million residents in service territory

• 5 million customer accounts in 445 cities and communities

Who We Are

Page 3: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

Our Grid

To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system.

730,000 Transformers

119,000 Miles of Transmission and Distribution Lines

4,600 Circuits

1.5 Million Poles

50,000 Square Miles

3

Page 4: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

Strengthening and Modernizing the Grid

• Infrastructure reliability – updating underground

cables, poles, switches, and transformers

• Wildfire mitigation – hardening infrastructure,

bolstering situational awareness capabilities, and

enhancing operational practices

• Transmission – connecting renewables, installing

new substations, and updating lines

• Grid readiness – updating the grid for impacts

from new technologies

• Long-term energy policy – supporting energy

storage, electric vehicles, and renewables

SCE plans to spend more than $5B each

year to maintain, improve, and harden

its infrastructure.

SCE’s investments support safe, reliable, affordable, and clean energy for our customers

2019 Capital Investments

179 miles of underground cable replaced

502 miles of overhead conductor replaced for public safety

16.4k distribution poles replaced

4.3k transmission poles replaced

71 underground structure replacements

4

Page 5: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

PATHWAY 2045SCE’S vision to help California achieve a carbon neutral future

Carbon neutrality is achieved through deep decarbonization of

electricity, transportation and building electrification,

and the use of low-carbon fuels

Meeting California’s Climate Change Goals

5

Page 6: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

• SCE filed its second Wildfire

Mitigation Plan in February 2020

• It builds on the progress made

in 2019 to reduce the risk of fire

ignitions caused by utility

infrastructure

• SCE crews will continue to work

to install hi-tech wildfire

mitigation tools and

technologies to make

communities safer, more

resilient, and to help reduce the

number of Public Safety Power

Shutoffs (PSPS)

Addressing Wildfire Risk

6

Page 7: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

• De-energizing power lines to prevent ignitions

• Used during elevated fire conditions

• Primarily impacts circuits in high fire risk areas

• Use of multiple methods to notify people in affected areas before, during and after a de-energization event

Public Safety Power Shutoffs (PSPS)

7

4-7 DAYS AHEAD

3 DAYSAHEAD

2 DAYSAHEAD

1 DAY AHEAD POWER SHUTOFF

POWER RESTORATION

PLANNING AND MONITORING OUTAGE

*Erratic or sudden onset of conditions may impact our ability to provide advanced notice to customers.

Forecast Weather & Fire

Conditions

SCE Incident Management Team on Alert

County Operational Areas

informed of potential activation

SCE Incident Management

Team Activated

1st Notification PSPS Possible sent

to agencies and customers

2nd Notification PSPS

Possible

3rd Notification Power Shutoff

4th Notification Power Restored After Inspection

Page 8: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

Reliability Overview

8

Page 9: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

What is Reliability?

• In simplest terms:

Having dependable electricity when you need it.

• Outages:

• Maintenance outages (aka planned outages)

• Repair outages (aka unplanned outages)

• Sustained Outage = An outage lasting > 5 minutes

• Momentary Outage = An outage lasting ≤ 5 minutes

9

Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption that spans multiple calendar days is accrued to the day on which the interruption began. Statistically, days having a daily system SAIDI greater than a threshold value are days on which the energy delivery system experienced stresses beyond that normally expected (such as severe weather).

Public Safety Power Shutoff (PSPS) : An operational protocol that SCE implements under extreme weather conditions in order to minimize the threat of wildfires and keep communities safe from potentially dangerous situations. These types of sustained outages are temporary and usually involve situations where high fire areas are experiencing adverse weather or public safety is at risk.

Page 10: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

How Do We Measure Reliability?

SAIDI SAIFI MAIFI CAIDI

10

Page 11: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

CityList1Communities in the THOUSAND OAKS District

CALABASAS

CASA CONEJO

HIDDEN HILLS

LOS ANGELES

MALIBU

MOORPARK

AGOURA HILLS

OAK PARK

SIMI VALLEY

THOUSAND OAKS

WESTLAKE VILLAGE

11

Page 12: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

*”Exclusions” are days which utilities are allowed to remove from their metrics because the outages on those days were caused by a severe acts of nature.**In the columns showing “Rank,” lower numbers indicate poorer performance.

12

Page 13: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

CircuitList1Overview of MalibuThere are 8 circuits that serve Malibu 1

Circuit Type Customers Circuit Type Customers Circuit Type Customers Circuit Type Customers

CUTHBERT(16KV) 2,295 - - -

GALAHAD(16KV) 2,019 - - -

MAGUIRE(16KV) 504 - - -

MERLIN(16KV) 976 - - -

NICHOLAS(16KV) 2,178 - - -

SEABOARD(16KV) 631 - - -

SERRA(16KV) 136 - - -

TUNA(16KV) 627 - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

Grand Total 9,366

13

Page 14: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

BarChart

SCE SYSTEMWIDE

**Data is as of 02/14/2020, data

can be slightly different due to

outage data validation process

Malibu

Reliability History of Circuits Serving Malibu (No Exclusions)

**“Exclusions” are days which

utilities are allowed to

remove from their metrics

because the outages on

those days were caused by

acts of nature.

362.5 241.2

12717.5

515.4134.5 139.7 136.8 178.0

0.0

2000.0

4000.0

6000.0

8000.0

10000.0

12000.0

14000.0

2016 2017 2018 2019

SAIDI

(average

minutes of

sustained

interruptions)

4.4

2.5

5.2

2.5

1.1 1.20.9 1.0

0.0

1.0

2.0

3.0

4.0

5.0

6.0

SAIFI

(average

frequency of

sustained

interruptions)

5.7

3.53.8

0.8

1.61.8

1.4 1.4

0.0

1.0

2.0

3.0

4.0

5.0

6.0

MAIFI

(average

frequency of

momentary

interruptions)

14

Page 15: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

SAIDIChart

SAIDI = the cumulative amount of time the average customer is interrupted by “sustained” outages each year.

Causes of Repair Outages in Malibu

2019

3rd Party

1.4%

Equipment Failure

14.5%

Operation

12.1%

Other

7.7%

Vegetation /Animal

2.8%

Weather /Fire

/Earthquake

4.6%

PSPS

57.0%

Contributions to SAIDI by Outage Cause

3rd Party

Equipment Failure

Operation

Other

Vegetation /Animal

Weather /Fire /Earthquake

PSPS

Equipment Failure

e.g., in-service failure of transformer, switch, or conductors

Vegetation/Animale.g., tree branch, rodent, or bird

causing a short circuit between conductors

Othere.g., patrolled but no cause found,

PSPS Operations

e.g., urgent maintenance w/o 3-daynotice

3rd Party e.g., balloon, car hit pole, dig-in

PSPS

e.g., Public Safety Power Shutoff

15

Page 16: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

SAIFIChart

SAIFI = the number of times the average customer is interrupted by “sustained” outages each year

Causes of Repair Outages in Malibu

2019

3rd Party

2.9%

Equipment Failure

37.4%

Operation

16.5%Other

17.9%

Vegetation /Animal

5.9%

Weather /Fire

/Earthquake

9.5%

PSPS

9.9%

Contributions to SAIFI by Outage Cause

3rd Party

Equipment Failure

Operation

Other

Vegetation /Animal

Weather /Fire /Earthquake

PSPS

Equipment Failure

e.g., in-service failure of transformer, switch, or conductors

Vegetation/Animale.g., tree branch, rodent, or bird

causing a short circuit between conductors

Othere.g., patrolled but no cause found

Operationse.g., urgent maintenance w/o 3-day

notice 3rd Party

e.g., balloon, car hit pole, dig-in

PSPS

e.g., Public Safety Power Shutoff

16

Page 17: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

17

Page 18: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

18

Page 19: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

Back-up Slides

Reliability Histories of Circuits Serving Malibu

Updated through Dec 2019

19

Page 20: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

CitySummary

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

362.5 4.4 5.7 241.2 2.5 3.5 12717.5 5.2 3.8 55.6 0.6 0.1 12.4 0.2 0.1 25.8 0.2 0.1 421.5 1.6 0.5 515.4 2.5 0.8

3rd Party 7% 6% 5% 12% 24% 8% 31% 14% 12% - - - - - - 22% 45% - 0% 0% - 1% 3% -

Equipment Failure 49% 39% 43% 48% 39% 64% 1% 17% 31% 23% 33% - 1% 1% - 49% 29% 99% 12% 44% - 14% 37% 10%

Operation 5% 12% 1% 10% 12% 1% 0% 6% 16% 30% 19% 14% 80% 46% 74% 23% 21% 1% 7% 12% 23% 12% 17% 23%

Other 27% 26% 30% 8% 10% 23% 46% 30% 32% 13% 14% 86% 18% 54% - 5% 5% - 7% 17% 48% 8% 18% 47%

Vegetation/Animal 0% 0% - - - - - - - - - - - - - - - - 3% 9% 29% 3% 6% 19%

Weather/Fire/Earthquake 12% 17% 21% 21% 15% 4% 22% 32% 8% 34% 35% - 2% 0% 26% - - - 1% 2% - 5% 10% 2%

PSPS - - - - - - - - - - - - - - - - - - 70% 16% - 57% 10% -

SCE SYSTEMWIDE 134.5 1.1 1.6 139.7 1.2 1.8 136.8 0.9 1.4 28.1 0.3 0.4 18.9 0.2 0.4 31.8 0.2 0.3 99.3 0.3 0.3 178.0 1.0 1.4

2nd Qtr 2019 3rd Qtr 2019

8 Circuits Serving Malibu -- Total Customers:

9,366

Average Reliability of 8 Circuits Serving Malibu

4th Qtr 2019 20192016 2017 2018 1st Qtr 2019

Notes:

No outages are excluded from the metrics.

Outage Causes: Other: e.g., patrolled but no cause could be foundOperations: e.g., urgent maintenance w/o 3-day notice to customers3rd Party: e.g., balloons, car hit pole, dig-inVegetation/Animal: e.g., tree branch, rodent, or bird causing short circuit across conductorsPSPS: e.g., Public Safety Power Shutoff

SAIDI (minutes) = the cumulative amount of time the average customer is interrupted by “sustained” (longer than 5 minutes) outages.

SAIFI (interruptions) = the number of times the average customer is interrupted by “sustained” outages.

MAIFI (interruptions) = the number of times the average customer is interrupted by “momentary " (lasting 5 minutes or less) outages.

20

Page 21: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

CircuitHistory1

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

CUTHBERT(16KV) - Customers: 2,295 272.3 4.6 9.0 310.6 2.5 2.5 14746.3 3.3 2.2 27.5 0.8 - 21.3 0.6 0.2 33.6 0.1 0.0 1443.0 2.6 1.0 1525.4 4.1 1.2

3rd Party 22% 13% 11% 14% 41% - 58% 29% - - - - - - - 9% 4% - 0% 0% - 1% 0% -

Equipment Failure 28% 44% 44% 80% 57% 59% 1% 19% 37% 95% 98% - 0% 0% - 78% 74% 100% 0% 0% - 4% 22% 3%

Operation 1% 2% - 2% 1% - 0% 0% 44% 5% 1% - 75% 36% 100% - - - 4% 16% - 5% 16% 14%

Other 15% 18% 11% 3% 2% 41% 41% 52% 19% 0% 0% - 24% 63% - 13% 22% - 8% 43% 100% 9% 37% 83%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 34% 22% 33% - - - - - - - - - - - - - - - 0% 0% - 0% 0% -

PSPS - - - - - - - - - - - - - - - - - - 86% 41% - 82% 25% -

GALAHAD(16KV) - Customers: 2,019 574.4 8.4 5.2 179.8 2.4 3.3 23677.5 6.4 7.6 158.2 1.3 0.1 0.0 0.0 - 49.1 0.4 - 108.8 1.8 0.7 316.2 3.5 0.8

3rd Party 8% 5% - 6% 26% 19% 23% 22% 24% - - - - - - 46% 84% - - - - 7% 9% -

Equipment Failure 37% 33% 37% 22% 6% 44% 0% 9% 38% 8% 2% - 100% 100% - 3% 1% - 40% 64% - 18% 34% -

Operation 5% 9% 2% 47% 47% 2% 0% 0% 8% 30% 21% 100% - - - 51% 15% - - - - 23% 9% 11%

Other 40% 30% 20% 8% 13% 26% 73% 35% 17% 7% 3% - - - - - - - - - - 4% 1% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - 60% 36% 100% 21% 19% 89%

Weather/Fire/Earthquake 10% 22% 42% 17% 7% 9% 3% 34% 13% 55% 73% - - - - - - - - - - 27% 27% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MAGUIRE(16KV) - Customers: 504 45.1 0.8 3.6 350.9 3.5 1.5 28632.5 3.1 2.7 140.9 0.4 0.5 4.2 0.0 - 0.2 0.0 - 1.4 0.0 - 146.6 0.4 0.5

3rd Party 25% 7% 7% 50% 69% 84% 12% 26% 18% - - - - - - - - - - - - - - -

Equipment Failure 35% 4% - 17% 7% - 1% 22% - 38% 21% - 47% 20% - - - - 100% 100% - 39% 23% -

Operation 29% 88% 9% 8% 5% - - - 6% 62% 79% - - - - 100% 100% - - - - 59% 73% -

Other - - 84% 25% 20% 16% 0% 11% 76% - - 100% 53% 80% - - - - - - - 2% 4% 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 11% 1% - - - - 87% 41% - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MERLIN(16KV) - Customers: 976 733.5 6.5 3.4 260.6 2.6 14.1 7645.9 4.4 3.9 39.5 0.4 0.5 - - - 1.3 0.0 - 74.4 0.4 - 115.1 0.8 0.5

3rd Party - - - - - - 45% 22% - - - - - - - - - - - - - - - -

Equipment Failure 44% 32% 29% 2% 22% 95% 1% 33% 12% 8% 5% - - - - 46% 85% - 41% 39% - 30% 25% -

Operation 0% 0% - 0% 1% - 0% 20% 37% 11% 36% - - - - 54% 15% - 10% 5% - 11% 20% -

Other 46% 57% 71% - - 2% 53% 25% 25% 81% 59% 100% - - - - - - - - - 28% 27% 100%

Vegetation/Animal 0% 0% - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 9% 12% - 98% 78% 3% 0% 0% 26% - - - - - - - - - 49% 55% - 32% 28% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Malibu - 1 of 2

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

21

Page 22: PowerPoint Presentation · 8 Circuits Serving Malibu -- Total Customers: 9,366 Average Reliability of 8 Circuits Serving Malibu 2016 2017 2018 1st Qtr 2019 4th Qtr 2019 2019 Notes:

CircuitHistory2

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

NICHOLAS(16KV) - Customers: 2,178 168.4 2.4 6.6 155.5 1.6 2.1 1630.8 5.8 4.0 6.0 0.1 - 20.2 0.1 0.1 28.2 0.2 0.0 63.2 1.1 - 117.6 1.4 0.1

3rd Party - - - - - 3% 0% 0% - - - - - - - - - - - - - - - -

Equipment Failure 89% 60% 70% 72% 61% 43% 6% 11% 25% 38% 9% - - - - 89% 48% - 100% 100% - 77% 83% -

Operation 11% 40% - 0% 0% 6% 7% 12% 12% 56% 91% - 78% 84% - 6% 50% 100% - - - 18% 16% 5%

Other - - 30% 19% 33% 47% 22% 24% 63% 7% 1% - 18% 13% - 5% 2% - - - - 5% 1% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 0% 0% - 9% 6% 1% 65% 53% - - - - 4% 3% 100% - - - - - - 1% 0% 95%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SEABOARD(16KV) - Customers: 631 732.8 1.8 2.5 501.4 6.2 1.0 2164.5 8.6 1.1 15.4 0.8 0.3 34.6 0.2 - 5.0 0.0 1.0 459.6 2.2 1.7 514.7 3.2 3.0

3rd Party - - - 1% 0% - - - - - - - - - - - - - - - - - - -

Equipment Failure 94% 84% - 57% 81% - 6% 16% 89% 2% 0% - - - - 100% 100% 100% 56% 55% - 51% 38% 33%

Operation 6% 16% - - - - 2% 17% - - - - 100% 100% - - - - 44% 45% 100% 46% 38% 58%

Other - - 100% - - 100% 16% 22% 11% 98% 100% 100% - - - - - - 0% 0% - 3% 24% 9%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - 42% 19% - 76% 44% - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SERRA(16KV) - Customers: 136 64.4 0.3 3.0 193.8 3.1 3.0 3375.5 3.4 2.0 3.1 0.0 1.0 - - - - - - 26.3 1.0 1.0 29.3 1.0 2.0

3rd Party 39% 41% 100% - - - 60% 28% - - - - - - - - - - - - - - - -

Equipment Failure 22% 41% - 13% 37% 33% 2% 35% 46% - - - - - - - - - - - - - - -

Operation 39% 17% - 10% 3% - - - - - - - - - - - - - 100% 100% - 90% 98% -

Other - - - - - - 38% 38% 54% 100% 100% 100% - - - - - - - - 100% 10% 2% 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - 77% 60% 67% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

TUNA(16KV) - Customers: 627 128.3 1.1 3.3 44.7 0.1 1.0 1824.1 7.0 0.2 - - - - - - - - - 45.4 1.0 - 45.4 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 63% 18% 30% 100% 100% - 17% 44% 100% - - - - - - - - - 100% 100% - 100% 100% -

Operation 17% 71% - - - - - - - - - - - - - - - - - - - - - -

Other - - 70% - - 100% 15% 16% - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 19% 11% - - - - 69% 41% - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

2019

Reliability Histories for Individual Circuits Serving Malibu - 2 of 2

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019

22